Loading...
Professional Services Contract & Agreement - Resource International, Ltd. - 3/31/14 OF R7�r Wit 1' GMA w 1634 Professional Services Agreement Between Isle of Wight County Board of Supervisors And Resource International, Ltd. PROFESSIONAL SERVICES AGREEMENT Page 1 of 16 INDEX Section Page Number 1. Definitions 3 2. Engineers Scope of Work 4 3. Interface and Site Conditions 5 4. Schedule 5 5. Changes 6 6. Payment 6 7. Rights of Owner and Engineer to Terminate 7 8. Project Execution 7 9. Warranty 8 10. Insurance 8 11. Indemnity 8 12. Dispute Resolution 9 13. Force Majeure 9 14. General Provisions 9 List of Exhibits A. Schedule of Billing Rates B. Insurance Requirements PROFESSIONAL SERVICES AGREEMENT Page 2 of 16 General Conditions This Agreement, is made this � day of ���'`f, , 2014, by and between the Board of Supervisors, Isle of Wight County, Virginia, a political subdivision of the Commonwealth of Virginia, having its main place of business at 17130 Monument Circle, P.O. Box 80, Isle of Wight, Virginia 23397 (hereinafter called the "Owner") and Resource International, Ltd., a corporation organized and acting under and pursuant to the laws of the Commonwealth of Virginia, having its main place of business at 9560 Kings Charter Drive, P.O. Box 6160, Ashland, Virginia 23005 (hereinafter called the "Engineer"). Owner and Engineer may sometimes be referred to herein individually as a"Party" or jointly as the "Parties". WITNESSETH: WHEREAS, Engineer is engaged in the performance of certain engineering services; and, WHEREAS, Owner desires Engineer to furnish and perform certain engineering services; Now, THEREFORE, in consideration of the premises and the mutual covenants and conditions herein contained, it is agreed as follows: 1. DEFINED TERMS AND ORDER OF PRECEDENCE 1.1 DEFINED TERMS: The following words, when capitalized, shall have the meanings set forth below: 1.1.1 AGREEMENT: "Agreement" means these General Conditions, the attached Exhibits A and B, and all additions or modifications thereto made in accordance with Section 14.4 below. 1.1.2 CONTRACT SITM: "Contract Sum" means the sum set forth in Section 6.1 below, or such greater or lesser amount as may be determined in accordance with Section 5 below. 1.1.3 ENGINEER'S PROJECT MANAGER: "Engineer's Project Manager" means. the individual designated from time to time by Engineer in writing as having the responsibilities described at Section 8.1 below. 1.1.4 DATE OF COMMENCEMENT: "Date of Commencement" means the date of commencement of this Agreement, which shall be the later of the date that it has been executed by both Parties. 1.1.5 DAY: "Day" means a calendar day. 1.1.6 FINAL COMPLETION: "Final Completion" means that all drawings and other documents identified as documents to be delivered by Engineer to Owner have been delivered. PROFESSIONAL SERVICES AGREEMENT Page 3 of 16 1.1.7 GENERAL CONDITIONS: "General Conditions" means all portions of this Agreement other than the attached Exhibits. 1.1.8 OWNER'S REPRESENTATIVE: "Owner's Representative" means the individual designated from time to time by Owner in writing as having the responsibilities described at Section 8.2 below. 1.1.9 SCHEDULE: "Schedule" means the any individual Project schedule, as amended from time to time by mutual agreement of the Parties in accordance with this Agreement. 1.1.10 WORK: "Work" means the obligations of Engineer to be performed under this Agreement and any individual Project Scope of Work (as more specifically defined herein) prior to Final Completion. 1.2 ORDER OF PRECEDENCE: In the event of any conflict between these General Conditions and the Exhibits hereto, these General Conditions shall be controlling. 2. ENGINEER'S SCOPE OF WORK 2.1 GENERAL DESCRIPTION OF WORK: Engineer shall perform professional services hereinafter stated which shall include customary civil, structural, mechanical and electrical engineering services and customary engineering services incidental thereto for specifically defined projects, as may be agreed to by Parties in writing (hereinafter a "Project Scope of Work")thereto. Engineer shall perform all services hereunder: (i) expeditiously and consistent with the orderly progress of the particular project; (ii) in accordance with the standard of care and skill of the engineering professions existing as of the date such services are provided; (iii) in accordance with all applicable laws, codes and regulations in effect at the time of Substantial Completion; and (iv) in accordance with current standard technology for complete individual projects accepted within the industry as of the time of Substantial Completion. In addition to its