June 9, 2016 - To Approve Priorities for VDOT's Secondary 6 Year Improvement Program for FY2017- Through FY2022A RESOLUTION OF THE BOARD OF SUPERVISORS OF ISLE OF WIGHT
COUNTY TO APPROVE PRIORITIES FOR THE VIRGINIA DEPARTMENT
OF TRANSPORTATION'S SECONDARY SIX-YEAR IMPROVEMENT
PROGRAM FOR FY 2017 THROUGH E'Y 2022
WHEREAS, Sections 33.1-23 and 33.1-23.4 of the Cade of Virginia (1950, as
amended) pro��ide the opportunity for each county to work with the Virginia Department
of Transportation (VDOT) in developing a Secondary Six-Year Improvement Program
(SSYIP); and,
WHEREAS, the Isle of Wight County Board has held a public hearing on the
proposed Plan (FY 2016-FY 2021), in accordance with VDOT policies and procedures, on
June 9, 2016 and all citizens of the County had the opportunity to make comments and
recommendations concerning the proposed Program; and,
WHEREAS, VDOT Local Program and Residency st�ff have revie���ed and
concurred with the proposed SSYIP (FY 2017-FY 2022).
NOW, THEREFORE, BE IT RESOLVED that the Board of Supervisors of the
Gounty of Isle of Wight, Virginia hereby approves the Secondary Six-Year Improvement
Program for FY �017-2022 as presented at the public hearing.
BE IT FURTHER RESOLVED that the County Administrator of Isle of Wight
County, Virginia is authorized to e�ecute all Program documents and make such
accounting adjustments and execute such agreetnents and contracts as necessary to proceed
with th� Program as approved.
Adopted this 9t" day of Ju�le 2016.
v f i . ,i,�
�� . Alphin, airman
C�rey Mi s-Storm, Clerk
Approved s to rm:
--__
ark C. Popov" , County Attorney
Secondary System
(sle of Wight County
Construction Program
Estimated Ailocations
Fund FY2017 FY2018 FY2019 FY2020 FY2021 FY2d22 Total
....�������������.�...�.__��_��__�������.�.�..��...������_—
CTB Formula - Unpaved State
5econdary Unpaved Roads
TeleFee
Residue Parcels
STP Conve�ted from iM
Federal STA - Bond Match
Formufa S7P
MG Fortnula
BR Formula
ather State Match
State Funds
Federal STP
Drstnc! Grant - Unpaved
553 32�
s0
sse as2
So
so
so
So
s0
So
So
so
so
ao
562, 878
so
S86 432
so
so
so
so
So
i0
so
so
sa
so
572,331
SO
586,432
so
so
so
ao
so
EO
so
so
so
SO
569 516
S�
S86 432
so
so
sa
so
ao
SO
so
so
so
SO
SO
SO
SB6,432
so
so
so
so
se
SO
sa
so
so
397,60b
Sp
SO
566,432
so
sa
so
so
so
SO
so
ao
so
597.6Q6
5258,049
SO
SStB,592
so
so
so
so
so
SO
so
so
so
S 185.212
.......�...�����������..�...��.�.....��..����������������..��.��..��.�..
T0181 5739,75E 5149.310 5158 763 5155,948 2184,038 5184 038 5971 853
Board Approval Date:
--��—��.�^�����.����—�����-
Gerald Kee
Residency Administrator(Aciing) Date
o (0 I 3 �O
-- -------------- ---
Sanforci Wa�e �'
Tyjt'Qv i nw County Admimstrator Date
�
Page 1 of 1
District: Hampton Roads
County: Isle of Wight Cou
Board Approval Date: (�
Route
PPMS ID
Accomplishment
Type of Funds
Type of Project
Prioritv t!
