Professional Services Contract & Agreement with Moseley Arhitects - June 10, 2014 "IN,
..,,,”:,;,,
4
i!,,,,t,l. a
4 /-0,,r- T p
, i
VIRGINIA
*1634*
Professional Services Agreement
Between
Isle of Wight County Board of Supervisors
And
Moseley Architects
PROFESSIONAL SERVICES AGREEMENT Page 1 of 15
INDEX
Section Page Number
1. Definitions 3
2. Moseley Architects Scope of Services 4
3. Interface and Site Conditions 5
4. Schedule 5
5. Changes 6
6. Payment 6
7. Rights of Owner and Moseley Architects to Terminate 7
8. Project Execution 7
9. Representations of Moseley Architects 8
10. Insurance 8
11. Indemnity 8
12. Dispute Resolution 9
13. Force Majeure 9
14. General Provisions 9
List of Exhibits
A. Insurance Requirements
PROFESSIONAL SERVICES AGREEMENT Page 2 of 15
General Conditions
This Agreement, is made this day of , 2014, by and between the
Board of Supervisors, Isle of Wight County, Virginia, a political subdivision of the
Commonwealth of Virginia, having its main place of business at 17130 Monument Circle, P.O.
Box 80, Isle of Wight, Virginia 23397 (hereinafter called the "Owner") and Moseley
Architects, a corporation organized and acting under and pursuant to the laws of the
Commonwealth of Virginia, having its main place of business at 3200 Norfolk Street, Richmond,
Virginia 23230 (hereinafter called the "Architect"). Owner and Architect may sometimes be
referred to herein individually as a"Party" or jointly as the "Parties".
WITNESSETH:
WHEREAS, Architect is engaged in the performance of certain architectural/engineering
services; and,
WHEREAS, Owner desires Architect to furnish and perform certain architectural and
engineering services;
NOW, THEREFORE, in consideration of the premises and the mutual covenants and
conditions herein contained, it is agreed as follows:
1. DEFINED TERMS AND ORDER OF PRECEDENCE
1.1 DEFINED TERMS: The following words, when capitalized, shall have the
meanings set forth below:
1.1.1 AGREEMENT: "Agreement" means these General Conditions, the attached
Exhibit, and all additions or modifications thereto made in accordance with Section 14.4 below.
1.1.2 CONTRACT SUM: "Contract Sum" means the sum set forth in Section 6.1
below, or such greater or lesser amount as may be determined in accordance with Section 5
below.
1.1.3 ARCHITECT'S PROJECT MANAGER: "Architect's Project Manager"
means the individual designated from time to time by Consultant in writing as having the
responsibilities described at Section 8.1 below.
1.1.4 DATE OF COMMENCEMENT: "Date of Commencement" means the date
of commencement of this Agreement, which shall be the later of the date that it has been
executed by both Parties.
1.1.5 DAY: "Day" means a calendar day.
PROFESSIONAL SERVICES AGREEMENT Page 3 of 15
1.1.6 FINAL COMPLETION: "Final Completion" means that all drawings and
other documents identified as documents to be delivered by Moseley Architects to Owner have
been delivered.
1.1.7 GENERAL CONDITIONS: "General Conditions" means all portions of this
Agreement other than the attached Exhibit.
1.1.8 OWNER'S REPRESENTATIVE: "Owner's Representative" means the
individual designated from time to time by Owner in writing as having the responsibilities
described at Section 8.2 below.
1.1.9 SCHEDULE: "Schedule" means any individual project schedule, as
amended from time to time by mutual agreement of the Parties in accordance with this
Agreement.
1.1.10 SERVICES: "Services" means the obligations of Architect to be performed
under this Agreement and any individual Project Scope of Services (as more specifically defined
herein) prior to Final Completion
1.2 ORDER OF PRECEDENCE: In the event of any conflict between these General
Conditions and the Exhibits hereto,these General Conditions shall be controlling.
