09-25-2012 Joint MeetingJOINT MEETING OF THE ISLE OF WIGHT COUNTY BOARD OF
SUPERVISORS HELD THE TWENTY -FIFTH DAY OF SEPTEMBER IN
THE YEAR TWO THOUSAND AND TWELVE
PRESENT: Alan E. Casteen, Chairman
JoAnn W. Hall, Vice - Chairman
Rex W. Alphin
Byron B. Bailey
Delores M. Darden
Also Attending: Mark C. Popovich, County Attorney
W. Douglas Caskey, County Administrator
Carey Mills Storm, Clerk
Chairman Casteen called the meeting to order at 4:00 p.m. for the
purpose of discussing jointly with the Planning Commission an update to the
County's 2012 Draft Cash Proffer Study.
Julie Herlands, Principal, TischlerBise, reviewed the draft update with
the Board and Planning Commission, a copy of which is attached and entitled
"Attachment A" to these minutes. It was noted that the Study was last
updated in 2003 and needs to be brought up -to -date with current economic
conditions.
The Board concurred that it would defer continued discussion of the
matter to the Commission and await its recommendation.
At 5:25 p.m., Chairman Casteen declared the joint meeting adjourned.
Alan E. Casteen, Chairman
Carey M lls Storm, Clerk
Board of Supervisors' Minutes
September 25, 2012
Attachment A
Cash Proffer Study
County of Isle of Wight, Virginia
Presentation to:
Isle of Wight Board of Supervisors
Isle of Wight Planning Commission
Presented by:
Julie Herlands, AICP, Principal
September 25, 2012
T
Fiscal, Economic & Planning Consultants
Tischler'nise, Rnc,
Fiscal, economic, and
planning consultants
National Practice
Fiscal Impact Evaluations
(700 +)
Impact Fees (800 +)
Infrastructure Needs &
Revenue Strategies
Public and Private Sector
Experience
M. C
Albemarle County
Alexandria
Amherst County
Chesapeake
Chesterfield County
Falls Church
Frederick County
Goochland County
Henrico County
Isle of Wight County
King George County
Leesburg
Prince George County
Prince William County
Spotsylvania County
Stafford County
Suffolk
Sussex County
q
TischlerBise is the only national firm
focused exclusively on cost of growth and
revenue enhancement issues.
2
i
.,mi,r
• One -time voluntary monetary commitment by
property owner
• Made at time of rezoning
• For capital facilities and additional capacity
• Offsets impact of the rezoning to provide
capital facilities
• Represents new growth's fair share of capital
facility needs and costs; payer must receive a
benefit
• Not a revenue raising mechanism but a way
to meet growth - related infrastructure needs
Ti9 hIsSise
Fnc.1 E-
Mn.nY Cun.ullnl. '
4,
•Interview key staff /obtain information and
review previous study and related reports
• Analyze current demographics and growth
• Determine existing levels of service and capital
needs due to new growth
• Determine appropriate generators of demand
• Evaluate methodological alternatives
• Evaluate need for credits
• Calculate cash proffer amounts
Tischl"Lw
Differences from Previous Cash Proffer. 7
I-.
• Updated existing categories
• Prepared new studies for Transportation, Water
and Sewer
• Amounts for single family units are presented
by size of unit as an option
• County buildings category is separated into
multiple categories to reflect demand indicators
- General government, Libraries, Sheriff
• Credit approach is revised to better reflect
linkages between demand from the land use
T�chlerBlse
General Methodologies
• Cost Recovery (past)
Oversized and unique facilities
• Incremental Expansion (present)
- Formula -based approach documents level -of- service
with both quantitative and qualitative measures
• Plan -Based (future)
- Common for utilities and transportation but can also
be used for other public facilities
Toth "ise 6
n IEun a. �d•u���•y i.n��n�.•.�
Isle of Wight County
Current (2011) Development Base
Population: 36,151
Housing Units: 14,913
9,697
Nonresidential
TwhlerBise
Area: 5.3 million
Isle of Wight County Demand Indicators
Persons per Housing Unit
Type of Unit Persons HUs Persons Per
Housing Unit
Single Family* 28,200 11,399 2.47
Multi Family /Other
11-698 1,028 1.65
Manufactured Homes 4,584 2,007 2.28
*Includes Single Family Detached and Single Family Attached.
