Loading...
Professional Services Contract & Agreement with Moseley Arhitects - June 10, 2014 "IN, ..,,,”:,;,, 4 i!,,,,t,l. a 4 /-0,,r- T p , i VIRGINIA *1634* Professional Services Agreement Between Isle of Wight County Board of Supervisors And Moseley Architects PROFESSIONAL SERVICES AGREEMENT Page 1 of 15 INDEX Section Page Number 1. Definitions 3 2. Moseley Architects Scope of Services 4 3. Interface and Site Conditions 5 4. Schedule 5 5. Changes 6 6. Payment 6 7. Rights of Owner and Moseley Architects to Terminate 7 8. Project Execution 7 9. Representations of Moseley Architects 8 10. Insurance 8 11. Indemnity 8 12. Dispute Resolution 9 13. Force Majeure 9 14. General Provisions 9 List of Exhibits A. Insurance Requirements PROFESSIONAL SERVICES AGREEMENT Page 2 of 15 General Conditions This Agreement, is made this day of , 2014, by and between the Board of Supervisors, Isle of Wight County, Virginia, a political subdivision of the Commonwealth of Virginia, having its main place of business at 17130 Monument Circle, P.O. Box 80, Isle of Wight, Virginia 23397 (hereinafter called the "Owner") and Moseley Architects, a corporation organized and acting under and pursuant to the laws of the Commonwealth of Virginia, having its main place of business at 3200 Norfolk Street, Richmond, Virginia 23230 (hereinafter called the "Architect"). Owner and Architect may sometimes be referred to herein individually as a"Party" or jointly as the "Parties". WITNESSETH: WHEREAS, Architect is engaged in the performance of certain architectural/engineering services; and, WHEREAS, Owner desires Architect to furnish and perform certain architectural and engineering services; NOW, THEREFORE, in consideration of the premises and the mutual covenants and conditions herein contained, it is agreed as follows: 1. DEFINED TERMS AND ORDER OF PRECEDENCE 1.1 DEFINED TERMS: The following words, when capitalized, shall have the meanings set forth below: 1.1.1 AGREEMENT: "Agreement" means these General Conditions, the attached Exhibit, and all additions or modifications thereto made in accordance with Section 14.4 below. 1.1.2 CONTRACT SUM: "Contract Sum" means the sum set forth in Section 6.1 below, or such greater or lesser amount as may be determined in accordance with Section 5 below. 1.1.3 ARCHITECT'S PROJECT MANAGER: "Architect's Project Manager" means the individual designated from time to time by Consultant in writing as having the responsibilities described at Section 8.1 below. 1.1.4 DATE OF COMMENCEMENT: "Date of Commencement" means the date of commencement of this Agreement, which shall be the later of the date that it has been executed by both Parties. 1.1.5 DAY: "Day" means a calendar day. PROFESSIONAL SERVICES AGREEMENT Page 3 of 15 1.1.6 FINAL COMPLETION: "Final Completion" means that all drawings and other documents identified as documents to be delivered by Moseley Architects to Owner have been delivered. 1.1.7 GENERAL CONDITIONS: "General Conditions" means all portions of this Agreement other than the attached Exhibit. 1.1.8 OWNER'S REPRESENTATIVE: "Owner's Representative" means the individual designated from time to time by Owner in writing as having the responsibilities described at Section 8.2 below. 1.1.9 SCHEDULE: "Schedule" means any individual project schedule, as amended from time to time by mutual agreement of the Parties in accordance with this Agreement. 1.1.10 SERVICES: "Services" means the obligations of Architect to be performed under this Agreement and any individual Project Scope of Services (as more specifically defined herein) prior to Final Completion 1.2 ORDER OF PRECEDENCE: In the event of any conflict between these General Conditions and the Exhibits hereto,these General Conditions shall be controlling. 2. ARCHITECT'S SCOPE OF SERVICES 2.1 GENERAL DESCRIPTION OF SERVICES: Architect shall perform professional services hereinafter stated which shall include customary civil, structural, mechanical and electrical architectural/engineering services and customary architectural services incidental thereto for specifically defined projects, as may be agreed to by the Parties in writing (hereinafter a "Project Scope of Work"). Architect shall perform all services hereunder: (i) in a timely manner and consistent with the orderly progress of the particular project; (ii) in accordance with the standard of care and skill of the architectural professions existing as of the date such services are provided; (iii) in accordance with reasonable interpretations of all applicable laws, codes and regulations in effect at the time of Substantial Completion; and (iv) in accordance with current standard technology to complete individual projects as accepted within the