2. ARCHITECT'S SCOPE OF SERVICES
2.1 GENERAL DESCRIPTION OF SERVICES: Architect shall perform professional
services hereinafter stated which shall include customary civil, structural, mechanical and
electrical architectural/engineering services and customary architectural services incidental
thereto for specifically defined projects, as may be agreed to by the Parties in writing (hereinafter
a "Project Scope of Work"). Architect shall perform all services hereunder: (i) in a timely
manner and consistent with the orderly progress of the particular project; (ii) in accordance with
the standard of care and skill of the architectural professions existing as of the date such services
are provided; (iii) in accordance with reasonable interpretations of all applicable laws, codes and
regulations in effect at the time of Substantial Completion; and (iv) in accordance with current
standard technology to complete individual projects as accepted within the industry as of the
time of Substantial Completion. In addition to its obligations under these General Conditions,
the Architect shall provide such services as more specifically described in this Agreement, all in
accordance with these General Conditions. Architect shall be responsible for the quality,
technical accuracy, timely completion, and coordination of all plans, studies, designs, drawings,
specifications, reports, and other services furnished by Architect under this Agreement.
Architect shall be responsible for the performance of consultants or persons retained by Architect
as if performed by it. The Owner's review of, or right to review, the work of Architect shall not
be construed as relieving Architect from its professional and legal responsibility consistent with
the services required under this Agreement. Architect shall, without additional compensation,
correct or revise any errors, omissions, or other deficiencies in its plans, studies, designs,
drawings, specifications, reports, and other services.
PROFESSIONAL SERVICES AGREEMENT Page 4 of 15
,
2.2 PERMITS: All permits required by applicable law or regulation, including without
limitation, permits related to environmental protection or activities of Owner or any of its
contractors, if any, other than Architect, shall be secured by Owner at Owner's expense.
2.3 DRAWINGS: All drawings shall comply with reasonable interpretations of all
applicable laws, statutes, ordinances, codes, rules and regulations ("Applicable Laws").
Architect shall indemnify and hold the Owner harmless for damages to the extent caused by the
Architect's negligent failure of such drawings to comply with reasonable interpretations of
Applicable Laws. Such damages include reasonable attorneys' fees, costs and expenses,
including reasonable expert witness or consultant fees and expenses. Architect shall, without
additional compensation, correct any and all errors and omissions in its services including failure
of the drawings to comply with reasonable interpretations of Applicable Laws. Architect shall,
without additional compensation, assist the Owner in the review and analysis, including any
mediation, or court action for damages, liabilities or costs that arise from all negligent acts, errors
or omissions in Architect's services. Architect shall, upon completion of the Services, deliver to
Owner a complete set of appropriately stamped or sealed drawings as required under the
applicable rules and regulations related to the practice of professional architecture. Architect
shall grant Owner the non-exclusive right to use said drawings as Owner deems appropriate,
provided the Owner substantially performs its obligations, including prompt payment of all sums
due, under this Agreement. In the event the Owner uses the drawings without retaining the
author of said drawings, the Owner releases the Architect and Architect's consultant(s) from all
claims and causes of action arising from such uses.
3. INTERFACE AND SITE CONDITIONS
3.1 SITE CONDITIONS: Unless indicated otherwise in this Agreement, Architect shall
visit the work site and become familiar with the conditions of the site as it applies to
performance of the Services. If conditions are encountered at the site that (1) were not readily
observable by visual inspection of the site, or (2) are unknown physical conditions of an unusual
nature, which differ materially from those ordinarily found to exist and generally recognized as
inherent in archaeological architectural activities of the character provided for in this Agreement,
then notice by the observing Party shall be given to the other Party promptly before such
conditions are further disturbed and in no event later than five (5) days after first observance of
the conditions. If any such condition causes any increase or decrease in Architect's cost of, or
time required for, performance of any part of the Work, or any increase or decrease in any other
obligation of Architect, Owner shall, within fifteen (15) days of issuance or receipt of notice, as
the case may be, under this Section 3.1, issue a change order in accordance with Section 5 below.
The Owner agrees to provide the following information, as required (or add to Architect's
Services as required): Geotechnical report, Hazardous material report, Topographical survey,
Underground utility location survey, Water flow and pressure tests, and Environmental
Assessment—Phase I and II, if deemed necessary.
3.2 COOPERATION WITH OTHERS: Architect will cooperate with Owner's other
contractors, if any, to facilitate coordination of the Services with the work of others, but any
changes to the Services or the Schedule required to do so shall be treated as a change under
Section 5 below.