Source: U.S. Census Bureau 2005 -2009 American Community Survey 5 -Yr Estimates
Tischlertlise
Isle of Wi
Schools
[091MO'' Mac �
Parks and Recreation
Libraries
Sheriff
Fire & Rescue
General Government
Transportation
Water and Sewer Utilities
TMhi"im
f n: V fuw J � � L �4P�1 �d CYMY.IInI\
Summary of Components &Methodologies
•
School Buildings Buses
Schools
Land Administration
Incremental Expansion
•
Mobile Units Office Space
•
Park Land Acquisition
Parks and Recreation
Recreation Centers
Park Improvements Vehicles /Equipment
Incremental Expansion
•
Trails /Multi -use
Plan -based
Pathways
Libraries
0
Buildings
Incremental Expansion
Sheriff
°
Sheriff Office Space • Vehicles /Equipment
Incremental Expansion
•
Animal Control Facility
Cost Recovery
Fire and Rescue
Fire Stations Rescue Stations
Incremental Expansion
•
Fire Apparatus 0 Rescue Apparatus
General Government
'
County Buildings 0 Vehicles /Equipment
Incremental
•
Court Buildings
Cost Recovery
Transportation
0
Road and Intersection Improvements
Plan -based
Water
Water Improvements (Source, Distribution,
Plan -based
Storage) by Development Service District
Wastewater
°
Wastewater Improvements (Collection) by
Plan -based
Development Service District
Components
- School construction
- Land
- Mobile Units
- Buses
- Admin /Operations facility
Demand generator: Student enrollment
Credit for outstanding debt
TwhIw6iw
Student Generation Rates
Single Family
Multifamily /Other
Manufactured Home
Source: TischlerBise
0 -2 Bdrms 3 -4 Bdrms 5+ Bdrms
0.1391 0.4171 0.730
A11 bedrooms = = =>
All bedrooms = =_>
Based on U.S. Census Bureau, Year 2005 -2009 ACS 5 -Yr Public Use Microdata Sample
for Virainia PUMA 03100 and calibrated to Isle of Wiaht Countv.
Tiwhler W
•�.a.l f {w. [ � a b r�N�� n�C.n:u��n�.
WAR,
Wtd A
Comparison of Updat
! 1 Current
F-I-vl .
Single Family **
Multifamily
Manufactured Homes
All
Grades
Current Increase
Adopted* • • • - • (Decrease�
0.64 0.38 ( 0.26)
0.63 0.28 ( 0.35)
0.56 0.30
* 2003 Isle of Wight County Cash Proffer Study, Hampton Roads Planning District Commission
** 2011 updated figure includes single family attached units
Twhler6ise
ntcd fw . n i v r .nn.n J Cw�rNt.n..
Schook---
Cash
Proffer
Input
Factor�-7
Twhk4d ise
INPUT VARIABLES: Isle of Wight County Schools
Public School Students Per Housing Unit (2011 -12)
(weighted averages)
Single Family*
Multifamily
Manufactured Homes
* Includes Single Family Detached and Attached Units
Current Level of Service Standards
School Level
Flementary Middle Hinh
0.180
0.067
0.132
0.180
0.055
0.047
0.146
0.047
0.108
Elementary Middle High
Building Square Feet Per Student 151 228 146
Total Cost Per Square Foot $183.72 $177.44 $139.63
Total Building Construction Cost Per Student $27,741.72 $40,456.32 $20.385.98
Acreage Per Student 0.055 0.054 0.055
Land Cost Per Acre $22,000 $22,000 $22,000
Land Cost Per Student
$1,210.00
$1,188.00
$1,210.00
Mobile Unit Classrooms Per Student 0.0021 0.0000 0.0000
Cost Per Mobile Unit Classroom $60,000 $60,000 $60,000
Mobile Unit Classroom Cost Per Student
$126.00
$0.00
$0.00
Buses per Student
Cost per Bus
0.015
$85,000
0.015
$85,000
0.015
$85,000
Bus Cost Per Student
$1,251.00
$1,251.00
$1,251.00
Admin Facilities Cost Per Student $71.56 1 $71.56 1 $71.56
Consultant Study Cost Per Student
$30,424.49
$24.21
$22,942.75
$24.21
$24.21
($5,400.49)
($5,400.49)
Total Net Local Capital Cost Per Student
$25,024.00
$37,590.60
$17,542.26
[Total Gross Capital Cost Per Student
$30,424.49
$42,991.09
$22,942.75
1 nra I Sharp of Ca na rity Cnct
inn no/
1 nn no/
1 nn no/
Total Gross Local Capital Cost Per Student
$30,424.49
$42,991.09
$22,942.75
Principal Payment Credit Per Student
($5,400.49)
($5,400.49)
($5,400.49)
Total Net Local Capital Cost Per Student
$25,024.00
$37,590.60
$17,542.26
Schools Cash Proffer Amount
