Loading...
Community Development Building Low Slope Roof Replacement IFB #16-4110-01 • Local Roots,Global Reach ISLE OF WIGHT COUNTY VIRGINIA December,18,2015 IFB#16-4110-01 INVITATION FOR BID DEPARTMENT OF BUDGET AND FINANCE Community Development Building Low Slope Roof Replacement Section A (Submit with the bid) • I-1 • rer Local Roots,Global Reach ISLE OF WIGHT COUNTY,VIRGINIA December 18,2015 IFB#16-4110-01 • INVITATION FOR BID DEPARTMENT OF BUDGET AND FINANCE Community Development Building Low Slope Roof Replacement Sealed bids subject to the conditions and instructions contained herein,will be received at the office of the Purchasing Agent listed below,until the time and date shown below(local prevailing time),for furnishing the items or services described herein. SCOPE OF WORK: Contractor shall provide all labor,superintendence,materials,tools,equipment,and other ancillary items necessary to perform the Work outlined in the Specifications and Drawings.This work is to include the removal and disposal of the existing thermoplastic roof systems on Roof Sections Al,A2,A3,A4,B1,and B2 down to the metal roof deck.Work is to include the complete removal and disposal of the existing roof membrane, flashings,insulation,gravel,wood blocking(not shown to remain)and sheet metal flashing down to existing deck. Provide a newly fully adhered EPDM roof membrane system over new mechanically attached polyisocyanurate insulation.Please see the full Scope of Work to follow. Optional Prebid Meeting: 10:00 AM, January 12, 2016 at the site: 17146 Monument Circle, Isle Wight County,VA 23397 Bid Due: 3:00 PM., February 2, 2016 Contract Officer: Michael Coburn,Sr.,Purchasing Agent,Michael.coburn@isleofwightus.net **SECTION"A"AND ONE ELECTRONIC CD COPY IS REQUESTED AT SUBMITTAL** In compliance with this invitation for bids,and subject to all the conditions thereof,the undersigned offers,if this bid is accepted within ninety (90)calendar days from the date of the opening,to furnish any or all of the items and/or services upon which prices are quoted,at the price set opposite each item,to be delivered at the time and place specified herein.The undersigned certifies he has read,understands,and agrees to all terms,conditions,and requirements of this bid,and is authorized to contract on behalf of firm named below. Company Name: Address: City/State/ Zip: Telephone: FAX No.: E-mail: Print Name: Title: Signature: Date: I-2 Table of Contents Section A 1 Bid Due: 3:00 PM.,February 2,2016 2 SCOPE OF WORK 4 INVITATION FOR BIDS 4 BID SUBMITALS: 4 QUESTIONS: 5 BID OPENING: 5 LIQUIDATED DAMAGES: 5 PRE-BID MEETING: 5 BID FORM 6 SCHEDULE OF UNIT PRICES 9 BID BOND 10 CONDITIONS AND INSTRUCTIONS 11 Section B 21 AGREEMENT 22 PERFORMANCE BOND 23 PAYMENT BOND 26 Section C 28 1-3 SCOPE OF WORK 1. Remove and dispose of the existing thermoplastic roof systems on Roof Sections Al,A2,A3, A4,B1, and B2 down to the metal deck. Work is to include the complete removal and disposal of the existing roof membrane,flashings, insulation, gravel,wood blocking(not shown to remain) and sheet metal flashing down to the existing deck.The approximate roof areas are as follows: • Roof Section Al —Approximately 3,500 SF(Metal Deck) • Roof Section A2—Approximately 50 SF(Metal Deck) • Roof Section A3—Approximately 130 SF(Metal Deck) • Roof Section A4—Approximately 80 SF(Metal Deck) • Roof Section B1 —Approximately 700 SF(Metal Deck) • Roof Section B2—Approximately 150 SF(Metal Deck) 2. Provide a new fully adhered EPDM roof membrane system over mechanically attached polyisoyanurate insulation. 3. Provide new fully adhered EPDM membrane flashings, sheet metal flashings,plywood sheathing and wood blocking as outlined in the Contract Documents. 4. Provide all necessary utility disconnects,reconnects and utility extensions needed to complete the work. 5. Remove the existing asphalt shingles from the steep slope roof adjacent to Roof Section Al as necessary to remove and replace the deteriorated tongue and groove deck boards 12 inches up from the roof eave.Provide new replacement tongue and grove decks boards to match existing. Provide new self-adhered underlayment. 6. Provide new through wall flashing at the masonry rising wall and Roof Section A2 interface as outlined in the Contract Documents. 7. Provide a 3 year contractor's warranty and a 20 year manufacture's roof system warranty. INVITATION FOR BIDS Contractor shall provide all labor, superintendence,materials,tools, equipment, and other ancillary items necessary as identified to replace the roofing system on the Community Development Building. Bids received prior to the opening time specified below shall be publicly opened and read aloud at the specified opening time in the IOWC Department of Budget and Finance. Sealed bids,subject to the conditions and instructions contained herein,will be accepted at: Department of Budget and Finance Isle of Wight County 17090 Monument Circle, Suite 137 Isle of Wight,VA 23397 BID SUBMITALS: Bid Documents may be obtained on the Isle of Wight website under Budget and Finance: http://www.co.isle-of-wight.va.us/budget-and-finance/and on the State's eVA website: http://eva.virginia.gov/,or from the Purchasing office at: Isle of Wight County,Department of Budget and Finance, 17090 Monument Circle, Suite 137,Isle of Wight,Virginia,23397 I-4 QUESTIONS: Questions concerning this project must be in writing and addressed to the Purchasing Agent as shown on the cover page; and,must be received no later than five(5)business days preceding the date that the bids are accepted. BID OPENING: Bids shall be publicly opened and read aloud on the date that the bids are accepted.Public opening will be held at 3:15 PM. (local prevailing time),in the Isle of Wight Purchasing Office at: 17090 Monument Circle,Isle of Wight,Virginia 23397. LIQUIDATED DAMAGES: If said work is not completed within the time stated in the Notice to Proceed,the Contractor shall be liable and hereby agrees to pay to the Owner as liquidated damages, and not as a penalty,the amount of five hundred dollars($100.00)per calendar day for each and every part of a day thereafter that said work remains substantially incomplete. The County reserves the right,at its sole discretion,to deduct liquidated damages from any outstanding amount due the Contractor. IF YOU NEED ANY REASONABLE ACCOMMODATION FOR ANY TYPE OF DISABILITY IN ORDER TO PARTICIPATE IN THIS PROCUREMENT, PLEASE CONTACT THIS DIVISION AS SOON AS POSSIBLE. F PRE-BID MEETING: An Optional prebid meeting shall occur at 10:00 AM, January 12, 2016 at the site: 17146 Monument Circle,Isle Wight County,VA 23397 Bids must be submitted on the designated Bid Form, signed by an authorized representative, delivered in a sealed opaque envelope bearing the Bidder's name,address,project name, acceptance date and time. An electronic copy is requested and should be included with your submittal. Revisions, changes, and deletions contained in the bid documents must be initialed by the Bidder. Failure to comply with this instruction may result in the bid being deemed non-responsive. Bidders should carefully examine the specifications and fully inform themselves to all conditions and matters that could have an effect on the cost. Should a Bidder find discrepancies in or omissions from the specifications or Invitation to Bid,or should be in doubt as to their meanings,he shall notify Procurement,personnel as noted above. The right is reserved to revise or amend these specifications prior to the date set for receipt of bids as may be required by the County. That date may be delayed if deemed necessary by the County. Any revisions and/or amendments will be in the form of an addendum to this document. The right is reserved to accept or reject any or all bids in whole or in part and to waive any informalities in the IFB, and to enter into any contract deemed to be in the best interest of IOWC. Bidder has examined copies of all the Bid Documents including the following Addenda: Date Number Bidder has made such independent investigations as Bidder deems necessary to fully inform himself as to the conditions affecting cost and progress of performance of the Work. I-5 BID FORM TO: Isle of Wight County,Virginia Director of Budget and Finance 17090 Monument Circle, Suite 137 Post Office Box 80 Isle of Wight,Virginia 23397 RE: Isle of Wight County,Virginia IOWC Community Development Building,Low Slope Roof Replacement Isle of Wight County IFB#16-4110-01 The undersigned Bidder, , offers and agrees, if this Bid is accepted, to enter into an Agreement with the Owner in the form included in the Contract Documents to complete all Work as specified or indicated in the Contract Documents for the Lump Sum of ($ ). Bidder agrees to begin the Work within ten (10) days of Notice to Proceed and that Final Completion shall be within seventy(70) calendar days of Notice to Proceed. In submitting this bid,Bidder represents, as more fully set forth in the Bid Documents,that: Bidder has examined copies of all the Bid Documents including the following Addenda: Date Number Bidder has examined the site and locality where the Work is to be performed, the legal requirements (federal, State and local laws, ordinance, rules and regulations) and has made such independent investigations as Bidder deems necessary to fully inform himself as to the conditions affecting cost and progress of performance of the Work. The Method of Payment is invoice processing upon presentation with Terms of Net 30 days. Not more than fifty percent (50%) of the work shall be subcontracted and the amount of any subcontractors proposed by the bidder in excess of ten percent (10%) of the bid price shall be identified on the Bid Form. Subcontractor: Subcontractor: I-6 Bidders shall provide a list of at least three (3) references (1 each from the last 3 construction projects). Each reference shall include the name of the organization, the complete mailing address,the name of the contact person and telephone number. ORGANIZATION ADDRESS CONTACT PERSON TELEPHONE 1. 2. 3. Bidder accepts all terms and conditions of the Contract Documents. I certify by my signature below that I have received the documents associated with this Bid and understand that the review for completeness of these documents and the understanding and comprehension of the specifications is solely my responsibility; based on this, by my signature below, I waive all rights to future claims against Isle of Wight County that the documents were incomplete or not understandable. My signature below certifies that this Bid is not the result of or affected by, any act of collusion with another person or company engaged in the same line of business or commerce, or any act of fraud punishable under Section 18.2-498.1 et. seq. of the Code of Virginia (1950, as amended). Furthermore, I understand that fraudulent bidding is a crime under the Virginia Governmental Frauds Act, the Virginia Government Bid Rigging Act, the Virginia Anti-Trust Act, and federal law and can result in fines, prison sentences,and civil damage awards. I certify that the bidder represented herein is eligible to bid with respect to all applicable sections of State and Local Government Conflict of Interest Act,Section 2.2-3100 Et Seq., of the Code of Virginia(1950, as amended). I agree to abide by all conditions of this Bid and certify that I am authorized to sign this Bid. Virginia Contractor No. Signature Date _ Print State Corporation Commission Identification No: Or Describe why the bidder or offeror is not required to be authorized by the State Corporation Commission: • I-7 (An Individual,Partnership,or Non-Incorporated Organization) Type/Print Name Title Name of Organization Business Address Phone Number Fax No. (A Corporation) Corporation Name State of Incorporation Person Authorized to Sign Title (Corporate Seal) Attest(Secretary) Business Address Phone Number Fax No. (A Joint Venture) By(Signature) Type/Print Name Title Virginia Contractor No. Business Address Phone Number Fax No. By(Signature) Type/PrintName Title Virginia Contractor No. Business Address Phone Number Fax No. (Each joint venturer must sign. The name of signing for each individual,partnership and corporation that is a party to the joint venture shall be in the manner indicated above.) III I-8 SCHEDULE OF UNIT PRICES Project: Community Development Building Low Slope Roof Replacement IFB#16-4110-01 Bid Submitted By: Unit Prices shall include the furnishing of labor,material and all incidental work called for in the Contract Documents. A. Unit Price#1: Provide a unit price to remove, dispose of, and provide new wood nailers/blocking in accordance with specifications Section 06105 "Miscellaneous Carpentry." $ per Board Foot Replaced -B. Unit Price#2: Provide a unit price to remove, dispose of and provide new metal roof decking and secure to framing. Decking shall match existing profile and grade. $ per Square Foot Replaced I-9 BID BOND KNOW ALL PERSONS BY THESE PRESENTS,that we,the undersigned, as Principal, and ,as Surety, are hereby held and firmly bound unto Isle of Wight County as Owner in the penal sum of for payment of which,well and truly to be made,we hereby jointly and severally bind ourselves,successors and assigns. Signed,this day of 2016.The condition of the above obligation is such that whereas the Principal has submitted to Isle of Wight County a certain BID, attached hereto and hereby made a part thereof to enter into an Agreement in writing, for the roof replacement as described in construction plans entitled Community Development Building Low Slope Roof Replacement,IFB# 16-4110-01. Details shown on plans. NOW THEREFORE, (a) If said BID shall be rejected, or (b) If said BID shall be accepted and the Principal shall execute and deliver an Agreement in the form attached hereto (properly completed in accordance with said BID) and shall furnish a BOND for his faithful performance of said Agreement, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all respects perform the Agreement created by the acceptance of said BID, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its Bond shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such BID; and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF,the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers,the day and year first set forth above. Principal Surety BY: IMPORTANT - Surety companies executing BONDS must appear on the Treasury Department's most current list(Circular 570 as amended) and be authorized to transact business in the state where the project is located. I-10 CONDITIONS AND INSTRUCTIONS Rev: 12/15/2015 1. Use of Form: All bids shall be submitted on and in accordance with this form. If more space is required to furnish a description of the goods and/or services bid, or delivery terms, the bidder may attach a letter hereto that will be made a part of the bid. In case of a conflict with published requirements, the bid may be considered non-responsive. The County's published specifications shall supersede any additional writings submitted with the bid. Such additional writings shall be clearly marked and noted as an exception. 2. Submittals: All bids shall be submitted sealed,plainly marked showing the bid number, date and time. Section `A' of the solicitation document is to be returned when submitting a bid. Failure to The entire Section `A' may result in a determination that the submittal is non-responsive. In addition, an electronic ".pdf' copy of your submittal is requested to be included in the package. Either CD or thumb drives are acceptable. 3. Late Bids: Bids and amendments thereto, if received by Purchasing after the date and time specified for bid opening, will not be considered. It will be the responsibility of the bidder to see that their bid is received by Purchasing as specified. There will be no exceptions. Date of postmark will not be considered. Telephone, facsimile, electronic and verbal bids will not be accepted. Prices or changes shown on the outside of an envelope will not be considered in determination of low bid. 4. County Closures: If County Offices are closed for business at the time scheduled for the bid opening, for whatever reasons, sealed bids will be accepted and opened on the next business day of the County,at the original scheduled hour. 5. Acceptance of Bid: Receipt of the bid by the County is not to be construed as an award or an order to ship. 6. Bid Security: Each bid shall be accompanied with a bid bond equal to five (5) percent of the total amount of the bid, made payable to Isle of Wight County. Upon approval of the County Attorney, a Bidder may furnish a personal bond or a bank or savings and loan association's letter of credit on certain designated funds for the amount required for the Bid Security. Such bid security shall be left with the County as a guarantee of good faith on the part of the Bidder that if the bid is accepted,the Bidder shall provide all required submittals and execute the contract. 7. Offer/Acceptance: Each bid is received with the understanding that the acceptance in writing by the County of the bidder to furnish any or all of the goods and/or services described therein, shall constitute a contract between the bidder and the County, which shall bind the bidder to furnish and deliver the goods and/or services quoted at the prices stated and in accordance with the conditions of the accepted bid; and the County on its part to order from such bidder, except for causes beyond reasonable control; and pay for, at the agreed prices, all goods and/or services specified and delivered. 8. Withdrawal of Bids: Bidder has the right to request withdrawal of their bids from consideration due to error by giving notice not later than two business days after the bids are publicly opened. Work papers showing evidence of error(s)may be required. I-11 Bids may be withdrawn any time prior to the bid opening. Withdrawal of bids may be accomplished by submitting such request in writing on the issuing company's letterhead in person, electronically(email) or by certified mail. 9. Addenda: If issued, addenda to this solicitation will be posted on the Purchasing website http://www.co.isle-of-wight.va.us/budget-and-finance/and on the Commonwealth's website, http://eva.virginia.gov/. It is the bidder's responsibility to check one of the websites or to contact the Purchasing division prior to the submittal deadline to ensure that the bidder has a complete, up-to-date package. Acknowledgement of all issued Addenda shall be indicated on the bid form in the appropriate spaces. 10. Governing Document: The solicitation document maintained by Purchasing in the bid file, shall be considered the official copy. In the case of any inconsistency between bid documents submitted to the County, but not clearly listed as an exception, the language of the official copy shall prevail. Furthermore, any exception or change to the specifications made by the bidder may be cause to disqualify your bid. 11. Award: Award will be made to the lowest responsive and responsible bidder. The quality of the goods and/or services to be supplied, their conformity with the specifications, their suitability to the requirements, the delivery, qualifications and references will be taken into consideration in making the award. The County reserves the right to refuse all bids.Determination of low bid shall be determined by the audited figure shown on the pricing page titled `Lump Sum.' 12. Negotiation: Unless canceled or rejected, a responsive bid from the lowest responsible bidder shall be accepted as submitted; except that if the bid from the lowest responsible bidder exceeds available funds, the County may negotiate with the apparent low bidder to obtain a contract price within the available funds. 13. Announcements: Upon the award or the announcement of the decision to award a contract, the County will publicly post such notice on the bulletin board located outside of the Purchasing Division and on the County's web site: http://www.co.isle-of-wight.va.us/budget-and-finance/ 14. County's Rights: The County reserves the right to reject any and all bids, and to waive any informality if it is determined to be in the best interest of the County. 15. Cooperative Agreements: If authorized by the bidder(s), the resultant contract(s) may be extended to any jurisdiction within the Commonwealth of Virginia to purchase at the contract prices in accordance with the contract terms. Any jurisdiction using such contracts shall place its own order(s) directly with the successful contractor(s). The County of Isle of Wight acts only as the contracting agent and is not responsible for placement of orders,payment, or discrepancies of the participating jurisdictions. It is the contractor's responsibility to notify the jurisdictions of the availability of contract(s). 16. Prices: Prices shall be stated in units of quantity specified. No additional charges shall be passed to the County, including any applicable taxes, delivery, or surcharges. Prices quoted shall be the final cost to the County. In case of error in the extension of prices,the unit price shall govern. 17. Corrections: All prices and notations should be in ink or typewritten. Mistakes may be crossed out and corrections made in ink and must be initialed and dated by the person signing the bid. I-12 • 18. Delivery: The time of delivery must be stated in definite terms. If time of delivery for different goods and/or services varies,the bidder shall so state. 19. Samples: Samples, when requested, must be furnished free of expense, and upon request, if not destroyed,will be returned at the bidder's risk and expense. 20. Brand Names: The use of the name of a manufacturer, brand, make or catalog designation in specifying an item shall restrict bidders to the manufacturer, brand, make or catalog designation identified, unless qualified by the provision "or equal." If qualified by the provision "or equal" the Brand Names are used simply to indicate the character, quality and/or performance equivalence of the goods and/or services desired. The goods and/or services on which bids are submitted must be of such character, quality and/or performance equivalence that it will serve as that specified. In submitting bids on goods and/or services other than as specified, bidder shall furnish complete data and identification with respect to the alternate goods and/or services that they propose to furnish. It shall be in the County's sole judgment if a substitute product offered is an approved equal and acceptable. 21. Standard equipment: Any equipment delivered must be standard, new and unused equipment, latest model, except as otherwise specifically stated in the bid. Where any part or the normal accessories of equipment is not described, it shall be understood that all the equipment and accessories that are usually provided in the manufacturer's stock model shall be furnished. 22. Silence of Specifications: The apparent silence of these specifications and any supplemental specifications as to any detail or the omission from the specifications of a detailed description concerning any point shall be regarded as meaning that only the best commercial.practices are to prevail and correct type, size and design are to be used. All interpretations of these specifications shall be made on the basis of this statement. 23. Capacity of Bidder: All bids must be signed by a responsible officer or employee having the authority to bind the firm in contract. The bidder agrees that its contract performance shall be in strict conformance with the contract documents. 24. Rights to Damages: By signing this bid,the bidder assigns to the County and all rights that it may have under the antitrust laws of the United States and the Commonwealth of Virginia in any way arising from or pertaining to this bid. This provision is remedial in nature and is to be liberally construed by any court in favor of the County. 25. Anti-collusion: The bidder certifies by signing this Invitation of Bid that this bid is made without prior understanding, agreement, or accord with any other person or firm submitting a bid for the same goods and/or services and that this bid is in all respects bona fide, fair, and not the result of any act of fraud or collusion with another person or firm engaged in the same line of business or commerce. Any false statement hereunder may constitute a felony and can result in a fine and imprisonment,as well as civil damages. • 26. Indemnification: The Contractor shall defend, indemnify and hold the County, and the County's employees, agents, and volunteers, harmless, from and against any and all damage claim, liability, cost, or expense (including, without limitation, attorney's fees and court costs) of every kind and nature (including, without limitation, those arising from any injury or damage to any person,property or business) incurred by or claimed against the contractor, its employees, agents, and volunteers, or incurred by or claimed against the County, the County's employees, agents, and volunteers, arising out of, or in connection with, the performance of all services hereunder by I-13 the contractor. This indemnification and hold harmless includes, but is not limited to, any financial or other loss including, but not limited to, any adverse regulatory, agency or administrative sanction or civil penalties, incurred by the County due to the negligent, fraudulent or criminal acts of the contractor or any of the Contractor's officers, shareholders, employees, agents, contractors, subcontractors, or any other person or entity hact i acting on behalf of the Contractor. Unless otherwise provided by law, the Contractor indemnification obligations hereunder shall not be limited in any way by the amount or type of damages, compensation, or benefits payable by or for the Contractor under worker's compensation acts, disability benefit acts, other employee benefit acts, or benefits payable under any insurance policy. This paragraph shall survive the termination of the contract including any renewal or extension thereof. 27. Copyright Protection: The Contractor agrees to defend and save the County, its agents, officials, and employees, harmless from liability of any nature or kind, for use of any copyright, composition, secret process, patented or unpatented invention, articles or appliances furnished or used in the performance of the contract, or which the Contractor is not the patentee, assignee, or licensee,to the same extent as provided in the above paragraph. 