PROFESSIONAL SERVICES AGREEMENT Page 5 of 15
4. SCHEDULE
4.1 SCHEDULE: Architect shall use its reasonable efforts to perform the Services in
accordance with the Schedule. In case of any delay other than a delay caused by Architect, its
employees, subcontractors or vendors, for reasons other than force majeure (which shall be
treated in accordance with Section 13 below), the Schedule for completion of the Services, or
any part of it, shall be automatically extended by a number of Days equal to the number of days
of such delay.
5. CHANGES
5.1 ISSUANCE OF CHANGE ORDERS BY OWNER: Owner may, by its written order,
require changes in the Services within the general scope of the Agreement and any individual
Project Scope of Services consisting of additions, deletions or other revisions that do not result in
any material change in the Services.
5.2 NOTICE OF IMPACT OF CHANGE ORDER: If Architect receives instructions from
Owner, which in Architect's opinion constitute a change in the Services, Architect shall so
advise Owner within five (5) Days of receipt of such instruction. If Architect receives a change
order under Section 5.1 above, then Architect shall, within ten (10) Days thereafter submit to
Owner a statement of the impact of such change on Contract Sum, Schedule, or any other
provisions of the Agreement affected thereby. Architect shall not delay prosecution of the Work
not affected by the change. Any adjustment to the Contract Sum or Schedule, if any, as a result
of such a change order shall be made by mutual agreement of the Parties.
6. PAYMENT
6.1 CONTRACT SUM: Owner shall pay Architect for the full and satisfactory
completion of Services a lump sum (the "Contract Sum") for each Project Scope of Services, or
such other sum as may be determined in writing by the Parties and as may be modified in
accordance with Section 5 above. The Contract Sum does not include any sales or other tax.
6.2 PAYMENT TERMS: Owner shall make payments to Architect upon submittal of
approved invoices with payment terms stated as Net 30.
6.3 FINAL PAYMENT: Architect shall invoice Owner for the final amount due to it
under this Agreement upon reaching Final Completion of a Project Scope of Services. Payment
of all of the Contract Sum remaining unpaid, and any and all other amounts owing to Architect
under this Agreement shall be made within thirty (30) days after Final Completion.
6.4 SUBCONTRACTOR PAYMENTS AND INTEREST: Architect is obligated to take one
(1) of the following two (2) actions within seven (7) days after receipt of amounts paid to
Architect by Owner for work performed by any subcontractor under this Agreement: (a) pay the
subcontractor for the proportionate share of the total payment received from the Owner
attributable to the work performed by the subcontractor under this Agreement, or (b) notify the
Owner and the subcontractor in writing of Architect's intention to withhold all or a part of the
PROFESSIONAL SERVICES AGREEMENT Page 6 of 15
payment with the reason for such nonpayment. Architect is obligated to pay interest to the
subcontractor on all amounts owed by Architect that remain unpaid after seven (7) Days
following receipt by Architect of payment from the Owner for work performed by the
subcontractor under this Agreement, except for amounts withheld as otherwise allowed.
Architect shall include language in its subcontracts and require such language to be included in
contracts with lower-tier subcontractors that provides: "Unless otherwise provided under the
terms of this Agreement, interest shall accrue at the rate of one percent (1%) per month".
Individual contractors are required by law to provide their Social Security numbers to the Owner;
proprietorships, partnerships and corporations are required to provide the Owner with their
Federal Employer Identification Number.
6.5 NON-APPROPRIATION: All funds for payments after June 30th of the current
fiscal year are subject to the availability of Owner's appropriation for this purpose. In the event
funding for payment pursuant to this Agreement is not appropriated by Owner, for any reason, or
is subject to the availability of federal or state funding and such federal or state funding is not
made available, this Agreement may be terminated by the Owner pursuant to Section 7.1 below.