MAXIMUM ALLOWABLE SCHOOL CASH PROFFERS (AVERAGE SIZE):
Cash Proffer Per Housing Unit (Weighted Avera
Single Family*
Multifamily
Manufactured Homes
* Includes Single Family Detached and Attached Units
School Cash Proffers Per Housing Unit (By Bedroom Count)
Single Family* TOTAL
0 -2 Bdrms $3,274
3 -4 Bdrms $10,261
S+ Bdrms $18,494
Average 1 $9,337
Twhlaiw
TOTAL
$9,337
$7,395
$7.313
r
�t � [ '� � /•; �./� sic i � � , pm
• Components
• Park improvements
• Parkland
• Recreation facility space
• Trails /Multi -use Pathways
• Vehicles /equipment
• Demand generators: Population
- Nonresidential vehicle trips for Multi -use Pathways
• Debt service credit
TwhImBise 16
icarks Cash Proffer 1 Facton�,,
Park Land Cost
Improved Park Land Cost
Unimproved /Passive Park Land Cost
Park Improvement Cost
Per Person
$23.47
$0.00
Improved Park Improvements Cost $265.86
Unimproved /Passive Park Improvements Cost $0.00
Recreation Facilities Cost $56.16
Trails Cost $109.79
Vehicles /Equipment Cost $23.15
Consultant Cost $1.90
GROSS COST PER PERSON $480.33
Debt Service Credit $6.18
NET CAPITAL COST $474.15
Ti9cM"ise
Trails /Multi -use Pathways Cash
Proffer (Nonresidential)
Trail /Multi -use Pathwa
GROSS COST $12.56
Debt Service Credit $0.67
NET CAPITAL COST $11.89
Nonres. Land Use Category
Weekday Vehicle
Trip Ends
Trip Rate Adj.
Facto101
�
ITECode
820
Commercial / Shpg Ctr
TJ a Ny . a )
42.94: 38 %
i_'.- i. M^,C
$0.19
710
Office
11.01;
50%
$0.06
......140
... ...............................
150
----------- ---- ------.............
152
Manufacturi. n ........................ ...............................
....
Warehousing
- -- ....- - . -
High -Cube Warehouse
.........................3.:82:
......
3.56
- -.-
1.44
50 %........................
:.............................. .......
50%
- -.. - 0 -
50%
.......................$0.02...
$0.02
- -- .__ ....._....... -
$0.00
T�chiefflise 19
..,,E „��..� .,„ u�P,,.o�...
Libra
Cash Proffer
Components
Library facilities
Demand generator: Population
Twh1wBise
Libraries Cash Pro
Level Of Service and Infrastructure Costs Per Person
Library Facilities $114.70
Consultant Cost $0.95
GROSS COST PER PERSON X115.65
Debt Service Credit
Residential Cash Proffers per Housina Unit
RghWBim
Number of
Persons per
C 14A 6 P 7
�
Unit Type
Bedrooms
Housing Unit
Single Family
..................................... I ................................................................
..............................................
0-2
1.73
..... I ..........................................
$200
....................................................
Single Family
Single
..........
..............................................
3-4
2.58
................................................
$298
....................................................
Single Family
5+
3.54
$409
Single Family
Avg
2.47
$285
Multi family/Other
All Sizes
1.65
$190
Manufactured Home
All Sizes
2.28
$263
RghWBim
Sheriff dash Piraffre7
® Components
• Buildings
• Animal Control
• Vehicles /equipment
® Cost allocation: % Calls for service to residential versus
nonresidential development
® Demand generator: Population and Nonresidential trips
• Credit for outstanding debt
Twhl"ise 22
Sheriff Cash Proffer (Residentia.1
Level Of Service and Infrastructure Costs Per Person
Sheriff Building Space $83.78
Animal Control $43.08
Sheriff Vehicles and Equipment $51.99
Consultant Cost $1.38
GROSS CAPITAL COST $180.23
Debt Service Credit ($35.68
NET CAPITAL COST 5144.55
Residential Cash Proffers Per Housina Unit
Number of
Unit Type � Bedrooms
i Persons per
g Unit
Housing
C�£
Single Family 0 -2
; 1.73
$250
Single Family - � 3 -4
Single Family E 5+
Single Family I Avg
_ 2.58
3.54
2.47
- $372
$511
$357
Multifamily/Other All Sizes
' 1.65
$238
Manufactured Home All Sizes
2.28
$329
T=h1wBise 23
nscJ fcw.an.. N.t.nn nN w�wrt.rt.