obligations under these General Conditions, the Engineer shall provide such services as more specifically described in Project Scopes of Work, all in accordance with these General Conditions. Engineer shall be responsible for the quality, technical accuracy, timely completion, and coordination of all plans, studies, designs, drawings, specifications, reports, and other services furnished by Engineer under this Agreement. Engineer shall be responsible for the performance of consultants or persons retained by Engineer as if performed by it. The Owner's review of, or right to review, the work of Engineer shall not be construed as relieving Engineer from its professional and legal responsibility consistent with the services required under this Agreement. Engineer shall, without additional compensation, correct or revise any errors, omissions, or other deficiencies in its plans, studies, designs, drawings, specifications, reports, and other services. 2.2 PERMITS: All permits required by applicable law or regulation, including without limitation, permits related to environmental protection or activities of Owner or any of its contractors, if any, other than Engineer, shall be secured by Owner at Owner's expense. PROFESSIONAL SERVICES AGREEMENT Page 4 of 16 2.3 DRAWINGS: All drawings shall comply with all applicable laws, statutes, ordinances, codes, rules and regulations ("Applicable Laws"). Engineer shall indemnify and hold the Owner harmless for any loss or damage resulting from the failure of such drawings to comply with Applicable Laws. Such loss or damage includes, but is not limited to, reasonable attorneys' fees, costs and expenses, including reasonable expert witness or consultant fees and expenses. Engineer shall, without additional compensation, correct any and all errors and omissions in its services including failure of the drawings to comply with Applicable Laws. Engineer shall, without additional compensation, assist the Owner in the review, analysis and defense, including any mediation, arbitration or court action for claims that arise from any and all errors or omissions in Engineer's services including, but not limited to, the failure of any drawings to comply with Applicable Laws. Engineer shall, upon completion of the Work, deliver to Owner a complete set of appropriately stamped or sealed drawings as required under the applicable rules and regulations related to the practice of professional engineering. Engineer shall grant Owner the non-exclusive right to use said drawings as Owner deems appropriate without any further requirements, restrictions or actions on the part of Owner. 3. INTERFACE AND SITE CONDITIONS 3.1 SITE CONDITIONS: Unless indicated otherwise in this Agreement, Engineer shall visit all Work sites and become familiar with the conditions of the site as it applies to performance of the Work. If conditions are encountered at the site that (1) were not readily observable by visual inspection of the site, or (2) are unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in archaeological engineering activities of the character provided for in this Agreement, then notice by the observing Party shall be given to the other Party promptly before such conditions are further disturbed and in no event later than five (5) days after first observance of the conditions. If any such condition causes any increase or decrease in Engineer's cost of, or time required for, performance of any part of the Work, or any increase or decrease in any other obligation of Engineer, Owner shall, within fifteen (15) days of issuance or receipt of notice, as the case may be, under this Section 3.1, issue a change order in accordance with Section 5 below. 3.2 COOPERATION WITH OTHERS: Engineer will cooperate with Owner's other contractors, if any, to facilitate coordination of the Work with the work of others, but any changes to the Work or the Schedule required to do so shall be treated as a change under Section 5 below. 4. SCHEDULE 4.1 SCHEDULE: Engineer shall use its best reasonable efforts to perform the Work in accordance with the Schedule. In case of any delay other than a delay caused by Engineer, its employees, subcontractors or vendors, for reasons other than force majeure (which shall be treated in accordance with Section 13 below), the Schedule for completion of the Work, or any part of it, shall be automatically extended by a number of Days equal to the number of day of such delay. 