7. RIGHTS OF OWNER AND CONSULTANT TO TERMINATE
7.1 OWNER'S RIGHT TO TERMINATE FOR CAUSE: Owner may terminate this
Agreement if: (a) a petition in bankruptcy is filed by Architect, and such filing materially
impacts Architect's ability to perform its obligations under this Agreement, or such a petitioner
is filed against Architect and it is not dismissed within thirty (30) days; (b) Architect commits a
material breach of a material obligation under this Agreement, or fails to make reasonable
progress toward completion of the Services, and fails to cure such breach or failure within the
longer of thirty (30) days of its receipt of written notice of such breach or such longer time as is
reasonably required to cure such breach; or (c) as a result of events described in Section 6.5
above. Upon termination due to (a) or (b), Owner may take possession of the work product
completed by Architect, take assignment of all purchase orders and subcontracts related to the
Services provided the Owner has made prompt payment of all sums due the Architect under this
Agreement and complete the Services by whatever reasonable method Owner may deem
expedient. In the event of termination for any of the reasons set forth in this Section 7.1,
Architect will be liable to Owner for any reasonable costs incurred by Owner to complete the
Services in excess of the Contract Sum remaining unpaid to Architect. In case of such
termination, no further payments will be made to Architect after termination until the Services
are completed and upon completion of the Services, Owner shall pay Architect the balance due
under this Agreement, less the amounts required to be paid by Owner to third parties to complete
the Services, and if the unpaid balance of the Contract Sum is less than the cost of finishing the
Services, Architect shall then pay such excess amount, but no more than the remaining fee plus
10%.
7.2 ARCHITECT'S RIGHT TO TERMINATE: Architect may terminate the Agreement
on seven (7) Days written notice if the Services are stopped, without fault on the part of
Architect or any of its vendors or subcontractors, for more than fifteen (15) Days, for any of the
following reasons: (a) issuance of any order of a court or other public authority having
jurisdiction; (b) Owner has not made payment within five (5) Days of the date due; or (c) Owner
PROFESSIONAL SERVICES AGREEMENT Page 7 of 15
commits any other material breach of a material obligation under this Agreement, and fails to
cure such breach within the longer of thirty (30) Days of its receipt of written notice of such
breach or such longer time as is reasonably required to cure such breach. Upon such termination
Owner shall pay Architect all amounts then due to it under this Agreement as of the date of
termination.
8. PROJECT EXECUTION
8.1 ARCHITECT REPRESENTATIVE: Architect will keep Architect's Project Manager
assigned to the Work at all times during its progress. Architect's Project Manager shall represent
Architect, and written communications given to Architect's Project Manager by Owner shall be
as binding as if given to Architect itself. All communications to Architect's Project Manager by
Owner shall be confirmed in writing upon request by Architect. Architect's Project Manager
shall devote all of his/her time as necessary to the Project as may be appropriate to and consistent
with the full and timely performance of this Agreement by Architect. Architect agrees that this
individual shall not be relieved from their responsibilities on this Project without the written
consent of the Owner, except in the event of their disability, death or departure from the employ
of Architect from the Commencement Date to Final Completion of the Project to the Owner's
satisfaction, including completion of all punch list activities. Owner shall retain the right to
approve any consultants hired by Architect for this Project which approval shall not be
unreasonably withheld, provided however, if the Owner does not provide such reasonable
approval and Architect is required to substitute a consultant, then Architect's compensation shall
be adjusted to reflect any differences in Architect's costs occasioned by such substitution.
8.2 OWNER REPRESENTATIVE: Owner will have at all times during the progress of
the Work a competent representative assigned to the Work. Owner's Representative shall
represent Owner, and written communications given to Owner's Representative shall be as
binding as if given to Owner itself. Owner shall have its Owner's Representative available
during normal business hours at all times during the progress of the Work.
9. REPRESENTATIONS OF MOSELEY ARCHITECTS
9.1 SERVICES: Architect represents and agrees, for a period ending on the last date
on which Architect performed Services under this Agreement if this Agreement is terminated for
any reason prior to Final Completion, that the Services provided by it hereunder will be provided
with reasonable skill and care of the type normally exercised by other architectural and
engineering professionals under similar circumstances.
9.2 NOTICE OF CLAIM: Owner shall notify Architect of any defect covered by the
representations set forth in Section 9.1 above within thirty (30) Days after discovering such
defect.
10. INSURANCE: Architect shall carry the insurance coverage described in Exhibit A as
insurance to be carried by it.