industry as of the time of Substantial Completion. In addition to its obligations under these General Conditions, the Architect shall provide such services as more specifically described in this Agreement, all in accordance with these General Conditions. Architect shall be responsible for the quality, technical accuracy, timely completion, and coordination of all plans, studies, designs, drawings, specifications, reports, and other services furnished by Architect under this Agreement. Architect shall be responsible for the performance of consultants or persons retained by Architect as if performed by it. The Owner's review of, or right to review, the work of Architect shall not be construed as relieving Architect from its professional and legal responsibility consistent with the services required under this Agreement. Architect shall, without additional compensation, correct or revise any errors, omissions, or other deficiencies in its plans, studies, designs, drawings, specifications, reports, and other services. PROFESSIONAL SERVICES AGREEMENT Page 4 of 15 , 2.2 PERMITS: All permits required by applicable law or regulation, including without limitation, permits related to environmental protection or activities of Owner or any of its contractors, if any, other than Architect, shall be secured by Owner at Owner's expense. 2.3 DRAWINGS: All drawings shall comply with reasonable interpretations of all applicable laws, statutes, ordinances, codes, rules and regulations ("Applicable Laws"). Architect shall indemnify and hold the Owner harmless for damages to the extent caused by the Architect's negligent failure of such drawings to comply with reasonable interpretations of Applicable Laws. Such damages include reasonable attorneys' fees, costs and expenses, including reasonable expert witness or consultant fees and expenses. Architect shall, without additional compensation, correct any and all errors and omissions in its services including failure of the drawings to comply with reasonable interpretations of Applicable Laws. Architect shall, without additional compensation, assist the Owner in the review and analysis, including any mediation, or court action for damages, liabilities or costs that arise from all negligent acts, errors or omissions in Architect's services. Architect shall, upon completion of the Services, deliver to Owner a complete set of appropriately stamped or sealed drawings as required under the applicable rules and regulations related to the practice of professional architecture. Architect shall grant Owner the non-exclusive right to use said drawings as Owner deems appropriate, provided the Owner substantially performs its obligations, including prompt payment of all sums due, under this Agreement. In the event the Owner uses the drawings without retaining the author of said drawings, the Owner releases the Architect and Architect's consultant(s) from all claims and causes of action arising from such uses. 3. INTERFACE AND SITE CONDITIONS 3.1 SITE CONDITIONS: Unless indicated otherwise in this Agreement, Architect shall visit the work site and become familiar with the conditions of the site as it applies to performance of the Services. If conditions are encountered at the site that (1) were not readily observable by visual inspection of the site, or (2) are unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in archaeological architectural activities of the character provided for in this Agreement, then notice by the observing Party shall be given to the other Party promptly before such conditions are further disturbed and in no event later than five (5) days after first observance of the conditions. If any such condition causes any increase or decrease in Architect's cost of, or time required for, performance of any part of the Work, or any increase or decrease in any other obligation of Architect, Owner shall, within fifteen (15) days of issuance or receipt of notice, as the case may be, under this Section 3.1, issue a change order in accordance with Section 5 below. The Owner agrees to provide the following information, as required (or add to Architect's Services as required): Geotechnical report, Hazardous material report, Topographical survey, Underground utility location survey, Water flow and pressure tests, and Environmental Assessment—Phase I and II, if deemed necessary. 