March 20, 2014 - Resolution of the Board of Supervisors of The Isle of Wight County, Virginia Establishing a Policy for the Pedestrian and Bicycle Facilities Master Plan RESOLUTION OF THE BOARD OF SUPERVISORS OF ISLE OF
WIGHT COUNTY, VIRGINIA ESTABLISHING A POLICY FOR
THE DEVELOPMENT OF THE FACILITIES IDENTIFIED IN
THE PEDESTRIAN AND BICYCLE FACILITIES MASTER
PLAN
WHEREAS, the Isle of Wight County Board of Supervisors has adopted a
countywide Pedestrian and Bicycle Facilities Master Plan which identifies the
location and type of bike and pedestrian facilities to be constructed; and
WHEREAS, the Board understands that providing for the construction of
these facilities by both the County and Development community, where applicable,
enhances the quality of life of the citizens of Isle of Wight County; and
WHEREAS, the Board recognizes the importance of developing policy
intended to promote the overall Bike and Pedestrian vision of the County, thereby
encouraging a non-motorized transportation network for the community and
supporting public health and safety consistent with the goals and objectives of the
Isle of Wight County Comprehensive Plan; and
WHEREAS, the Board recognizes the importance of the policy while being
fiscally responsible to the citizens of Isle of Wight County; and
WHEREAS, the Board recognizes the role of the development community
in the implementation of the Pedestrian and Bicycle Facilities Master Plan in
conjunction with all types of development as an important means of completing the
construction of these facilities in a reasonable timeframe and at reasonable cost to
all parties, while being flexible to each development situation;
NOW, THEREFORE, BE IT RESOLVED THAT in an effort to promote
the health, public safety, and mobility of the County and remain focused on the
implementation of the Pedestrian and Bicycle Facilities Master Plan, the Board of
Supervisors of Isle of Wight County hereby adopts a policy for development of the
facilities identified in the Pedestrian and Bicycle Facilities Master Plan, as follows:
I. Purpose:
This policy is intended to establish an implementation strategy that clearly
outlines the requirements for creating a quality non-motorized transportation
network as a priority of future development in Isle of Wight County in
accordance with the goals and objectives of the Isle of Wight County
Comprehensive Plan as follows:
• Ensure that new developments (both commercial and residential) are
safer for walking and bicycling, and that the non-motorized
transportation and recreation facilities identified in the plan are
constructed during development projects.
• County staff should require future developers to construct the public
greenway, pedestrian, and bicycle facilities that are indentified in the
plan as part of their developments.
• The County should act to codify specific requirements for pedestrian
and bicycle accommodations in the Zoning Ordinance to include,
sidewalks on both sides of roadways.
• As an advisory board to the Board of Supervisors, the Planning
Commission's responsibilities include providing recommendations to
the Board of Supervisors in achieving the County's vision for the
location of pedestrian and bicycle facilities.
The Board of Supervisors of Isle of Wight County, through the creation and
appointment of a Bike and Pedestrian Committee (BPC), the adoption of the
Pedestrian and Bicycle Facilities Master Plan as a supplement to the
Comprehensive Plan in 2006 amended 2009, and approval of a Design
Specifications Manual in 2009, has set forth a mechanism for citizen
involvement in the process of establishing priorities for facilities location and
construction specifications to be followed in the creation, enhancement and
protection of bike and pedestrian facilities and greenway corridors
throughout the County.
This policy will serve to carryout and further define all aspects of
implementation and funding for the creation of a countywide non-motorized
transportation network in Isle of Wight County.
II. Applicability:
The following project types shall be reviewed for compliance with the
facilities identified in the Bicycle and Pedestrian Facilities Master Plan.
A. Any new development project which requires any of the following
actions for approval:
i. Conditional Use Permit (CUP)
ii. Special Use Permit (SUP)
iii. Rezoning
iv. Preliminary Site Plan
B. Any existing development project which requires any of the
following actions for approval:
i. Conditional Use Permit (CUP)
ii. Special Use Permit (SUP)
iii. Rezoning
iv. Preliminary Site Plan
C. Any Subdivision of 5 or more lots, will construct bicycle and
pedestrian facilities as required by the Isle of Wight County
Subdivision and Zoning Ordinances, regardless of this policy.
III. Requirements:
A. All applicants shall dedicate and record an easement as needed for
the implementation of the specifically designated facilities for the site
in question, prior to the issuance of a Zoning Permit for the project.