Sheriff Cash Proffer (Nonresidential)
Level Of Service and Infrastructure Costs Per Nonres Trip
Sheriff Building Space $28.69
Animal Control $0.00
Sheriff Vehicles and Equipment $20.37
Consultant Cost $0.13
GROSS CAPITAL COST $49.19
Debt Service Cred it $4.15
NET CAPITAL COST $45.04
Tis WwBise 24
f ii..l E— .", , N .— -, C. t.ult.nt+
Nonres. Land Use Category
Weekday Vehicle
Trip Ends
Trip Rate Adj.
Factors
ITECodei�'S
s +�7
• .t - - --
i� • 1
• •.r %1G�
...............................
$0.73
820 Commercial / Shpg Ctr
.............................................................................................................................................................................,........................................................................
42.94: 38%
710_
Office _
11.01:
_ 50%
_ _$0.24
140
Manufacturing
3.82:
50 %�
$0.08
....... 150...
Warehousing ............................ ...............................
3.: 56.
� ............................50%
................... ........................$0.08..
152
High -Cube Warehouse
1.44:
50%
$0.03
Tis WwBise 24
f ii..l E— .", , N .— -, C. t.ult.nt+
• •.. r N i �•, i a
/ liiii!
• Components
• Fire Station space
• Fire Vehicles /Apparatus
• Rescue Station Space
• Rescue Vehicles /Apparatus
• Cost allocation: % Calls for service to
residential versus nonresidential development
• Demand generator: Population and
Nonresidential trips
• Credit for outstanding debt
TWhl"im 25
I..:U i:.� o ^. M1 runn rtl (onw•1� ^i•
Fire and Rescue Cash Proffer
(Residential)
Level Of Service and Infrastructure Costs
Per Person
Fire Station Space
$206.58
Fi re Appa ratus and Equipment
$267.67
Rescue Station Space
$53.31
Rescue Apparatus and Equipment
$42.38
Consultant Cost
$1.42
GROSS CAPITAL COST
$571.36
Debt Service Credit ($66.02
NET CAPITAL COST $505.3fi
Residential Cash Proffers Per Housina Unit
I =-, .
Number of
Persons per
Unit Type
Bedrooms
Housing Unit
Single Family
0-2
1.73
$874
Single Family
3-4
2.58
$1,303
Single Family
5+
3.54
$1,788
Single Family
Avg
2.47
$1,248
MukomilyjOther
All Sizes
1.65
$833
Manufactured Home
A11 Sizes
2.28
t $1,152
I =-, .
Fire and Rescue Cash Preffe,.--
(Nonresidential)
Level Of Service and Infrastructure Costs
Per Nonres Trip
Fire Station Space
$91.94
Fire Apparatus and Equipment
$119.13
Rescue Station Space
$19.26
Rescue Apparatus and Equipment
$15.31
Consultant Cost
$0.12
GROSS CAPITAL COST
$245.76
Debt Service Credit ($22.73)
NET CAPITAL COST .5223.03
TwhImBise 27
rn. 11 . feu en.b.i..n yu.1. 1.
Weekday Vehicle
Trip Rate Adj.
Nonres. Land Use Category
(• ,�
Trip Ends
Factors
ITE Code
:',i i r.
. >�, .fir r,..,,i���--�.. , /���
820 Commercial / Shp Ctr
42.94 38%
$3.63
710 Office
11.01
50%
$1.22
140 Manufacturin
.. ......
..................... . . . .. .................................. ...............................
3.82
............... ............................... ......
50%
... ............................... .....
0.42
...................... ............................... ...
150 Warehousing ......... ...............................
...........................
3.56
50%
...
$0.39
....................... ...............................
152 High -Cube Warehouse
1.44
50%
$0.16
TwhImBise 27
rn. 11 . feu en.b.i..n yu.1. 1.