5. CHANGES PROFESSIONAL SERVICES AGREEMENT Page 5 of 16 5.1 ISSUANCE OF CHANGE ORDERS BY OWNER: Owner may, by its written order, require changes in the Work within the general scope of this Agreement and any individual Project Scope of Work consisting of additions, deletions or other revisions that do not result in any material change in the Work. 5.2 NOTICE OF IMPACT OF CHANGE ORDER: If Engineer receives instructions from Owner, which in Engineer's opinion constitute a change in the Work, Engineer shall so advise Owner within five (5) Days of receipt of such instruction. If Engineer receives a change order under Section 5.1 above, then Engineer shall, within ten (10) Days thereafter submit to Owner a statement of the impact of such change on Contract Sum, Schedule, or any other provisions of the Agreement affected thereby. Engineer shall not delay prosecution of the Work not affected by the change. Any adjustment to the Contract Sum or Schedule, if any, as a result of such a change order shall be made by mutual agreement of the Parties. 6. PAYMENT 6.1 CONTRACT SUM: Owner shall pay Engineer for the full and satisfactory completion of the Work a lump sum (the "Contract Sum") for each Project Scope of Work, or such other sum as may be determined in writing by the Parties and as may be modified in accordance with Section 5 above. The Contract Sum does not include any sales or other tax. 6.2 PAYMENT TERMS: Owner shall make payments to Engineer upon submittal of approved invoices with payment terms stated as Net 30. 6.3 FINAL PAYMENT: Engineer shall invoice Owner for the final amount due to it under this Agreement upon reaching Final Completion of a Project Scope of Work. Payment of all of the Contract Sum remaining unpaid, and any and all other amounts owing to Engineer under this Agreement shall be made within thirty (30) days after Final Completion. 6.4 SUBCONTRACTOR PAYMENTS AND INTEREST: Engineer is obligated to take one (1) of the following two (2) actions within seven (7) days after receipt of amounts paid to Engineer by Owner for work performed by any subcontractor under this Agreement: (a) pay the subcontractor for the proportionate share of the total payment received from the Owner attributable to the work performed by the subcontractor under this Agreement, or (b) notify the Owner and the subcontractor in writing of Engineer's intention to withhold all or a part of the payment with the reason for such nonpayment. Engineer is obligated to pay interest to the subcontractor on all amounts owed by Engineer that remain unpaid after seven (7) Days following receipt by Engineer of payment from the Owner for work performed by the subcontractor under this Agreement, except for amounts withheld as otherwise allowed. Engineer shall include language in its subcontracts and require such language to be included in contracts with lower-tier subcontractors that provides: "Unless otherwise provided under the terms of this Agreement, interest shall accrue at the rate of one percent (1%) per month". Individual contractors are required by law to provide their Social Security numbers to the Owner; proprietorships, partnerships and corporations are required to provide the Owner with their Federal Employer Identification Number. PROFESSIONAL SERVICES AGREEMENT Page 6 of 16 6.5 NON-APPROPRIATION: All funds for payments after June 30`h of the current fiscal year are subject to the availability of Owner's appropriation for this purpose. In the event funding for payment pursuant to this Agreement is not appropriated by Owner, for any reason, or is subject to the availability of federal or state funding and such federal or state funding is not made available, this Agreement may be terminated by the Owner pursuant to Section 7.1 below. 7. RIGHTS OF OWNER AND ENGINEER TO TERMINATE 7.1 OWNER'S RIGHT TO TERMINATE FOR CAUSE: Owner may terminate this Agreement if: (a) a petition in bankruptcy is filed by Engineer, and such filing materially impacts Engineer's ability to perform its obligations under this Agreement, or such a petitioner is filed against Engineer and it is not dismissed within thirty (30) days; (b) Engineer commits a material breach of a material obligation under this Agreement, or fails to make reasonable progress toward completion of the Work, and fails to cure such breach or failure within the longer of thirty (30) days of its receipt of written notice of such breach or such longer time as is reasonably required to cure such breach; or (c) as a result of events described in Section 6.5 above. Upon termination due to (a) or (b), Owner may take possession of the Work completed by Engineer, take assignment of all purchase orders and subcontracts related to the Work and complete the Work by whatever reasonable method Owner may deem expedient. In the event of termination for any of the reasons set forth in this Section 7.1, Engineer will be liable to Owner for any reasonable costs incurred by Owner to complete the Work in excess of the Contract Sum remaining unpaid to Engineer. In case of such termination, no further payments will be made to Engineer after termination until the Work is completed and upon completion of the Work, Owner shall pay Engineer the balance due under this Agreement, less the amounts required to be paid by Owner to third parties to complete the Work, and if the unpaid balance of the Contract Sum is less than the cost of finishing the Work, Engineer shall then pay such excess amount. 