PROFESSIONAL SERVICES AGREEMENT Page 8 of 15
11. INDEMNITY: Architect agrees, to the fullest extent permitted by law, to indemnify and
hold harmless Owner and its employees against all damages, and costs, including reasonable
attorney's fees, to the extent caused by the Architect's negligent performance of their
professional services under this Agreement and that of its subcontractors, or anyone for whose
acts the Architect is legally liable. In the event that any such damage, loss or expense was caused
in part by Owner or by any other person or entity, however, then Architect is responsible for only
the portion of the actual damages or costs, including reasonable attorney's fees, as is attributable
to its relative share of the negligence or omission which caused such damage or cost. The
Architect shall not be obligated to indemnify the Owner for the Owner's own negligence or for
the negligence of others.
12. DISPUTE RESOLUTION: Contractual claims shall be processed in accordance with the
procedure in Section 2.2-4363 of the Code of Virginia (1950), as amended. Architect shall
submit its claim, whether for money or other relief, in writing to the Owner no later than sixty
(60) Days after final payment. The Owner will meet at the next regularly scheduled Board
meeting, after due notice, to discuss the claim. The Owner shall issue its final decision on the
claim in writing ninety (90)Days after the Board meeting.
13. FORCE MAJEURE: No delay in, or failure of, performance by either Party under this
Agreement will constitute default hereunder or give rise to any claim for damages if and to the
extent caused by an occurrence beyond the control of the Party affected, to include but not
limited to, acts of governmental authority, acts of God, strikes or other concerted acts of
workmen, fire, flood, explosions, riots, war, rebellion or sabotage.
14. GENERAL PROVISIONS
14.1 EQUAL EMPLOYMENT: During the performance of this Agreement, for itself, its
assigns and successors in interest, Architect agrees as follows:
14.1.1 NONDISCRIMINATION: Architect will not discriminate against any
employee or applicant for employment because of race, religion, color, sex, or national origin,
except where religion, sex, or natural origin is a bona fide occupational qualification, reasonably
necessary to the normal operation of Architect. Architect agrees to post in conspicuous places,
available to employees and applicants for employment, notices setting forth the provisions of this
nondiscrimination clause.
14.1.2 SOLICITATIONS: Architect, in all solicitations or advertisements for
employees placed by or on behalf of Architect, will state that Architect is an equal opportunity
employer.
14.1.3 NOTICES AND ADVERTISEMENTS: Notices, advertisements and
solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient
for the purpose of meeting the requirements of this Section 14.1.
14.1.4 CIVIL RIGHTS: Architect agrees to conduct all services in compliance
with all of the requirements imposed by or pursuant to Title VI of the Civil Rights Act of 1964,
PROFESSIONAL SERVICES AGREEMENT Page 9 of 15
Part 21 of the Regulations of the Secretary of Transportation and Executive Order No. 11246
"Equal Employment Opportunity: as supplemented in Department of Labor Regulations (41
CFR,Part 60)".
14.2 DRUG-FREE WORKPLACE: During the performance of this Agreement, Architect
agrees to (i) provide a drug-free workplace for Architect's employees; (ii) post in conspicuous
places, available to employees and applicants for employment, a statement notifying employees
that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled
substance or marijuana is prohibited in the Architect's workplace and specifying the actions that
will be taken against employees for violations of such prohibition; (iii) state in all solicitations or
advertisements for employees placed by or on behalf of Architect that Architect maintains a
drug-free workplace; and (iv) include the provisions of the foregoing clauses in every
subcontract or purchase order of over Ten Thousand Dollars ($10,000), so that the provisions
will be binding upon each subcontractor or vendor. For the purposes of this Section 14.2, "drug-
free workplace" means a site for the performance of work done in connection with a specific
contract awarded to Architect, the employees of whom are prohibited from engaging in the
manufacture, sale, distribution, dispensation, possession or use of any controlled substance or
marijuana during the performance of the contract.
14.3 ASSIGNMENT: Neither Architect nor Owner shall assign or transfer its duties or
obligations hereunder without the prior written consent of the other. This Agreement shall be
binding upon and shall inure to the benefit of the Parties and the successors and permitted
assigns of Owner and Architect.