28. Laws,Regulations: The Contractor shall keep fully informed of all federal, state, and local laws, ordinances and regulations that in any manner affect the conduct of the work. The Contractor shall at all times observe and comply with all such laws, ordinances and regulations. 29. Alien employment: The Contractor certifies that he does not and shall not during the performance of the contract for goods and services in the Commonwealth, knowingly employ unauthorized aliens as defined in the federal Immigration Reform and Control Act of 1986, as amended. 30. SCC Authorization: All bidders or offerors organized or authorized to transact business in the Commonwealth pursuant to Title 13.1 or Title 50, as amended, shall include the identification number issued to it by the State Corporation Commission. Any bidder or offeror that is not required to be authorized to transact business in the Commonwealth as a foreign business entity under Title 13.1 or Title 50, as amended, or as otherwise required by law shall include in its bid or proposal a statement describing why the bidder or offeror is not required to be so authorized. SCC Number or Statement: Any business entity that enters into a contract with a public body pursuant to this chapter shall not allow its existence to lapse or its certificate of authority or registration to transact business in the Commonwealth, if so required under Title 13.1, or Title 50, as amended,to be revoked or cancelled at any time during the term of the contract.The County may void any contract with a business entity if the business entity fails to remain in compliance with the provisions of this section. 31. Contractor's License: If any of the services promulgated under this solicitation consist of construction work, it is required under Title 54.1, Chapter 11, Code of Virginia, for a contractor who performs or manages construction, removal, repair, or improvement when the total value referred to in a single contract or project is: One hundred twenty thousand dollars($120,000)or more,or the total value of all such construction,removal,repair or improvements undertaken by such person within any twelve- month period is seven hundred fifty thousand dollars($750,000)or more shall show evidence of being licensed as a Class A Contractor. I-14 Ten thousand dollars($10,000) or more,but less than one hundred twenty thousand dollars or the total value of all such construction,removal,repair, or improvement undertaken ($120,000) P � P by such person within any twelve-month period is one hundred and fifty thousand dollars ($150,000) or more,but less than seven hundred fifty thousand dollars($750,000)shall show evidence of being licensed as a Class B Contractor. Over one thousand($1,000)but less than ten thousand($10,000), or the total value of all such construction,removal,repair, or improvements undertaken by such person within any twelve- month period is one hundred and fifty thousand dollars($150,000)shall show evidence of being licensed as a Class C Contractor. The County shall require master certification as a condition of licensure or certification of electrical,plumbing and heating,ventilation and air conditions contractors. A valid business license from the County may be required.The bidder shall complete whichever of the following notations as appropriate: "Licensed Class A Virginia Contractor Number "Licensed Class B Virginia Contractor Number ." "Licensed Class C Virginia Contractor Number ." 32. Payment Terms: Payment terms shall be `Net 30'days, from the date of Contractor invoice approval by the County. Payment terms, if offered, shall not be considered in determining the low bidder. Discount period,if offered,shall be computed from the date of proper receipt of the contractor's correct invoice,or from the date of acceptable receipt of the goods and/or services,whichever is latest. The payment terms stated herein must appear on the contractor's invoice.Failure to comply with this requirement shall result in the invoice being returned to the contractor for correction. Late payment charges shall not exceed the allowable rate specified by the Commonwealth of Virginia Prompt Payment Act. (1%per month) Contractor shall submit invoices in duplicate, such statement to include detailed breakdown of all charges, and shall be based on completion of tasks or deliverables. Individual Contractors shall provide their social security numbers, and proprietorships, partnerships, and corporations shall provide their federal employer identification number on their submittal. The County prefers to make payment with the County's Purchasing Card.Typically this enables faster payments to the Contractor.Are you willing and able to accept this type of payment? Yes No (See paragraph 65 for links) I-15 33. Default: In event of default by the Contractor,the County reserves the right to procure the goods and/or services from other sources, and hold the Contractor liable for any excess cost occasioned thereby. Such actions taken by the County shall not release the contractor from additional remedies that may be allowed by law. 34. .Availability of Funds: A contract shall be deemed in force only to the extent of appropriations available to each department for the purchase of such goods and/or services. The County's extended obligations on those contracts that envision extended funding through successive fiscal periods shall be contingent upon actual appropriations for the following years. 35. Appeals Procedure: Upon your request, administrative appeals information will be provided that shall be used for hearing protests of a decision to award, or an award, appeals from refusal to allow withdrawal of bids, appeals from disqualification, appeals for debarment or suspension, or determination of non-responsibility and appeals from decision or disputes arising during the performance of a contract. To be timely all appeals shall be made within the time periods set forth by the Virginia Public Procurement Act, §2.2-4357, et seq. Contact the buyer at once for assistance. 36. Faith-based Organizations: The County of Isle of Wight does not discriminate against faith- based organizations. 37. Anti-Discrimination: By submitting their bids, bidders certify to the County that they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended, as well as the Virginia Fair Employment Contracting Act of 1975, as amended, where applicable, the Virginians with Disabilities Act,the Americans with Disabilities Act and 2.2-4311 of the Virginia Public Procurement Act (VPPA). If the award is made to a faith-based organization, the organization shall not discriminate against any recipient of goods, services, or disbursements made pursuant to the contract on the basis of the recipient's religion, religious belief, refusal to participate in a religious practice, or on the basis of race, age, color, gender or national origin and shall be subject to the same rules as other organizations that contract with public bodies to account for the use of the funds provided; however, if the faith-based organization segregates public funds into separate accounts, only the accounts and programs funded with public funds shall be subject to audit by the public body. (Code of Virginia 2.2.4343.1E). In every contract over$10,000 shall include the following provisions: 1. During the performance of this contract,the Contractor agrees as follows: a. The Contractor will not discriminate against any employee or applicant for employment because of race,religion, color, sex,national origin,age, disability, service disabled veterans or any other basis prohibited by state law relating to discrimination in employment, except where there is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor.The Contractor agrees to post in conspicuous places, available to employees and applicants for employment,notices setting forth the provisions of this nondiscrimination clause. b. The Contractor,in all solicitations or advertisements for employees placed by or on behalf of the Contractor,will state that such Contractor is an equal opportunity employer. c. Notices,advertisements and solicitations placed in accordance with federal law,rule or regulation shall be deemed sufficient for the purpose of meeting these requirements. I-16 2. The Contractor will include the provisions of Section a,b, and c above in every subcontract or purchase order over$10,000, so that the provisions will be binding upon each subcontractor or vendor. 38. Drug-Free Workplace: During the performance of this contract, the Contractor agrees to (1) provide a drug-free workplace for the Contractor's employees; (2) post in conspicuous place, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor's workplace and specifying the actions that will be taken against employees for violations of such prohibition; (3) state in all solicitation or advertisement for employees placed by or on behalf of the Contractor that the Contractor maintains a drug-free workplace; and(4) include the provisions of the foregoing clauses in every subcontract or purchase order of over $10,000, so that the provisions will be binding upon each subcontractor or vendor. For the purposes of this section, "drug-free workplace"means a site for the performance of work done in connection with a specific contract awarded to a Contractor,the employees of whom are prohibited from engaging in the unlawful manufacture,sale, distribution, dispensation,possession or use of any controlled substance or marijuana during the performance of the contract. 39. Assignment of Contract: A contract shall not be assignable by the Contractor in whole or in part without the written consent of the County. 40. Independent Contractor: The Contractor and any employees, agents, or other persons or entities acting on behalf of the Contractor shall act in an independent capacity and not as officers, employees, or agents of the County. 41. Scheduling and Delays: The parties to any contract resultant of this solicitation acknowledge that all or part of the work to be performed hereunder may be delayed and extended at the option of the County. Such delays may be caused by delays, denials and modifications of the various state or federal permits, or for other reasons. The County shall not be required to pay any of the Contractor's direct or indirect costs, or claims for compensation, extended overhead, or other damage or consequential damages arising out of or related to any delays or interruptions required or ordered by the County. If the County delays the project for any reason for a continuous period of ninety (90) days or more, the County and Contractor will negotiate a mutually agreeable adjustment to the Contractor's award amount. Notwithstanding the above, in construction contracts,to the extent that an unreasonable delay is caused by the act or omissions of the County due to causes within the County's control,the above waiver or release shall not apply. 42. Governing Law: This Agreement is made, entered into, and shall be performed in the County of Isle of Wight, Virginia, and shall be governed by the applicable laws of the Commonwealth of Virginia without regard to its conflict of law rules. In the event of litigation concerning this Agreement, the parties agree to the exclusive jurisdiction and,venue of the Circuit Court of the County of Isle of Wight, Virginia; however, in the event that the federal court has jurisdiction over the matter, then the parties agree to the exclusive jurisdiction and venue of the U.S. District Court for the Eastern District of Virginia,Norfolk Division. The Contractor shall not cause a delay in services because of the pending or during litigation proceedings, except with the express,written consent of the County or written instruction/order from the Court. I-17 43. Severability: If any provision of this contract or the application thereof to any person or circumstances shall to any extent be invalid or unenforceable, the remainder of this contract, or the application of such provision to persons or circumstances other than those which it is invalid or unenforceable, shall not be affected hereby, and each provision of this contract shall be valid and enforced to the full extent permitted by law. 44. Termination for Convenience: The County may at any time, and for any reason, terminate this Contract by written notice to Contractor specifying the termination date, which shall be not less than thirty(30)days from the date such notice is mailed. Notice shall be given to Contractor by certified mail/return receipt requested at the address set forth in Contractor's Bid Proposal or as provided in this Contract. In the event of such termination,Contractor shall be paid such amount as shall compensate Contractor for the work satisfactorily completed, and accepted by the County, at the time of termination. If the County terminates this Contract, Contractor shall withdraw its personnel and equipment, cease performance of any further work under this Contract,and turn over to the County any work completed or in process for which payment has been made. 45. Termination for Cause: In the event that Contractor shall for any reason or through any cause be in default of the terms of this Contract, the County may give Contractor written notice of such default by certified mail/return receipt requested at the address set forth in Contractor's Bid/Proposal or as provided in this Contract. Unless otherwise provided,Contractor shall have ten(10)days from the date such notice is mailed in which to cure the default. Upon failure of Contractor to cure the default,the County may immediately cancel and terminate this Contract as of the mailing date of the default notice. Upon termination,Contractor shall withdraw its personnel and equipment, cease performance of any further work under the Contract,and turn over to the County any work in process for which payment has been made.In the event of violations of law,safety or health standards and regulations,this Contract may be immediately cancelled and terminated by the County and provisions herein with respect to opportunity to cure default shall not be applicable. 46. Contact Prohibition: Direct contact with County departments other than Purchasing,on the subject of this bid is expressly forbidden except with the foreknowledge and permission of the Contract Officer.Violation may result in a determination that your firm is ineligible for an award. All questions shall be in writing to the Contract Officer shown on the title page of the bid. The respondents to this IFB shall not contact,either directly or indirectly,any other employee or agent of the County regarding this IFB. This prohibition shall also extend to the County Board of Supervisors and locally elected officials.Any such unauthorized contact may disqualify the bidder from this procurement. 47. Additional Conditions: The Conditions and Instructions in this solicitation are intended to apply to the resulting contract and shall supersede any conflicting terms offered. Any additional conditions a bidder intends be considered must be submitted with the bid and noted as an exception. Such exceptions may result in a finding that the submittal is `non-responsive' to the bid, negating possibility of an award to that bidder. Contractual documents submitted by the successful firm after an award will not be accepted. I-18 48. Contractor Failure to Perform: Failure of the Contractor to perform the contract by reason of the County's non-acceptance of additional conditions submitted after the award shall result in termination of the contract by the County, and may result in debarment of the Contractor for a period of up to three (3) years. Termination and /or debarment of the Contractor shall not constitute a waiver by the County of any other rights or remedies available to the County by law or contract. 49. Conflict: In the event of a conflict between the contract documents, including these Conditions and Instructions, and the terms of a purchase order or related document issued by Purchasing,the contract documents shall control. 50. Records and Inspection: The Contractor shall maintain full and accurate records with respect to all matters covered under this contract, including, without limitation, accounting records, written policies, procedures, time records, telephone records, and any other supporting evidence used to memorialize, reflect, and substantiate charges or fees related to this contract. The Contractor's records shall be open to inspection and subject to audit and/or reproduction, during normal working hours,by the County and its employees,agents or authorized representatives after giving at least three (3) days' notice to the Contractor by the County. The County shall have access to such records from the effective date of this contract, for the duration of the contract, and for five (5) years after the date of final payment by the County to the Contractor pursuant to this contract or any renewal or extension of this contract. The County's employees, agents or authorized representatives shall have access to the Contractor's facilities, shall have access to all necessary records and shall be provided adequate and appropriate work space, in order to conduct audits. 51. Rights and Remedies Not Waived: In no event shall the making by the County of any payment to the Contractor, or the waiver by the County of any provision under this contract including any obligation of the Contractor, constitute or be construed as a waiver by the County of any other provision, obligation, breach of covenant, or any default which may exist under this contract on the part of the Contractor, and the making of any such payment by the County while any such breach or default exists shall not impair or prejudice any right or remedies available to the County. 52. Entire Agreement: This contract and any additional or supplementary documents incorporated herein by reference contain all the terms and conditions agreed upon by the parties hereto, and no other agreements, oral or otherwise, regarding the subject matter of this contract or any part thereof shall have any validity or bind any of the parties hereto. This contract shall not be modified, altered, changed or amended unless in writing and signed by the parties hereto. 53. Conflicts of Interests: Contractor shall not accept or receive commissions or other payments from third parties for soliciting, negotiating, procuring, or effecting insurance on behalf of the County. 54. Responsibility of Contractor: The Contractor shall, without additional costs or fee to the County, correct or revise any errors or deficiencies in his performance. Neither the County's review, approval or acceptance of, nor payment for any of the services required under this Agreement shall be deemed a waiver of rights by the County, and the Contractor shall remain liable to the County for all costs which are incurred by the County as a result of the Contractor's negligent performance of any of the services furnished under this Agreement. I-19 55. Changes and Additions: It shall be the responsibility of the Contractor to notify the County, in writing, of any necessary modifications or additions in the Scope of this Agreement. Compensation for changes or additions in the Scope of this Agreement will be negotiated and approved by the County,in writing. It is understood and agreed to by both the County and the Contractor that such modifications or additions to this Agreement shall be made only by the full execution of the County's standard Agreement change order form. Furthermore,it is understood and agreed by both parties that any work done by the Contractor on such modification or addition to this Agreement prior to the County's execution of its standard Agreement change order form shall be at the total risk of the Contractor and said work may not be compensated by the County. 56. Debarment Status: By submitting a bid, bidders certify that they are not currently debarred by the Commonwealth of Virginia from submitting bids or proposals on contracts for the type of goods and/or services covered by this solicitation, nor are they an agent of any person or entity that is currently so debarred. 57. Safety: All Contractors and subcontractors performing services for the County are required and shall comply with all Occupational Safety and Health Administration (OSHA), State and County Safety and Occupational Health Standards and any other applicable rules and regulations. Also all Contractors and subcontractors shall be held responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site area under this contract. 58. License Requirement: All firms doing business in the County of Isle of Wight are required to be licensed in accordance with the County of Isle of Wight business license ordinance. Wholesale and retail merchants without a business location in the County of Isle of Wight are exempt from this requirement. Any questions concerning business licenses should be directed to the Commissioner of the Revenue's Office. 59. Contractor's Form: In cases where the County may accept the Contractor's form agreement, whereas certain standard clauses that may appear in the Contractor's form agreement cannot be accepted by the County, and in consideration of the convenience of using that form, and this form, without the necessity of negotiating a separate contract document, the parties hereto specifically agree that, notwithstanding any provisions appearing in the attached Contractor's form contract, the County's contract addendum shall prevail over the terms of the Contractor's agreement in the event of a conflict. 60. Bidder Qualifications: Only bids from established contractors for work similar in scope to work herein shall be considered; the County reserves the right to request specific reference information prior to award. Bidder shall demonstrate that he has adequate and appropriate manpower, tools and equipment to respond and perform in accordance with the provisions herein. The County may, at its option, disqualify a bidder and reject his bid for cause. Reasons deemed to be sufficient for this action shall include,but not be limited to,the following: o Evidence of collusion among bidders. o Receipt of more than one bid on any project from an individual,or from a corporation. This restriction does not apply to subcontractors o Default on any previous contract. I-20 o For unreasonable failure to complete a previous contract within the specified time or for being in arrears on an existing contract without reasonable cause for being in arrears. o Inability to perform as revealed by an investigation of the Bidder's financial statement, experience and/or plant and equipment. o Contractor does not meet project-specific requirements,as identified in the Contract Documents 61. Pricing to be F.O.B.Destination—Freight Allowed: Pricing shall be F.O.B. destination-freight included for all competitive bids. F.O.B. Destination-Freight Included shall include all shipping costs to the County location(s)at the unit cost.No additional shipping charges shall be allowed. 62. Contract Quantities:_The quantities specified in the Invitation for Bid are estimates only unless otherwise clearly noted, and are given for the information of bidders and for the purpose of bid evaluation. They do not indicate the actual quantity that will be required, since such volume will depend upon requirements that may develop during the contract period. Quantities shown shall not be construed to represent any amount which the County shall be obligated to purchase under the contract, or relieve the Contractor of his obligation to fill all orders placed by the County, except as clearly noted. 63. Competition Intended: It is the County's intent that the Invitation for Bid (IFB) permits competition. It shall be the bidder's responsibility to advise the Buyer in writing if any language requirement, specification, etc., or any combination thereof, inadvertently restricts or limits the requirements stated in this IFB to a single source. Such notification must be received by the Contract Officer prior to the date set for bids to close. 64. Default on Taxes: No bid or proposal will be accepted from, or any Contract awarded to any person, firm, or corporation that is in arrears, or in default to the County upon any debt or Contract,or that is a defaulter as surety, or otherwise upon any obligation to the County. 