Loading...
Morgarts Beach Road Project c Kimley>>)Horn March 4, 2016 Jamie Oliver Project Manager, Engineering Division Isle of Wight County 13048 Poor House Road Isle of Wight County, VA 23397 RE: Mogarts Beach Road(East) Rural Rustic Road Project Scope and Fee Dear Ms Oliver, Kimley-Horn and Associates, Inc. ("Kimley-Horn" or "the Consultant") is pleased to submit this Agreement (the "Agreement") to Isle of Wight County ("the Client" or the County"), to provide engineering services for the design and construction of roadway improvements along Mogarts Beach Road (East). This work will be performed under the Professional Services On-Call agreement (dated April 23, 2014) between Isle of.Wight County and Kimley-Horn. Below is our understanding of the project and our anticipated scope of work. Project Understanding This project consists of the design of roadway improvements to Mogarts Beach Road (East), a local road within the County. Roadway improvements shall be in accordance with the Virginia Department of Transportation Rural Rustic Road Program, which provides a practical approach to paving low volume unpaved roads within the Commonwealth. The limits of proposed improvements extend from State Route 674 (Blounts Corner Road) to State Route 705 (Fort Boykin Trail). The project is approximately 1.05 miles long. Roadway improvements will consist of paving existing gravel roads with no planned widening or shoulder restoration and minimal drainage improvements to include minor grading and/or maintaining existing ditches. Improvements will not include adjustments to the horizontal or vertical alignment of the existing road and no additional Right-of-Way will be required. Through conversations with Isle of Wight County, Kimley-Horn understands that this project meets the eligibility requirements for the Rural Rustic Road Program and have been approved by VDOT and the County's Board of Supervisors. Scope of Services Kimley-Horn will provide professional services to develop a"No Plan"set of construction documents in accordance with Section A-7 "No Plan" Projects in the VDOT Road Design Manual and IIM-LD-245 Rural Rustic Road Projects. Documents will consist of minimal essential information and notes necessary to govern construction. kimley-horn:corn 4500 Main Street, Suite 500,Virginia Beach,VA 23462 757 213 8600 Kinky) Horn Page 2 Outlined below are the necessary tasks required to create construction documents for approval by VDOT: Task 1 - Field Visit and Data Collection Kimley-Horn will perform a site visit to observe existing conditions, roadway dimensions, drainage patterns and any potential conflicts. This site visit will include confirming conditions previously documented in the field and documenting any changed conditions. It is anticipated that the field work will occur within a single day. No topographic survey will be required for work on this project. Task 2 - "No Plan" First Submittal Kimley-Horn will prepare a set of"No Plan"construction documents with minimal essential information as described in the VDOT Road Design Manual. Kimley-Horn will coordinate with VDOT throughout the design and review process. Coordination efforts will consist of providing the environmental documents as outlined in Task 4, proposed pavement section coordination with the geotechnical engineer and VDOT Pavement Division, and bid phase and construction phase services. The "No Plans" package will consist of the following: • Title Sheet • Field Narrative • Project Location Map • Details • Typical Sections • Quantity Summary Tables • General Notes • Cost Estimate • Erosion and Sediment Control Plan • Specifications and Narrative A First Submittal will be made to the County for review and comment. Upon approval from the County, Kimley-Horn will provide a copy of the First Submittal to VDOT for review and comment. Kimley-Horn will provide both hard copies and an electronic version of the document to the County and VDOT for review. Kimley-Horn will attend up to one scoping meeting to discuss the projects with the County and VDOT representatives. Kimley-Horn will attend up to one review meeting with Isle of Wight County and VDOT representatives to discuss the First Submittal. Prior to finalizing the"No Plan" construction documents, Kimley-Horn shall coordinate a field meeting with VDOT, VDOT Maintenance Division, and Isle of Wight County to discuss the proposed design at each project location and coordinate efforts between the proposed design and maintenance plans on each roadway. kimley-horn.com 4500 Main Street, Suite 500,Virginia Beach, VA 23462 757 213 8600 pn Kim ey>>>Horn Page 3 Task 3 - "No Plan" Final Submittal Upon review and reconciliation of comments from the County and VDOT review of First Submittal, Kimley-Horn will proceed with the Final Submittal. This task will consist of incorporating appropriate review comments into the following package: • Title Sheets • Field Narrative • Project Location Map • Details • Typical Sections • Quantity Summary Tables • General Notes • Cost Estimate • Erosion and Sediment Control Plan • Specifications and Narrative A Final Submittal will be made to the County and VDOT for review and approval. Kimley-Horn will provide two (2) sets of documents each to the County and VDOT for review. Both hard copies and electronic copies will be provided. Task 4— Environmental Compliance As a result of state funding being applied to this project, this project must comply with the State Environmental Review