3.2 COOPERATION WITH OTHERS: Architect will cooperate with Owner's other contractors, if any, to facilitate coordination of the Services with the work of others, but any changes to the Services or the Schedule required to do so shall be treated as a change under Section 5 below. PROFESSIONAL SERVICES AGREEMENT Page 5 of 15 4. SCHEDULE 4.1 SCHEDULE: Architect shall use its reasonable efforts to perform the Services in accordance with the Schedule. In case of any delay other than a delay caused by Architect, its employees, subcontractors or vendors, for reasons other than force majeure (which shall be treated in accordance with Section 13 below), the Schedule for completion of the Services, or any part of it, shall be automatically extended by a number of Days equal to the number of days of such delay. 5. CHANGES 5.1 ISSUANCE OF CHANGE ORDERS BY OWNER: Owner may, by its written order, require changes in the Services within the general scope of the Agreement and any individual Project Scope of Services consisting of additions, deletions or other revisions that do not result in any material change in the Services. 5.2 NOTICE OF IMPACT OF CHANGE ORDER: If Architect receives instructions from Owner, which in Architect's opinion constitute a change in the Services, Architect shall so advise Owner within five (5) Days of receipt of such instruction. If Architect receives a change order under Section 5.1 above, then Architect shall, within ten (10) Days thereafter submit to Owner a statement of the impact of such change on Contract Sum, Schedule, or any other provisions of the Agreement affected thereby. Architect shall not delay prosecution of the Work not affected by the change. Any adjustment to the Contract Sum or Schedule, if any, as a result of such a change order shall be made by mutual agreement of the Parties. 6. PAYMENT 6.1 CONTRACT SUM: Owner shall pay Architect for the full and satisfactory completion of Services a lump sum (the "Contract Sum") for each Project Scope of Services, or such other sum as may be determined in writing by the Parties and as may be modified in accordance with Section 5 above. The Contract Sum does not include any sales or other tax. 6.2 PAYMENT TERMS: Owner shall make payments to Architect upon submittal of approved invoices with payment terms stated as Net 30. 6.3 FINAL PAYMENT: Architect shall invoice Owner for the final amount due to it under this Agreement upon reaching Final Completion of a Project Scope of Services. Payment of all of the Contract Sum remaining unpaid, and any and all other amounts owing to Architect under this Agreement shall be made within thirty (30) days after Final Completion. 6.4 SUBCONTRACTOR PAYMENTS AND INTEREST: Architect is obligated to take one (1) of the following two (2) actions within seven (7) days after receipt of amounts paid to Architect by Owner for work performed by any subcontractor under this Agreement: (a) pay the subcontractor for the proportionate share of the total payment received from the Owner attributable to the work performed by the subcontractor under this Agreement, or (b) notify the Owner and the subcontractor in writing of Architect's intention to withhold all or a part of the PROFESSIONAL SERVICES AGREEMENT Page 6 of 15 payment with the reason for such nonpayment. Architect is obligated to pay interest to the subcontractor on all amounts owed by Architect that remain unpaid after seven (7) Days following receipt by Architect of payment from the Owner for work performed by the subcontractor under this Agreement, except for amounts withheld as otherwise allowed. Architect shall include language in its subcontracts and require such language to be included in contracts with lower-tier subcontractors that provides: "Unless otherwise provided under the terms of this Agreement, interest shall accrue at the rate of one percent (1%) per month". Individual contractors are required by law to provide their Social Security numbers to the Owner; proprietorships, partnerships and corporations are required to provide the Owner with their Federal Employer Identification Number. 6.5 NON-APPROPRIATION: All funds for payments after June 30th of the current fiscal year are subject to the availability of Owner's appropriation for this purpose. In the event funding for payment pursuant to this Agreement is not appropriated by Owner, for any reason, or is subject to the availability of federal or state funding and such federal or state funding is not made available, this Agreement may be terminated by the Owner pursuant to Section 7.1 below. 