65. The County prefers to make payment with t he County's s Purchasin Card, or b direct deposit. If you are willing to use either of these methods please register at the following sites: Pcards: www.bankofamerica.com/epayablesvendors Direct Deposit: www.paymode.com/isleofwight Section B (To be filled out and returned by Successful Bidder) I-21 AGREEMENT THIS AGREEMENT, made and entered into this day of , 2016, by and between the COUNTY OF ISLE OF WIGHT, VIRGINIA, whose principal office is 17090 Monument Circle, Suite 137, Isle of Wight, Virginia 23397, hereinafter called "OWNER", party of the first part, and hereinafter referred to as "CONTRACTOR",party of the second part. The CONTRACTOR did, on the day of 2016, submit a sealed bid to perform the services stipulated in accordance with plans and specifications prepared by the OWNER entitled which by reference is made a part hereof. It is mutually understood and agreed by the parties hereto that the Invitation to Bid inviting Contractors to bid as published, Instructions to Bidder, Schedule of Unit Prices, Bid Form, Bid Bond, Contract Agreement, Hold Harmless Agreement, Certificate of Insurance, Scope of Services and Drawings, all proceedings by the governing body of the OWNER pertaining to the subject matter of this Contract, all of which documents are hereinafter referred to as Contract Documents and are a part of this Contract by reference the same as if each had been fully set out and attached hereto. In consideration of the following mutual agreements and covenants to be kept by each party: a. The CONTRACTOR agrees to furnish and pay for all labor,tools, equipment,machinery, supplies, facilities, superintendence, insurance, taxes, utilities and services necessary to perform all items set forth in the written Contract Documents hereto attached and made a part hereof in strict compliance with the Contract Documents and Lump Sum of (the "Contract Sum"), subject to adjustment as provided in said documents. b. Invoice payments for work completed under this contract shall be made in strict accordance with the project specifications and any special conditions attached thereto. c. It is understood and agreed that all work shall be accomplished in strict compliance with the provisions of the Contract Documents. It is understood and agreed by both the County and the Contractor that any modifications or additions to this agreement shall be made only by the full execution of the County's standard contract change order form. Furthermore, it is understood and agreed by both parties that any work done by the CONTRACTOR on any such modification or addition to this AGREEMENT prior to the County's execution of its standard Contract Change Order form shall be at the total risk of the CONTRACTOR and said work shall not be compensated by the County. d. CONTRACTOR agrees to begin the work within ten (10) days of Notice to Proceed and I-22 • that final completion shall be within ninety(70) calendar days of Notice to Proceed. e. The parties agree that damages due to delay in completion of the work are uncertain and not readily capable of ascertainment. Accordingly, if the CONTRACTOR shall fail to complete the work or any part thereof within the time stipulated, or an applicable extension thereof, the CONTRACTOR shall pay to the OWNER as fixed and agreed, liquidated damages for each calendar day of delay until the delayed work is corrected or accepted, an of $100 per day. The parties agree that this sum is proportionate to the probable loss and is not a penalty. (a) The CONTRACTOR expressly waives any defense as to the validity of any liquidated damages stated in this Agreement as they may appear on the grounds that such liquidated damages are void as penalties or are not reasonably related to actual damages. IN WITNESS WHEREOF, the parties hereto have executed and sealed this Agreement as of the day and year first above written. OWNER:County of Isle of Wight,Virginia By: County Administrator CONTRACTOR: By: ATTEST: By: Title: Approved as to form: Mark C.Popovich,Isle of Wight County Attorney PERFORMANCE BOND (CONTRACT DOCUMENT TO BE COMPLETED AT TIME OF AWARD) Bond No. Amount: $ I-23 KNOW ALL PERSONS BY THESE PRESENTS,that of ,hereinafter called the Contractor and a corporation duly organized and existing under and by virtue of the laws of the State of ,hereinafter called the Surety,and authorized to transact business within the Commonwealth of Virginia as the Surety,are held and firmly bound unto Isle of Wight County,Virginia as Owner, in the sum of dollars($ ),lawful money of the United States of America,for payment of which,well and truly be made to the Owner,the Contractor and the Surety bind themselves and each of their heirs,executors,administrators,successors,and assigns,jointly and severally,firmly by these presents as follows: THE CONDITION OF THE ABOVE OBLIGATION IS SUCH THAT: WHEREAS,the Contractor has executed and entered into a certain Agreement,hereto attached,with the Owner dated ,2016, for roof replacement as described in the bid titled Community Development Building Low Slope Roof Replacement, IFB# 16-4110-01. NOW THEREFORE, if the Contractor,and its successors and assigns,shall at all times duly,promptly, and faithfully perform the Work and any alteration in or addition to the obligations of the Contractor arising there under,including the matter of infringement,if any,of patents or other proprietary rights, and shall assure all guarantees against defective workmanship and materials,including the guarantee period following final completion by the Contractor and final acceptance by the Owner and comply with all the covenants therein contained in the Specifications,Drawings, and other Contract Documents required to be performed by the Contractor, in the manner and within the times provided in the Agreement,and shall fully indemnify and save harmless the Owner from all costs and damage which it may suffer by reason or failure to do so, and shall fully reimburse and repay it all outlay and expenses which it may incur in making good any default,and reasonable counsel fees incurred in the prosecution of or defense of any action arising out of or in connection with any such default,then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER,that the Surety, for value received,for itself and its successors and assigns, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract Documents or to the Work to be performed there under, or payment there under before the time required therein, or waiver of any provision thereof, or assignment,subletting or transfer thereof or any part thereof, shall in any way affect its obligation on this Bond,and it does hereby waive notice of any such change, extension of time, alteration, addition to the terms of the Contract Documents or any such payment,waiver,assignment, subcontract or transfer. PROVIDED,FURTHER,that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder,whose claim may be unsatisfied. Whenever Contractor shall be declared by Owner to be in default under the Contract,the Owner having performed Owner's obligations there under,the Owner shall have the right, at its option,to require the Surety to promptly proceed to remedy the default within 30 days of notice by proceeding or procuring others to proceed with completing the Agreement with its terms and conditions; and all reserves, deferred payments, and other funds provided by the Agreement to be paid to Contractor shall be paid to Surety at the same times and under the same conditions as by the terms of that Agreement such fund would have been paid to Contractor had the Agreement been performed by Contractor; and Surety shall be entitled to such funds in preference to any assignee of Principal of any adverse claimant.Notwithstanding the above, the Owner shall have the right,with the approval of the Surety which shall not be unreasonably withheld, to take over and assume completion of the Agreement and be promptly paid in cash by the Surety for the cost of such completion less the balance of the Contract price. I-24 IN WITNESS WHEREOF, all above parties bounded together have executed this instrument this day of ,2016,the name and corporate seal of each corporate party being hereto affixed and those presents duly signed by its undersigned representative,pursuant to authority of its governing body. CONTRACTOR By: (Seal) Name: Title: Attest SURETY By: (Seal) Attest APPROVED AS TO FORM: ,2016 Mark Popovich,County Attorney NOTE:Date of Bond shall not be prior to the date of the Agreement. If the Contractor is a partnership, all partners shall execute the Bond. IMPORTANT:The Surety named on this Bond shall be one who is licensed to conduct business in the Commonwealth of Virginia,and named in the current list of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies, as published in Circular 570(amended)by the Audit Staff Bureau of Accounts,U.S.Treasury Department. All Bonds signed by an agent shall be accompanied by a certified copy of the authority to act for the Surety at the time of signing of this Bond. I-25 PAYMENT BOND (CONTRACT DOCUMENT TO BE COMPLETED AT TIME OF AWARD) Bond No. Amount: KNOW ALL PERSONS BY THESE PRESENTS, that of hereinafter called the Contractor and , a Corporation duly organized and existing under and by virtue of the laws of the State , Virginia as the Surety, are held and firmly bound unto Isle of Wight County, Virginia as Owner, in the sum of dollars ($ ), lawful money of the United States of America, for payment of which, well and truly be made to the Owner, the Contractor and the Surety bind themselves and each of their heirs, executors, administrators, successors,and assigns,jointly and severally, firmly by these presents as follows: THE CONDITION OF THE ABOVE OBLIGATION IS SUCH THAT: WHEREAS, the Contractor has executed and entered into a certain Agreement, hereto attached, with the Owner dated , 2016, for roof replacement as described in the bid titled, Community Development Building Low Slope Roof Replace,IFB# 16-4110-01. NOW THEREFORE, if the Contractor shall promptly make payments to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in the Agreement, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, repairs on machinery, equipment, and tools consumed,used or rented in connection with the construction of the Work, and all insurance premiums on the Work, and for all labor performed in the Work, whether by Subcontractor or otherwise, then this obligation shall be void, otherwise to remain in full force and effect. PROVIDED, HOWEVER, that the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract Documents or to the Work to be performed there under, shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract Documents. PROVIDED, FURTHER,that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder,whose claim may be unsatisfied. IN WITNESS WHEREOF, all above parties bounded together have executed this instrument this day of , 2016, the name and corporate seal of each corporate party being hereto affixed and those presents duly signed by its undersigned representative,pursuant to authority of its governing body. I-26 CONTRACTOR By: (Seal) Name: Title: Attest SURETY By: Attest APPROVED AS TO FORM: ,2016 Mark Popovich,County Attorney NOTE: Date of Bond shall not be prior to the date of the Agreement. If the Contractor is a partnership, all partners shall execute the Bond. IMPORTANT: The Surety named on this Bond shall be one who is licensed to conduct business in the Commonwealth of Virginia, and named in the current list of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies, as published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department. All Bonds signed by an agent shall be accompanied by a certified copy of the authority to act for the Surety at the time of signing of this Bond. I-27 Section C (Drawings and Technical Specifications) I-28 Local Roots,Global Reach ISLE OF WIGHT COUNTY,VIRGINIA PROJECT MANUAL FOR COMMUNITY DEVELOPMENT BUILDING LOW SLOPE ROOF REPLACEMENT 17146 MONUMENT CIRCLE ISLE OF WIGHT, VIRGINIA December 8, 2015 Hentz Engineering Project Number: 15116-110 Prepared By: Hentz Engineering, Inc. 4 Pi Building Solutions 750 Lord Dunmore Drive,Suite 103 •Virginia Beach,VA 23464 Phone:(757)961-7224 Fax: (757)961-7641 www.hentzengineering.com COMMUNITY DEVELOPMENT BUILDING LOW SLOPE ROOF REPLACEMENT TABLE OF CONTENTS DIVISION 1-GENERAL REQUIREMENTS 01100 SUMMARY 01140 WORK RESTRICTIONS 01250 CONTRACT MODIFICATOIN PROCEDURES 01270 UNIT PRICES 01290 PAYMENT PROCEDURES 01310 PROJECT MANGEMENT AND COORDINATION 01320 CONSTRUCTION PROGRESS DOCUMENTATION 01330 SUBMITTAL PROCEDURES 01500 TEMPORARY FACILITIES AND CONTROLS 01610 MATERIAL STORAGE&HANDLING 01720 PROJECT RECORD DOCUMENTS 01750 WARRANTIES 01770 CLOSEOUT PROCEDURES DIVISION 2-3 NOT USED DIVISION 4- MASONRY 04520 MASONRY REPAIR DIVISION 5 NOT USED DIVISION 6-WOOD AND PLASTICS 06105 MISCELLANEOUS CARPENTRY DIVISION 7-THERMAL AND MOISTURE PROTECTION 07311 ASPHALT SHINGLES 07531 EPDM MEMBRANE ROOFING 07591 MEMBRANE ROOFING PREPARATION/DEMOLITION 07620 SHEET METAL FLASHING AND TRIM DIVISION 8-16 NOT USED DRAWING INDEX Community Development Building December 8,2015 SECTION 01100-SUMMARY PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. B. Related Sections include the following: 1. Division 4, Section 04520"Masonry Repair" 2. Division 6, Section 06105 "Miscellaneous Carpentry" 3. Division 7, Section 07311 "Asphalt Shingles" 4. Division 7, Section 07531 "EPDM Membrane Roofing" 5. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" 6. Division 7, Section 07620"Sheet Metal Flashing and Trim" 1.2 WORK COVERED BY CONTRACT DOCUMENTS A. Project Name: Community Development Building Low Slope Roof Replacement. 1. Project Location: 17146 Monument Circle,Isle Wight County,VA 23397 2. Owner: Isle of Wight County B. Engineer Identification: The Contract Documents, dated December 8, 2015 which were prepared for the Project by Hentz Engineering, Inc., 750 Lord Dunmore Drive Suite 103, Virginia Beach,VA 23464. 1.3 WORK INCLUDED A. This Section includes providing all labor, materials, equipment and supervision as outlined in the Specifications and Drawings. The following is a summary description of the Project: 1. Remove and dispose of the existing theromoplastic roof systems on Roof Sections Al, A2, A3, A4, B1 and B2 down to the metal roof deck. Work is to include the complete removal and disposal of the existing roof membranes, flashings, insulation, gravel, wood blocking (not shown to remain) and sheet metal flashing down to the existing deck. The approximate roof areas are as follows: • Roof Section Al -Approximately 3,500 SF(Metal Deck) • Roof Section A2-Approximately 50 SF(Metal Deck) • Roof Section A3 -Approximately 130 SF (Metal Deck) • Roof Section A4-Approximately 80 SF (Metal Deck) • Roof Section B1 -Approximately 700 SF (Metal Deck) • Roof Section B2-Approximately 150 SF (Metal Deck) SUMMARY 01100 - 1 Community Development Building December 8,2015 2. Provide a new fully adhered EPDM roof membrane system over new mechanically attached polyisocyanurate insulation. 3. Provide new fully adhered EPDM membrane flashings, sheet metal flashings, plywood sheathing and wood blocking as outlined in the Contract Documents. 4. Provide all necessary utility disconnects, reconnects and utility extensions needed to complete the work. 5. Remove the existing asphalt shingles from the steep slope roof adjacent to Roof Section Al as necessary to remove and replace the deteriorated tongue and groove deck boards 12 inches up from the roof eave. Provide new replacement tongue and groove decks boards to match existing. Provide new self adhered underlayment. 6. Provide new through wall flashing at the masonry rising wall and Roof Section A2 interface as outlined in the Contract Documents. 7. Provide a 3 year contractor's warranty and a 20 year manufacture's roof system warranty. 1.4 USE OF PREMISES A. General: Owner will occupy the facility during the Work, the Contractor shall coordinate the Work which will impact the use of the facility with the Owners onsite personnel. PART 2 -PRODUCTS (Not Used) PART 3 -EXECUTION(Not Used) END OF SECTION 01100 SUMMARY 01100 -2 Community Development Building December 8,2015 SECTION 01140-WORK RESTRICTIONS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,apply to this Section. 1.2 USE OF PREMISES A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated. 1. Limits: Confine construction operations to the roof areas where work is to be performed. 2. Owner Occupancy: Allow for Owner occupancy of site. 3. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. B. Use of Existing Building: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period. 1.3 CONSTRUCTION SEQUENCE A. The removal and replacement of the existing roof systems above Roof Section Al and A3 is to be scheduled first. Work on these roof sections will require the temporary removal of the existing roof top HVAC unit and duct work. Removal of the existing HVAC unit and duct work is to be performed by the Owner. The Contractor shall coordinate with the Owner for the removal of the roof top HVAC unit. The Contractor shall provide all necessary temporary flashings and tie-ins of the existing roof system once the roof top HVAC unit and duct work has been removed. 1.4 OCCUPANCY REQUIREMENTS. A. Full Owner Occupancy: Owner will occupy site and existing building during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. B. Access to the roof shall be limited to a ladder or temporary stairs from the exterior. WORK RESTRICTIONS 01140- 1 Community Development Building December 8,2015 C. Owner reserves the right to postpone or delay contractor work schedule to accommodate interior facility use. D. The Contractor shall be solely responsible for supervising and directing the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract. The Contractor shall be solely responsible for the means, methods, techniques, sequences and procedures of construction and for coordinating all portions of the Work under the Contract, except where otherwise specified in the Contract Documents. The Contractor is solely responsible to the Owner that the finished Work complies with the Contract Documents. E. The Contractor shall be solely responsible for health and safety precautions and programs for workers and others in connection with the Work.No inspection by, knowledge on the part of, or acquiescence by the Consultant, the Project Observer, the Owner, the Owner's employees and agents, or any other entity whatever shall relieve the Contractor from its sole responsibility for compliance with the requirements of the Contract or its sole responsibility for health and safety programs and precautions. PART 2 -PRODUCTS (Not Used) PART 3 -EXECUTION(Not Used) END OF SECTION 01140 WORK RESTRICTIONS 01140-2 Community Development Building December 8,2015 SECTION 01250 -CONTRACT MODIFICATION PROCEDURES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section specifies administrative and procedural requirements for handling and processing Contract modifications. 1.3 PROPOSAL REQUESTS A. Owner-Initiated Proposal Requests: Engineer will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications. 1. Proposal Requests issued by Engineer are for information only. Do not consider them instructions either to stop work in progress or to execute the proposed change. 2. Within time specified in Proposal Request after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change. a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. c. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. B. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to the Contract,Contractor may propose changes by submitting a request for a change to the Engineer. 1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time. 2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. 3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. CONTRACT MODIFICATION PROCEDURES 01250 - 1 Community Development Building December 8,2015 4. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. C. Proposal Request Form: For Change Order proposals,use forms provided by Owner. 1.4 ALLOWANCES A. Allowance Adjustment: To adjust allowance amounts, base each Change Order proposal on the difference between purchase amount and the allowance, multiplied by final measurement of work-in-place. If applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes,normal product imperfections,and similar margins. 1. Include installation costs in purchase amount only where indicated as part of the allowance. 2. If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other margins claimed. 3. Submit substantiation of a change in scope of work, if any, claimed in Change Orders related to unit-cost allowances. 4. Owner reserves the right to establish the quantity of work-in-place by independent quantity survey,measure, or count. B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents, whether for the Purchase Order amount or Contractor's handling, labor, installation, overhead, and profit. Submit claims within 14 days of receipt of the Change Order or Construction Change Directive authorizing work to proceed. Owner will reject claims submitted later than 14 days after such authorization. 1.5 CHANGE ORDER PROCEDURES A. On Owner's approval of a Proposal Request, Engineer will issue a Change Order for signatures of Owner and Contractor on AIA Form G701 or on the Isle of Wight County Change Order Form. 1.6 MINOR CHANGES IN THE WORK A. Engineer will issue supplemental instructions authorizing Minor Changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710 Form. 1.7 CONSTRUCTION CHANGE DIRECTIVE A. Construction Change Directive: Engineer may issue a Construction Change Directive on AIA Form G714. Construction Change Directive instructs Contractor to proceed with a change in the Work,for subsequent inclusion in a Change Order. CONTRACT MODIFICATION PROCEDURES 01250 -2 Community Development Building December 8,2015 1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time. B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive. 1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract. PART 2-PRODUCTS (Not Used) PART 3 -EXECUTION(Not Used) END OF SECTION 01250 CONTRACT MODIFICATION PROCEDURES 01250-3 Community Development Building December 8,2015 SECTION 01270 -UNIT PRICES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,apply to this Section. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for unit prices. B. Related Sections include the following: 1. Division 6, Section 06105 "Miscellaneous Carpentry" 1.3 DEFINITIONS A. Unit price is an amount proposed by bidders, stated on the Bid Form, as a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if estimated quantities of Work required by the Contract Documents are increased or decreased. B. Board Foot (BF): A unit of measure equal to 144 cubic inches, calculated by measuring board nominal thickness x nominal face width x length divided by 144. Example: 2 x 4 x 8 foot long =(2"x 4"x 96")/ 144=5.33 board feet. C. Square Foot (SF): A unit of measure equal to 144 square inches, calculated by the nominal length x nominal width of an item 1.4 PROCEDURES A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead,and profit. B. Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections. C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor. UNIT PRICES 01270- 1 Community Development Building December 8,2015 D. List of Unit Prices: A list of unit rices is included at the end of this Section. Specification P P Sections referenced in the schedule contain requirements for materials described under each unit price. PART 2-PRODUCTS (Not Used) PART 3 -EXECUTION 3.1 LIST OF UNIT PRICES A. Unit Price No. 1 —Remove and replace deteriorated wood nailers/blocking. 1. Description: Provide a unit price to remove, dispose of and provide new wood p P p P nailers/blocking in accordance with specification Section 06105 "Miscellaneous Carpentry". 2. Unit of Measurement: Board Foot Replaced. B. Unit Price No. 2—Remove and replace deteriorated metal deck. 1. Description: Provide a unit price to remove, dispose of and provide new metal roof decking and secure to framing. Decking shall match existing profile and grade. 2. Unit of Measurement: Square Foot Replaced. END OF SECTION 01270 UNIT PRICES 01270-2 Community Development Building December 8,2015 SECTION 01290-PAYMENT PROCEDURES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,apply to this Section. 1.2 SUMMARY A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment. B. Related Sections include the following: 1. Division 1, Section 01250 "Contract Modification Procedures" for administrative procedures for handling changes to the Contract. 2. Division 1, Section 01320 "Construction Progress Documentation" for administrative requirements governing preparation and submittal of Contractor's Construction Schedule and Submittals Schedule. 1.3 DEFINITIONS A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 1.4 SCHEDULE OF VALUES A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule. 1. Correlate line items in the Schedule of Values with other required administrative forms and schedules,including the following: a. Application for Payment forms with Continuation Sheets. b. Submittals Schedule. 2. Submit the Schedule of Values to Engineer at earliest possible date but no later than 14 days before the date scheduled for submittal of initial Applications for Payment. B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section. PAYMENT PROCEDURES 01290 - 1 Community Development Building December 8,2015 1. Identification: Include the following Project identification on the Schedule of Values: a. Project name and location. b. Name of Engineer. c. Engineer's project number. d. Contractor's name and address. e. Date of submittal. 2. Arrange the Schedule of Values in tabular form with separate columns to indicate the following for each item listed: a. Related Specification Section or Division. b. Description of the Work. c. Change Orders(numbers)that affect value. d. Dollar value. 1) Percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent. 3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate. 4. Round amounts to nearest whole dollar; total shall equal the Contract Sum. 5. Provide a separate line item in the Schedule of Values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored,but not yet installed. a. Differentiate between items stored on-site and items stored off-site. Include evidence of insurance or bonded warehousing if required. 6. Provide separate line items in the Schedule of Values for initial cost of materials,for each subsequent stage of completion,and for total installed value of that part of the Work. 7. Each item in the Schedule of Values and Applications for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item. a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option. 8. Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum. 1.5 APPLICATIONS FOR PAYMENT A. Each Application for Payment shall be consistent with previous applications and payments as certified by Engineer and paid for by Owner. PAYMENT PROCEDURES 01290-2 Community Development Building December 8,2015 1. Initial Application for Payment, Application for Payment at time of Substantial Completion,and final Application for Payment involve additional requirements. B. Payment Application Times: The date for each progress payment is the 25 day of each month. The period covered by each Application for Payment starts on the day following the end of the preceding period. C. Payment Application Forms: Use AIA Form G702 and G703 as forms for Applications for Payment. D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Engineer will return incomplete applications without action. 1. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use updated schedules if revisions were made. 2. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application. E. Transmittal: Submit three (3) signed and notarized original copies of each Application for Payment to Engineer by a method ensuring receipt. One copy shall include waivers of lien and similar attachments if required. 1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application. F. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's lien from every entity who is lawfully entitled to file a mechanic's lien arising out of the Contract and related to the Work covered by the payment. 1. Submit partial waivers on each item for amount requested,before deduction for retainage, on each item. 2. When an application shows completion of an item, submit final or full waivers. 3. Owner reserves the right to designate which entities involved in the Work must submit waivers. 