7.2 ENGINEER'S RIGHT TO TERMINATE: Engineer may terminate the Agreement on seven (7) Days written notice if the Work is stopped, without fault on the part of Engineer or any of its vendors or subcontractors, for more than fifteen (15) Days, for any of the following reasons: (a) issuance of any order of a court or other public authority having jurisdiction; (b) Owner has not made payment within five (5) Days of the date due; or (c) Owner commits any other material breach of a material obligation under this Agreement, and fails to cure such breach within the longer of thirty (30) Days of its receipt of written notice of such breach or such longer time as is reasonably required to cure such breach. Upon such termination Owner shall pay Engineer all amounts then due to it under this Agreement as of the date of termination. 8. PROJECT EXECUTION 8.1 ENGINEER'S REPRESENTATIVE: Engineer will keep Engineer's Project Manager assigned to the Work at all times during its progress. Engineer's Project Manager shall represent Engineer, and written communications given to Engineer's Project Manager by Owner shall be as binding as if given to Engineer itself. All communications to Engineer's Project Manager by Owner shall be confirmed in writing upon request by Engineer. Engineer's Project Manager shall devote all of his/her time as necessary to the Project as may be appropriate to and consistent PROFESSIONAL SERVICES AGREEMENT Page 7 of 16 with the full and timely performance of this Agreement by Engineer. Engineer agrees that this individual shall not be relieved from their responsibilities on this Project without the written consent of the Owner, except in the event of their disability, death or departure from the employ of Engineer from the Commencement Date to Final Completion of the Project to the Owner's satisfaction, including completion of all punch list activities. Owner shall retain the right to approve any consultants hired by Engineer for this Project which approval shall not be unreasonably withheld, provided however, if the Owner does not provide such reasonable approval and Engineer is required to substitute an Engineer, then Engineer's compensation shall be adjusted to reflect any differences in Engineer's costs occasioned by such substitution. 8.2 OWNER REPRESENTATIVE: Owner will have at all times during the progress of the Work a competent representative assigned to the Work. Owner's Representative shall represent Owner, and written communications given to Owner's Representative shall be as binding as if given to Owner itself. Owner shall have its Owner's Representative available during normal business hours at all times during the progress of the Work. 9. WARRANTY 9.1 SERVICES: Engineer warrants, for a period ending two (2) years after Final Completion, or the last date on which Engineer performed work under this Agreement if this Agreement is terminated for any reason prior to Final Completion, that the services provided by it hereunder will be provided with reasonable skill and care of the type normally exercised by other Engineering professionals under similar circumstances. 9.2 NOTICE OF WARRANTY CLAIM: Owner shall notify Engineer of any defect covered by the warranty set forth in Section 9.1 above within thirty (30) Days after discovering such defect. 10. INSURANCE: Engineer shall carry the insurance coverage described in Exhibit B as insurance to be carried by it. 11. INDEMNITY: Engineer shall indemnify and hold harmless Owner and its agents and employees from and against all claims made by a third party for any, damages, losses and expenses, including, but not limited to attorney's fees, arising out of or resulting from Engineer's performance of the Work,provided that any such damage, loss or expense: (1) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property and (2) is caused in whole or in part by any negligent act or omission of Engineer, its subcontractors, or anyone for whose acts Engineer is liable. In the event that any such damage, loss or expense was caused in part by Owner or by any other person or entity, however, then Engineer shall be obligated to pay only the portion of the damage, loss or expense, including reasonable attorney's fees, as is attributable to its relative share of the negligence or omission which caused such damage, loss or expense. 