Process (SERP). This scope assumes the total project cost will not exceed $500,000 and therefore it is anticipated that this project will be exempt from the preparation of a Preliminary Environmental Inventory(PEI). The completion of the Project Early Notification Form (EQ- 429)is still required. In general accordance with Part 3,Chapter 15 of the Locally Administered Projects (LAP) Manual, Kimley-Horn will complete the Project Early Notification Form (EQ-429) which will consist of information relating to the proposed project and a topographic map depicting the project limits. The County is still responsible for'obtaining any environmental clearances necessary to satisfy state/federal regulatory requirements. Therefore, Kimley-Horn will conduct the following: • Site visit — Kimley-Horn will conduct a field review of the project corridor from public thoroughfares. The purpose of the site visit will be to document the current land use and photograph structures greater than 50 years old, if any. • Historic Resources Review — Kimley-Horn will search the Virginia Department of Historic Resources (VDHR) archives using the Virginia Cultural Resource Information System (V- CRIS) database, prepare photo documentation of structures appearing to be greater than 50 years old located on properties adjacent to the proposed improvements, and submit the project for review to VDHR. Given the nature of the proposed project, it is anticipated that a finding of "no effect" or "no adverse effect" will be determined. Additional coordination is excluded from the scope herein. • Threatened and Endangered Species Coordination-Kimley-Horn will solicit comments from the Department of Game and Inland Fisheries (DGIF), Department of Conservation and Recreation (DCR), and US Fish and Wildlife Service (USFWS) regarding listed state or kirnley-horn.corn 4500 Main Street, Suite 500,Virginia Beach,VA 23462 757 213 8600 • rn Kim ey>>>Horn Page 4 federal threatened or endangered species which have been reported within the project area. Technical studies or additional coordination is excluded from the scope herein. • Wetlands Review — Kimley-Horn will conduct a delineation of wetlands and waters within existing VDOT right-of-way along the project corridors. The wetlands and WOUS boundaries will be flagged and numbered for inspection by the COE. The flags will be located using Global Positioning System (GPS) and plotted on a base map of the site. Kimley-Horn will prepare an exhibit and letter memo summarizing the approximate location, size, and type of wetlands and WOUS on the project site. Kimley-Horn will then schedule a field confirmation with the COE to review and approve the flagged wetland boundaries. Kimley-Horn will accompany the COE on up to one wetland delineation confirmation site visit. • Hazardous Materials Review—Kimley-Horn will conduct a preliminary review of the proposed project area to assess the potential to encounter hazardous materials or petroleum-impacted soil during the construction of the proposed project. The preliminary review will consist of a field review of the project area from public thoroughfares and a review of major state and federal environmental databases. As the project does not include the acquisition of additional right-of-way, this assessment will not be to the level of an ASTM Standard E1527-05 Phase I Environmental Site Assessment and will not include a review of the Department of Environmental Quality files, interviews or review of historical aerial photographs and topographic maps. • Kimley-Horn will complete the EQ-555 (Water Quality Permits and Natural Resources Form) and EQ-121 (Hazardous Material Form) for submittal to VDOT utilizing the above T&E species clearances and wetland and waters delineation. It is assumed that there will be no impact to historic resources and threatened and endangered species. Therefore, additional coordination with these agencies beyond the scoping letters is not included herein. Kimley-Horn will prepare a brief memorandum documenting the site conditions of the proposed project area, a summary of findings based on the above investigations, and recommendations for additional studies, if any. Task 5 - Hydraulic Review Requirements Based on the VDOT Road Design Manual and Instructional and Informational Memoranda (IIM), minimal hydraulic reviews are required for this project. A detailed hydraulic review will only be performed when existing ditches have been determined to not function appropriately to meet hydraulic requirements. Detailed analyses are not included in this scope of work and if identified during the initial field work will be identified and performed as additional services. Task 6 - Public Involvement It is Kimley-Horn's understanding that this roadway improvement project has been presented to the public through the public hearing process and no further public involvement is required. Therefore, no public involvement is included in this scope of work. In a previous meeting with the County, the County suggested the adjacent property owners within the project limits be informed of construction activities directly before they begin. This communication will be handled by either the County or the Contractor once the construction phase of the project has begun. kirnley-1 orn.com 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 Kimley> Horn Page 5 Task 7— Pavement Section Coordination Kimley-Horn will procure a geotechnical engineer to provide professional services for