4. Submit final Application for Payment with or preceded by final waivers from every entity involved with performance of the Work covered by the application who is lawfully entitled to a lien. 5. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to Owner. G. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following: 1. List of subcontractors. 2. Schedule of Values. 3. Contractor's Construction Schedule(preliminary if not final). 4. Products list. 5. Submittals/Submittal Log. 6. Report of preconstruction conference. 7. Performance and payment bonds if required in the contract. PAYMENT PROCEDURES 01290 -3 Community Development Building December 8,2015 H. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete. 1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum. I. Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following: 1. Evidence of completion of Project closeout requirements. 2. Insurance certificates for products and completed operations where required and proof that taxes,fees, and similar obligations were paid. 3. Updated final statement, accounting for final changes to the Contract Sum. 4. AIA Form G706A, "Contractor's Affidavit of Release of Liens" PART 2 -PRODUCTS (Not Used) PART 3 -EXECUTION(Not Used) END OF SECTION 01290 PAYMENT PROCEDURES 01290-4 Community Development Building December 8,2015 SECTION 01310-PROJECT MANAGEMENT AND COORDINATION PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,apply to this Section. 1.2 SUMMARY A. This Section includes administrative provisions for coordinating construction operations on Project including,but not limited to,the following: 1. General project coordination procedures. 2. Coordination Drawings. 3. Administrative and supervisory personnel. 4. Project meetings. B. Each contractor shall participate in coordination requirements. Certain areas of responsibility will be assigned to a specific contractor. C. Related Sections: The following Sections contain requirements that relate to this Section: 1. Division 1 Section "Construction Progress Documentation" for preparing and submitting the Contractor's Construction Schedule. 2. Division 1 Section"Closeout Procedures" for coordinating Contract closeout. 1.3 COORDINATION A. Coordination: Coordinate construction operations included in various Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that depend on each other for proper installation, connection, and operation. 1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation. 2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair. 3. Make adequate provisions to accommodate items scheduled for later installation. B. If necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings. PROJECT MANAGEMENT AND COORDINATION 01310 - 1 Community Development Building December 8,2015 1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required. C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to,the following: 1. Preparation of Contractor's Construction Schedule. 2. Preparation of the Schedule of Values. 3. Installation and removal of temporary facilities and controls. 4. Delivery and processing of submittals. 5. Progress meetings. 6. Preinstallation conferences. 7. Project closeout activities. 1.4 SUBMITTALS A. Staff Names: Within 14 days of starting construction operations, submit a list of principal staff assignments,including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities and provide a telephone number for each. 1.5 PROJECT MEETINGS A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated. 1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Engineer of scheduled meeting dates and times. 2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees. 3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Engineer, within 3 days of the meeting. B. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Owner and Engineer. Hold the conference at Project site or another convenient location. Conduct the meeting to review responsibilities and personnel assignments. 1. Attendees: Authorized representatives of Owner, Engineer and Contractor and its superintendent; major subcontractors; manufacturers; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. 2. Agenda: Discuss items of significance that could affect progress, including the following: a. Tentative construction schedule. b. Phasing. PROJECT MANAGEMENT AND COORDINATION 01310-2 Community Development Building December 8,2015 c. Critical work sequencing. d. Designation of responsible personnel. e. Procedures for processing field decisions and Change Orders. f. Procedures for processing Applications for Payment. g. Distribution of the Contract Documents. h. Submittal procedures. i. Preparation of Record Documents. j. Use of the premises/restrictions. k. Responsibility for temporary facilities and controls. 1. Parking availability. m. Site laydown and storage areas. n. Equipment deliveries and priorities. o. First aid. p. Security. q. Progress cleaning. r. Working hours. C. Progress Meetings: Conduct progress meetings at monthly intervals. Coordinate dates of meetings with preparation of payment requests. 1. Attendees: In addition to representatives of Owner and Engineer, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. 2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. b. Review present and future needs of each entity present, including the following: 1) Delivery requirements. 2) Sequence of operations. 3) Status of submittals. 4) Access. 5) Site utilization. 6) Temporary facilities and controls. 7) Work hours. 8) Hazards and risks. 9) Progress cleaning. 10) Quality and work standards. 11) Change Orders. 12) Documentation of information for payment requests. PROJECT MANAGEMENT AND COORDINATION 01310 -3 it Community Development Building December 8,2015 3. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present. Include a brief summary, in narrative form, of progress since the previous meeting and report. a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting. PART 2-PRODUCTS (Not Used) PART 3 -EXECUTION(Not Used) END OF SECTION 01310 PROJECT MANAGEMENT AND COORDINATION 01310-4 Community Development Building December 8,2015 SECTION 01320 -CONSTRUCTION PROGRESS DOCUMENTATION PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,apply to this Section. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work,including the following: 1. Contractor's Construction Schedule. B. Related Sections include the following: 1. Division 1, Section 01290 "Payment Procedures". 2. Division 1, Section 01310 "Project Management and Coordination". 3. Division 1, Section 01330 "Submittal Procedures". 1.3 DESCRIPTION A. Work Included: 1. To assure adequate planning and execution of the work so the work is completed within the number of calendar days allowed in the contract, and to assist Consultant in evaluating progress of the work, prepare and maintain the schedules and reports described in this section. B. Definition 1. "Day"used throughout the contract,unless otherwise stated means"calendar day.". 1.4 RELIANCE UPON APPROVED SCHEDULE A. Should any activity not be completed within fifteen days after the stated scheduled date, Owner shall have the right to order Contractor to expedite completion of the activity by whatever means Owner deems appropriate and necessary,without additional compensation to Contractor. B. Should any activity be 30 or more days behind schedule,the owner shall have the right to perform the activity or have the activity performed by whatever method Owner deems appropriate. C. Costs incurred by Owner in connection with expediting construction activity under this article shall be reimbursed to Owner by Contractor. CONSTRUCTION PROGRESS DOCUMENTATION 01320 - 1 Community Development Building December 8,2015 D. It is expressly understood and agreed that failure by Owner to exercise the option to either order Contractor to expedite an activity or to expedite the activity by other means shall not be considered precedent-setting for any other activities. 1.5 SUBMITTALS A. Contractor's Construction Schedule: Submit three(3)printed copies to Engineer for review. 1.6 COORDINATION A. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports. 1. Secure time commitments for performing critical elements of the Work from parties involved. 2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence. PART 2 -PRODUCTS 2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Substantial Completion. 1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date,unless specifically authorized by Change Order. B. Diagram: 1. Legibly in either a typed or ink format, graphically show the order and interdependence of all activities necessary to complete the work,and the sequence in which each activity is to be accomplished, as planned by Contractor and his project field superintendent in coordination with all Subcontractors whose work is shown on the diagram. 2. The detail of information shall be such that duration times of activities shall be more than one day. The selection and number of activities shall be subject to Owner's approval. PART 3 -EXECUTION 3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE A. At the pre-construction meeting,present the completed construction schedule. CONSTRUCTION PROGRESS DOCUMENTATION 01320 -2 Community Development Building December 8,2015 B. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one day before each regularly scheduled progress meeting. C. Distribution: Distribute copies of approved schedule to Engineer, Owner, separate contractors, and other parties identified by Contractor with a need-to-know schedule responsibility. When revisions are made, distribute updated schedules to the same parties. END OF SECTION 01320 • CONSTRUCTION PROGRESS DOCUMENTATION 01320 -3 Community Development Building December 8,2015 SECTION 01330-SUBMITTAL PROCEDURES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,apply to this Section. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for submitting Shop Drawings,Product Data, Samples, and other miscellaneous submittals. 1.3 DEFINITIONS A. Action Submittals: Written and graphic information that requires Engineer's responsive action. B. Informational Submittals: Written information that does not require Engineer's approval. Submittals may be rejected for not complying with requirements. 1.4 SUBMITTAL PROCEDURES A. Manufacturers literature, certificates,warranties, schedule of values,color charts: 1. The Contractor shall submit four copies of the requested submittals to the Engineer for review. The Engineer will process submittals within seven(7)days of receipt. 2. Submittals shall be clearly marked with the Project Name and clearly show which portions of the contents is being submitted for review. The submittal shall be organized into a single bound submittal package with an index of the items included. Submittals that are not in the proper form or are incomplete will be returned without review. B. Samples: 1. The Contractor shall submit three samples to the Engineer for review. 2. Samples shall be clearly marked with the Project name and clearly show the products utilized to construct the Sample. 3. An approved sample shall be maintained on the project site throughout the duration of the project. 1.5 SUBMITTAL SCHEDULE A. Attached to this section is a Submittal Schedule. Contractor is to fully complete the attached schedule and include with submittal package. SUBMITTAL PROCEDURES 01330 - 1 Communi ty Development ve opment Building December 8,2015 PART 2-PRODUCTS (Not Used) PART 3 -EXECUTION(Not Used) END OF SECTION 01330 SUBMITTAL PROCEDURES 01330 -2 Community Development Building December 8,2015 SUBMITTAL SCHEDULE Item Specification Section Contractors Initials l Number Number Description Indicating Item is Reviewers Comments Included 1 01290— 1.4- A Schedule of Values 2 01310 - 1.4-A Staff Names 3 01320 - 1.5 - A Construction Schedule 4 04520 -2.1 -A Face Brick Sample 5 04520 -2.2 -A Mortar 6 04520 -2.4 -A Self Adhering Flashing Membrane and Mastic 7 04520 -2.5 - A Termination Bar 8 04520 -2.7 - A Weeps 9 07311 -2.2 -A Self Adhered Underlayment 10 07311 -2.3 - A Fascia Intake Vent 11 07531 —2.2 -A EPDM Membrane 12 07531 —2.3 —C Bonding Adhesive Data Sheet 13 07531 —2.3 - D Membrane Seam Tape 14 07531 —2.3—E Lap Sealant Data Sheet 15 07531 —2.3 —F Water Cut-Off Sealant Data Sheet 16 07531 —2.3 —J Membrane Seam Plates &Fasteners 17 07531 —2.6—B,C,D Polyisocyanurate Insulation(Tapered/Flat) 18 07531 —2.4—A Roof Drain and Accessories 19 07531 —2.8—A Cable Fasteners 20 07531 —2.8—B Cone Vent and Base 21 07531 —2.8—C Cobra FasciaFlow 22 07531 — 1.5—B Insulation Board Fastening Pattern 23 07531 — 1.5—C Contractor Certification Letter from Roof Manufacturer 24 07531 — 1.5—D Manufacturer Certification/Assembly Letter 25 07531 — 1.5 -E Qualification Data: For Installer and Manufacturer 26 07531 — 1.5—F Product Test Reports SUBMITTAL PROCEDURES 01330 Community Development Building December 8,2015 Item Specification Section Contractors Initials Number Number Description Indicating Item is Reviewers Comments Included 27 07531 — 1.5 —G Roof Maintenance Data 28 07531 - 1.5 - H Roofing Installer's &Manufacturer's Warranty 29 07591 — 1.6—A Photos/Video of Existing Damage 30 07620— 1.5 - B Aluminum Sheet Metal Data Sheet and Color Chart SUBMITTAL PROCEDURES 01330 Community Development Building December 8,2015 SECTION 01500 -TEMPORARY FACILITIES AND CONTROLS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,apply to this Section. 1.2 SUMMARY A. This Section includes requirements for temporary facilities and controls, including temporary utilities, support facilities, and security and protection facilities. B. Temporary utilities include,but are not limited to,the following: 1. Water service and distribution. 2. Sanitary facilities,including toilets and wash facilities. 3. Electric power service. C. Support facilities include,but are not limited to,the following: 1. Project identification and temporary signs. 2. Waste disposal facilities. 3. Lifts and hoists. 4. Temporary stairs. 5. Construction aids and miscellaneous services and facilities. D. Security and protection facilities include,but are not limited to,the following: 1. Environmental protection. 2. Stormwater control. 3. Tree and plant protection. 4. Site enclosure fence. 5. Security enclosure and lockup. 6. Barricades,warning signs,and lights. 7. Covered walkways. 8. Temporary enclosures. 9. Temporary partitions. 10. Fire protection. 1.3 USE CHARGES A. General: Cost or use charges for temporary facilities are not chargeable to Owner or Engineer and shall be included in the Contract Sum. Allow other entities to use temporary services and facilities without cost,including,but not limited to,the following: TEMPORARY FACILITIES AND CONTROLS 01500- 1 Community Development Building December 8,2015 1. Owner's construction forces. 2. Occupants of Project. 3. Engineer. 4. Testing agencies. 5. Personnel of authorities having jurisdiction. B. Water Service: Pay water service use charges, whether metered or otherwise, for water used by all entities engaged in construction activities at Project site. C. Electric Power Service: Use electric power from Owner's existing system without metering and without payment of use charges. 1.4 PROJECT CONDITIONS A. Conditions of Use: The following conditions apply to use of temporary services and facilities by all parties engaged in the Work: 1. Keep temporary services and facilities clean and neat. 2. Relocate temporary services and facilities as required by progress of the Work. 3. Make all required connections to existing utility systems with minimum disruption to services in the existing utility systems. When disruption of the existing service is required, do not proceed without the Owner's approval and, when required, provide alternate temporary service. PART 2 -PRODUCTS 2.1 MATERIALS A. General: All temporary facilities shall be subject to the Owner's approval. 2.2 ELECTRICAL FACILITIES • A. The contractor shall make arrangements with the Owner to connect into the existing electrical service for temporary power. Contractor shall provide all temporary wiring and upon completion of the work, remove such temporary facility. If electrical power is not available by Owner, Contractor shall provide temporary power. B. Unless otherwise designated by the Owner, the circuit provided for the Contractors use shall be limited to 110 volts for the operation of hand power tools and small machines. C. Runs of the temporary power lines to the construction area shall not pass through areas of the facility open to the patrons of the Owner. These lines shall have adequate safety protection against harm to personnel and property. TEMPORARY FACILITIES AND CONTROLS 01500 -2 Community Development Building December 8,2015 2.3 WATER FACILITIES A. The Contractor shall designate a source for construction water and shall pay the cost of water used for construction purposes. B. The Contractor shall provide temporary connections to the water source and all piping, fittings, and hoses required to extend the water supply to the work area, and remove same at the completion of the project. 2.4 SANITARY FACILITIES A. Contractor shall provide temporary sanitary facilities in the quantity required, for use of all personnel. Maintain in a sanitary condition at all times. B. Locate temporary sanitary facilities in the area designated by the Owner. 2.5 ENCLOSURES A. Contractor shall provide and maintain for the duration of the project all required scaffolds, tarpaulins, barricades, warning signs, steps, ramps, bridges, platforms and other temporary construction necessary for proper completion of the work in compliance with all safety regulations and local codes. B. Contractor is responsible for the structural integrity of all temporary construction. Temporary construction shall meet all pertinent safety regulations. 2.6 FENCING OF THE CONSTRUCTION AREA A. Contractor shall provide temporary traffic barricades, directional arrows, signs and caution tape as directed by the Owner and in compliance with all safety regulations and local codes around all ground located equipment and materials. 2.7 EXTERIOR PROTECTION A. The Contractor shall provide and maintain ballasted reinforced polyethylene or canvas tarps over all exterior walls where equipment, material and/or debris is required to be raised or lowered from various roof elevations or from roof elevations to the designated staging areas during the construction project. B. The Contractor shall be responsible for the cleaning of all wall surfaces and adjacent building components which are scheduled to remain which have been soiled during the construction project. The cleaning shall be performed to the satisfaction of the Owner. C. Walls and adjacent building components scheduled to remain which cannot be cleaned to the satisfaction of the Owner shall be sandblasted, repainted, repaired or replaced at no additional cost to the Owner. TEMPORARY FACILITIES AND CONTROLS 01500-3 Community Development Building December 8,2015 2.8 GROUND PROTECTION A. The contractor shall provide ground protection as necessary in all material storage areas, staging areas,dumpster locations and along all haul routes that may exist between these areas. B. All parking lot paving materials, sidewalks, curbs, walls, fences, windows, HVAC units, etc. located in any material storage areas, staging areas and along all haul routes that may exist between these areas shall be protected. C. Any and all of the property on the ground which is damaged during the construction project shall be repaired or replaced at no additional cost to the Owner. Lanscaping including grass areas shall be restored to Owners satisfaction. Contractor shall grade and provide new sod in all grass areas disturbed during construction. D. Photographic documentation of any existing deficiencies on the roof, building surfaces, or on the ground is recommended prior to beginning any Work. The Contractor shall be responsible for documenting and providing the Owner documentation of all damages prior to beginning work. 2.9 PROTECTION OF ROOF SURFACES A. 15/32" oriented strand board or plywood and 1" extruded polystyrene insulation for use over finished roofing surfaces. PART 3 -EXECUTION 3.1 TEMPORARY UTILITY INSTALLATION A. Water Service: Install water service and distribution piping in sizes and pressures adequate for construction. B. Sanitary Facilities: Provide temporary toilets and wash facilities. Comply with regulations and health codes for type,number,location, operation, and maintenance of fixtures and facilities. 1. Disposable Supplies: Provide toilet tissue, paper towels and similar disposable materials for each facility. Maintain adequate supply. Provide covered waste containers for disposal of used material. 2. Toilets: Install self-contained toilet units. Shield toilets to ensure privacy. C. Electric Power Service: Use of Owner's existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to Owner. 3.2 SUPPORT FACILITIES INSTALLATION A. General: Comply with the following: 1. Locate storage sheds, sanitary facilities, and other temporary construction and support facilities for easy access. TEMPORARY FACILITIES AND CONTROLS 01500-4 Community Development Building December 8,2015 2. Provide incombustible construction for offices, shops, and sheds located within construction area or within 30 feet of building lines. Comply with NFPA 241. 3. Maintain support facilities until near Substantial Completion. Remove before Substantial Completion. Personnel remaining after Substantial Completion will be permitted to use permanent facilities,under conditions acceptable to Owner. B. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. C. Temporary Stairs: Provide temporary stairs to access roof from the exterior. 3.3 PROTECTION FACILITIES INSTALLATION A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Avoid using tools and equipment that produce harmful noise. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons or firms near Project site. B. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting,including flashing red or amber lights. C. Covered Walkway: Erect a structurally adequate, protective, covered walkway for passage of persons along'adjacent public streets and sidewalks. Coordinate with entrance gates, other facilities,and obstructions. Comply with regulations of authorities having jurisdiction. 1. Construct covered walkways using scaffold or shoring framing. 2. Provide wood-plank overhead decking, protective plywood enclosure walls, handrails, barricades, warning signs, lights, safe and well-drained walkways, and similar provisions for protection and safe passage. 3. Paint and maintain in a manner approved by Owner and Engineer. 3.4 OPERATION,TERMINATION,AND REMOVAL A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse,limit availability of temporary facilities to essential and intended uses. B. Maintenance: Maintain facilities in good operating condition until removal. Protect from damage caused by freezing temperatures and similar elements. C. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces,and replace construction that cannot be satisfactorily repaired. TEMPORARY FACILITIES AND CONTROLS 01500 -5 Community Development Building December 8,2015 3.5 ROOF PROTECTION A. Protection of Existing Roofing 1. Roof Membrane Protection a. Roof membrane protection shall be provided and installed at all areas where materials, equipment and/or debris will be transported across roof sections that are scheduled to remain or on newly replaced roof sections. b. Roof membrane protection is also required under all equipment, scaffolding,ramps and/or ladders required to complete the work. c. Roof membrane protection is also required under all materials, tool boxes, or equipment stored on the roof membrane surfaces. d. Plywood shall be fully supported by foam insulation board over 100% of the surface of the plywood. e. Roof membrane protection shall be a minimum of 4 feet in width. f. Roof membrane protection shall be in place prior to the start of the roof demolition work. g. Contractor shall inspect, maintain and secure the membrane protection on a daily basis throughout the course of the project. h. Maintain all roof membrane protection as long as needed for the safe and proper completion of the work. Remove all such roof membrane protection as rapidly as progress of the work will permit, or as directed by the consultant. i. The Contractor shall be responsible for the repair of damages to the existing remaining roofs,or the replacement roof systems,as a result of construction. 3.6 Protection of Replacement Roofing A. Traffic over any replaced roof area shall be limited to light foot traffic only. No hauling of heavy materials or storage of materials over these areas will be allowed unless membrane protection is provided. B. The contractor shall be responsible for the replacement of any damaged roof system materials,metal flashing components and/or related roof insulation as a result of traffic END OF SECTION 01500 TEMPORARY FACILITIES AND CONTROLS 01500-6 Community Development Building December 8,2015 SECTION 01610-MATERIAL STORAGE AND HANDLING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. B. Related Sections include the following: 1. Division 4, Section 04520"Masonry Repair" 2. Division 6, Section 06105 "Miscellaneous Carpentry" 3. Division 7, Section 07311 "Asphalt Shingles" 4. Division 7, Section 07531 "EPDM Membrane Roofing" 5. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" 6. Division 7, Section 07620"Sheet Metal Flashing and Trim" 1.2 SUMMARY A. This Section specifies provisions governing the delivery, storage and handling of equipment and materials required to complete the Work include,but are not limited to: 1. Ground staging and storage areas for materials and equipment. 2. Rooftop storage of materials and equipment. 3. Handling and protection of materials to be incorporated into the roof system. PART 2-PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 PRODUCT DELIVERY, STORAGE AND HANDLING—GENERAL A. Protection 1. Use all means to protect the materials to be included in the Work before, during, and after installation and to protect the work and materials of all other trades. B. Delivery and Storage 1. Deliver materials to the job site in original, unopened containers no sooner than thirty (30)days prior to start of job. a. Materials and equipment are to be stored in the areas designated by the Owner. MATERIAL STORAGE AND HANDLING 01610-2 Community Development Building December 8,2015 b. Protection of materials and equipment stored on the job site from theft, damage or other loss is the sole responsibility of the Contractor. Contractor shall replace all lost, stolen or damaged materials,necessary for the proper completion of the work, at no cost to the Owner. 