7. RIGHTS OF OWNER AND CONSULTANT TO TERMINATE 7.1 OWNER'S RIGHT TO TERMINATE FOR CAUSE: Owner may terminate this Agreement if: (a) a petition in bankruptcy is filed by Architect, and such filing materially impacts Architect's ability to perform its obligations under this Agreement, or such a petitioner is filed against Architect and it is not dismissed within thirty (30) days; (b) Architect commits a material breach of a material obligation under this Agreement, or fails to make reasonable progress toward completion of the Services, and fails to cure such breach or failure within the longer of thirty (30) days of its receipt of written notice of such breach or such longer time as is reasonably required to cure such breach; or (c) as a result of events described in Section 6.5 above. Upon termination due to (a) or (b), Owner may take possession of the work product completed by Architect, take assignment of all purchase orders and subcontracts related to the Services provided the Owner has made prompt payment of all sums due the Architect under this Agreement and complete the Services by whatever reasonable method Owner may deem expedient. In the event of termination for any of the reasons set forth in this Section 7.1, Architect will be liable to Owner for any reasonable costs incurred by Owner to complete the Services in excess of the Contract Sum remaining unpaid to Architect. In case of such termination, no further payments will be made to Architect after termination until the Services are completed and upon completion of the Services, Owner shall pay Architect the balance due under this Agreement, less the amounts required to be paid by Owner to third parties to complete the Services, and if the unpaid balance of the Contract Sum is less than the cost of finishing the Services, Architect shall then pay such excess amount, but no more than the remaining fee plus 10%. 7.2 ARCHITECT'S RIGHT TO TERMINATE: Architect may terminate the Agreement on seven (7) Days written notice if the Services are stopped, without fault on the part of Architect or any of its vendors or subcontractors, for more than fifteen (15) Days, for any of the following reasons: (a) issuance of any order of a court or other public authority having jurisdiction; (b) Owner has not made payment within five (5) Days of the date due; or (c) Owner PROFESSIONAL SERVICES AGREEMENT Page 7 of 15 commits any other material breach of a material obligation under this Agreement, and fails to cure such breach within the longer of thirty (30) Days of its receipt of written notice of such breach or such longer time as is reasonably required to cure such breach. Upon such termination Owner shall pay Architect all amounts then due to it under this Agreement as of the date of termination. 8. PROJECT EXECUTION 8.1 ARCHITECT REPRESENTATIVE: Architect will keep Architect's Project Manager assigned to the Work at all times during its progress. Architect's Project Manager shall represent Architect, and written communications given to Architect's Project Manager by Owner shall be as binding as if given to Architect itself. All communications to Architect's Project Manager by Owner shall be confirmed in writing upon request by Architect. Architect's Project Manager shall devote all of his/her time as necessary to the Project as may be appropriate to and consistent with the full and timely performance of this Agreement by Architect. Architect agrees that this individual shall not be relieved from their responsibilities on this Project without the written consent of the Owner, except in the event of their disability, death or departure from the employ of Architect from the Commencement Date to Final Completion of the Project to the Owner's satisfaction, including completion of all punch list activities. Owner shall retain the right to approve any consultants hired by Architect for this Project which approval shall not be unreasonably withheld, provided however, if the Owner does not provide such reasonable approval and Architect is required to substitute a consultant, then Architect's compensation shall be adjusted to reflect any differences in Architect's costs occasioned by such substitution. 8.2 OWNER REPRESENTATIVE: Owner will have at all times during the progress of the Work a competent representative assigned to the Work. Owner's Representative shall represent Owner, and written communications given to Owner's Representative shall be as binding as if given to Owner itself. Owner shall have its Owner's Representative available during normal business hours at all times during the progress of the Work. 9. REPRESENTATIONS OF MOSELEY ARCHITECTS 9.1 SERVICES: Architect represents and agrees, for a period ending on the last date on which Architect performed Services under this Agreement if this Agreement is terminated for any reason prior to Final Completion, that the Services provided by it hereunder will be provided with reasonable skill and care of the type normally exercised by other architectural and engineering professionals under similar circumstances. 9.2 NOTICE OF CLAIM: Owner shall notify Architect of any defect covered by the representations set forth in Section 9.1 above within thirty (30) Days after discovering such defect. 