12. DISPUTE RESOLUTION: Contractual claims shall be processed in accordance with the procedure in Section 2.2-4363 of the Code of Virginia (1950), as amended. Engineer shall submit its claim, whether for money or other relief, in writing to the Owner no later than sixty PROFESSIONAL SERVICES AGREEMENT Page 8 of 16 (60) Days after final payment. The Owner will meet at the next regularly scheduled Board meeting, after due notice, to discuss the claim. The Owner shall issue its final decision on the claim in writing ninety (90)Days after the Board meeting. 13. FORCE MAJEURE: No delay in, or failure of, performance by either Party under this Agreement will constitute default hereunder or give rise to any claim for damages if and to the extent caused by an occurrence beyond the control of the Party affected, to include but not limited to, acts of governmental authority, acts of God, strikes or other concerted acts of workmen, fire, flood, explosions, riots, war, rebellion or sabotage. 14. GENERAL PROVISIONS 14.1 EQUAL EMPLOYMENT: During the performance of this Agreement, for itself, its assigns and successors in interest, Engineer agrees as follows: 14.1.1 NONDISCRIMINATION: Engineer will not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, except where religion, sex, or natural origin is a bona fide occupational qualification, reasonably necessary to the normal operation of Engineer. Engineer agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause. 14.1.2 SOLICITATIONS: Engineer, in all solicitations or advertisements for employees placed by or on behalf of Engineer, will state that Engineer is an equal opportunity employer. 14.1.3 NOTICES AND ADVERTISEMENTS: Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this Section 14.1. 14.1.4 CIVIL RIGHTS: Engineer agrees to conduct all services in compliance with all of the requirements imposed by or pursuant to Title VI of the Civil Rights Act of 1964, Part 21 of the Regulations of the Secretary of Transportation and Executive Order No. 11246 "Equal Employment Opportunity: as supplemented in Department of Labor Regulations (41 CFR, Part 60)". 14.2 DRUG-FREE WORKPLACE: During the performance of this Agreement, Engineer agrees to (i) provide a drug-free workplace for Engineer's employees; (ii) post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Engineer's workplace and specifying the actions that will be taken against employees for violations of such prohibition; (iii) state in all solicitations or advertisements for employees placed by or on behalf of Engineer that Engineer maintains a drug- free workplace; and (iv) include the provisions of the foregoing clauses in every subcontract or purchase order of over Ten Thousand Dollars ($10,000), so that the provisions will be binding upon each subcontractor or vendor. For the purposes of this Section 14.2, "drug-free workplace" PROFESSIONAL SERVICES AGREEMENT Page 9 of 16 means a site for the performance of work done in connection with a specific contract awarded to Engineer, the employees of whom are prohibited from engaging in the manufacture, sale, distribution, dispensation, possession or use of any controlled substance or marijuana during the performance of the contract. 14.3 ASSIGNMENT: Neither Engineer nor Owner shall assign or transfer its duties or obligations hereunder without the prior written consent of the other. This Agreement shall be binding upon and shall inure to the benefit of the Parties and the successors and permitted assigns of Owner and Engineer. 14.4 ENTIRE AGREEMENT; WAIVER; AMENDMENT: These General Conditions and the attached Exhibits constitute the full and complete contract between the Parties hereto with respect to the subject matter hereof. There are no statements, agreements, understandings, representations or trade customs of any kind, express or implied, concerning the subject matter which are not merged herein or superseded hereby. A waiver of any of the terms of this Agreement shall not bind either Party unless signed by one of its duly authorized representatives. Waiver by either Party of any default by the other Party hereunder shall not be deemed a waiver by such Party of any default by the other which may occur thereafter. This Agreement may only be modified or amended by an agreement in writing executed by both Parties hereto. 