2. Materials to be incorporated into the roof system shall be stored up off of the roof deck or ground, and covered with weatherproof coverings anchored sufficiently so as to resist wind blow off. Materials damaged due to blown off coverings shall be replaced by the Contractor at no cost to the Owner. 3. When storing materials on the roof, do not overstress the roof deck. Materials shall not be stored within 12 feet from any perimeter edge of the roof. 4. Storage of materials at the ground level shall be in an area designated by the Owner. Building access must be maintained at all times. Contractor shall provide a temporary chain link fence enclosure around all materials and equipment stored at the ground level. 3.2 STORAGE OF WOOD PRODUCTS A. All wood products to be incorporated into the work shall be stored a minimum of 6" off of the ground or roof surface and secured together with rope, wire or twine to prevent materials from being blown around the site. B. All wood products shall be covered with breathable canvas tarps securely fastened or weighted in place to prevent blow off of the tarps. END OF SECTION 01610 MATERIAL STORAGE AND HANDLING 01610 -3 Community Development Building December 8,2015 SECTION 01720—PROJECT RECORD DOCUMENTS • PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. B. Related Sections include the following: 1. Division 4, Section 04520"Masonry Repair" 2. Division 6, Section 06105 "Miscellaneous Carpentry" 3. Division 7, Section 07311 "Asphalt Shingles" 4. Division 7, Section 07531 "EPDM Membrane Roofing" 5. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" 6. Division 7, Section 07620"Sheet Metal Flashing and Trim" 1.2 SUMMARY • A. This Section includes administrative and procedural requirements governing project record documents. 1.3 DESCRIPTION A. Throughout the work of this contract,maintain an accurate record of the following 1. Contract documents (project manual with shop drawings). 2. Addendum. 3. Change orders and other modifications to the contract. 4. Field orders and instructions. 5. Construction schedule. 6. Product samples. 7. Progress reports. 1.4 QUALITY ASSURANCE A. Delegate the responsibility for maintenance of record documents to one person on the contractor's staff as approved in advance by the owner. B. Make all entries within 24 hours after receipt of information. PROJECT RECORD DOCUMENTS 01720 - 1 Community Development Building December 8,2015 1.5 PRODUCT HANDLING A. Maintain the job set of record documents completely protected from deterioration and from loss and damage until completion of the work and transfer of the recorded data to the final record documents. PART 2-PRODUCTS 2.1 RECORD DOCUMENTS A. Secure from the Owner at the pre-construction meeting, at no charge to the Contractor, one complete set of all documents comprising the contract. PART 3 -EXECUTION 3.1 MAINTENANCE OF RECORD DOCUMENTS A. Upon receipt of record documents described above, identify each of the documents with the title "Project Record Documents". B. Maintain the record documents at the job site. Documents shall be available to the Owner and Engineer during all working hours. C. The Contractor shall use record document set to record day by day "as built" information. Where the drawings are diagrammatic, such drawings shall be corrected or redrawn to show actual installation. D. During the phase of construction, if required by the Engineer, Contractor shall obtain a set of prints from the Engineer without cost and shall, in a neat and legible manner,transfer"as built" information from the record set. 3.2 REVIEW AND APPROVAL A. Submit the completed total set of record documents to the Engineer for review. Participate in review meeting or meetings as required by the Engineer, make all required changes in the documents and promptly deliver the final project record documents through the Engineer to the Owner. END OF SECTION 01720 PROJECT RECORD DOCUMENTS 01720-2 Community Development Building December 8,2015 SECTION 01750-WARRANTIES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,apply to this Section. B. Related Sections include the following: 1. Division 4, Section 04520"Masonry Repair" 2. Division 6, Section 06105 "Miscellaneous Carpentry" 3. Division 7, Section 07311 "Asphalt Shingles" 4. Division 7, Section 07531 "EPDM Membrane Roofing" 5. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" 6. Division 7, Section 07620"Sheet Metal Flashing and Trim" 1.2 SUMMARY A. This Section includes administrative and procedural requirements for Warranties. 1.3 PROCEDURES A. The following items are to be submitted to the Engineer as part of this Section. - 1. Contractor's written three(3)year guarantee covering all materials and workmanship. 2. Provide manufacturer's twenty year (20) year, no dollar limit labor-and-material warranty to Owner for the new EPDM membrane roofing system installed. Warranty shall include coverage for storms with wind speeds of up to 72 mph. 3. Provide manufacturer's standard material warranty's for all other products. 4. A report from the membrane manufacturer's representative indicating that the roof has been inspected and is suitable for warranty. Include a copy of the manufacturer's punch list, if any. Owner must be present during the inspection. 1.4 SPECIAL WARRANTIES A. The Contractor warrants that, unless otherwise specified, all materials and equipment incorporated in the Work under the Contract shall be new and in compliance with the Submittals and the Contract Documents. The Contractor further warrants that all workmanship shall be of the highest quality and in accordance with best industry practices and the Contract Documents and shall be performed by persons qualified at their respective trades. WARRANTIES 01750- 1 Community Development Building December 8,2015 B. Work not conforming to these warranties shall be considered Defective. C. This warranty of materials and workmanship is separate and independent from and in addition to any of the Contractor's and system manufacturer's other guarantees or obligations in the Contract or under relevant State law. PART 2 -PRODUCTS (Not Used) PART 3 -EXECUTION 3.1 Submit all required documentation upon completion of the Work and prior to final payment. 3.2 All warranties are to be submitted to the Owner,through the Engineer. END OF SECTION 01750 WARRANTIES 01750-2 Community Development Building December 8,2015 SECTION 01770-CLOSEOUT PROCEDURES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,apply to this Section. B. Related Sections include the following: 1. Division 4, Section 04520"Masonry Repair" 2. Division 6, Section 06105"Miscellaneous Carpentry" 3. Division 7, Section 07311 "Asphalt Shingles" 4. Division 7, Section 07531 "EPDM Membrane Roofing" 5. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" 6. Division 7, Section 07620"Sheet Metal Flashing and Trim" 1.2 SUMMARY A. This Section includes administrative and procedural requirements for contract closeout, including,but not limited to,the following: 1. Inspection procedures. 2. Warranties. 3. Final cleaning. 1.3 SUBSTANTIAL COMPLETION A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. 1. Prepare a list of items to be completed and corrected(punch list),the value of items on the list,and reasons why the Work is not complete. 2. Advise Owner of pending insurance changeover requirements. 3. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents. 4. Terminate and remove temporary facilities from Project site, along with mockups, construction tools,and similar elements. 5. Complete final cleaning requirements. 6. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects. B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Engineer will either proceed with inspection or notify Contractor of unfulfilled requirements. Engineer will prepare the Certificate of Substantial Completion after inspection CLOSEOUT PROCEDURES 01770- 1 Community Development Building December 8,2015 or will notify Contractor of items, either on Contractor's list or additional items identified by Engineer,that must be completed or corrected before certificate will be issued. 1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected. 2. Results of completed inspection will form the basis of requirements for Final Completion. 1.4 FINAL COMPLETION A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion,complete the following: 1. Submit a final Application for Payment. 2. Submit certified copy of Engineer's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Engineer. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance. B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Engineer will either proceed with inspection or notify Contractor of unfulfilled requirements. Engineer will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued. 1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected. 1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST) A. Preparation: Submit three (3) copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including,if necessary, areas disturbed by Contractor that are outside the limits of construction. 1. Organize list of spaces in sequential order. 2. Include the following information at the top of each page: a. Project name. b. Date. c. Name of Engineer. d. Name of Contractor. e. Page number. 1.6 WARRANTIES A. Submit written warranties for the Work where commencement of warranties other than date of Substantial Completion is indicated. CLOSEOUT PROCEDURES 01770-2 Community Development Building December 8,2015 PART 2-PRODUCTS 2.1 MATERIALS A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces. PART 3 -EXECUTION 3.1 FINAL CLEANING A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. 1. Cleaning: Complete the following cleaning operations before requesting inspection for certification of Substantial Completion: a. Clean Project site,yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish,waste material, litter, and other foreign substances. b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits. c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface. d. Remove tools, construction equipment, machinery, and surplus material from Project site. e. Remove labels that are not permanent. B. Comply with safety standards for cleaning. Do not bum waste materials. Do not bury debris or excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully. END OF SECTION 01770 CLOSEOUT PROCEDURES 01770-3 Community Development Building December 8,2015 SECTION 04520—MASONRY REPAIR PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes providing all labor, materials, equipment and supervision as outlined in the Specifications and Drawings. The following is a brief description of the Work: 1. Removal of existing masonry units as required to facilitate the installation of new through wall flashing above Roof Section B. B. Related Sections include the following: 1. Division 7, Section 07531 "EPDM Membrane Roofing" 2. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" 3. Division 7, Section 07620"Sheet Metal Flashing and Trim" 1.3 SUBMITTALS A. Product Data: For each type of product indicated. Include brick and mortar samples for owner approval. 1.4 QUALITY ASSURANCE A. Restoration Specialist Qualifications: Engage an experienced masonry restoration and cleaning firm to perform work of this Section. Firm shall have completed work similar in material, design, and extent to that indicated for this Project with a record of successful in-service performance. B. Restoration Worker Qualifications: Persons who are experienced in restoration work of types they will be performing. C. Source Limitations: Obtain each type of material for masonry restoration (face brick, cement, sand, etc.) from one source with resources to provide materials of consistent quality in appearance and physical properties. MASONRY REPAIR 04520 - 1 Community Development Building December 8,2015 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver masonry units to Project site strapped together in suitable packs or pallets or in heavy- duty cartons. B. Deliver other materials to Project site in manufacturer's original and unopened containers, labeled with manufacturer's name and type of products. C. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp. D. Store sand where grading and other required characteristics can be maintained and contamination avoided. 1.6 PROJECT CONDITIONS A. Repair masonry only when air temperature is between and 40 and 90 deg F and is predicted to remain so for at least 7 days after completion of work. B. Cold-Weather Requirements: Comply with the following procedures for masonry repair and mortar joint pointing: 1. When air temperature is below 40 deg F, heat mortar ingredients, masonry repair materials, and existing masonry walls to produce temperatures between 40 and 120 deg F. 2. When mean daily air temperature is below 40 deg F, provide enclosure and heat to maintain temperatures above 32 deg F within the enclosure for 7 days after repair and pointing. C. Hot-Weather Requirements: Protect masonry repair and mortar joint pointing when temperature and humidity conditions produce excessive evaporation of water from mortar and repair materials. Provide artificial shade and wind breaks and use cooled materials as required. Do not apply mortar to substrates with temperatures of 90 deg F and above. D. Patch masonry only when air and surface temperatures are between and 55 and 100 deg F and are predicted to remain above 55 deg F for at least 7 days after completion of work. On days when air temperature is predicted to go above 90 deg F, schedule patching work to coincide with time that surface being patched will be in shade or during cooler morning hours. E. Clean masonry surfaces only when air temperature is 40 deg F and above and is predicted to remain so for at least 7 days after completion of cleaning. 1.7 SEQUENCING AND SCHEDULING A. Order replacement materials at earliest possible date, to avoid delaying completion of the Work. B. Take delivery of and store at Project site a sufficient quantity of sand to complete Project. C. Perform all work required for masonry flashing installation prior to installation of new roof system. MASONRY REPAIR 04520 -2 Community Development Building December 8,2015 PART 2-PRODUCTS 2.1 MASONRY MATERIALS A. Face Brick: Provide face brick and accessories where required to complete masonry work. 1. Provide units with colors, surface texture, size, and shape to match existing brickwork - and with physical properties not less than those determined from preconstruction testing of selected existing units. a. For existing brickwork that exhibits a range of colors, provide brick that matches that range rather than brick that matches an individual color within that range. 2.2 MORTAR MATERIALS A. Masonry Mortar shall be proportioned in accordance with ASTM C270 to match the color of the existing mortar and consist of one of the following: 1. Ready mix pre-colored masonry cement with the physical properties specified in ASTM C91,Type N 2. Masonry sand conforming to ASTM C144 3. Potable water. 2.3 CLEANING MATERIALS A. Water for Cleaning: Potable. B. Mild Acidic Cleaner: Manufacturer's standard mildly acidic cleaner containing no hydrochloric, hydrofluoric, or sulfuric acid; or chlorine bleaches. 1. Products: a. Diedrich Technologies Inc.; Envirorestore 100. b. Dominion Restoration, Inc.; DR-60 Stone and Masonry Cleaner. c. Dumond Chemicals, Inc.; Safe n'Easy Heavy Duty Restoration Cleaner. d. ProSoCo; Sure Klean Light-Duty Restoration Cleaner. e. Approved equal MASONRY REPAIR 04520 -3 Community Development Building December 8,2015 2.4 SELF ADHERING FLASHING MEMBRANE A. Rubberized-Asphalt Flashing: Manufacturer's standard composite flashing product consisting of a pliable and highly adhesive rubberized-asphalt compound,bonded to a high-density, cross- laminated polyethylene film to produce an overall thickness of 0.040 inch. Provide manufacturers recommended primer. 1. Products: a. Henry TWF;by Henry Company b. Perm-A-Barrier Wall Flashing; W. R. Grace & Co., Construction Products Division. c. Approved equal 2.5 Termination Bar A. Aluminum bar approximately 1/8"x 1"with sealant ledge. 2.6 Sealant/Mastic A. Sealant/mastic as recommended by self-adhering membrane manufacturer. 2.7 Weeps A. Hohmann&Barnard QV-Quadro-Vent sized to fit existing brick PART 3 -EXECUTION 3.1 PROTECTION A. Protect persons, motor vehicles, surrounding surfaces of building being restored, building site, a t pl n s, and surrounding buildings from harm resulting from masonry restoration work. B. Comply protecting with chemical cleaner manufacturer's written instructions for rotectin building and g other surfaces against damage from exposure to its products. Prevent chemical cleaning solutions from coming into contact with pedestrians, motor vehicles, landscaping, buildings, and other surfaces that could be harmed by such contact. C. Prevent mortar from staining face of surrounding masonry and other surfaces. 1. Keep wall area wet below rebuilding and pointing work to discourage mortar from adhering. 2. Immediately remove mortar in contact with exposed masonry and other surfaces. MASONRY REPAIR 04520-4 Community Development Building December 8,2015 3.2 BRICK REMOVAL AND REPLACEMENT A. At locations indicated, remove bricks necessary to install the new through wall flashing. Carefully demolish or remove entire units from joint to joint, without damaging surrounding masonry, in a manner that permits replacement with full-size units. When removing single bricks, remove material from center of brick and work toward outside edges. Brick removal must be performed using dust extraction equipment to prevent dust entry to the building interior. B. Support and protect remaining masonry that surrounds removal area. Maintain weather barrier and adjoining construction in an undamaged condition. C. Notify Engineer of unforeseen detrimental conditions including voids, cracks, bulges, and loose masonry units in existing masonry backup, rotted wood, rusted metal, and other deteriorated items. D. Remove in an undamaged condition as many whole bricks as possible. 1. Remove mortar, loose particles, and soil from brick by cleaning with hand chisels, brushes, and water. 2. Store brick for reuse, as indicated. E. Clean bricks surrounding removal areas by removing mortar, dust, and loose particles in preparation for replacement. F. Provide new co pp er through wall flashin g,p rime copper wall surfaces and provide new self adhering rubberized asphalt membrane. Hold self-adhering membrane flashing back from the face of brick ''A" to ''h". Install self-adhering flashing without wrinkles and fully adhered to the substrate. Roll the entire surface of the flashing to ensure a full bond. G. Secure the top edge of the rubberized asphalt membrane flashing with a continuous termination bar secured 16 inches on center to metal stud framing. Apply sealant/mastic along the top edge. Lap rubberized asphalt 4 inches minimum and apply mastic to edges. H. Provide pre-molded end dams at the end of flashing runs. I. Provide weeps spaced 24 inches on center. J. If cutting is required, use a motor-driven saw designed to cut masonry with clean, sharp, unchipped edges. K. Mix mortar following ASTM C270 proportion specification using 3 parts masonry sand to one part masonry cement. L. Lay replacement brick with completely filled bed and head joints. Butter ends with sufficient mortar to fill head joints and shove into place. Use wetting methods that ensure that units are nearly saturated but-surface is dry when laid. Maintain joint width for replacement units to match existing joints. 1. Tool exposed mortar joints in repaired areas to match joints of surrounding existing brickwork. MASONRY REPAIR 04520-5 Community Development Building December 8,2015 2. Rake out mortar used for laying brick before mortar sets and point new mortar joints in repaired area to comply with requirements for repointing existing masonry, and at same time as repointing of surrounding area. 3.3 CLEANING MASONRY, GENERAL A. Proceed with cleaning in an orderly manner; work from top to bottom and from one end of each elevation to the other. B. Use only those cleaning methods indicated for each masonry material and location. 1. Do not use wire brushes or brushes that are not resistant to chemical cleaner being used. 2. For chemical cleaner spray application, use low-pressure tank or chemical pump suitable for chemical cleaner indicated, equipped with cone-shaped spray tip. C. -Chemical Cleaner Application Methods: Apply chemical cleaners to masonry surfaces to comply with chemical cleaner manufacturer's written instructions; use brush or spray application methods, at Contractor's option. Do not spray apply at pressures exceeding 50 psi. Do not allow chemicals to remain on surface for periods longer than those indicated or recommended by manufacturer. D. Rinse off chemical residue and soil. Periodically during each rinse, test pH of rinse water running off of cleaned area to determine that chemical cleaner is completely removed. 1. Apply neutralizing agent and repeat rinse, if necessary, to produce tested pH of between 6.7 and 7.5. E. After cleaning is complete, remove protection no longer required. Remove tape and adhesive marks. 3.4 CLEANING BRICKWORK A. Chemical Cleaning: 1. Wet masonry with cold water applied by low-pressure spray. 2. Apply cleaner to masonry by brush or low-pressure spray. Let cleaner remain on surface as recommended by chemical cleaner manufacture. 3. Rinse with cold water applied by medium-pressure spray to remove chemicals and soil. MASONRY REPAIR 04520 -6 Community Development Building December 8,2015 3.5 CLEAN-UP A. After mortar has fully hardened, thoroughly clean exposed masonry surfaces of excess mortar and foreign matter; use wood scrapers, stiff-nylon or -fiber brushes, and clean water, spray applied at low pressure. 1. Do not use metal scrapers or brushes. 2. Do not use acidic or alkaline cleaners. B. Wash adjacent woodwork and other nonmasonry surfaces. Use detergent and soft brushes or cloths. C. Clean masonry debris from roof; remove debris from drains, gutters and downspouts. Rinse off roof and flush gutters and downspouts. D. Sweep and rake adjacent pavement and grounds to remove masonry debris. Where necessary, pressure wash surfaces to remove mortar, dust, dirt, and stains. 3.6 MASONRY WASTE DISPOSAL A. Unless otherwise indicated, excess masonry materials are Contractor's property. At completion of Masonry Repair work,remove from Project site and legally dispose of off Owner's property. END OF SECTION 04520 MASONRY REPAIR 04520 -7 Community Development Building December 8,2015 SECTION 06105 -MISCELLANEOUS CARPENTRY PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes providing all labor, materials, equipment and supervision as outlined in the Specifications and Drawings. The following is a brief description of the Work: 1. Wood blocking and nailers 2. Plywood sheathing 3. Wood plank deck B. Related Sections include the following: 1. Division 7; Section 07531 "EPDM Membrane Roofing" 2. Division 7, Section 07311 "Asphalt Shingles" 3. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" 4. Division 7, Section 07620"Sheet Metal Flashing and Trim" 1.3 UNIT PRICES A. Provide quantities specified under Section 01270 — "Unit Prices", materials to be used are specified in this section. 1.4 SUBMITTALS A. Product Data: 1. Not Required 1.5 DELIVERY, STORAGE,AND HANDLING A. Stack lumber, plywood, and other panels; place spacers between each bundle to provide air circulation. Provide for air circulation around stacks and under coverings. MISCELLANEOUS CARPENTRY 06105 - 1 Community Development Building December 8,2015 1.6 SCHEDULING A. Coordinate work of this section with interfacing and adjoining work for proper sequencing of each installation. Ensure weather resistance,durability and protection of materials and finishes. PART 2 -PRODUCTS 2.1 MISCELANEOUS LUMBER,NAILERS,BLOCKING,WOOD PLANK A. For items of dimension lumber size, provide No. 2 grade lumber with any of the following species: 1. Mixed southern pine; SPIB. 2. Hem-fir or Hem-fir(north);NLGA,WCLIB, or WWPA. 3. Spruce-pine-fir(south)or Spruce-pine-fir;NELMA,NLGA,WCLIB, or WWPA. 4. Eastern softwoods;NELMA. 5. Northern species;NLGA. B. Kiln-dry material to maximum moisture content of 19 percent for lumber and 15 percent for plywood. Do not use material that is warped or does not comply with requirements for untreated material. 1. Mark each item with the treatment quality mark of an inspection agency approved by the American Lumber Standards Committee Board of Review. C. Provide lumber in the sizes indicated in the Drawings. 2.2 PANEL PRODUCTS A. Miscellaneous Concealed Plywood: Exterior tongue and groove CDX sheathing, span rating to suit framing in each location,nominal 3/4"inch thick. 2.3 FASTENERS A. General: Provide fasteners of size and type indicated that comply with requirements specified in this Article for material and manufacture. 1. Provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M. B. Common Nails: Hot dipped galvanized of sizes required. C. Roofing Nails: Stainless steel ring shank,minimum 1-1/4"long or as indicated. D. Wood Screws: Corrosion resistant coated meeting ASME B18.6.1. MISCELLANEOUS CARPENTRY 06105 -2 Community Development Building December 8,2015 PART 3 -EXECUTION 3.1 INSTALLATION, GENERAL A. Discard units of material with defects that impair quality of carpentry and that are too small to use with minimum number of joints or optimum joint arrangement. B. Set carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit carpentry to other construction; scribe and cope as needed for accurate fit. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction. C. Countersink fastener heads on exposed carpentry work and fill holes with wood filler. D. Securely attach carpentry work to substrate by anchoring and fastening as indicated, where not indicated, comply with the following: 1. Table 2304.9.1 "Fastening Schedule," in the 2012 International Building Code. 3.2 WOOD BLOCKING,AND NAILER INSTALLATION A. Install where indicated and where required for attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved. B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces, unless otherwise indicated. 