10. INSURANCE: Architect shall carry the insurance coverage described in Exhibit A as insurance to be carried by it. PROFESSIONAL SERVICES AGREEMENT Page 8 of 15 11. INDEMNITY: Architect agrees, to the fullest extent permitted by law, to indemnify and hold harmless Owner and its employees against all damages, and costs, including reasonable attorney's fees, to the extent caused by the Architect's negligent performance of their professional services under this Agreement and that of its subcontractors, or anyone for whose acts the Architect is legally liable. In the event that any such damage, loss or expense was caused in part by Owner or by any other person or entity, however, then Architect is responsible for only the portion of the actual damages or costs, including reasonable attorney's fees, as is attributable to its relative share of the negligence or omission which caused such damage or cost. The Architect shall not be obligated to indemnify the Owner for the Owner's own negligence or for the negligence of others. 12. DISPUTE RESOLUTION: Contractual claims shall be processed in accordance with the procedure in Section 2.2-4363 of the Code of Virginia (1950), as amended. Architect shall submit its claim, whether for money or other relief, in writing to the Owner no later than sixty (60) Days after final payment. The Owner will meet at the next regularly scheduled Board meeting, after due notice, to discuss the claim. The Owner shall issue its final decision on the claim in writing ninety (90)Days after the Board meeting. 13. FORCE MAJEURE: No delay in, or failure of, performance by either Party under this Agreement will constitute default hereunder or give rise to any claim for damages if and to the extent caused by an occurrence beyond the control of the Party affected, to include but not limited to, acts of governmental authority, acts of God, strikes or other concerted acts of workmen, fire, flood, explosions, riots, war, rebellion or sabotage. 14. GENERAL PROVISIONS 14.1 EQUAL EMPLOYMENT: During the performance of this Agreement, for itself, its assigns and successors in interest, Architect agrees as follows: 14.1.1 NONDISCRIMINATION: Architect will not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, except where religion, sex, or natural origin is a bona fide occupational qualification, reasonably necessary to the normal operation of Architect. Architect agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause. 14.1.2 SOLICITATIONS: Architect, in all solicitations or advertisements for employees placed by or on behalf of Architect, will state that Architect is an equal opportunity employer. 14.1.3 NOTICES AND ADVERTISEMENTS: Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this Section 14.1. 14.1.4 CIVIL RIGHTS: Architect agrees to conduct all services in compliance with all of the requirements imposed by or pursuant to Title VI of the Civil Rights Act of 1964, PROFESSIONAL SERVICES AGREEMENT Page 9 of 15 Part 21 of the Regulations of the Secretary of Transportation and Executive Order No. 11246 "Equal Employment Opportunity: as supplemented in Department of Labor Regulations (41 CFR,Part 60)". 14.2 DRUG-FREE WORKPLACE: During the performance of this Agreement, Architect agrees to (i) provide a drug-free workplace for Architect's employees; (ii) post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Architect's workplace and specifying the actions that will be taken against employees for violations of such prohibition; (iii) state in all solicitations or advertisements for employees placed by or on behalf of Architect that Architect maintains a drug-free workplace; and (iv) include the provisions of the foregoing clauses in every subcontract or purchase order of over Ten Thousand Dollars ($10,000), so that the provisions will be binding upon each subcontractor or vendor. For the purposes of this Section 14.2, "drug- free workplace" means a site for the performance of work done in connection with a specific contract awarded to Architect, the employees of whom are prohibited from engaging in the manufacture, sale, distribution, dispensation, possession or use of any controlled substance or marijuana during the performance of the contract. 14.3 ASSIGNMENT: Neither Architect nor Owner shall assign or transfer its duties or obligations hereunder without the prior written consent of the other. This Agreement shall be binding upon and shall inure to the benefit of the Parties and the successors and permitted assigns of Owner and Architect. 