B. The applicant will construct the bicycle and pedestrian facilities
identified for the site in accordance with the requirements of the
Zoning Ordinance.
i. If the applicant does not wish to construct the pedestrian
facilities, as required by the Zoning Ordinance, they shall pay
into the Pedestrian and Bicycle Facilities Fund (PBFF) the
amount of one hundred and twenty percent (120%) of the
engineering estimate, as approved by the County, for
construction of the designated facilities on their site by the
County. This payment shall be made prior to the issuance of a
Zoning Permit for the project; or,
ii. The applicant shall pay into the PBFF the amount of eighty
percent (80%) of the engineering estimate, based on on-site
construction of the facility, as approved by the County, which
will then be used to fund off-site construction of bike and
pedestrian facilities as identified in the Pedestrian and Bicycle
Facilities Master Plan. This payment shall be made prior to the
issuance of a Zoning Permit for the project. The allocation of
said funds and the location of the facility to be constructed shall
be determined at the discretion of the County.
C. In the event that development activity is scheduled to occur on a
property where the pedestrian and bicycle facilities have already been
constructed (in accordance with this policy), the applicant shall
contribute their pro rata share of the real cost of the project to the
PBFF.
IV. Pedestrian and Bicycle Facilities Fund (PBFF)
A. The Pedestrian and Bicycle Facilities Fund (PBFF) shall be a Capital
Project Fund to hold funds tied to bike and pedestrian facilities
construction capital projects as identified in the Capital Improvement
Plan (CIP).
B. Funds from the PBFF shall be allocated every year through the
normal CIP process as follows:
i. For funds contributed through Section 3(B)(i) of this policy the
facility in question will be built during the next budget cycle.
ii. For funds contributed through Section 3(B)(ii) of this policy the
construction of facilities will be triggered by funds adequate for
the construction of five hundred (500) feet of new facilities or a
distance (shorter or longer) which allows for the facility to come
to a reasonable terminus (such as a property line), as identified by
the Pedestrian and Bicycle Facilities Master Plan. Those facilities
include but are not limited to sidewalks, multi use paths,
designated bike lanes, and widened shoulders. With the exception
of B(i) above.
C. If the PBFF does not contain sufficient funds to implement the
designated amount of facilities those funds shall be retained and
rolled over into the next budget cycle, repeating if necessary, until
such time as sufficient funds are available.
D. The allocation of PBFF funds shall be considered on an annual basis.
A regular report of the fund shall be generated by the Isle of Wight
County Budget and Finance Department. This report will be
distributed for consideration by the Bike and Pedestrian Committee,
with projects being identified in the Isle of Wight County Parks and
Recreation Department budget, and project management
administered by Isle of Wight County General Services Department.
All projects shall be prioritized according to the following hierarchy:
i. Funds shall be allocated to projects immediately adjacent to
existing facilities over projects which do not connect to an
existing facility.
ii. Funds shall be allocated to projects inside a Development
Service District (DSD) prior to projects outside a DSD.
iii. Funds shall be allocated to projects according to the project
prioritization completed by the Bike and Pedestrian Committee
(see attached).
iv. This fund can be used to leverage additional construction funds
as long as the proposed project falls on the Pedestrian and
Bicycle Facilities Master Plan, and the proposed project has
been approved by the Bike and Pedestrian Committee.
v. Perpetual maintenance of the Pedestrian and Bicycle Facilities
constructed through normal development activity and the
requirements of this policy should be considered in future
budget cycles.
V. Construction Standards
A. Sidewalks — Sidewalks shall be constructed within residential
subdivisions as required by the Isle of Wight County Subdivision
Ordinance, they shall be located within the public right of way, and
constructed in accordance with VDOT standards.
B. Multi-Use Paths — Multi-Use Paths shall be constructed as required by
the Bicycle and Pedestrian Facilities Master Plan, they shall be
located within an easement dedicated to the County as required by this
policy, and constructed in accordance with the Isle of Wight County
Bike and Pedestrian Facility Design Specifications Manual.
Adopted this 20th day of March, 2014 by the Isle of Wight County Board of
Supervisors.
if -
Signed by:
Byron B. Bailey, Chairman
Attest:
Contl
Carey M s Storm, Clerk
Approved. to,Form:
—
i
Mark C. Pop ich, County Attorney