3.3 CLEAN-UP A. All debris shall be removed from the job site by the Contractor in accordance with Contract provisions. END OF SECTION 06105 MISCELLANEOUS CARPENTRY 06105 -3 Community Development Building December 8,2015 SECTION 07311 -ASPHALT SHINGLES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Self-Adhering Underlayment. 2. Fascia Intake Vent B. Related Sections include the following: 1. Division 6, Section 06105 "Miscellaneous Carpentry" 2. Division 7, Section 07531 "EPDM Membrane Roofing" 3. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" 4. Division 7, Section 07620"Sheet Metal Flashing and Trim" 1.3 DEFINITIONS A. Roofmg Terminology: Refer to ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" for definitions of terms related to roofing work in this Section. 1.4 SUBMITTALS A. Product Data: For each type of product indicated. 1.5 QUALITY ASSURANCE A. Installer Qualifications: A firm or individual that is approved, authorized, or licensed by asphalt shingle roofing system manufacturer to install roofing system indicated. 1.6 DELIVERY, STORAGE,AND HANDLING A. Store roofing materials in a dry, well-ventilated, weather tight location according to manufacturer's written instructions. Store underlayment rolls on end on pallets or other raised surfaces. Do not double-stack rolls. ASPHALT SHINGLES 07311 - 1 Community Development Building December 8,2015 1. Handle, store, and place roofing materials in a manner to avoid significant or permanent damage to roof deck or structural supporting members. B. Protect unused underlayment from weather, sunlight, and moisture when left overnight or when roofing work is not in progress. 1.7 PROJECT CONDITIONS A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit asphalt shingle.roofing to be performed according to manufacturer's written instructions and warranty requirements. 1. Install self-adhering sheet underlayment within the range of ambient and substrate temperatures recommended by manufacturer. PART 2-PRODUCTS 2.1 MANUFACTURERS 1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include,but are not limited to,products specified. 2. Products: Subject to compliance with requirements, provide one of the products specified. 2.2 UNDERLAYMENT MATERIALS A. Self Adhered Underlayment: ASTM D 1970, minimum of 55-mil thick sheet; glass-fiber-mat- reinforced, SBS-modified asphalt; mineral-granule surfaced; with release paper backing; cold applied. 1. Available Products: a. CertainTeed Corporation;WinterGuard. b. Approved equal 2.3 FASCIA INTAKE VENT A. Fascia Intake Vent: . 1. Available Product: a. GAF Materials Corporation; Cobra FasciaFlow b. Approved equal 2. Minimum Net Free Area: 9 sq. in.per foot ASPHALT SHINGLES 07311 -2 Community Development Building December 8,2015 2.4 ACCESSORIES A. Roofing Nails: ASTM F 1667; stainless-steel shingle nails, minimum 0.120-inch diameter, barbed shank, sharp-pointed, with a minimum 3/8-inch diameter flat head and of sufficient length to penetrate 3/4 inch into solid wood decking or extend at least 1/8 inch through OSB or plywood sheathing. 1. Where nails are in contact with metal flashing, use nails made from same metal as flashing. 2.5 METAL FLASHING AND TRIM A. Sheet Metal Flashing and Trim: Comply with requirements in Division 7 Section "Sheet Metal Flashing and Trim." B. Fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item. 1. Drip Edges: Fabricate in lengths not exceeding 10 feet with 4-inch roof deck flange and 5 -inch fascia flange with 3/8-inch drip at lower edge. PART 3 -EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of work. 1. Examine roof sheathing to verify that sheathing joints are supported by framing and blocking or metal clips and that installation is within flatness tolerances. 2. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and completely anchored; and that provision has been made for flashings and penetrations through asphalt shingles. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 UNDERLAYMENT INSTALLATION A. Self-Adhering Sheet Underlayment: Install self-adhering sheet underlayment, wrinkle free, on roof deck. Comply with low-temperature installation restrictions of underlayment manufacturer if applicable. Install at locations indicated on Drawings, lapped in direction to shed water. Lap under existing felt paper 6 inches minimum. Lap ends not less than 6 inches staggered. Roll laps with roller. Cover underlayment within seven days. ASPHALT SHINGLES 07311 -3 Community Development Building December 8,2015 3.3 METAL FLASHING INSTALLATION A. General: Install metal flashings and other sheet metal to comply with requirements in Division 7 Section"Sheet Metal Flashing and Trim." 1. Install metal flashings according to recommendations in ARMA's "Residential Asphalt Roofing Manual" and asphalt shingle recommendations in NRCA's "The NRCA Roofing and Waterproofing Manual." . B. Eave Drip Edges: Install eave drip edge flashings below underlayment and fasten to roof sheathing. 3.4 ASPHALT SHINGLE INSTALLATION A. Install asphalt shingles according to manufacturer's written instructions, recommendations in ARMA's "Residential Asphalt Roofing Manual," and asphalt shingle recommendations in NRCA's "The NRCA Roofing and Waterproofing Manual." B. Install starter strip along lowest roof edge, consisting of an asphalt shingle strip with self- sealing strip face up at roof edge. 1. Extend asphalt shingles 1/2 inch over fascia at eaves. 2. Install starter strip along rake edge. C. Fasten asphalt shingle strips with a minimum of five roofing nails located according to manufacturer's written instructions. 1. When ambient temperature during installation is below 50 deg F, seal asphalt shingles with asphalt roofing cement spots. D. Fascia Intake Vents: Install continuous fascia intake vent according to manufacturer's written instructions. END OF SECTION 07311 ASPHALT SHINGLES 07311 -4 Community Development Building December 8,2015 SECTION 07531 -EPDM MEMBRANE ROOFING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Adhered membrane roofing system. B. Related Sections include the following: 1. Division 4, Section 04520"Masonry Repair" 2. Division 6, Section 06105 "Miscellaneous Carpentry" 3. Division 7, Section 07311 "Asphalt Shingles" 4. Division 7, Section 07531 `EPDM Membrane Roofing" 5. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" 6. Division 7, Section 07620"Sheet Metal Flashing and Trim" C. Unit Prices: Refer to Division 1 Section "Unit Prices" for description of Work in this Section affected by unit prices. 1.3 DEFINITIONS A. Roofing Terminology: Refer to ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" for definition of terms related to roofing work in this Section. 1.4 PERFORMANCE REQUIREMENTS A. General: Provide installed roofing membrane and base flashings that remain watertight; do not permit the passage of water; and resist specified uplift pressures, thermally induced movement, and exposure to weather without failure. B. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by roofing membrane manufacturer based on testing and field experience. EPDM MEMBRANE ROOFING 07531 - 1 Community Development Building December 8,2015 C. Roofing System Design: Provide a membrane roofing system that is identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist uplift pressure calculated according to ASCE 7. (Factor of Safety of 2) 1. Field Uplift Pressure: 38 lbf/sq. ft. 2. Perimeter Uplift Pressure: 64 lbf/sq. ft. 3. Corner Uplift Pressure: 97 lbf/sq. ft. 1.5 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: For roofing system. 1. Insulation board fastening patterns. C. Installer Certificates: Signed by roofing system manufacturer certifying that Installer is approved,authorized,or licensed by manufacturer to install roofing system. D. Manufacturer Certificates: Signed by roofing manufacturer certifying that roofing system complies with requirements specified in"Performance Requirements" Article. 1. Submit Roof Assembly Letter indicating evidence of meeting performance requirements. E. Qualification Data: For Installer and manufacturer. F. Product Test Reports: Based on evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified testing agency, for components of roofing system. G. Maintenance Data: For roofing system to include in maintenance manuals. H. Warranties: Special warranties specified in this Section. 1.6 QUALITY ASSURANCE A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's warranty. B. Manufacturer Qualifications: A qualified manufacturer that has UL listing or FMG approval for membrane roofing system identical to that used for this Project. C. Testing Agency Qualifications: An independent testing agency with the experience and capability to conduct the testing indicated, as documented according to ASTM E 548. D. Source Limitations: Obtain components for membrane roofing system from same manufacturer as roofing membrane or as approved by roofing membrane manufacturer.. E. Fire-Test-Response Characteristics: Provide membrane roofing materials with the fire-test- response characteristics indicated as determined by testing identical products per test method EPDM MEMBRANE ROOFING 07531 -2 Community Development Building December 8,2015 below by UL, FMG, or another testing and inspecting agency acceptable to authorities having jurisdiction. Materials shall be identified with appropriate markings of applicable testing and inspecting agency. 1. Exterior Fire-Test Exposure: Class A; ASTM E 108, for application and roof slopes indicated. F. Preconstruction Conference: Conduct conference at Project site. Comply with requirements in Division 1 Section "Project Management and Coordination." Review methods and procedures related to roofing system including,but not limited to,the following: 1. Meet with Owner; Engineer; Owner's insurer if applicable; roofing Installer; roofing system manufacturer's representative and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment. 2. Review methods and procedures related to roofing installation, including manufacturer's written instructions. 3. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays. 4. Examine deck substrate conditions and finishes for compliance with requirements, including flatness and fastening. 5. Review structural loading limitations of roof deck during and after roofing. 6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that will affect roofing system. 7. Review governing regulations and requirements for insurance and certificates if applicable. 8. Review temporary protection requirements for roofing system during and after installation. 1.7 DELIVERY, STORAGE,AND HANDLING A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name,product brand name and type, date of manufacture, and directions for storing and mixing with other components. B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight. 1. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life. C. Protect roof materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation. D. Handle and store roofing materials and place equipment in a manner to avoid permanent deflection of deck. EPDM MEMBRANE ROOFING 07531 -3 Community Development Building December 8,2015 1.8 PROJECT CONDITIONS A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements. 1.9 WARRANTY A. Manufacturer's Warranty: Manufacturer's standard form, without monetary limitation, in which manufacturer agrees to repair or replace components of membrane roofing system that fail in materials or workmanship within specified warranty period. Failure includes roof leaks. 1. Manufacturer's warranty includes roofing membrane, base flashings, roofing accessories, fasteners and other components of membrane roofing system. 2. Warranty Period: 20 years from date of Substantial Completion. B. Roofing Installer's Warranty: Submit Roofing Installer's Warranty, on warranty form at end of this Section, signed by Installer, covering Work of this Section, including all components of membrane roofing system such as roofing membrane, base flashing, roof insulation, fasteners, cover boards, substrate boards, vapor retarders, roof pavers, and walkway products, for the following warranty period: 1. Warranty Period: Three(3)years from date of Substantial Completion. PART 2 -PRODUCTS 2.1 MANUFACTURERS 1. EPDM membrane shall be obtained from a single manufacturer. Secondary materials (insulation, adhesive, fasteners, etc.) shall be by manufacturer of EPDM membrane; or, as required by manufacturer of EPDM membrane. If secondary materials are provided by others,they must be approved by the primary membrane manufacturer. 2.2 EPDM ROOFING MEMBRANE A. EPDM Roofing Membrane: ASTM D 4637, Type I, nonreinforced uniform, flexible sheet made from EPDM, and as follows: 1. Manufacturers: a. Carlisle SynTec Incorporated. b. Firestone Building Products Company. c. GenFlex Roofing Systems. d. Versico Inc. 2. Thickness: 60 mils,nominal. 3. Exposed Face Color: Black. EPDM MEMBRANE ROOFING 07531 -4 Community Development Building December 8,2015 2.3 EPDM ROOF MEMBRANE ACCESSORIES A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with membrane roofing. 1. Liquid-type auxiliary materials shall meet VOC limits of authorities having jurisdiction. B. Sheet Flashing: 60-mil-thick EPDM,partially cured or cured, according to application. C. Bonding Adhesive: Manufacturer's standard bonding adhesive. D. Seaming Material: Manufacturer's standard synthetic-rubber polymer primer and 6-inch-wide minimum,butyl splice tape with release film. E. Lap Sealant: Manufacturer's standard single-component sealant, color to match roofing membrane. F. Water Cutoff Mastic: Manufacturer's standard butyl mastic sealant. G. Polyurethane Sealant: Single component polyurethane sealant meeting minimum requirements of ASTM C920, Type S, Class 25, Grade NS and Use NT, M and A; color to be selected by Owner. 1. Available Products: a. Master Builders-Masterseal;NP1 b. Sika; SikaFlex 1A c. Approved Equal H. Silicone Sealant: Single component neutral-curing silicone sealant. 1. Available Products: a. Pecora Corporation; 890 b. Tremco; Spectrem 3 c. Approved equal. I. Miscellaneous Roof Membrane Accessories: Provide pourable sealers, preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings, T-joint covers, termination reglets, cover strips,and other accessories. J. Membrane Seam Plates and Fasteners: Factory-coated steel fasteners and metal plates designed for fastening membrane to substrate,and acceptable to roofing system manufacturer. 2.4 ROOF DRAINS A. Roof Drains: 3" diameter drain, cast iron bowl, strainers, underdeck clamps, metal drain sump pan, clamping rings, hardware, no-hub plumbing fitting to connect to piping. Drains, clamping rings, under deck clamps and strainers shall be cast iron, metal drain sump pans shall be 14 gauge galvanized steel. 1. Available products: a. Wade, Series 3000 or 3000AE b. Josam, Series 21500 or 21500AE EPDM MEMBRANE ROOFING 07531 -5 Community Development Building December 8,2015 c. Zurn, Series Z-100 or Z-100EA d. J.R. Smith, Series 1010 or 1015 e. Approved equal 2.5 ROOF DRAIN ACCESSORIES A. Pipe Insulation — preformed glass fiber pipe insulation bonded with a thermosetting resin complying with ASTM C547, Type 1 with factory applied ASJ jacket meeting ASTM C 1136 and adhesive strip,insulation to be ''A"thick minimum. 1. Available Products a. Johns Manville Micro-Lok b. Knauf 1000 ASJ c. Owens Corning Fiberglass Pipe Insulation • d. Approved equal B. Pipe Insulation Tape—ASJ tape,white vapor retarder tape matching factory applied jacket with acrylic adhesive complying with ASTM C 1136, as recommended by pipe insulation manufacturer C. Preformed Insulated Pipe Fittings—PVC jacketing fittings with fiberglass insulation inserts for insulating pipe fittings,provide all accessory materials,tapes and adhesives for installation. 1. Available Products a. Johns Manville Zeston 2000 b. Approved equal D. Drain Bowl Insulation — Foil faced fiberglass batt insulation, meeting the requirements of ASTM C665,Type 3, CL.B and C,minimum thickness of 2 inches. E. Drain Insulation Tape—Premium Heavy duty foil tape meeting UL 181A-P standards for use as a closure material for duct systems. 2.6 ROOF INSULATION A. General: Provide preformed roof insulation boards that comply with requirements and referenced standards, selected from manufacturer's standard sizes and of thicknesses indicated. Roof insulation shall be UL and FM approved. Insulation shall be approved in writing by the insulation manufacturer for intended use and for use with the specified roof assembly. B. Polyisocyanurate Board Insulation (Fill): ASTM C 1289, Type II, Class2, Grade 2 glass-fiber mat facer on both major surfaces. Maximum board size 4 feet by 8 feet. Thickness as required to maintain specified slope. C. Tapered Insulation (tapered field insulation): Polyisocyanurate ASTM C 1289, Type II, Class 2, Grade 2 glass-fiber mat facer on both major surfaces. Maximum board size 4 feet by 4 feet. Provide factory-tapered insulation boards fabricated to slope of 1/4 inch per 12 inches, as indicated in the drawings. EPDM MEMBRANE ROOFING 07531 -6 Community Development Building December 8,2015 D. Provide saddles, crickets,manufactured from polyisocyanurate meeting ASTM C 1289,Type II, Class 2, Grade 2 glass-fiber mat facer on both major surfaces and other insulation shapes where indicated for sloping to drain. Fabricated to %2"per foot slope unless otherwise indicated 2.7 ROOF INSULATION ACCESSORIES A. General: Roof insulation accessories recommended by insulation manufacturer for intended use and compatible with membrane roofing. Roof insulation accessories shall be UL and FM approved. Insulation shall be approved in writing by the insulation manufacturer for intended use and for use with the specified roof assembly. B. Fasteners: Factory-coated steel fasteners and metal or plastic plates meeting corrosion- resistance provisions in FMG 4470, designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer. 2.8 MISCELLANEOUS ROOF ACCESSORIES A. Aluminum Stamped Adhesive Cable Fasteners 1. Available Products: a. Erico-Model LPA810 b. Kuefler Lightning Protection-Series 810 c. Approved equal B. Single Cone Vent and Curb Roofing Mounting Base-Mill Finished aluminum siphon vent, 10" diameter throat constructed of minimum 0.025" aluminum with #8 aluminum mesh insect screen and curb mount base. 1. Available Products: a. Empire Ventilation-Eveco Ventilator b. Approved equal C. Fascia Intake Vent: PVC intake vent with insect screen designed for installation along open rafters. 1. Available Products: a. GAF/ELK-Cobra FasciaFlow b. Approved equal PART 3 -EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions, with Installer present, for compliance with the following requirements and other conditions affecting performance of roofing system: EPDM MEMBRANE ROOFING 07531 -7 Community Development Building December 8,2015 1. Verify that roof openings and penetrations are in place and set and braced and that roof drains are securely clamped in place. 2. Verify that wood blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation. 3. Verify the existing deck is suitable for application of the new roof system. Remove and replace ant deteriorated wood decking. Secure any loose boards. 4. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean substrate of dust,debris,moisture, and other substances detrimental to roofing installation according to roofing system manufacturer's written instructions. Remove sharp projections. B. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast. Remove and discard temporary seals before beginning work on adjoining roofing. 3.3 INSULATION INSTALLATION A. Comply with roofing system manufacturer's written instructions for installing roof insulation. B. Install tapered insulation under area of roofing to conform to slopes indicated. C. Install insulation with long joints of insulation in a continuous straight line with end joints staggered between rows, abutting edges and ends between boards. Fill gaps exceeding 1/4 inch with insulation. 1. Cut and fit insulation within 1/4 inch of nailers,projections, and penetrations. D. Install one or more layers of insulation under area of roofing to achieve required thickness. Where overall insulation thickness is 2 inches or greater, install 2 or more layers with joints of each succeeding layer staggered from of previous layer a minimum of 6 inches in each direction. E. Trim surface of insulation where necessary at roof drains so completed surface is flush and does not restrict flow of water. F. Mechanically Fastened Insulation: Install each layer of insulation and secure to deck using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to deck type. 3.4 ADHERED ROOFING MEMBRANE INSTALLATION A. Install roofing membrane over area to receive roofing according to membrane roofing system manufacturer's written instructions. Unroll roofing membrane and allow to relax before installing. B. Start installation of roofing membrane in presence of membrane roofing system manufacturer's technical personnel. EPDM MEMBRANE ROOFING 07531 -8 Community Development Building December 8,2015 C. Accurately align roofing membrane and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps. D. Bonding Adhesive: Apply bonding adhesive to substrate and underside of roofing membrane at rate required by manufacturer and allow to partially dry before installing roofing membrane. Do not apply bonding adhesive to splice area of roofing membrane. E. Mechanically or adhesively fasten roofing membrane securely at terminations,penetrations,and perimeter of roofing. F. Apply roofing membrane with side laps shingled with slope of roof deck where possible. G. Tape Seam Installation: Clean and prime both faces of splice areas, apply splice tape, and firmly roll side and end laps of overlapping roofing membranes according to manufacturer's written instructions to ensure a watertight seam installation. Apply lap sealant and seal exposed edges of roofing membrane terminations. H. Repair tears,voids, and lapped seams in roofing that does not meet requirements. 3.5 BASE FLASHING INSTALLATION A. Install sheet flashings and preformed flashing accessories and adhere to substrates according to membrane roofing system manufacturer's written instructions. B. Apply bonding adhesive to substrate and underside of sheet flashing at required rate and allow to partially dry. Do not apply bonding adhesive to seam area of flashing. C. Flash penetrations and field-formed inside and outside corners with cured or uncured sheet flashing. D. Clean splice areas, apply splicing cement, and firmly roll side and end laps of overlapping sheets to ensure a watertight seam installation. Apply lap sealant and seal exposed edges of sheet flashing terminations. E. Terminate and seal top of sheet flashings. 3.6 DRAIN INSTALLATION A. Access to the underside of the roof deck at each existing roof drain location will be made from the interior of second floor office spaces. Provide all necessary manpower, equipment and materials needed to access the underside of the roof drains. B. Provide all necessary connections, piping and fittings to install new drains. Cut pipes as necessary to accommodate new roof drain and sump elevations. Complete all plumbing connections prior to leaving site each day. C. Provide new drain, sump pan, no hub connection, pipes and fittings to install new drains as shown in the Drawings. Insulate new roof drain bowls and vertical leaders. All work shall conform to the International Plumbing Code. EPDM MEMBRANE ROOFING 07531 -9 Community Development Building December 8,2015 D. Perform water tests of newly added drains by installing plugs and allowing drains to sit for 24 hours. Verify no leaks have occurred; make necessary repairs if leaks are discovered. 3.7 FIELD QUALITY CONTROL A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to perform roof tests and inspections and to prepare test reports. B. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion and submit report to Engineer. 1. Notify Engineer and Owner 48 hours in advance of date and time of inspection. C. Repair or remove and replace components of membrane roofing system where test results or inspections indicate that they do not comply with specified requirements. D. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements. 3.8 PROTECTING AND CLEANING A. Protect membrane roofing system from damage and wear during remainder of construction period. When remaining construction will not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner. B. Correct deficiencies in or remove membrane roofing system that does not comply with requirements, repair substrates and repair or reinstall membrane roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements. C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction. 3.9 ROOFING INSTALLER'S WARRANTY A. WHEREAS <Insert name> of<Insert address>, herein called the "Roofing Installer," has performed roofing and associated work("work")on the following project: 1. Owner: Isle of Wight 2. Address: 13048 Poor House Road, Isle of Wight,VA 23397 3. Building Name/Type: Community Development Building 4. Address: 17146 Monument Circle,VA 5. Area of Work: Community Development Building Roof Areas Al, A2, A3, A4, B1 and B2 6. Acceptance Date: <Insert date.> 7. Warranty Period: 3 Years 8. Expiration Date: <Insert date.> EPDM MEMBRANE ROOFING 07531 - 10 Community Development Building December 8,2015 B. AND WHEREAS Roofing Installer has contracted(either directly with Owner or indirectly as a subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period, C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period he will, at his own cost and expense, make or cause to be made such repairs to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition. D. This Warranty is made subject to the following terms and conditions: 1. Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents,caused by: a. lightning; b. peak gust wind speed exceeding 72 mph; c. fire; d. failure of roofing system substrate, including cracking, settlement, excessive deflection, deterioration,and decomposition; e. faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment supports, and other edge conditions and penetrations of the work; f. vapor condensation on bottom of roofing; and g. activity on roofing by others, including construction contractors, maintenance personnel, other persons, and animals, whether authorized or unauthorized by Owner. 