14.4 ENTIRE AGREEMENT; WAIVER; AMENDMENT: These General Conditions and the attached Exhibits constitute the full and complete contract between the Parties hereto with respect to the subject matter hereof. There are no statements, agreements, understandings, representations or trade customs of any kind, express or implied, concerning the subject matter which are not merged herein or superseded hereby. A waiver of any of the terms of this Agreement shall not bind either Party unless signed by one of its duly authorized representatives. Waiver by either Party of any default by the other Party hereunder shall not be deemed a waiver by such Party of any default by the other which may occur thereafter. This Agreement may only be modified or amended by an agreement in writing executed by both Parties hereto. 14.5 GOVERNING LAW: The Parties agree that this Agreement shall be deemed to have been made in Virginia and the validity and construction of this Agreement shall be governed by the laws of the Commonwealth of Virginia. The Parties further agree that any legal action or proceeding arising out of this Agreement shall be commenced and tried in the Circuit Court of Isle of Wight County to the express exclusion of any otherwise permissible forum. 14.6 NOTICES: All notices provided for herein will be considered properly given if in writing and delivered personally or, by fax or sent properly addressed, postage pre-paid: If to Consultant, to: Moseley Architects 3200 Norfolk Street Richmond, Virginia 23230 PROFESSIONAL SERVICES AGREEMENT Page 10 of 15 Attn: Anthony J. Bell, III, AIA If to Owner,to: Isle of Wight County Department of Budget &Finance Attn: Michael Terry, Director • Isle of Wight County P.O. Box 80 Isle of Wight, Virginia 23397 With a copy to: Mark, Popovich, County Attorney Isle of Wight County P.O. Box 80 Isle of Wight, Virginia 23397 Notices shall be deemed effective upon actual receipt, or in the case of posting in the U.S. mail, on the fourth Day after mailing. 14.7 SURVIVAL: Section 9.1 shall survive termination of this Agreement W ES W REOF, the Parties hereto have executed this Agreement on the *day of , 2014. OWNER: CONTRACTOR: ISLE OF WIGHT COUNTY,VIRGINIA MOSELEY ARCHITECTS By: am* gtradaede By: i Anne F. Seward Auth•red Representative County Administrator ATT .T: ATTEST FOR CONSULTANT: By: �,L../. / .t By: Carey ills Sto , Clerk Board of Supervisors APPROVED AS • FO' : 4/ / d - ark 'opovich, of Wight County Attorney PROFESSIONAL SERVICES AGREEMENT Page 11 of 15 F EXHIBIT A ISLE OF WIGHT COUNTY INSURANCE REQUIREMENTS The Architect shall comply with the insurance requirements set forth in the Agreement, including the items set forth below: A. Neither the Architect nor any subconsultant shall commence Services under this Agreement until the Architect has obtained and provided proof of the required insurance coverages to the County, and such proof has been approved by the County. The Architect confirms to the County that all subconsultants have provided Architect with proof of such insurance, or will do so prior to commencing any work under this Agreement. B. Architect, including all subconsultants, shall, at its and/or their sole expense, obtain and maintain during the life of this Agreement the insurance policies and/or coverages required by this section. The County and its officers and employees, shall be added as an additional insured to the general liability and automobile coverages of any such policies and such insurance coverages shall be primary and noncontributory to any insurance and/or self insurance such additional insureds may have. The Architect shall notify in writing the County within 30 days of any changes, modifications, and/or termination of any insurance coverages and/or policies required by this Agreement. The Architect shall provide to the County with the signed Agreement an Acord certificate of insurance which states in the description of operations section one of the two paragraphs below: (1) The County and its officers and employees are additional insureds as coverage under this policy includes ISO endorsement CG 20 33 which provides that the insured status of such entities is automatic if required by a contract or a written agreement. If additional insured status is automatic under a different coverage form, Architect must attach a copy of the coverage form to its certificate. Any required insurance policies shall be effective prior to the beginning of any Services or other performance by Architect and any subconsultants under this Agreement. OR (2) ISO endorsement CG 20 10 will be issued, prior to the beginning of any work or other performance by Architect under this Agreement, to the County and its officers and employees naming them as an additional insured under the general liability coverage. A copy of the binder confirming the issuance must be attached to the certificate. Any required