14.5 GOVERNING LAW: The Parties agree that this Agreement shall be deemed to have been made in Virginia and the validity and construction of this Agreement shall be governed by the laws of the Commonwealth of Virginia. The Parties further agree that any legal action or proceeding arising out of this Agreement shall be commenced and tried in the Circuit Court of Isle of Wight County to the express exclusion of any otherwise permissible forum. 14.6 NOTICES: All notices provided for herein will be considered properly given if in writing and delivered personally or, by fax or sent properly addressed, postage pre-paid: If to Engineer, to: Resource International, Ltd. 9560 Kings Charter Drive P. O. Box 6160 Ashland, Virginia 23005 Attn: M. Scott Courtney, P.E. If to Owner, to: Isle of Wight County Department of Budget & Finance Attn: Michael Terry, Director Isle of Wight County P.O. Box 80 Isle of Wight, Virginia 23397 With a copy to: Mark, Popovich, County Attorney Isle of Wight County P.O. Box 80 Isle of Wight, Virginia 23397 PROFESSIONAL SERVICES AGREEMENT Page 10 of 16 Notices shall be deemed effective upon actual receipt, or in the case of posting in the U.S. mail, on the fourth Day after mailing. 14.7 SURVIVAL: Section 9.1 shall survive termination of this Agreement WITNESS WHEREOF, the Parties hereto have executed this Agreement on the day of , 2014. OWNER: ENGINEER: ISLE OF WIGHT COUNTY,VIRGINIA RESOURCE INTERNATIONAL,LTD. By: aw B y: Byron B. Bailey, Chairrr Authorized Representative,/ Board of Supervisors TTE T: AT ES iFQR ENGIN R: , B • By: Carey NVIls Storm, Clerk Board of Supervisors APPROVED AS TO FO Mark Pop6vich, Isle of Wight County Attorney PROFESSIONAL SERVICES AGREEMENT Page 1 1 of 16 EXHIBIT A SCHEDULE OF BILLING RATES RESOURCE INTERNATIONAL,LTD. HOURLY BILLING RATES (EFFECTIVE CONTRACT DATE) DISCIPLINE HOURLY RATE( ) LABOR COSTS The above hourly rates represent all direct salary costs, overhead and profit. These rates are subject o periodic adjustment at renewal time for merit and cost of living increases. The time charged for services performed will be the actual number of hours worked. PROFESSIONAL SERVICES AGREEMENT Page 12 of 16 EXHIBIT B ISLE OF WIGHT COUNTY INSURANCE REQUIREMENTS The Contractor shall comply with the insurance requirements set forth in the Contract, including the items set forth below: A. Neither the Contractor nor any subcontractor shall commence work under this Contract until the Contractor has obtained and provided proof of the required insurance coverages to the County, and such proof has been approved by the County. The Contractor confirms to the County that all subcontractors have provided Contractor with proof of such insurance, or will do so prior to commencing any work under this Contract. B. Contractor, including all subcontractors, shall, at its and/or their sole expense, obtain and maintain during the life of this Contract the insurance policies and/or coverages required by this section. The County and its officers, employees, agents, assigns, and volunteers shall be added as an additional insured to the general liability and automobile coverages of any such policies and such insurance coverages shall be primary and noncontributory to any insurance and/or self insurance such additional insureds may have. The Contractor shall immediately notify in writing the County of any changes, modifications, and/or termination of any insurance coverages and/or policies required by this Contract. The Contractor shall provide to the County with the signed Contract an Acord certificate of insurance which states in the description of operations section one of the two paragraphs below: (1) The County and its officers, employees, agents, assigns, and volunteers are additional insureds as coverage under this policy includes ISO endorsement CG 20 33 which provides that the insured status of such entities is automatic if required by a contract or a written agreement. If additional insured status is automatic under a different coverage form, Contractor must attach a copy of the coverage form to its certificate. Any required insurance policies shall be effective prior to the beginning of any work or other performance by Contractor and any subcontractors under this Contract. OR (2) ISO endorsement CG 20 10 will be issued, prior to the beginning of any work or other performance by Contractor under this Contract, to the County and its officers, employees, agents, assigns, and volunteers naming them as an additional insured under the general liability coverage. A copy of the binder confirming the issuance must be attached to the certificate. Any required insurance policies shall be effective prior to the beginning of any work or other performance by Contractor and any subcontractors