2. When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated. 3. Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work. 4. During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Installer, including cutting, patching, and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing Installer to perform said alterations, Warranty shall not become null and void unless Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty. 5. During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray-cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty. 6. Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration. EPDM MEMBRANE ROOFING 07531 - 11 Community Development Building December 8,2015 7. This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor. E. IN WITNESS THEREOF, this instrument has been duly executed this <Insert day> day of <Insert month>, <Insert year>. 1. Authorized Signature: <Insert signature.> 2. Name: <Insert name.> 3. Title: <Insert title.> END OF SECTION 07531 EPDM MEMBRANE ROOFING 07531 - 12 Community Development Building November 13, 2015 Roof Approximate Existing Asbestos Section Roof Area Roof Deck Existing Roof Construction Containing ID (Square Feet) Type Roofing Materials Mechanically attached thermoplastic membrane over a separator sheet over a 1/4" Al 3,500 Metal Deck thick layer of extruded polystyrene insulation over a separator sheet over a No thermoplastic membrane over another thermoplastic membrane over a separator sheet over two layers of 2"thick extruded polystyrene insulation on a metal deck. A2 50 Metal Deck Mechanically attached thermoplastic membrane over a thermoplastic membrane No over a separator sheet over a 6" thick layer of extruded polystyrene on a metal deck. Mechanically attached thermoplastic membrane over a separator sheet over a 1/4" A3 130 Metal Deck thick layer of extruded polystyrene insulation over a separator sheet over a No thermoplastic membrane over another thermoplastic membrane over a separator sheet over two layers of 2" thick extruded polystyrene insulation on a metal deck. Mechanically attached thermoplastic membrane over a separator sheet over a 1/4" A4 80 Metal Deck thick layer of extruded polystyrene insulation over a separator sheet over a No thermoplastic membrane over another thermoplastic membrane over a separator sheet over two layers of 2" thick extruded polystyrene insulation on a metal deck. B1 700 Metal Deck Mechanically attached thermoplastic membrane over a 1-1/2" thick layer of No polyisocyanurate insulation. B2 150 Metal Deck Mechanically attached thermoplastic membrane over a 1-1/2" thick layer of No polyisocyanurate insulation. MEMBRANE ROOFING PREPARATION/DEMOLITION 07591 Community Development Building December 8,2015 SECTION 07591 -MEMBRANE ROOFING PREPARATION/DEMOLITION PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,apply to this Section. 1.2 SUMMARY A. This Section includes providing all labor, materials, equipment and supervision as outlined in the Specifications and Drawings. The following is a brief description of the Work: 1. Roof system demolition and disposal. ' 2. Preparation of surfaces for installation of new roofing. 3. Protection of existing roofing systems. B. Related Sections include the following: 1. Division 4, Section 04520"Masonry Repair" 2. Division 6, Section 06105 "Miscellaneous Carpentry" 3. Division 7, Section 07311 "Asphalt Shingles" 4. Division 7, Section 07531 "EPDM Membrane Roofing" 5. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" 6. Division 7, Section 07620"Sheet Metal Flashing and Trim" C. Unit Prices: Refer to Division 1 Section "Unit Prices" for description of Work in this Section affected by unit prices. 1.3 MATERIALS OWNERSHIP A. Except for items or materials indicated to be reused, reinstalled, or otherwise indicated to remain Owner's property, demolished materials shall become Contractor's property and shall be removed from Project site. 1.4 WORK INCLUDED A. Provide all labor, materials, equipment, tools and supervision as required to remove the existing roof materials and prepare the existing substrates for the application of the new roof system. B. Provide for the proper disposal of all existing materials to be removed. Provide approved trash receptacles located in areas designated by the Owner's representative. MEMBRANE ROOFING PREPARATION/DEMOLITION 07591 - 1 Community Development Building December 8,2015 C. Coordinate the roof preparation work with the new roofing work in such a manner as to keep the new insulation and roofing materials, building, and building interior absolutely clean, dry and watertight. D. The Contractor expressly undertakes, both directly and through his Subcontractors, to take every reasonable precaution at all times for the protection of all persons and property which may come on the Site or be affected by the Contractor's Work. E. The Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. F. The provisions of all Federal, State and local rules and regulations governing health and safety as adopted by the relevant authority, shall apply to all Work under this Contract. G. The Contractor shall continuously maintain adequate protection of all his Work from damage and shall protect the Owner's property from injury or loss arising in connection with this Contract. He shall make good any such damage, injury or loss, except as may be directly and solely due to errors in the Contract Documents or caused by agents or employees of the Owner. The Contractor shall adequately protect adjacent property to prevent any damage to it or loss of use and enjoyment by its owners. The Contractor shall provide and maintain all passageways, guard fences, lights and other facilities for protection as required by State or local authority, local conditions, or the Contract. 1.5 DEFINITIONS A. Roofing Terminology: Refer to ASTM D 1079 and glossary in NRCA's "The NRCA Roofing and Waterproofing Manual" for definition of terms related to roofing work in this Section. 1.6 SUBMITTALS A. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including exterior and interior finish surfaces that might be misconstrued as having been damaged by roofing operations. Submit before Work begins. 1.7 EXISTING CONSTRUCTION A. Attached to this section is a table with existing construction of the roof as determined by the Engineer through limited roof core samples. Contractor may obtain additional core samples to verify existing construction prior to bidding providing membrane repairs are made. 1.8 PROJECT CONDITIONS A. Owner will occupy the building immediately below roof area. Conduct roofing so Owner's operations will not be disrupted. Provide Owner with not less than 24 hours'notice of activities that may affect Owner's operations. 1. Coordinate work activities daily with Owner so Owner can place protective dust or water leakage covers over sensitive equipment or furnishings, shut down HVAC and fire-alarm MEMBRANE ROOFING PREPARATION/DEMOLITION 07591 -2 Community Development Building December 8,2015 or -detection equipment if needed, and evacuate occupants from below the work area if � P desired. 2. Before working over structurally impaired areas of deck or areas requiring replacement, notify Owner to evacuate occupants from below the affected area. Verify that occupants below the work area have been evacuated prior to proceeding with work over the impaired deck area. Provide temporary barriers and signage to prevent entry of pedestrians. Remove any equipment that may be damaged and install tarps and protective sheathing to prevent damage to interior. Upon completion clean all surfaces to the satisfaction of the Owner. B. Protect building to be roofed, adjacent buildings, walkways, site improvements, exterior plantings,and landscaping from damage or soiling from roofing operations. C. Maintain access to existing walkways,corridors, and other adjacent occupied or used facilities. D. Owner assumes no responsibility for condition of areas to be roofed. 1. Conditions existing at time of inspection for bidding will be maintained by Owner as far as practical. E. Limit construction loads on roof to rooftop equipment wheel loads. F. Weather Limitations: Proceed with roofing preparation only when existing and forecasted weather conditions permit Work to proceed without water entering into existing roofing system or building 1.9 REMOVAL,HANDLING AND DISPOSAL OF ROOFING MATERIALS A. Codes and Regulations: 1. General Applicability of Codes,Regulations,and Standards a. Except to the extent that more explicit or more stringent requirements are written directly into the contract documents, all applicable codes, regulations, and standards have the same force and effect and are made a part of the contract documents by reference as if copied directly into the contract documents, or as if published copies are bound herewith. 2. Contractor Responsibility: B. The Contractor shall assume full responsibility and liability for the compliance with all applicable Federal, State, and local regulations pertaining to work practices, hauling, disposal, — and protection of workers, visitors to the site, and persons occupying areas adjacent to the site. The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable Federal, State, and local regulations. The Contractor shall hold the Owner, the Owner's Representative and the Consultant harmless for failure to comply with any applicable work, hauling, disposal, safety, health or other regulation on the part of himself,his employees, or his subcontractors. MEMBRANE ROOFING PREPARATION/DEMOLITION 07591 -3 Community Development Building December 8,2015 PART 2-PRODUCTS (NOT USED) PART 3 -EXECUTION 3.1 PREPARATION A. Protect existing membrane roofing system that is indicated not in work and finished roof surfaces. 1. Loosely lay 1-inch minimum thick, molded expanded polystyrene insulation (MEPS) over the roofing membrane in areas indicated. Loosely lay 15/32-inch plywood or OSB panels over MEPS. Extend MEPS past edges of plywood or OSB panels a minimum of 1 inch. 2. Limit traffic and material storage to areas of existing roofing membrane that have been protected. 3. Maintain temporary protection and leave in place until replacement roofing has been completed. B. Coordinate with Owner to shut down air intake equipment in the vicinity of the Work. Cover air intake louvers before proceeding with roofing work that could affect indoor air quality or activate smoke detectors in the ductwork. C. During removal operations, have sufficient and suitable materials on-site to facilitate rapid installation of temporary protection in the event of unexpected rain. 3.2 ROOF TEAR-OFF A. General: Notify Owner each day of extent of roof tear-off proposed. Contactor shall remove only which can be replaced in the same day. Contractor shall restore the roof system to a watertight condition at the end of each work day and shall provided necessary protection to the facility during sudden weather changes if work is in progress. B. Roof Tear-Off: Remove existing roofing membranes and other membrane roofing system components down to the existing deck. 1. Remove and dispose of membranes, aggregate, mastics, roof insulation, sheet metal, flashing, counterflashing, membrane flashing, fasteners and all other items not indicated "to remain" or "existing" in the project Drawings. Remove materials in their entirety down to the existing roof decks as shown in the drawings. C. Remove existing base flashings around parapets, curbs,walls, and penetrations. 1. Clean substrates of loose contaminants such as asphalt,sheet materials,dirt, and debris. 3.3 DECK PREPARATION A. Inspect deck after tear-off of membrane roofing systems. MEMBRANE ROOFING PREPARATION/DEMOLITION 07591 -4 Community Development Building December 8,2015 1. Carefully examine the existing roof decks for deterioration, water damage, holes,uneven areas,moisture, incomplete work or other unsuitable conditions for the proper installation or performance of the roof membrane and insulation. Remove/replace any deteriorated wood plank decking or metal decking encountered. Repair of damaged or defective roof deck in excessive of the quantities provided for in the base bid will be considered an addition to the Contract. The project inspector will verify quantities prior to replacement B. If deck surface is not suitable for receiving new roofing, or if structural integrity of deck is suspect, immediately notify Engineer. Do not proceed with installation until directed by Engineer. 3.4 DISPOSAL A. Collect and place demolished materials in containers. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site. 1. Storage or sale of demolished items or materials on-site will not be permitted. B. Transport demolished material off Owner's property and legally dispose of them. C. Properly dispose of all debris from roof demolition and preparation on a daily basis into a properly labeled trash receptacle as required by applicable regulations. D. Provide closed trash chutes or other approved means for removal of debris to the ground level. 3.5 PROTECTION OF SURFACES A. Contractor shall take all necessary precautions during roof preparation to protect the building and adjacent surfaces from being soiled or damaged. B. When weather threatens,cease work under this section and return roof to a watertight condition. C. Contractor shall restore to original condition any damages caused during work performed in this Section. 3.6 CLEAN-UP A. Prior to the completion of the work, remove from the job site all tools, equipment, debris and waste and properly dispose of off site. END OF SECTION 07591 MEMBRANE ROOFING PREPARATION/DEMOLITION 07591 -5 Community Development Building December 8,2015 SECTION 07620 -SHEET METAL FLASHING AND TRIM PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes providing all labor, materials, equipment and supervision as outlined in the Specifications and Drawings. The following is a brief description of the Work: 1. Formed low-slope roof edge metal flashing, counterflashing, cleat, coping. 2. Formed steep-slope drip edge flashing. 3. Frieze board wrap. 4. Gutters and downspouts. B. Related Sections include the following: 1. Division 4, Section 04520"Masonry Repair" 2. Division 6, Section 06105 "Miscellaneous Carpentry" 3. Division 7, Section 07311 "Asphalt Shingles" 4. Division 7, Section 07531 "EPDM Membrane Roofing" 5. Division 7, Section 07591 "Membrane Roofing Preparation/Demolition" • 1.3 REFERENCES A. Factory Mutual Loss Prevention Data Sheet 1-49 B. Sheet Metal and Air Conditioning Contractor's National Association(SMACNA),Architectural Sheet Metal Manual, 7th Edition C. ANSI/SPRI ES-1 "American National Standard for Edge Systems Used with Low Slope Roof Systems." 1.4 PERFORMANCE REQUIREMENTS A. General: Install sheet metal flashing and trim to withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failing, rattling, leaking, and fastener disengagement. SHEET METAL FLASHING AND TRIM 07620- 1 Community Development Building December 8,2015 B. Fabricate and install roof edge flashing and copings designed and tested in accordance with ANSI/SPRI ES-1. Shop fabricated sheet metal components in profiles previously tested by NRCA or SMACNA are acceptable. Sheet metal components shall be designed and tested to resist the following loads(The following values include a factor of safety of 2): 1. Velocity Pressure: -27.1 lbs./ft.2 2. Vertical Design Pressure: -96.9 lbs.ft.2 3. Horizontal Design Pressure: -48.1 lbs.ft.2 C. Water Infiltration: Provide sheet metal flashing and trim that do not allow water infiltration to building interior. 1.5 SUBMITTALS A. Product Data: For each type of product indicated. Include color charts and manufacturers technical data sheet with material descriptions and finishes. 1.6 QUALITY ASSURANCE A. Sheet Metal Flashing and Trim Standard: Comply with SMACNA's "Architectural Sheet Metal Manual — 7th Edition." Conform to dimensions and profiles shown unless more stringent requirements are indicated. 1.7 DELIVERY, STORAGE,AND HANDLING A. Deliver sheet metal flashing materials and fabrications undamaged. Protect sheet metal flashing and trim materials and fabrications during transportation and handling. B. Unload, store, and install sheet metal flashing materials and fabrications in a manner to prevent bending,warping,twisting,and surface damage. C. Stack materials on platforms or pallets, covered with suitable weather tight and ventilated covering. Do not store sheet metal flashing and trim materials in contact with other materials that might cause staining,denting,.or other surface damage. 1.8 COORDINATION A. Coordinate installation of sheet metal flashing and trim with interfacing and adjoining construction to provide a leak proof, secure, and non-corrosive installation. PART 2-PRODUCTS 2.1 SHEET METALS A. Copper Sheet: ASTM B 370,Temper H00 or H01, cold-rolled copper sheet. SHEET METAL FLASHING AND TRIM 07620-2 Community Development Building December 8,2015 B. Prefinished Sheet Metal flashing: Aluminum sheet meeting ASTM B 209, Alloy 3005H25, or alloy and temper suitable for forming and structural performance required, but not less than H14, finished as follows: 1. High-Performance Organic Finish: AA-C12C42R1x (Chemical Finish: cleaned with inhibited chemicals; Chemical Finish: acid-chromate-fluoride-phosphate conversion coating; Organic Coating: as specified below). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions. a. Fluoropolymer 2-Coat System: Manufacturer's standard 2-coat, thermocured system consisting of specially formulated inhibitive primer and fluoropolymer color topcoat containing not less than 70 percent (KYNAR 500) fluoropolymer resin by weight. 1) Color: To be selected by Owner from manufacturer's full range. 2.2 MISCELLANEOUS MATERIALS A. General: Provide materials and types of fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation. B. Fasteners: Wood screws, annular threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads. 1. Nails for Aluminum Sheet: Stainless steel ring shank roofing nails 2. Nails for Copper Sheet: Copper or hardware bronze, 0.109 inch minimum and not less than 7/8 inch long,barbed with large head 3. Exposed Fasteners: Heads matching color of sheet metal by means of plastic caps or factory-applied coating. 4. Fasteners for Flashing and Trim: Blind fasteners or self-drilling screws, gasketed, with hex washer head. 5. Blind Fasteners: High-strength aluminum, copper or stainless-steel rivets, to match materials being fastened. C. Sealing Tape: Pressure-sensitive, 100 percent solids, polyisobutylene compound sealing tape with release-paper backing. Provide permanently elastic,nonsag,nontoxic,nonstaining tape. D. Solder for Copper: ASTM B 32, Grade Sn50, 50 percent tin and 50 percent lead E. Elastomeric Sealant: ASTM C 920, elastomeric polyurethane polymer or silicone sealant as indicated in drawings; of type, grade, class, and use classifications required to seal joints in sheet metal flashing and trim and remain watertight. F. Butyl Sealant: ASTM C 1311, single-component, solvent-release butyl rubber sealant, polyisobutylene plasticized, heavy bodied for hooked-type expansion joints with limited movement. G. Weather Resistant Barrier: Spun bond polyolefin weather barrier. SHEET METAL FLASHING AND TRIM 07620 -3 Community Development Building December 8,2015 1. Available Products: a. DuPont Tyvek Commercial b. Dow Weathermate c. Approved equal H. Flexible Flashing: Polypropylene film faced with butyl rubber adhesive compatible with the weather resistant barrier; 9 inch minimum width. 1. Available Products: a. DuPont FlexWrap b. Dow WeatherMate Flexible Flashing c. Approved equal 2.3 FABRICATION, GENERAL A. General: Custom fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated. Shop fabricate items where practicable. Obtain field measurements for accurate fit before shop fabrication. B. Fabricate sheet metal flashing and trim in thickness or weight needed to comply with performance requirements,but not less than that specified for each application and metal. C. Fabricate sheet metal flashing and trim without excessive oil canning,buckling, and tool marks and true to line and levels indicated,with exposed edges folded back to form hems. 1. Seams for Aluminum: Fabricate nonmoving seams with flat-lock seams. Form seams and seal. Rivet joints for additional strength. 2. Seams for Other Than Aluminum: Fabricate nonmoving seams in accessories with flat- lock seams. Tin edges to be seamed,form seams, and solder. D. Sealed Joints: Form non-expansion but movable joints in metal to accommodate elastomeric sealant to comply with SMACNA recommendations. E. Expansion Provisions: Where lapped or bayonet-type expansion provisions in the Work cannot be used, form expansion joints of intermeshing hooked flanges,not less than 1 inch deep, filled with butyl sealant concealed within joints. F. Conceal fasteners and expansion provisions where possible on exposed-to-view sheet metal flashing and trim,unless otherwise indicated. 2.4 LOW-SLOPE ROOF AND TRIM SHEET METAL FABRICATIONS A. Fabricate in minimum 96-inch long, but not exceeding 10-foot long, sections. Fabricate joint plates of same thickness as materials being joined. Furnish with continuous cleats to support edge of external leg and interior leg. Miter corners, seal aluminum watertight. B. Sheet Metal Flashing materials and component thicknesses are provided on the drawings. Where material types are shown and thicknesses of materials are not shown provide sheet metal components of the following minimum thicknesses: SHEET METAL FLASHING AND TRIM 07620 -4 Community Development Building December 8,2015 1. Fabricate copings,counterflashing and edge metal from the following material: a. Prefinished aluminum: 0.040 inch thick,unless otherwise indicated. 2. Fabricate cleats from the following material: a. Aluminum: 0.050 inch thick,unless otherwise indicated. 3. Fabricate Fascia board wrap and box gutter from the following material: a. Prefinished aluminum: 0.032 inch thick,unless otherwise indicated. 4. Fabricate box gutter spacer from the following material: a. Flat stock aluminum: 1/16 inch thick x linch wide,unless otherwise indicated. 5. Fabricate box gutter support bracket from the following material: a. Flat stock aluminum: 3-16 inch thick x 1 inch wide, paint to match gutter, unless otherwise indicated. 6. Fabricate box gutter support bracket from the following material: a. Flat stock aluminum: 3-16 inch thick x 1 inch wide,unless otherwise indicated. 7. Fabricate overflow scupper, picture frame and conductor head, downspout, downspout brackets from the following material: a. 16 oz copper,unless otherwise indicated. 8. Fabricate trough wall flashing and through wall counter flashing from the following materials: a. 20 oz copper,unless otherwise indicated. 2.5 FINISHES A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. B. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable,temporary protective covering before shipping. C. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. PART 3 -EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions, with Installer present, to verify actual locations, dimensions and other conditions affecting performance of work. SHEET METAL FLASHING AND TRIM 07620-5 Community Development Building December 8,2015 1. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely anchored. 2. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION,GENERAL A. General: Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required to complete sheet metal flashing and trim system. 1. Torch cutting of sheet metal flashing and trim is not permitted. B. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with bituminous coating or by other permanent separation as recommended by fabricator or manufacturers of dissimilar metals. 1. Underlayment: Where installing metal flashing directly on cementitious or wood substrates, install a course of felt underlayment and cover with a slip sheet or install a course of polyethylene underlayment. C. Install exposed sheet metal flashing and trim without excessive oil canning, buckling, and tool marks. Provide elongated holes for securing to allow for thermal expansion. D. Install sheet metal flashing and trim true to line and levels indicated. Provide uniform, neat seams with minimum exposure of solder,welds,and sealant. E. Install sheet metal flashing and trim to fit substrates and to result in watertight performance. Verify shapes and dimensions of surfaces to be covered before fabricating sheet metal. F. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim. Space movement joints at a maximum of 10 feet with no joints allowed within 24 inches of corner or intersection. Where lapped or bayonet-type expansion provisions cannot be used or would not be sufficiently watertight, form expansion joints of intermeshing hooked flanges,not less than 1 inch deep,filled with butyl sealant concealed within joints. G. Provide 6 inch wide back-up plates at end laps of frieze board wrap and coping. Provide 2 beads of butyl sealant on each side of the lap. H. Provide 6 inch wide back-up plates at end laps of coping. Provide 2 beads of butyl sealant on each side of the lap. I. Provide 6 inch cover plates at coping to edge metal transition. J. Fasteners: Use fasteners of sizes that will penetrate substrate not less than 1-1/4 inches for nails and not less than 3/4 inch for wood screws. 1. Galvanized or Prepainted,Metallic-Coated Steel: Use stainless-steel fasteners. 2. Aluminum: Use stainless-steel fasteners. 3. Copper: Use copper or stainless steel fasteners SHEET METAL FLASHING AND TRIM 07620-6 Community Development Building December 8,2015 K. Seal joints with butyl sealant as required for watertight construction. 1. Where sealant-filled joints are used, embed hooked flanges of joint members not less than 1 inch into sealant. Form joints to completely conceal sealant. When ambient temperature at time of installation is moderate, between 40 and 70 deg F, set joint members for 50 percent movement either way. Adjust setting proportionately for installation at higher ambient temperatures. Do not install sealant-type joints at temperatures below 40 deg F. L. Aluminum Flashing: Rivet joints in aluminum where necessary for strength. 