General Government Cash Proffer
• Components
• County Buildings
• Court Facilities
• Vehicles
• Cost allocation: Proportionate share for
residential versus nonresidential development
• Demand generator: Population and jobs
• Credit for outstanding debt
TwhIbSise
—., Ewa — l C.—lu"
General Government Cash Proffer
(Residential)
Level Of Service and Infrastructure Costs
County Facilities Building Cost
Courts Facilities Building Cost
County Vehicles Cost $36.92
Consultant Cost $0.84
GROSS CAPITAL COST $646.18
Debt Service Cred it
NET CAPITAL COST
Residential Cash Proffers Der Housina Unit
Unit Type
Number of
Bedrooms
Persons per
Housing Unit
Single Family
0 -2
1.73
$673
Single Fa mi I y
3_ -4
2.58
$_1,003
Single Family ....
Single Family
5+
Avg
�.... 3.54
2.47
$1,377
$960
Multi amil /Other
All Sizes
1.65
$641
Manufactured Home
A11 Sizes
2.28
$887
ThwhlerBise
re ...i E €�as�n s ti N.nre n�a Cu �.ulu.' Y
General Government Cash Proffer
(Nonresidential)
Level Of Service and Infrastructure Costs
County Facilities Building Cost
Courts Facilities Building Cost
Per lob
$57.63
$112.08
County Vehicles Cost $14.46
Consultant Cost $0.10
GROSS CAPITAL COST $184.27
Debt Service Credit ($96.88)
NET CAPITAL COST $87.39
Nonresidential Cash Proffers per Square Foot o Floor Area
Nonres. Land Use Category
Employees
I R
ITE Code
l!A/,!r *1.1
820 Commercial / Shpg Ctr Average
-._ _.._.._ .- .....� .............
2.00
$0.17
710_Office_ _ _
3.32
$_0.29
140 M_anufacturi_n_g_ ..._. �mm �.. --....
1.79�T
_ $0.1_6_
..__.....�_......_.
150 Warehousing
..........................................................................................................................................................................................................
0.92
_
$0.08
...............................
152 High -Cube Warehouse
0.37
$0.03
TiscM"ise
Ironl Eu� c�r�� y �411�1 ny Ca i.ull.`i�t
30
Total Updated Cash Proffer- Amounts
(Existing Categories)
Ti9chlerBise
gnu. (u,rumnb�ann.g CumwL�r..
Number of
Residential Bedrooms
Single Family 0 -2
$3,274
$820
$200
$250
$874
$673
$6,091
Single Family 3 -4
$10,261
$1,223
$298
$372
$1,303
$1,003
$14,460
Single Family 5+
$18,494
$1,678
$409
$511
$1,788
$1,377
$24,257
Single Family Avg
$9,337
$1,171
$285
$357
$1,248
$960
$13,358
Multifamily /Other All Sizes
$7,395
$782
$190
$238
$833
$641
$10,079
Manufactured Home All Sizes
$7,313
$1,081
$263
$329
$1,152
$887
$11,025
Nonresidential
820
Commercial/ Shpg Ctr
n/a
$0.19
n/a
$0.73
$3.63
_ $0.17
$4.72
710
Office
n/a
$0.06
n/a
$0.24
$1.22
$0.29
$1.81
140
Manufacturing
n/a
$0.02
n/a
$0.08
$0.42
$0.16
$0.68
150
Warehousing
n/a
$0.02
n/a
$0.08
$0.39
$0.08
$0.57
152
High -Cube Warehouse
n/a
$0.00
n/a
$0.03
$0.16
$0.03
$0.22
Ti9chlerBise
gnu. (u,rumnb�ann.g CumwL�r..
Existing Cash Proffer Amounts
From 2003 Ce
Proffer Stud
ToNerBise
Table 1; Schedule of Maximum Supportable Gast Proffers
Cash Proffer Schedule
Isle of Wight County, Virginia
ash
V
Residential
Single Familly (1)
Multifamily (2)
Mobile Home & Other
Non - Residential
Office
Business Park
Retali/Shopping Ctr (3)
Manufacturing
Warehousing
Public
Recreational
County
Rescue
Fire
Total
School
Facilities
Buildings (4)
Squad
Dept.
Proffer
Per Housing Unit
$9,641
$695
5362
$54
$437
$11,189
$12,141
$539
$452
$42
$437
$93,811
$9,893
$640
$487
$60
$437
$11,507
Per 1,000 Square Feet of Gross Floor Area
$67
$529
$64
$529
$103
$529
$36
.$529
$25
$529
$596
$593
$632
$565
$554
) Single Family includes .attached and townhouse units T
) The lower average market value per unit is the major reason why the school proffer is higher for this
►tegory than the single family category.
RetaillShopping Center includes eating and drinking establishments.
County building proffers may be reduced by the Board of Supervisors to account for possible State funding.