14.4 ENTIRE AGREEMENT; WAIVER; AMENDMENT: These General Conditions and
the attached Exhibits constitute the full and complete contract between the Parties hereto with
respect to the subject matter hereof. There are no statements, agreements, understandings,
representations or trade customs of any kind, express or implied, concerning the subject matter
which are not merged herein or superseded hereby. A waiver of any of the terms of this
Agreement shall not bind either Party unless signed by one of its duly authorized representatives.
Waiver by either Party of any default by the other Party hereunder shall not be deemed a waiver
by such Party of any default by the other which may occur thereafter. This Agreement may only
be modified or amended by an agreement in writing executed by both Parties hereto.
14.5 GOVERNING LAW: The Parties agree that this Agreement shall be deemed to
have been made in Virginia and the validity and construction of this Agreement shall be
governed by the laws of the Commonwealth of Virginia. The Parties further agree that any legal
action or proceeding arising out of this Agreement shall be commenced and tried in the Circuit
Court of Isle of Wight County to the express exclusion of any otherwise permissible forum.
14.6 NOTICES: All notices provided for herein will be considered properly given if in
writing and delivered personally or, by fax or sent properly addressed, postage pre-paid:
If to Consultant, to: Moseley Architects
3200 Norfolk Street
Richmond, Virginia 23230
PROFESSIONAL SERVICES AGREEMENT Page 10 of 15
Attn: Anthony J. Bell, III, AIA
If to Owner,to: Isle of Wight County
Department of Budget &Finance
Attn: Michael Terry, Director •
Isle of Wight County
P.O. Box 80
Isle of Wight, Virginia 23397
With a copy to: Mark, Popovich, County Attorney
Isle of Wight County
P.O. Box 80
Isle of Wight, Virginia 23397
Notices shall be deemed effective upon actual receipt, or in the case of posting in the U.S. mail,
on the fourth Day after mailing.
14.7 SURVIVAL: Section 9.1 shall survive termination of this Agreement
W ES W REOF, the Parties hereto have executed this Agreement on the *day of
, 2014.
OWNER: CONTRACTOR:
ISLE OF WIGHT COUNTY,VIRGINIA MOSELEY ARCHITECTS
By: am* gtradaede By: i
Anne F. Seward Auth•red Representative
County Administrator
ATT .T: ATTEST FOR CONSULTANT:
By: �,L../. / .t By:
Carey ills Sto , Clerk
Board of Supervisors
APPROVED AS • FO' :
4/ / d
- ark 'opovich, of Wight County Attorney
PROFESSIONAL SERVICES AGREEMENT Page 11 of 15
F
EXHIBIT A
ISLE OF WIGHT COUNTY
INSURANCE REQUIREMENTS
The Architect shall comply with the insurance requirements set forth in the Agreement, including
the items set forth below:
A. Neither the Architect nor any subconsultant shall commence Services under this
Agreement until the Architect has obtained and provided proof of the required insurance
coverages to the County, and such proof has been approved by the County. The
Architect confirms to the County that all subconsultants have provided Architect with
proof of such insurance, or will do so prior to commencing any work under this
Agreement.
B. Architect, including all subconsultants, shall, at its and/or their sole expense, obtain and
maintain during the life of this Agreement the insurance policies and/or coverages
required by this section. The County and its officers and employees, shall be added as an
additional insured to the general liability and automobile coverages of any such policies
and such insurance coverages shall be primary and noncontributory to any insurance
and/or self insurance such additional insureds may have. The Architect shall notify in
writing the County within 30 days of any changes, modifications, and/or termination of
any insurance coverages and/or policies required by this Agreement. The Architect shall
provide to the County with the signed Agreement an Acord certificate of insurance which
states in the description of operations section one of the two paragraphs below:
(1) The County and its officers and employees are additional insureds as coverage
under this policy includes ISO endorsement CG 20 33 which provides that the
insured status of such entities is automatic if required by a contract or a written
agreement. If additional insured status is automatic under a different coverage
form, Architect must attach a copy of the coverage form to its certificate. Any
required insurance policies shall be effective prior to the beginning of any
Services or other performance by Architect and any subconsultants under this
Agreement.