insurance policies shall be effective prior to the beginning of any Services or other performance by Architect and any subconsultants under this Agreement. PROFESSIONAL SERVICES AGREEMENT Page 12 of 15 However, if B (1) or (2) cannot be provided, the County's Attorney, in such Attorney's sole discretion, may approve such other certificate of insurance or insurance document(s) that the Attorney deems acceptable. C. The minimum insurance policies and/or coverages that shall be provided by the Architect, including its subconsultants, include the following: (1) Commercial General Liability: $1,000,000.00 $1,000,000.00 General Aggregate Limit (other than Products/Completed Operations). $1,000,000.00 Products/Completed Operations Aggregate Limit. $1,000,000.00 Personal Injury Liability (including liability for slander, libel, and defamation of character). $1,000,000.00 each occurrence limit (2) Automobile Liability: $1,000,000.00 combined single limit with applicable endorsement to cover waste cargo. (3) Workers' Compensation and Employer's Liability: Workers' Compensation: statutory coverage for Virginia Employer's Liability: $100,000.00 Bodily Injury by Accident each occurrence $500,000.00 Bodily Injury by Disease Policy Limit. $100,000.00 Bodily Injury by Disease each employee. (1) Professional Liability in an amount of not less than $1,000,000 per claim and in the aggregate. Coverage may be written on an occurrence or claims made coverage form. However, if a claims made coverage form is used, coverage must remain in effect for a minimum of 3 years after the Architect's Services are concluded. (5) The required limits of insurance for this Agreement may be achieved by combining underlying primary coverage with an umbrella liability coverage to apply in excess of the general and automobile liability policies, provided that such umbrella liability policy follows the form of the underlying primary coverage. PROFESSIONAL SERVICES AGREEMENT Page 13 of 15 (6) Such insurance policies and/or coverages shall provide for coverage against any and all claims made by a person or persons or any other entity for property damages or bodily or personal injury (including death) incurred in connection with the Services, to be provided under this Agreement with respect to the commercial general liability coverages and the automobile liability coverages. With respect to the workers' compensation coverage, Architect's and its subconsultants insurance company shall waive rights of subrogation against the County and its officers and employees. (7) Architect shall provide such other insurance policies and/or coverages that may be required by other parts of this Agreement. D. Proof of Insurance Coverage: (1) Architect shall furnish the County with the above required certificates of insurance showing the type, amount, effective dates, and date of expiration of the policies. (2) Where waiver of subrogation is required with respect to any policy of insurance required under this Section, such waiver shall be specified on the certificate of insurance. E. Insurance coverage shall be in a form and with an insurance company approved by the County, which approval shall not be unreasonably withheld. Any insurance company providing coverage under this Agreement shall be authorized to do business in the Commonwealth of Virginia. F. The Architect's insurance policies and/or coverages shall not contain any exclusions for the Architects's subconsultants. G. The continued maintenance of the insurance policies and coverages required by the Agreement is a continuing obligation, and the lapse and/or termination of any such policies or coverages without approved replacement policies and/or coverages being obtained shall be grounds for termination of the Architect for default. H. Nothing contained in the insurance requirements is to be construed as limiting the liability of the Architect, and/or its subconsultants, or their insurance carriers. The County does not in any way represent that the coverages or the limits of insurance specified are sufficient or adequate to protect the Architects's interest or liabilities, but are merely minimums. The obligation of the Architect, and its subconsultants, to purchase insurance shall not in any way limit the obligations of the Architect in the event that the County or any of those named above should suffer any injury or loss in excess of the amount actually recoverable through insurance. Furthermore, there is no requirement or obligation for the County to seek any recovery against the Architect's insurance company before seeking recovery directly from the Architect. PROFESSIONAL SERVICES AGREEMENT Page 14 of 15 END PROFESSIONAL SERVICES AGREEMENT Page 15 of 15