14994
RAAPCONTRACT
STP
MIN PLAN,FED-AID,SECONDARY
0001.00
Rt.0620
105469
RAAPCONTRACT
SECONOARY SYSTEM CONSTRUCTION PROGRAM (in dollars)
� � � 2017-18
Road Name Estimated Cost Previous Additional PROIKTED FISCAL YEAR ALLOCATIONS
Project p Funding Funding
Description Required
fROM SSVP 2016-17 20ll-18 2018-19 2019-20 2020-21 2021-22
D
Funding
Other
Funding
Ad Date Totol
PE $405,145
RW $237,618 $1,456,367 $0 $0 $0 $0
RTE 620 - RECONSTRUCTION CON $2,362,39;
0.031 MI. W. INT. ROUTE 681 Total $3,005,16(
0.061 MI. E. INT. ROUTE 637
1.4 12/13/2011
BroadwaterRoad PE $500,00C
0620046650 RW $500,00C
Rte 620 Reconstruction - Broadwater Road CON $3,686,68]
Southampton County line To[ol $4,686,68]
Ss9,�v� Ssz,�v� Ss2,�vl5sz,
Ssii,a�a�5a,vs,so��5se,�i�� Ssz,�v�5sz,�i��5sz,
Minimum Plan Strawberry Plains (Route 681)
0003.00 1.8 2/11/2022
Rt.9999 PE 50
31665 999904681 RW $0 S
STATE FORCES/HIRED EQUIPMENT RTE 9999 - BUDGET ITEM CON $162,914
S DRAINAGE & SIDEWALK AT WINDSOR Total $162,914 $
BUDGET ITEMS YEARLY PROJECT FOR ISLE OF WIGHT
9999.01 0.0 4/16/2010
Rt.0673 Morgart Beach Road PE $68,000
104806 0673046653 RW $0
NON VDOT Rural Rustic Projec[ - Resurface (Mogart Beach CON $512,430 $
Road)
S/REVSH Page � ota Blounts Corner Road (Route 674) Totol $580,430 $
(542,0
3alance to
Traffic Count
complete Scope of Work
FHWAq
Comments
nstruction w/o Added Capacity
Project complete, currently going through doseout
proreediings. Eligible surplus funds will be transferred
to UPC 105469 (Broadwater btw Strawberrv Ln and S.
Reconstruction w/o Added Capacity
14004
$3,713,680
Anticipated to received eligible surplus funds from
UPCs 14994 (Broadwater Road btw R[e 681 and Rte
637) and UPC 14991 (W. Blackwater Road btw Rte 642
Environmental Only
IS65,011) 16020
ing
No Plan Fort Boykin Trail (Route 705)
9999.01 1.1 7/1/2016
Rt.4002 pE
-2892 1204002 RW
COUNTVWIDE PIPE & ENTRANCE CON
VARIOUS LOCATIONS IN COUNTY Toml
9999.02
Rt.0646
104809
NON VDOT
S
Minimum Plan
9999.02
Rt.4003
99975
S
9999.03
Rt.4005
99976
5
9999.05
Rt4006
100245
5 Page 2 of 4
Rattlesnake Trail PE $62,i
0646046649 RW
Rural Rustic Paving Project (Rattlesnake Trail) CON $844,1
Town Drive (Route 637) Tatol $906,1
Ramsey Road (Route 622)
2.1 3/1/2015
PE
1204003 {7 W
COUNTYWIDERURALADDITIONS CON $250,(
VARIOUS LOCATIONS IN COUNTV Tatal $250,(
VARIOUS LOCATIONS IN COUNTY
3/1/2011
PE
1204005 RW
COUNTVWIDE ENGINEERING & SURVEY CON 5250,C
VARIOUS LOCATIONS IN COUNTY Total $250,f
VARIOUS LOCATIONS IN COUNTV
3/1/2011
PE
1204006 /7 W
COUNTYWIOE FERTILIZATION & SEEDING CON $250,C
VARIOUS LOCATIONS IN COUNTY Total $250,0
5448,150�55
$56,575� $
$97.
INSTALLATION CHARGE FOR PIPES AT PRIVATE
ENTRANCES AND OTHER MINOR DRAINAGE
IMPROVEMENTS.
rfacing
Reconstruction w/o Added Capacity
$0
$5,111 $184,88916004
RURAL ADDITIONS - SECTION 33.1-72.1. ROLLOVER OF
FUNDS CAN BE FOR FIVE YEARS.