OR
(2) ISO endorsement CG 20 10 will be issued, prior to the beginning of any work or
other performance by Architect under this Agreement, to the County and its
officers and employees naming them as an additional insured under the general
liability coverage. A copy of the binder confirming the issuance must be attached
to the certificate. Any required insurance policies shall be effective prior to the
beginning of any Services or other performance by Architect and any
subconsultants under this Agreement.
PROFESSIONAL SERVICES AGREEMENT Page 12 of 15
However, if B (1) or (2) cannot be provided, the County's Attorney, in such Attorney's
sole discretion, may approve such other certificate of insurance or insurance document(s)
that the Attorney deems acceptable.
C. The minimum insurance policies and/or coverages that shall be provided by the
Architect, including its subconsultants, include the following:
(1) Commercial General Liability: $1,000,000.00
$1,000,000.00 General Aggregate Limit (other than Products/Completed
Operations).
$1,000,000.00 Products/Completed Operations Aggregate Limit.
$1,000,000.00 Personal Injury Liability (including liability for slander, libel, and
defamation of character).
$1,000,000.00 each occurrence limit
(2) Automobile Liability: $1,000,000.00 combined single limit with applicable
endorsement to cover waste cargo.
(3) Workers' Compensation and Employer's Liability:
Workers' Compensation: statutory coverage for Virginia
Employer's Liability:
$100,000.00 Bodily Injury by Accident each occurrence
$500,000.00 Bodily Injury by Disease Policy Limit.
$100,000.00 Bodily Injury by Disease each employee.
(1) Professional Liability in an amount of not less than $1,000,000 per claim and in
the aggregate. Coverage may be written on an occurrence or claims made
coverage form. However, if a claims made coverage form is used, coverage must
remain in effect for a minimum of 3 years after the Architect's Services are
concluded.
(5) The required limits of insurance for this Agreement may be achieved by
combining underlying primary coverage with an umbrella liability coverage to
apply in excess of the general and automobile liability policies, provided that such
umbrella liability policy follows the form of the underlying primary coverage.
PROFESSIONAL SERVICES AGREEMENT Page 13 of 15
(6) Such insurance policies and/or coverages shall provide for coverage against any
and all claims made by a person or persons or any other entity for property
damages or bodily or personal injury (including death) incurred in connection
with the Services, to be provided under this Agreement with respect to the
commercial general liability coverages and the automobile liability coverages.
With respect to the workers' compensation coverage, Architect's and its
subconsultants insurance company shall waive rights of subrogation against the
County and its officers and employees.
(7) Architect shall provide such other insurance policies and/or coverages that may be
required by other parts of this Agreement.
D. Proof of Insurance Coverage:
(1) Architect shall furnish the County with the above required certificates of
insurance showing the type, amount, effective dates, and date of expiration of the
policies.
(2) Where waiver of subrogation is required with respect to any policy of
insurance required under this Section, such waiver shall be specified on
the certificate of insurance.
E. Insurance coverage shall be in a form and with an insurance company approved by the
County, which approval shall not be unreasonably withheld. Any insurance company
providing coverage under this Agreement shall be authorized to do business in the
Commonwealth of Virginia.
F. The Architect's insurance policies and/or coverages shall not contain any exclusions for
the Architects's subconsultants.
G. The continued maintenance of the insurance policies and coverages required by the
Agreement is a continuing obligation, and the lapse and/or termination of any such
policies or coverages without approved replacement policies and/or coverages being
obtained shall be grounds for termination of the Architect for default.
H. Nothing contained in the insurance requirements is to be construed as limiting the
liability of the Architect, and/or its subconsultants, or their insurance carriers. The
County does not in any way represent that the coverages or the limits of insurance
specified are sufficient or adequate to protect the Architects's interest or liabilities, but
are merely minimums. The obligation of the Architect, and its subconsultants, to
purchase insurance shall not in any way limit the obligations of the Architect in the event
that the County or any of those named above should suffer any injury or loss in excess of
the amount actually recoverable through insurance. Furthermore, there is no requirement
or obligation for the County to seek any recovery against the Architect's insurance
company before seeking recovery directly from the Architect.
PROFESSIONAL SERVICES AGREEMENT Page 14 of 15
END
PROFESSIONAL SERVICES AGREEMENT Page 15 of 15