® Plan -based improvements
• Capacity road and intersection improvements
® Demand Generator: Vehicle miles of travel
• Trip
rates by
type
and size of housing unit
• Trip
rates by
type
of nonresidential development
TwhlerBise 33
ii.c.l Ftw ci ^.� 6 F .nri -� CYnu[.wn �
Road Improvements
Lane -Mile
Project Increase
ESTIMATED TOTAL
PROJECT COSTS
Other (Non - Local)
Funding (50 %)
TOTAL COUNTY
ESTIMATED COST
Route 669
0.6
$4,300,000
$2,150,000
$2,150,000
Route 258
15.2
$91,200,000
$45,600,000
$45,600,000
Route 258
2.0
$25,600,000
$12,800,000
$12,800,000
Route 258
2.0
$22,4501000
$11,225,000
$11,225,000
TOTALS 1 19.8 $143,550,000 1 $71,775,000 1 $71,775,000
Intersection Improvements
.
Project
ESTIMATED TOTAL
PROJECT COSTS
Other (Non - Local)
Funding (50 %)
TOTAL COUNTY
ESTIMATED COST
Route 460 Windsor Blvd at Rte 258 (Prince St )
$3,100,000
$1,550,000
$1,550,000
Rte 460 (Windsor Blvd) at Rte 607 (Old Mill Rd)
$1,500,000
$750,000
$750,000
Rte 10 Byp a s s a t Rte 258 (Ma i n St. )
$1,000,000
$500,000
$500,000
Rte 17 Carrolton Blvd at Rte 669 (Smiths Neck Rd)
$3,000,000
$1,500,000
$1,500,000
Rte 17 (Carrolton Blvd) at Rte 258 (Brewers Neck)
$1,000,000 7
1 $500,000
1 $500,000
Tt9( hl"ise TOTALS $9,600,000 $4,800,000 $4,800,000 4
fnn Fu.e cin a H .—B C—O.-
Utilities Cash Proffers /Capacity Fees
• Plan -based capacity improvements to serve growth
• Water improvements
• Sewer improvements
• Organized by Development Service District
• Consulted County Water and Sewer Master Plan,
Water and Sewer Rate Study, County CI Ps, County
Comp Plan, and County Staff
• Demand Generator
m Water use per EDU
® Sewer use per EDU
Tw lerBise
ort DSD
Cash Proffers /Capaci
NEWPORT Development Service District (DSD)
fees
Meter Size (inches) WATER WASTEWATER
TOTAL
5/8"
$2,437
$0
$2,437
3/4"
$3,655
$0
$3,655
1.00
$6,092
$0
$6,092
F- 1.50
$12,183
$0
$12,183
® Treated water to serve Newport and Windsor DSD (divided
between existing users and new development): $57.6 million
total over 14 years, with a portion allocated to growth
® Water Distribution to deliver treated water to both Newport and
Windsor DSD: $4.3 million
• Water
Storage specifically for
Newport DSD: $3
million
• Water
Distribution specifically
for Newport DSD:
$1.7 million
Ti Awise
M
Windsor DSD
Cash Proffers /Capaci
WINDSOR Development Service District (DSD)
Fees
Meter Size (inches) WATER WASTEWATER
TOTAL
5/8"
$2,291
$5,816
$8,107
3/4"
$3,436
$8,723
$12,159
1.00
$5,727
$14,539
$20,266
1.50
$11,4551
$29,078
$40,533
o Treated water to serve Newport and Windsor DSD (divided
between existing users and new development): $57.6 million
i
total over 14 years, with a portion allocated to growth
® Water Distribution to deliver treated water to both Newport and
Windsor DSD: $4.3 million
e Water Storage specifically for Windsor DSD: $3.4 million
a e Water Distribution specifically for Windsor DSD: $1.8 million
o Wastewater Collection for Windsor DSD: $6.6 million
T=MerBise
. N Ew o N ..N1 ry W +vtn.t
Camptown DSID
Cash
CAMPTOWN Development Service District (DSD)
Meter Size (inches) WATER WASTEWATER
TOTAL
5/8"
$3,019
$1,922
$4,941
3/4"
$4,528
$2,883
$7,411
1.00
$7,546
$4,805
$12,351
1.50
$15,093
$9,610
$24,703
Water Storage for Camptown DSD: $
Water Distribution for Camptown DS
Wastewater Collection for Camptown
TisghWise
n¢a tw , na d� Bunn cy w•�wd.•...
m