Preliminary Engineering
$193,425 16015
MINOR SURVEV & PRELIMINARY ENGINEERING FOR
BUDGET ITEMS AND INCIDENTAL TYPE WORK.
Preliminary Engineering
16015
OUS LOCATIONS IN COUNTY
3/1/2011
PE $0
1204007 RW $0 $47
COUNTYWIDE TRAFFIC SERVICES CON $250,000
VARIOUS LOCATIONS IN COUNTY Total 5250,000 S47
VARIOUS LOCATIONS IN COUNTY
3/1/2011
PE $0
1204008 RW $0 $8,
COUNTYWIDE RIGHT OF WAY ENGR. CON $250,000
VARIOUS LOCATIONS IN COUNTY Total $250,000 S8,
VARIOUS LOCATIONS IN COUNTY
1/30/2011
Orbit Road PE $340,789
0637046573 RW $126,637 5128,
Rte 637 Over Nuby Run VA s[r. 6045 CON $1,068,203 $1,648,
0.016 MI. SOUTH OF NUBY RUN Total $1,535,629 $1,777,
0.017 MI. NORTH OF NUBY RUN
10/8/2013
Country Way PE $14,156
0671046629 RW SO $161,
ROUTE 671- RURAL RUSTIC SURFACE TREAT CON 5140,693
NON-HARDSURFACEROAD
Rte.704 Total $154,849 $161,
Dead End
�.5 9/5/2014
iwin Hill Lane PE $12,378
)667046630 RW $0 $109,
40UTE 667- RURAL RUSTIC SURFACE TREAT CON 586,140
VON-HARDSURFACEROAD
2te.665 Total 598.518 5109.'.
($
$3,715 53,715 $3,715 53,715
$0 $0 $0 $0
$3,715 $3,715 $3,715 $3,715
$
FERTILIZATION AND SEEDING TO IMPROVE SLOPE
STABILIZATION ON SECONDARY SYSTEM
TRAFFIC SERVICES INCLUDE SECONDARY SPEED
ZONES, SPEED STUDIES, OTHER NEW SECONDARY
SIGNS
0
Right of Way
16016
USE WHEN IMPARTICAL TO OPEN A PROJECT:
ATTORNEY FEES and ACQUISITION COST.
e Replacement w/o Added Capacity
1
iinQ funds for CN
rfacing
Resurfacing
($11,196) 16005
No Plan
9999.10
RL0675
103055
NON VDOT
5
No Plan
999910
Rt. 2003
103056
NON VDOT
5
No Plan
9999.10
Rt.0716
103057
NON VDOT
5
No Plan
9999.10
Rt.0644
103021
NON VDOT
STP
Minimum Plan
9999.99
Page 4 of 4
Dead End
0.3 9/5/2014
Holly Point Way PE $11,7;
0675046631 RW ;
ROUTE 675- RURAL RUSTIC SURFACE TREAT CON $168,T
NON-HARDSURFACEROAD
Rte.10 Total $180,54
Dead End
0.7 9/5/2014
Poplar Drive PE $20,0(
2003046632 /7W ;
ROUTE 2003- Rural Addition Surface Treat Non CON $130,35
Hardsurface RD
Rte. 2001 Woodmere Lane Totol $150,35
�Rte. 2002 South Shore Drive
0.4 9/5/2014
Yellow Rock Lane PE $12,07
0716046633 RW $
ROUTE 0716- Rural Addi[ion Surface Treat Non- CON $164,73
Hardsurface RD
Rte.665 SmithneckROad Total $176,81
Hideaway Lane
0.7 9/S/2014
Turner Drive PE $50,00
0644046628 RW $30,00
Turner Drive Intersection Improvements at CON 5270,00
Benns Church Blvd
Benns Church (Route 10/32) Total $350,00
Benns Church(Entersection)
6/30/2018
$150,353
$198,7
esu rfacing
6005
Resurfacing
16005
Management/Engineering
31024
MPO project