under this Contract. PROFESSIONAL SERVICES AGREEMENT Page 13 of 16 However, if B (1) or (2) cannot be provided, the County's Attorney, in such Attorney's sole discretion, may approve such other certificate of insurance or insurance document(s) that the Attorney deems acceptable. C. The minimum insurance policies and/or coverages that shall be provided by the Contractor, including its subcontractors, include the following: (1) Commercial General Liability: $1,000,000.00 $1,000,000.00 General Aggregate Limit (other than Products/Completed Operations). $1,000,000.00 Products/Completed Operations Aggregate Limit. $1,000,000.00 Personal Injury Liability (including liability for slander, libel, and defamation of character). $1,000,000.00 each occurrence limit (2) Automobile Liability: $1,000,000.00 combined single limit with applicable endorsement to cover waste cargo. (3) Workers' Compensation wid Employer's Liability: Workers' Compensation: statutory coverage for Virginia Employer's Liability: $100,000.00 Bodily Injury by Accident each occurrence $500,000.00 Bodily Injury by Disease Policy Limit. $100,000.00 Bodily Injury by Disease each employee. (4) The required limits of insurance for this Contract may be achieved by combining underlying primary coverage with an umbrella liability coverage to apply in excess of the general and automobile liability policies, provided that such umbrella liability policy follows the form of the underlying primary coverage. (5) Such insurance policies and/or coverages shall provide for coverage against any and all claims and demands made by a person or persons or any other entity for property damages or bodily or personal injury (including death) incurred in connection with the services, work, items, and/or other matters to be provided under this Contract with respect to the commercial general liability coverages and the automobile liability coverages. With respect to the workers' compensation PROFESSIONAL SERVICES AGREEMENT Page 14 of 16 coverage, Contractor's and its subcontractors' insurance company shall waive rights of subrogation against the County and its officers, employees, agents, assigns, and volunteers. (6) Contractor shall provide such other insurance policies and/or coverages that may be required by other parts of this Contract. D. Proof of Insurance Coverage: (1) Contractor shall furnish the County with the above required certificates of insurance showing the type, amount, effective dates, and date of expiration of the policies. (2) Where waiver of subrogation is required with respect to any policy of insurance required under this Section, such waiver shall be specified on the certificate of insurance. E. Insurance coverage shall be in a form and with an insurance company approved by the County, which approval shall not be unreasonably withheld. Any insurance company providing coverage under this Contract shall be authorized to do business in the Commonwealth of Virginia. F. The Contractor's insurance policies and/or coverages shall not contain any exclusions for the Contractor's subcontractors. G. The continued maintenance of the insurance policies and coverages required by the Contract is a continuing obligation, and the lapse and/or termination of any such policies or coverages without approved replacement policies and/or coverages being obtained shall be grounds for termination of the Contractor for default. H. Nothing contained in the insurance requirements is to be construed as limiting the liability of the Contractor, and/or its subcontractors, or their insurance carriers. The County does not in any way represent that the coverages or the limits of insurance specified are sufficient or adequate to protect the Contractor's interest or liabilities, but are merely minimums. The obligation of the Contractor, and its subcontractors, to purchase insurance shall not in any way limit the obligations of the Contractor in the event that the County or any of those named above should suffer any injury or loss in excess of the amount actually recoverable through insurance. Furthermore, there is no requirement or obligation for the County to seek any recovery against the Contractor's insurance company before seeking recovery directly from the Contractor. END PROFESSIONAL SERVICES AGREEMENT Page 15 of 16 PROFESSIONAL SERVICES AGREEMENT Page 16 of 16 RESOURCE r INTERNATIONAL, LTD. ENGINEERS*SCIENTISTS*SURVEYORS-PLANNERS P.O.BOX 6160.9560 KINGS CHARTER DRIVE•ASHLAND,VA 23005 (804)550-9200•FAX(804)550-9259 www.resaurceinti.com FEE SCHEDULE Effective Date October 1,2013 PERSONNEL HOURLY RATES Administrative Personnel Land Planning Personnel Principal $180 Development Manager $135 Program Manager,Project Director $120 Senior Manager $120 Financial Analyst II $65 Project Manager $100 Technical Writer/Editor $75 Municipal Planner $90 Executive Administrator $60 Project Planner $80 Admin Assistant I $57 Staff Planner $70 Admin Assistant II $45 Planning Designer I $70 Planning Designer II $65 Engineering/Land Development Personnel Planning Assistant $60 Principal Engineer $155 Senior Manager $120 Surveying Personnel Senior Project Manager $115 GPS Survey Crew $175 Senior Engineer $110 2-man Survey Crew $135 Project Manager/Landscape Architect $100 Principal Surveyor $110 Project Engineer 1 $95 Senior Surveyor $95 Project Engineer III $85 Survey Technician I $75 Staff Engineer $79 Survey Technician II $70 Designer $79 Field Surveyor $67.50 Engineering Designer 1 $72 Engineering Designer II $68 Resident Project Representative I $75 Expenses(Direct Costs) Resident Project Representative II $65 Copies(up to 11 x 17) $0.25 ea Resident Project Representative III $55 Color Copies(8.5"x11") $1.05 ea Color Copies(8.5"x14") $1.35 ea Environmental Personnel Color Copies(11"x17") $2.10 ea Principal Scientist,Principal Geologist $135 Vellum(any size) $6.25 ea Senior Manager $120 Mylar(any size) $13.00 ea Senior Project Manager $115 Fax-Local/Incoming $0.45 page Senior Scientist, Senior Geologist $115 Fax-Long Distance $0.55 page Environmental Services Project Manager $115 Car Mileage $0.70 mile Project Manager $100 Truck Mileage $0.80 mile Project Scientist I $100 Project Scientist II $85 Large Format Copies/Prints Project Scientist III $80 24 x 36 Black&White $1.50 ea Staff Scientist $75 24 x 36 Color $14.00 ea Project Geologist I $100 24 x 36 Color Photo $20.00 ea Project Geologist II $85 30 x 42 Black&White $1.95 ea Project Geologist III $80 30 x 42 Color $18.50 ea Staff Geologist $75 30 x 42 Color Photo $30.00 ea Environmental Technician $68 36 x 48 Black&White $2.75 ea 36 x 48 Color $27.00 ea 36 x 48 Color Photo $40.00 ea *Subject to Change Without Notice Fee 2013 Client#:405980 35RESOUINT F DATE(MMIDD YYY) '"' CERTIFICATE LIABILITY I /Y8/06/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(les)must be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAME, Sandy Krevonick BB&T Insurance Services,Inc. p "E 804 678-5025 8887513010 No Exl: A/C No 2108 W.Laburnum Ave Suite 300 ADD ss: skrevonick @bbandt.com PO Box 17370 INSURER(S)AFFORDING COVERAGE NAIL X Richmond,VA 23227 INSURERA:Hartford Fire Insurance Company 19682 INSURED INSURER B:Hartford Casualty Insurance Corn 29424 Resource International Ltd. Property&Casual Ins Co of H 34690 PO Box 6160 INSURER c: p rtY Casualty INSURER D:XL Specialty Insurance Company 37885 Ashland,VA 23005 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. TR TYPE OF INSURANCE INSRL WVD POLICY NUMBER MOMIDDY EFF MMroCY EX LIMITS A GENERAL LIABILITY 14UUNUD3344 8/10/2013 08110®0/201 EACH OCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIABILITY PIN&IT ER,E occu enca $300,000 CLAIMS-MADE ®OCCUR MED EXP(Any one person $10,000 PERSONAL&ADV INJURY $1,000,000 GENERAL AGGREGATE 52,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $2,000,000 POLICY PRO- X LOC $ A AUTOMOBILE LIABILITY 14UENUD3717 8/10/2013 08/10/2014 EaaBBINEDSINGLE LIMIT 1,000,000 IX ANY AUTO BODILY INJURY(Per person) $ ALLOWNED SCHEDULED BODILY INJURY(Peraccldent) $ AUTOS AUTOS HIRED AU70S X NON-OWNED PROPERTY DAMAGE $ AUTOS (par.ccident $ B X UMBRELLA LIAR IV_I OCCUR 14XHUUD0799 8/10/2013 08/10/2014 EACH OCCURRENCE s5,000,000 EXCESS UAB CLAIMS-MADE AGGREGATE s5,000,000 DED I X RETENTION$10,000 $ C WORKERS COMPENSATION 14WBIW3421 4/10/2013 04110/201 X TO Y LIMIT OTH- AND EMPLOYERS'LIABILITY ANY PROPRIETORIPARTNERIEXECUTIVE YIN E.L.EACH ACCIDENT $500 OOO OFFICER/MEMBER EXCLUDED? ® N/A (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $500000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $500,000 D Professional DPR9701459 5/04/2013 05/04/201 $2,000,000 Per Claim Liability $2,000,000 Aggregate $50,000 Deductible DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,If more space Is required) Umbrella Liability does not extend over Professional Liability Isle of Wight County is Included as Additional Insured with respect to General Liability Coverage. CERTIFICATE HOLDER CANCELLATION Isle of Wight County THEUEXPIRA IONHDATEOVTHEREO, NOTICEIEWILLCBECDELIVERED IN Office of Budget&Finance ACCORDANCE WITH THE POLICY PROVISIONS. P O Box 80 Isle Of Wight,VA 23397 AUTHORIZED REPRESENTATIVE 0 1988-2010 ACORD CORPORATION.All rights reserved. ACORD 25(2010/05) 1 of 1 The ACORD name and logo are registered marks of ACORD #S10894640/M10887263 DLB This page has been left blank intentionally.