determining existing stone depths along the project. The geotechnical engineer will perform hang auger borings every 500'along each project, alternating from left outside edge of travel location, centerline location, to right outside edge of travel location and provide a report of findings to Kimley-Horn and the County. Kimley-Horn will review the report and coordinate with VDOT, including a field meeting, to discuss any potential reductions to the standard pavement section recommendation from VDOT. Task 8 — Bid Phase Services Kimley-Horn will oversee the reprographics and distribution of the bid packages consisting of the plans and specifications notebook and maintain a list of known plan holders. Kimley-Horn will attend and conduct the Pre-Bid Meeting to be held at the County office and answer questions from Contractor's both during the Pre-Bid meeting and throughout the bidding process. The County will attend and conduct the Bid Opening and compile the bid packages from all bidders and review the packages for procurement related conformance. The County will forward the bid packages to Kimley-Horn for tabulation and review. Kimley-Horn will tabulate the bids, comment on any errors or inconsistencies, and provide an opinion on the contract award to the County. Task 9— Construction Phase Services Pre-Construction Meeting-Kimley-Horn will attend and conduct a Pre-Construction Meeting to be held at the County General Services building. Shop Drawings and Samples-During construction, Kimley-Horn will review and approve or take other appropriate action in respect to Shop Drawings and Samples and other data which the Contractor is required to submit, but only for conformance with the information given in the Contract Documents. Such review and approvals or other action will not extend to means, methods, techniques, equipment choice and usage, sequences,schedules,or procedures of construction or to related safety precautions and programs. Site Visits to Observe Construction - Kimley-Horn will provide on-site construction observation services during the construction phase. Kimley-Horn will make visits at construction milestones and intervals as directed by Client in order to observe the progress of the Work. Such visits and observations by Kimley-Horn are not intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation of the Work based on Kimley-Horn's exercise of professional judgment. Based on information obtained during such visits and such observations, Kimley-Horn will evaluate whether Contractor's work is generally proceeding in accordance with the Contract Documents, and Kimley-Horn will keep Client informed of the general progress of the Work. k mley-horn.corn: 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 Kimley>>>Horn Page 6 The purpose of Kimley-Horn's site visits will be to enable Kimley-Horn to better carry out the duties and responsibilities specifically assigned in this Agreement, and to provide the County a greater degree of confidence that the completed Work will conform in general to the Contract Documents. Kimley-Horn shall not, during such visits or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall Kimley-Horn have authority over or responsibility for the means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. Accordingly, Kimley-Horn neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the Contract Documents. Engineering Support-Kimley-Horn will be available during construction to answer questions, resolve construction conflicts, evaluate value engineering proposals, and review field changes. Kimley-Horn will provide engineering support when required for design changes based on findings in the field. Clarifications and Interpretations - Kimley-Horn will respond to reasonable and appropriate Contractor requests for information and issue necessary clarifications and interpretations of the Contract Documents to Client as appropriate to the orderly completion of Contractor's work. Any orders authorizing variations from the Contract Documents will be made by the County. . Change Orders - Kimley-Horn may recommend Change Orders to the County, and will review and make recommendations related to Change Orders submitted or proposed by the Contractor. Progress Meetings- Kimley-Horn will attend monthly construction progress meetings as directed by the County. Limitation of Responsibilities—Kimley-Horn shall not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or furnishing the Work. Kimley-Horn shall not have the authority or responsibility to stop the work of any Contractor. Services Not Included The following services have not been included in this scope of services but can be included as additional services upon written request by the County: • Right-of-Way Acquisition Coordination • Acquisition Plats • Test Pits kimley-horncom 4500 Main Street, Suite 500,Virginia Beach, VA 23462 757 213 8600 Kimley>>>Horn Page 7 • Public Involvement • Wetland Permits Schedule Kimley-Horn will complete the work detailed in this scope of services based on the schedule below. Our tentative schedule is as follows: Task 1 will take approximately 7 days to complete Task 2 will take approximately 21 days to complete,followed by an anticipated 90 day review period by the County and VDOT. Task 3 will take approximately 14 days to complete,followed by an anticipated 90 day review period by the County and VDOT. Fee and Billing All tasks included in this scope of services will be accomplished based on a cost plus contract (time and materials). Below is a breakdown of the anticipated fee. Construction Documents $ 7,810.00 Environmental Coordination $ 4,060.00 Expenses $ 500.00 Environmental Expense $ 600.00 Pavement Borinns(Geotechnical Engineer) $ 2,000.00 TOTAL $ 14,970.00 A breakdown of the estimated man-hours to complete this task is shown in the Appendix. Fees will be invoiced monthly based upon the man-hours of service provided as of the invoice date. Payment will be due within 25 days of your receipt of the invoice. Also included in the Appendix is additional information on project team members and their roles on the project, experience within the County for key project members, and a description of qualifications on similar projects. kimley-horn:com . 4500 Main Street, Suite 500,Virginia Beach, VA 23462 757 213 8600 Kimley>>>Horn Page 8 Closure We appreciate the opportunity to provide these services to you. We can begin work immediately upon receipt of authorization from Isle of Wight County. Given that this work will be performed under the Professional Services On-Call contract between Isle of Wight County and Kimley-Horn, we anticipate a purchase order or some similar form of written notice to proceed. If the County determines that verbal authorization is appropriate,we would respectfully request that you sign in the space below and return a copy of the signed form to Kimley-Horn. Please contact us if you have any questions. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. feflea William Mackey Jr. P.E. Andrew P. Farthing, P.E. Vice-President Project Manager Nat-AAA County Administrator kimley-horn.com . 4500 Main Street, Suite 500,Virginia Beach, VA 23462 757 213 8600 Kim ley> Horn Page 9 Appendix Isle of Wight County-Mogarts Beach Road(East) Senior Professional Professional Engr/Plnr Analyst Admin. TOTAL Kicicoff/WorIcplan 4 — 4 - Field Visit/Data Collection 4 4 M?tlarl-Firt Submittal Details and Narrative 2 4 6 Specifications 2 4 6 Review Meetings 4 4 Environmental Requirements -77.777-77-7777 77-717 EQ-429 2 2 Coordination with VDHR 6 6 Other Agency Coordination 4 _ _ _ 4 Site Visit-delineation,has mat,Historic Resources 4 __ _ 4 COE Site Visit and Coordination 4 4 — _ Additional Forms(121,555,EDR) 8 8 Site Visit to Coordinate Design with VDOT 4 No Plan Second Submittal 4 4 Pavement Section Coordination 4 4 _ Bid Phase Services 4 4 --------- -- -- Construction Phase Services 4 4 QA/QC 4 4 Opinion of Probable Construction Costs 2 4 6 Accounting 4 4 Total 4 66 0 12 4 86 Is 185.00 $ 145.00 $ 125.004! 105.00 I $ 75.00 $ kirnley-horn,cbm 4500 Main Street, Suite 500, Virginia Beach,VA 23462 757 213 8600 Kim ey>>>Horn Page 10 DESIGN TEAM MEMBERS Project Manager:Andrew Farthing, PE, ENV SP • Over 10 years of experience providing engineering design services on transportation projects within the state of Virginia. • Locally Administered Project(LAP) experience with various municipalities including Isle of Wight County, City of Suffolk, City of Virginia Beach, and James City County. • Recently served as project manager on the completed Windsor Middle School Sidewalk Project within the County. • Recently served as project manager for ten (10) successfully completed Rural Rustic Road projects within the County and partnered with County staff to develop a prioritization tool for ranking future Rural Rustic Road and Rural Addition projects within the County. • On this project, Andrew will perform the project site visit, attend and lead design meetings with the County and VDOT staff, prepare construction documents, coordinate pavement section requirements with VDOT, and assist the County with bid phase and construction phase services. Environmental Task Manager: Katie Crum, PWS, CPWD • Over 12 years of experience in environmental planning and permitting including extensive experience with managing and preparing NEPA documents for locally administered transportation projects throughout Virginia • Has experience in conducting wetland delineations in accordance with methods outlined in the U.S.Army Corps of Engineers (USACE) 1987 Wetland Delineation Manual • Has experience in preparing Joint Permit Applications(JPAs)for a wide array of projects for both tidal and non-tidal wetland and waters impacts. • Performs permit compliance activities during construction activities • Recently served as environmental task manager on ten (10) successfully completed Rural Rustic Road projects within the County • On this project, Katie will serve as the Environmental Task Manager and perform the required environmental due diligence and environmental documentation for this project. _ Quality Assurance/Quality Control:William F. Mackey, Jr, PE, ENV SP • Over 28 years of experience on design projects throughout Virginia that range from rural secondary roads to large complex interstate interchange improvement projects • Specializes in locally administered projects and currently plays an integral role in the planning, design, and phasing of CIP projects in an on-call environment • His array of experience in roadway design coupled with his focus on delivering quality products provides Isle of Wight County with both an assurance manager and quality control reviewer for this project. • On this project, Bill Mackey will serve as the Quality Assurance and Quality Control manager for the project to consist of continual support of the project and review of design documents. kirnley-horn.corrm 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600