3.3 LOW SLOPE ROOF&TRIM SHEET METAL FABRICATIONS A. General: Install sheet metal roof flashing and trim to comply with performance requirements and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, set units true to line, and level as indicated. Install work with laps,joints, and seams that will be permanently watertight. Provide back-up and cover plates set in sealant at end laps. B. Anchor sheet metal fabrication flashing components to resist uplift and outward forces provided. 1. Interlock bottom edge of flashings with continuous cleats anchored to substrate as shown in the drawings. 3.4 CLEAN-UP A. Clean exposed metal surfaces that interfere with uniform oxidation and weathering. B. Clean and neutralize flux materials. Clean off excess solder and sealants. C. Remove temporary protective coverings and strippable films as sheet metal flashing and trim are installed. On completion of installation, clean finished surfaces, including removing unused fasteners, metal filings, pop rivet stems, and pieces of flashing. Maintain in a clean condition during construction. D. Replace sheet metal flashing and trim that have been damaged or that have deteriorated beyond successful repair by finish touchup or similar minor repair procedures. E. END OF SECTION 07620 SHEET METAL FLASHING AND TRIM 07620 -7 COMMUNITY DEVELOPMENT BUILDING LOW SLOPE ROOF REPLACEMENT 17146 MONUMENT CIRCLE ISLE OF WIGHT, VIRGINIA December 8, 2015 Hentz Engineering Project Number: 15116-110 DRAWING INDEX COVER PAGE SHEET 1-CONTRACTOR MATERIAL STORAGE&STAGING PLAN SHEET 2-ROOF PLAN SHEET 3-ROOF WIND UPLIFT PLAN SHEET 4-ROOF DETAILS SHEET 5-ROOF DETAILS SHEET 6-ROOF DETAILS SHEET 7-ROOF DETAILS �_ti,$OF WjG, VIRGINIA. -'1 *1634 INVITATION FOR BIDS No. ##-####-## COMMUNITY DEVELOPMENT BUILDING LOW SLOPE ROOF REPLACEMENT 17146 MONUMENT CIRCLE ISLE OF WIGHT, VIRGINIA HENTZ ENGINEERING PROJECT NUMBER: 15116.110 LOCATION MAP /_/ Hentz Engineering, inc °°- '« ; sl!�� Building Solutions w y ` �A�r" ✓^�;� `t, 750 Lord Dunmore Drive,Suite 103,Virginia Beach,VA 23464 r S r Phone:(757)961-7224 14, 40 • /-44t ' `jl" :� .4444 fyp` { rl Ic L S �'x \ Community Development Building • 1 - .-, . E , V,A •_14 ..▪= - Contractor Staging Arca _x. ffi Nor Fully AdAatd 0 OP R W 'n EPIN Manbrate .0 5. l_l CO ' ,: ".1% %,-' , P,\•,,, ''''-1 --'-"A•P',.„:4,. 1 'EFBEE°3333333-Fil 11140-Inoo 4 amass= 1111111111111111111111111 5. .. - ., l'• ''')', , ' ' . i '1‘,f.^.e.•,,,,:,'-',',, " . .rom frit , r .'' Typical Roof System-Roof Section Al 4 °. ..,,\ 91' Neve Fay AdTrrn11106fr CM,g1ILA.. .- N * , ... , UM NI emlunc , ,. ;.• i 14..,■ ' 1 ' :. , ''''.'I'y .' 'a' ' N 1‘.....le*a 1311) , ■■■__ _..,-. ._.■...............1. ■ % 11333333333333333333 Nov Wro fr.T.0,.., % 4, . ,. , E133333333333333EEE'833 Nip.,=nu hude., ik,,,t,,,s0, . ,, , ' NA. ,-''' , A : li, 3333333333333333133333333333333M33 sx. dy,,,,,," 1-: 933333:83333328$193393$6333333333 m .." 33333333333333ZEEE 93333333333333333.- S3333333333333332E33333332E1333333333 • 'r . -:,..,,, .1 i'''::''^- 4,■' 1,'V., 4'A, ^ . , 0 ,,,s, , , ,,,,, \ 13333333333333333M333333333333333333 E*,_ m*,nt,i, I W II I - 4. .--oilit c- ,.,..:-.,,, ,,. , - ;.-1.... - •*" s'd ?P.., , , . Typical Roof System-Roof Section 42 cr. ' ',41 • „ '3 J " '• , ' New Fully Adhaed DOW ' ■ ) ',,,O#• -: ' L '4' DI ' ' 144'1",'V-.711."1 . '.':4' '4 V- 'k.' ' ''.4i.'• - .— -.-------=.--■—■m ir'''',=72... 2 Ea'-6u,,c, ' EEEEEEEEEEEEEEEEEEEffi . ° :1: ' . te'° '-'=: ''P"'I )<N1,° \'`+'. .. '''• ''' :$ 1':°,. ,°.''''2121*,:l.' '':-.. ' : "1,%?,4::.i.iit4"7 — 1 9333333333333333mEEEEEEEB3333333me ''''''''''""'' ________________ 3333333333333333:31333333333333333333 ,„ 33E133333EB33:EME1333333333333333333 E,,,,,mg ma wa = co CA 0 E-■-• &•,...,' At'', •'-' ' t1":r i•,..hrtr : •• co ce o 1'4':: ' ' * 17 Typical Roof System-Roof Sections A3&A4 CI 11) ..—■ . , EMI Alcrobrzu = r•-. .4 ...1 . No.W pa l'oo17,411 E 3 ' pob.,....k.b... 0 (...) - .,t4t.,-. ,--e" ■., ' -t4 4#410,. t'-.-4.:,i. ,''''.,-,..:.°:L ,, ot....‘i.1... - 4-. At4.-..,..*',.-1.'l;•''"'' — .. 433333333EEEEEEEEE93333333333M333333 • A ' .. . jr W W I v:4'1 ‘.t' `' '--:-47M 3'.;:',,t?:'-:-.. IA' ,! .,1; '' L ,. - Typical Roof System-Roof Sections B1&132 -' i •1„ 4, 41•'',1,•:-• \:‘ic44( :4 IF ' . . -1'..r% • "" •••••t',•' •— :c•" ‘, t..,P ' , :',34 z ir:/;•1. I $••:, t i .. , •-;'',:, - , . L .'*- ''''':'!r: ''' ti-4'''''''.+'''71i';',.: .97 c . .... 04 ..=1-10„4: 1;... ..44. ,.. .....3,-,..0, .., . .. --,,„, , P Ci ...' 4 i a 1 .2 -. a, :4 a, . .5 ,!, b.c) , g ., ..:1 r.g 1 Li Contractor Material Storage/Staging Plan g rd ,.. 0 I g ' `CJ ' ±�`I1 Plan Legend General Notes Ok" A,' Roof llem I. [mmatwmprovikaR tmlitydiamayatahemmarad �o .y mmtiimlm'mr]ay to pngamwat Jtn v+ 0 • PmenatiooPWn 2. CanaalorOA fickl unify all mauancromu and quantities prior a2m2 01 ' Roof Construction Plan m Vaal Pipe to bidding. R - - - 1. Gmtmamshallprm;dcttaa,aypmtammtnaR:mraes a D] t� Sm4:lIJ'•1'.0• ®Scapakmm Camara shaIlpmupmmmplaimuf wort •1 0 �R° v Scupper d. Cmaatmshu➢mtOTeth or»stnwtoaewettpJ condition al k: .° . yR� . - the and ormcnerk day awl Sha0 man&necessary protadmm Q 0 CS O.rI Scupper trier liryawingsuMm ecvnn<pmgnirwnt1 is in proms. ,�+E .�. .: sryhw Vol C fl arull ma i&moray baduda and gmmp utm aZ - S lanky pnwmcl.Drib NevY•ppaa ® b. CmmnorrEoll parmm emk so m not m interfere Wk the kl. 3 ssliN New1S•Pa /�. !oa(Hdr ®Sikh. operation and.hill mwdivt po m�aance.up raNity �� root Cr4ln ____w__Whdeil4 pmlmcl uhcn.mk.in' ]. lmmmrtem dais'bane lava i m ta ground m a notmRed d as byho'olDashmute a cme FF N0)3',1'Tapad ��ws� O Demolition Notes E CO DI. Binh,rool-,hto be rmmddd¢po,r oL Prori&e0e. 0 co deal to match De arisen dad pmpe d grade.The ].SD Op Pr.maul deck etv4nated ova Ge opc®g and rym from*1m �4ay' b�— lost Same oermeW decktnjo• aaith UK4,takIODM e ink IF E. 0 N selfmt9mgxm]macvadmce.;0ktryimemauofthe St..]Dealt Costive ISDIC � \ US D3. Rammxdm3 the top ofthcexisting mammy wall doves to tic try ^qo of abss rustio3 mail deck ofroof crow Rh.Win god page wens New a ends of removed mmaoyeall. ""ONk4tiM4 A U3. Was aisring bole kmasomy wall twallww fir fiamlUtim of the new P'vide a J'high Dra4 wall a.m.box. D,. Remove and&ose of existing PVC dmampm.. '� ,,,,/-fora Oic et D!. known and dispma of existing roof drams. 4 Db. C0 holrtdcough eusdag m a m m y m Gmiata the C r tv�� O s ■ R aRa fihean nppamedhro,ctgpcn a, UI C�{ SG` 41 Nrn1YJ'Tapard 3 (� �`I D1.Remmeadstmdbtiet mvaeaaymmsaRnn tmoupb m Jo msuladow Sump i O 11 wall llu�b Nvrideur+mirkm m•m eaiumg. 0 't c„,..2 Construction Notes E a�i `�� t W6 C2 Cl. Proaidevw muplm¢dat®ltheatis®geawvmvmtpipe O E ' \v r/] I - 13'rMctl smfa¢o(thmarm(m�mbrmcprimm0admP. N O = c_0) 0 _,Sy_ 3p_______wr______w,__ > O C DS �Da— �-' C3. Praidctwq nrymat=facthe cmtmg nn apW d C' O X' / p elzpboaecd4es.ALT tkimu0aionoft eun-EPD74 rmf 03 NI- tl z Dl synmkprmikmmged WkWdlea,Mmsralmtm3fi'm aq0 O if ion Quin p ms0 courant!etolvahm to roof eaZ Drama and ware =VS^ rn-t �./ El;: �� CO. Provide mwl1%10V3'a 3'cone.rplaahplak,at tic E p•--• r+aI p v duchvge and o03)w aoDDerdow1pom.3)1103000) 0 J 69 g EPDMmdb pada uda mall splmhI I wail padam woad U � Q I eg 6'ow Lau erh side ofnew aplvh War •N CJ. Reuse mstIlPdlmsptm.m®xs new gar. ■ C3-1 NrtC.• Cl. Provide roping m edge meal o-msilio.T0yiral Coping m Edge foot Cti• hlnal Lap DamT wished b. New 3'a4'Tarred P InaaJaam Swap tl ` [b. [ntadhate,cmmallaumnlftlU wiG lslen(wtigk fumy. ��� Won 'II. Z coo a yv \1° 0 • a 01 et I N0)K,'prr P a-U= foot Wad ' NvY"per S, ��' (ant[ticks B v , ,c,-0 n: • ® I }-WC] N0)k" l W1 kk foot[tirk�ct tl V.,' tl„ 1 Dt t�a w ty. • ` _ CI e SE IIII.4/84 T `�f!rasa® wrora®m ym.ra® yrom® W..av® IT-,® ter-ra® vr.ra® rvrvr® r. r I woo ',or 3 4 a 4 7 'a z 3 4 i 0 - a SO' co-- f , 5 Ao 4 _o ..y f a o. Steep Slope Roof Not In Scope Of Work b w 5 4 ° ,7 4 ` \ 1 G O . o 4 -1 - \ i G 1. $ — '4 @yyy [ q E .g. ; R s i R" 7 44 Project Name: Community Development Building �y�"�` 4,4, Drawn Checked Number. Date: Sheet: Hentz Engineering,Inc. Low Slope Roof Replacement S r By. f -; e ums Wm.. 1 i fr ,�, sw,,,°,.,-„„;� V.z„, 17146 Monument Cirde � �� sa isus ito t�oens 3 °m° "' Isle of Wight,Virginia it- „,"e • . Nov Bp.,Coated Mr Alm :.T - Coping...Bahlb Plan _ N VI New nigh Dasily Wood Fin \ Tam Edge Nov Mile Fluhin ' an 6 Nn Ryoafoud ONO'Aron Coping A' Bah Up Plain Ni ?kw kT a N.v'[wc 0.050' �_ Ntw Niyh Density Wrod Fla Tgvcd Edge &ilmt O . ,,, .., Alm Cle 0.D50. Nov0040'R5'm Cwmd Drip Edge Nn Pnsson5emmsn (/// wl�'1wg Stainless p►,1� Nov Cw30.050'Alm❑maamda/�' g N.v'Rasoe SEtidge Stripping Fly. 0.0 4 0. m / I��•� Iona Soles.Steel Rafing Us.'ae.,BB. Mad sward a/1 Stamina SUx1 ,mg,,,,, alad mm.F'onto Field Membune Edge stand a/1%•Stainless Sin Drip o �-(era de Cg j ►��♦� SleelRmfNLm 2'wm FuM AI®60me Roofine Nmisul"wee.smgytd E .�-h jj/ �.�♦�♦�. 6'ac.,ayp.bai n � 1 bah side of pampa Rwfin9 Nails u S•oz..stagecrtd a / ♦...1 udn New lYUn Cwan5alml New'fuBya&ned0060' = ,'^ Nrw Naia j/ ►���� ;� E.ining Y•sb«thiy uew005n co.,Vin Clean EMU Mnr�bmne �� NnCona.0450"Alum Clot aZ■ /j ♦���1 �' coed w/Aomless Steel Roamg ,�1� word wllY•stamlm St«7 33333333333333 CwanSealm /���� •r.. Ndls.ae•n<, f/ �♦�.•l•4 Newweuher Ming Banger / Nov Y'FlYwmd 56whie '- - ./1,117 Exi.tinR M<d / ;% n Rtwfmgxmlem6•a.<. S Existing cing a jA �������4 New Fu11 Mimed FEN Nov D.D50'[quo. Alm 1I Fully EPDM Ilea ���,1/ 'y.. Blocking r II NM D.DNr Fun 111111 Pa.µt Nall Fishing provide Wl lWhing w/6•aide Rack Up I P Wan FWbmg J't.1 1/ raping y wl(Lob hnmmatimm Phtra 1/ J 'V..�.� agiidbYAlmufaron 1� Novtwp Nov Fly Adh1d a06P MIA VIII // l%/® j/ New;•Plprool Seeahivg ►���� New Cwt 0.050'Alm Clog Sdml Aladale ��® NmY.'pafwaioveJ I/ F�gAluawy 1I ./® Polyi,et5mmteinvdaiq I. Eab®g K'FlriWSba�e 1 Nn lap New Fully goal w/IY..•SubJmSteel II.-- I —1 Ir A sm.J'Ibi um I� Les S.!BEEEBEEszersame Wa0 Salm1 Alehobrnw prong Nall at 6'oe .�♦�♦�♦� _ �A .-_ ,<I' New 5.Goer Evsiio wins eloeFina j/ New Fulyndhaaaaom'Froff O m • / ' ►.���.;� Nov High Wong Fibs ► al(imnSpaaCfemr j�� NtwY.'Per foaT,.... 8 V. Nerlap Mobcaps •••���G...��� / ►♦♦♦.. � Sppm Bmam spade /I.! 31"min. uiw I/ Scalm rl,ap,61,' ® - a'.e}]. _ /////. M•no,spawsilwldwly 4S'mmurimia, II �� jj/ r' .Ian TgmedEdge - befamed In fins hba3 ►♦��♦♦/ � ►, off nmJSyaad / Using Moil Deck 3® � ' �♦�W v#4//. Nag Otto•Krug:: Vii- -_ ahlw<Iywl Brutm Existing Masonry N.(Wan i j ����1„® \Vera FWhinidewide l� Ng.'Polimry'murue ������� Eaiming Wood Blocking ►�����1� y / / Bank Up Phan IyI��IyI/ Insulation. Nnhe Fascia Board thaws m �� ///�� Existing Eat0io Wood Song gat F�gMSmv Wall 4 ••♦♦1 N ow Y r pa foot Taped S e m m u l m w t or/n e %//////// Dancing Alai Dsck Ili'oe.slob Exiling Nlasnuy vl Polyi e oa no weeps ul6'o.e. Mnvmy Saesa IF at Nov4'Pol2 ate 4•mn Nebo EzmB NrodB1«3iE rsuhtinn 2logo Ncw 0.032•Kyoa Coated aiming AIM Deck Fame Bunt W05 Riving Mail Deck EavmaB Wad BINA* Ol Note I:Rini&mechanical amtimum of fida sliest as Note I:hocidenceeEari<il lamination ofiicld mliMa<u required by the Mmuf inn. Note,hol a mechanical imnioatiw dfi<M lsmbrme as rryimd by the llanufanwa. C minitdby au Mandan-tom 57- CC] O Parapet Wall Flashing Detail xr , O Parapet Wall Flashing Detail y O Roof Edge Flashing Detail �10 O Roof Edge Flashing Detail s� °° cu _CO xwut-rh ewugah 1u1.J. C N U'Ode E v Existing SkyiHh0amwe ad New W000Cwaxgalmt d� sc�aO maEOr Dasme ._ L No1EgNF0a ructetd Foisting W'eafa Bmie 1'wi&BaryITmem Nwei by N O O Of ce Fanwniormapnli& _ Tambimw Basn.odal r... w'mr(1van5nlm New SelfAdbad Udo,by o, / v u_ NiNc.Nov OOJO'K)m Coat,Alm 111• Nov Self Adhei ilaili Manhole ��� \ msu0'mdee msimE kb �4 .tZ tO O CmiwOaAip �►, g a ��1I, hmJ.rhrym uwo&6'vsm Lp ,/�� =N Cr a-�-. Fautig Nick venm.wmn.eadarnla<mr hone //.j I '� 3.--1 Ncw 0.0.10•Kyua[aatd Alm Drip gcig®gFlWwg ibe euWlaeon oftbcnv Through Wall Flashing Edge a mod wl IY•Soodmswa Nov fun Nad W'ap,a la'oz. I Nca 0.040'Alm Drip Edge sawed ��� OE J Rmf,o..1.I.O.nsoggad I r ♦� • New 30 of Copper Though Wel no/ Soul Roofing Nat U _ U N'cw Cone 10050 AIOn nut Ntw lap g Poetic 21 ///.1 1'o.eMaaiCnd �i Stripping�Sly.Sknda Ilnbme nth J saadwt W'S6mlm Stal Sealant ���, �5, s a Feld Mmi,me Bp.J� New Coati 0.040-Along Roofing Nails a 6'ae c^ j/ New eel lnaake\'mten at Nip Ggeserwdrl y' pg�t� t�I New 3002Copps COwOertlubmg /i/ 1 dwlrvn Ul faavmn at r r1�+ Simlsg Sigel Rwfin Nal. 1►,� � /� O eahMerwl 6%.i - Nreloanc had o.0a0'FPDM 1'o.c.tagged g Nov Wee CmbDSeella 1�//�t� Fes N<w Alm Tnmbwion Arnaud I'�- '-j Alankx Novi II I�F� t�/� u13'O.a wlllmvonsa AUbrw �/j New Polprol�ne Salve °'i� SmIW Nn.[wCO.05r Akan Cleat hi New Y'PlfvmJS3taaip, ` /►,�����•, Exhiig ReM �,.. secured w/IY'guhJm Sled • de New00Ny FWly Adhered}Van secure aobiakmdu top u9 I W New WnatLiaQScalint �A Flashing — Rna(m Nmb ue'no. Z N'is g,rlywaoa. ��I a ,taws and CAN wtWar I ` wdlPtq Dope Ilammaset Anebra m F1'0.e II Vin OI �GWIy AAiercd HMI New Full Adhered MO'Mgt Is Existing TAG peck ' , AAmdrFul 1 Eustmg35'Plywood angling �1 NMI',fool Twined g Membrane New[,p .�f;\ , •' ` Pargm Wall Flashing a II Pollisns}amse ho,lno, New Fun Adhered 4.064. Nov l� Sim Y ` Newt'Plywood Shaming NnY•pr Won Taped Now 0.060'Funy Adtrrd II O'�0u,lvmmamh.. Mgt hhmmmt Sealant j - \ Isso9'aa0ue huutmeq New fdy dprnd 1 lei htoficeismg wood .'��` Po / ON,EPDM N N'aa Flasbwg �I blogrlmg - �/ Nat Cawnehearm& 11i's'rm dihm 16 ■ ` �,% 5ecmmalrne. M�absmt■Nov Fully AdhadD060• I������ �� 0 i//' FPDAI risks 1...♦. 1 E.mwpA5eu111 1 I∎ E.isonH Ma Deck yy• II/������ �i Nn'PN vAmcgWm ,� d xtrJ'Pdyisorymuwae �1������ Ea'amg\}'cad Ban«tint ��Sty j/ , .,`, Nokl Neah101VaodBloskmpsmvudw/ .1333 3333333333333333 IzsulatinOlaycn 1������ Purist Wood(lob �//////� mad / `� .� a EVaamg 1 •�•�� Nov 4'P011'hrcyloue Foisting MUVmy Wall /`t;�`� y , AIeml Dec %1 ..:.♦. Prsory'oueT,"`' E'stng Naal Dock cad 2 X' c Plywood ol(ihim�mmsa /�j/_� Na.Y•pa foot 'n 33333133331333333 II►.�.�.�.�.�-� S/5.min.iiekm Anchor,at Ir o.c. , Tarred Li asss ®��I•������ Existing Nitta]Deck P tics.we N'o 1 Existing Wood Blacking ®1333,I, 4 oottl:Provide meeb�salterminawm Nnt<I:Roo;a.methmkilASmhwtionnrfidamaotmmeasmurea min.1�®1_�; ♦♦�:.:♦: fMielfm�brmeaaan'i•'dbythe Nate l:Rmidemecbld oSWoIIiwoffiddmanbtleutrytmdbyth eMmufaaea. s' by Mmofactact �' q m q4 Nom 2:Provide newllunugb N'aa Flashing to achieve mg'»®m USOFlUhmglinghtu lktighcu poet ord.new goof III 3:Rnwve eiiamguplull shingles u neensv5'm faelliiate the installation nflhetryla«mmt tongue and gmn.e deck 7)A ��►�����1 alstan,New TNoulWall Flashing slunddmwmuthis level dwughowteHck may well.ITO.iduitlpmary appwm boats.i01000 new uphalt shingles Im.6:Ae.umg.Nv plazsmmishvooksto b epruriddby Irk ofWighl None I:Provide snalumihalls®wiunaffield mmdrlesst9vdby the MmufoNOa. F.dvugMWOttk �ym �6° twat doing gashing installation Cluny.Fast=sbingla with 5 Caroms pa 16aHlt. £d. O Skylight Flashing Detail >ee..,„b10 O Wall Base Flashing Detail Nu tw,.110 O Wall Base Flashing Detail . x.�3.1.A.10 O Wall Base Flashing Detail g,10 r+''' 1,.1,.10 y S a t �{`oa[.g<® I/1hrc® yrr ® NW,-® Wr,® 3r1r Mac® 00.14.® M1aa® I I/ow® 1--r-a.® :\ • • • Restore aMarylau Balnuu Coping New Po11mn1 Sealant Joints w/New SS am Seal.and ,P UaknRad,typical wa➢Coping Nov W IT&1 loom,Rake Afmaml'4pA - j/4 _ .1 New 0040'Kiss road M. Regis Mwmd l'mmtmladdngm Lel new Mw mlTryln __— ` • New Using oIngsgs/Seth / / 1 New Alves Tmnbaum BU Swam �1-r• ——— Nn'PoI}v Am<Scalmu o w/Ilmvne See AncMmull'oo � uL•a Existing Copper Ensiling °. % LN, =-- V.,.t.' .,b New Y'P.T.Plywood Skslhieg ` o'-'E New Alm.Simi..gas naffed , ' New Wain secured w/l awl of War llammer -- — •y San Anchonull'as \' New 10"diameter MT Finished n`.Z wl Hv®ass Mrbu alll'o.c. (WritrSealal `�j Alas Single Cr.VenoLmr New lap Sealant New Ve PlyumdSkgataii mrd New 0M0'Fully Adhered FPOM `r New Alva Curb Rootglmm®8 New Stainless Steel Ur.Bad I S wll mwaof Y'd'Ilm®mn ` �j Wall Flailing 1,1 1St Bascsiubfiton l0'dimna Maim at ld'ne. 1w A `.. Single Cmai lams New Wats(1.11Sealmt �I�- Nov Fully Adnertd 0U60'EYOM N.Lep j�j New 0.060'Fully Adhered Membrane Seal. ` Nn HO Domed Gashed Sax, Nn Prtfmbncud FPOAI Um FPOAI Wall Hailing 1 `� Ep sid' New My Adhcrzd0.0W' J 1■, FPOAIAImMa New lap �`j�j .I,■, N.Fully AdhmdOtkO' em � EPOM Memk®e New lap p�'.EmEEEEBEEEEEBEBEFEE 9/ New 0.060'Full Adlerd aaxisig WWYIGNNQ.....- � i ®®, / , `j% Nn Fully AdbmdO.UA' New beery �I NE" EPDSI Man �Sea1. New:All Wood f.LSb /�/ New per(ant 7�emd i�% ___ I G^ jta 4 nasal Newy'per(omT New!a6 Wood Wee warred m .aaV�� Pol' and P°lysmyawm hruladoa .� dakw 6'a.a. Newt ynaommT oO 'h.. 4 yasogmmn[baulatiml OMA4� U$'mb.thi[kmu OS'min.tldckiwu .�� Existing Maurmy Wag EautmgMUmuy Wall y'nw.adorn Nw1$'perloot Fai5A0P AICW DaI Fsistmg Metal Deck • Tapered PoIynayanuate . Insulation nickel NeOrgcrrod Tpmd Poirim ramam mwanma • Existing Mvvl Deck Note l:I'mvid:mahm¢al termini.of Mg minimal u required by t iMaamus. lii.min.@icbme Of Nolo l:Provide mNwial lamina.of Mg number.uregwred by 0e Manufactures C Nose l:N°rikmnAmiol tnmbanvn of Aeldn¢mhrnneurtquirtdhy the Flmufanwn. F'ritE"SMavl Deck 'a C Note II:!inside mech®ral tnmmrom of field meanmme u wind by the Abmufamura. 5 tL co fO O Parapet Wall Flashing Detail Wall Pace Flashing Detail Curb Flashing Detail Vent Pine Flashing Detail u se,..lw.T.ule 10 kg:Mick. ll sma.wT.f.w l2 s010.00SW. F., m te—+rn rR[moveadTeplaesekmufopmF N.Water o r E /obis velNew Vie.seal.ad CdFOtiSealm a- 01 Backer UMW.a➢Copbg > o C•- New KynaCmed0.01P Alan Copbgw/6• Job,Rak Mona to I'aepet d ce O Bak Up Plate Cl O N.IBPb Dimity Wood Fag Tapered Edge '=eA n New Risible Fleshing New Cow 00/P Al.Clew nosed iv/�• Eria®gPmy.Gaping E 3 r∎ rbmg Slakles Steel Roofing Nos u 6'ne,to Sun O both fide ofpwHm Note Ii Inmlek Ow tmdneide°libel.dram bowl ad vertical kiln. ai 0 J Note 22:Pmridemnpgemmsiomad Fubegfmntamtuv A®bevstbBOliabb8. New Pd)wc0me5elmt- j V N.IVUee QUnnkrlal 1110 1/ EusmigdPSbeathkg p, ►/,Ioy i EaudoBCoppn Flasl®P °•N. �'rI New%'Ply wood Sbewbmg N.FWIv Mimed 0.060'Weubee Rnistat aeon w/Hans.Throbs.Hammed ,r`I N.PalywnAme W.and III EPDM Mmibaw wlHamn see AmMna Lv'on. ` Bicker Rad ut �1/ N.0.060'Fdy Adheed ` of ad NdcJm N..Pit'Kyna Goad p ,f EYIIM YSapn lVaO Flashing N.CUI Ban. Nm SeWP+ Alura Piero Frain I• 1 14 N.lVeurfWOHSeilml FbenP°'P eN.y.'Plywmd Sheathkgfwvd � �N.0.0w'K)gaCaul Alum New Metal Dtmtstap Aa..ii I'..g.Ia®ass /C j SiJdal4mpcto Newomer' E N.OadO'Kyne Cmmd lkvugbwa➢OreAaw Sagla Pa fastend m Mk Now CUIlmo SOabv Anslumal]'o.<. S[gga Box mNw(iAq[r Almon.Wag giggling wl 6' Condmrm/bead nick Bad lip Plan N.fully Ad6aed Nwa'Poliimcymmwe Nn'0.060'FuByAdbnd `j / 0-6-.....1...- rNn'lap Ir 006PpD11 ............. EI'UMWa➢Flabmg Nn foal O.U•Aba.(lcw IF I / Rratnu I MntOme huulaia f I L a emdw/13'Sw,) Steal ..•111 N.Fully/Wised 0.060. Rmhg Nab ea 6'ae C FPDM Melds. Nev r Ey New V side s er m➢N az New Ralik Flashing 1/ODA „:?egi--.. �II Ily moans o/ IdrndSwm Soggn Paa� a ....�.;k'�"...x: fay. y U > r �4/wwm Nn@ghDmmy Wood Rice .Spxyw...m.:.L"xu I .16 e"[ i Tapered Edge c. . �_ T7(ff►New Y14• �. .G 5 Seal.).wl I//////// —Existing Mail M4 t weeps ul6'os. New Can lean Maio Bowl E�rng MmalOM ExistIng!7'gypn Intl g Existing Wood Blocking / Ouwm5oN W HO €^ • Rnadmtio EPOMMmimaieeatmN I'pail N.sae Wood HlaekbSSnm[d to deck u 6•ac. OE clanginglinC.shall Magee disdain pipe diameter / 1 €m N.Nwbubf m EaistkgMannyWell Nana H i m. vivo Stripping Ply.EVmd min.2'.0 field matins. 0t)e 9 Ta Noel:Simidsmechani['a!tinsmitis,of field mcmbrme umymd by du Mad<ur. say m 61, See NmnlaE Note l:Proidemcekaical temwtanm of field laminae u required by lheMauf meT. all 19 Overflow Scupper Flashing Detail 14 Roof Drain Flashing Detail s•..T.aN IS Scupper Flashing Detail f,.ww,. ' h.T.f.,k i11� S r Y re® N6y<® Nr>1',0® 11,.14,® 1,1LT® sere® Mr4,® W•re® 1•x4,® IVr.l'a'® rtir4,® t'` • Remove amdrryma SSJma an Hoping New We. Ivies al New Slisme Sulam and Cw.QSam ,•/t • BrckerRad opicel at ell Coping % xp Jame,Rake Marta to I'&ph t co Existing Paapet[opmg ../...x-----...x .. m Sow Nrw Pdymnhme S<Jm +X 11{'x IA'Aluminum Me$• New Alm.TmFlmlonv r; / /I / _ xiZ New Alum.Temmunm au sawed / o t a/Haa®cSn Agchms air o.c. ` Nrwdealmt 1• .y Nor X.Plywood Shca0mgaetted I Mawr. o.c.lmmmn d`j / I/ Nn'l6 ox Crcppa Conductor Hod m S AmAnaat l3'o.c ` j I. �N Up. LlutMr— �a� New 0.060"Fully Adhvud FAUnI Wall Robing .{� { both sides New FWh A&md0060' EPDM Membamc New N'wirk x{'WI 10 or New16 mr.Capper Picm Frame 1' New 16 ox.Copper Dunn e.. Ncw'Y'pa fmMTa Nv Lap Cmmerlroughwill Soppa Boa cube,uaim BaWt Dm Sdml ;_ zdtont Eaiamgl'x3• �hmm=n Throughwall Scupper Box Detail , Cypn Downspout ■ ■ ( ---,.p.;.\tx p./ �' typal Blivd Rivmm'e �j ° faiatmg E'tl'Cnppa lMwnryoM W / - EaitvnemmvJ COppafiwa - r � °ONAL" • Edisamg'Sr x 31¢Coma owls Tube Fuamw Meal Dcrk 3' Jr 3 - - Nv2vfi lVmd Blocking A. E"u®&NI'hen STivgleRmFgyza® 1 f S' r ELEVATION SIDE VIEW Existing nlmamywan ` rn Conductor Head Detail 0 Note 1:ProvidemabmisJ armman°nof field mcmbnn<urtgwaany the Almuf a. :0 II m .0 16 Overflow Scupper Flashing Detail NewKymrCOatetl 0.D10. Coping E t..)•2 I P ram aury35ealant, — ` New 6•vdde Kytar Coated each side M)tlnt E cu C 5:,4111111111 Alum.Back Up Hate / O ce co t • O_ • a� /// �tIP I z CU u- New Alum C,qm: IWV- D.tO O dkI U N e w Now WmaC wQ f\\ II1I :1000 .n , Dmmpoui al rapper Dm.wort tn sealant -a Eviamg Masonry Wall Bmcletnt'va of Two I� Coypu powwynw Baxkm Steed I \ I i O from r wide 16 ox Coma IX Faldd, \\ / CJ provide Yr stand off , \ / r v New Ky.Costal O.OW Alma New0.050'mM. Edec kcal w/6'Back Up Mars New Polyffahme Sok.,c p A q/.I Atl°m•n-"' New fl flexible Flashing °".t. New TomMairy W°°' ■` \\\� 1 ' Typical Coping Lap Detail Fla Tgrcrd Edge fJa�B Ye Sheathing Nrn0.UM Ahm.Regln Momtd C°mumlatAmg, allow 11cm ma Hack to 111 m wavnGmt0.lon,lmaless mwmnew'14g1n , Mimithaoo•cop g New erevac SenvnveS aumd wl W,'Iwe Samlm Nn�'Plywood5hmlmig hchivd ikeaawayme aogeo Sall Roofing Nalx a 6'o.S New Almn Tmnmation Bar wcmcd w/Hamm,Sa rPlY Hoed roll Nmlme flmge n( }p•By.ho0,aaka efPUapet NewOUW'FunYAdoered FPpAI Avsh°ndll'os. ` Emmg MamuytV. \ Ner Almon Edge Meal end wrier des P WJf Flasla / Coves Plate ontoA am ALmm. New Fun Adhad0W0'EPOM New FuBYAdkvd 0060'EPDA7Membrme �I I Nn POlymnhaNEm1,3 \ ,,,-.w7 C°PMS a . 1 I 1/I� „/ Mnnbmc II,J\ Nw NaafutoQSaL t .. New Peswe&maive Sm+PPmR �� 1L New ltl'x1014'et•Gmaete 5➢Issb Black— �I �r /. NewO WO'Funy \\ — T\_ i / New P.TPl-•zd Adbmsd EPUM \ PIY C Plne a Nov New Wata Cl,LnnSeilmt ► New FROMW Pad % Sbea3mp snood u/ Pain N'ill Flvhmg � 1 ,`\ram'ova C) tVmMResipmu Baba .' a d n ; Andtma Il'oc�a5m New 00a0"Kyna Coved \\\\l� I l __ _ tti ' �"i ` am(bun.actin WUa I N.w Kyaw \ _•I♦�� ticw 0.060"Fully AdAacd GwoQSalam .• Cead00da' ''.22.....Q.............:.., 6 New 0080°K Cold a a ,� EMI WO He \\\� A Almon Ede — _ Qpi-{ AImu Wall Flashing w/6” �I_�� � Y tl New Hamer Sc AmLmr \\\\ I McW N wide Batupemta I iouivviviiiii L ;/ Mrz^°x '. ( \•� - Newq•eah;smmame P s Im..,2layas ` \ Nm 6•wade Kyna w I Cover D'040'Num `y • e mpExisting nlaal Uak ExitmRtVmoJ Blaslovg N_arhamfqd bytbc Maaeanamr. Typical Vertical Wall Termination Detail I: a m n EJadngMml Ma Typical Coping to Edge Metal Lap Detail f'i^ fl Parapet Wall Flashing Detail 0 wm r wN Wall Flashing Detail R tar ® I,aa rw® a/ax4a�® gw-ad® 0 10' ® tm..o.® a,eIa® 1,•-®s tNr.aa® >.r.a® ,UUrl'` • • • • . T Ln an t rZoly Omni onst. a lVatm OUaRSdm Existing Penman New Wma o_ Nm'SUvdm SmlpnwbmJ k3• New Nansbrak Cmmt CuooRSwlm, 1Ja .-v Nm'Pomblc SNm ����.JJ1 p E •�• New Wmatight Stinks,SteilRa Cale a Z Aypmil/,'<kam<e al amen overlapping Prnauuw road In Newland-off Sam New 36 garye Stmlm Seal Pmmtivm Nov Nyma Comd003^Alm. Pokn w/wda<d teau t'min clmmu CowtmAUloa Nm9'wide EPuM from p.m%4'mm.height sad l'mil Flmlring Almvbrm ):'� y.,g v 11mFe New Up Sedans • 6t- rNcwFuaYAdbmd bik -it-:-.e• —New Rill 0060-EPIIAI No.Fully Adhered 0.060' f.b Almkmu EPDM Membrane %/ Kai it 4rzdi woLmnalarm �New Rata Rod �1 `Fist',Mal Ikti �� '$A� �c�' —New 4'Polyisoryawae W.-P.7.10 Mad Nakn Existing MeulD %70n1.0 InsuLrvm m.1114 Nei/ euulanmv.fmtrn m dak w/IWO screws at Ir o.c.suggacatm. IT Nac C Nov RN Club m be pmiddby Isle of11501C 4.New curb mbeiradaand 0uMJby Canna=Contra=to 'p C coo*.We ieseRatim atilt N W' Rw/isle of fn., _ OJ ePitch Pocket Detail O Curb Flashing Detail m y u 19 mb.w„o,me 2U WWI.. CCi r 2.7'En E cu 5 oE_,-.--. • z"3-‘412 o' ay E 3•-. J U E z 17,5 I • C 1 a) 0 Z5 , < IF IS tl].d® Wee® L,n,tl /1.IP® Vnm® Vm•a'® 1/nlV® VV., ® IVY.tm'® ® 1` W • Local Roan Global Reach ISLE OF WIGHT COUNTY,VIRGINIA December 18,2015 IFB#16-4110-01 INVITATION FOR BID ADDENDUM #1 Community Development Building Low Slope Roof Replacement Sealed bids subject to the conditions and instructions contained herein,will be received at the office of the Purchasing Agent listed below,until the time and date shown below(local prevailing time),for furnishing the items or services described herein. • The location for the optional prebid meeting is amended to read as follows: Optional Prebid Meeting: 10:00 AM, January 12, 2016 at the site: 17140 Monument Circle, Isle Wight County,VA 23397 Bid Due: 3:00 PM., February 2, 2016 Contract Officer: Michael Coburn,Sr.,Purchasing Agent,Michael.coburnAisleofwightus.net **SECTION "A" AND ONE ELECTRONIC CD COPY IS REQUESTED AT SUBMITTAL** In compliance with this invitation for bids,and subject to all the conditions thereof,the undersigned offers,if this bid is accepted within ninety(90) calendar days from the date of the opening,to furnish any or all of the items and/or services upon which prices are quoted,at the price set opposite each item,to be delivered at the time and place specified herein. The undersigned certifies he has read,understands, and agrees to all terms, conditions,and requirements of this bid,and is authorized to contract on behalf of firm named below. Company Name: Address: City/State/ Zip: Telephone: FAX No.: E-mail: Print Name: Title: Signature: Date: • Local Roots,Global Reach ISLE OF WIGHT COUNTY,VIRGINIA January 26,2016 IFB# 16-4110-01 INVITATION FOR BID ADDENDUM #2 Community Development Building Low Slope Roof Replacement Sealed bids subject to the conditions and instructions contained herein,will be received at the office of the Purchasing Agent listed below,until the time and date shown below(local prevailing time),for furnishing the items or services described herein. Please change the paragraph on page 5 to read as follows: LIQUIDATED DAMAGES: If said work is not completed within the time stated in the Notice to Proceed,the Contractor shall be liable and hereby agrees to pay to the Owner as liquidated damages, and not as a penalty, the amount of one hundred dollars ($100.00)per calendar day for each and every part of a day thereafter that said work remains substantially incomplete. The County reserves the right, at its sole discretion,to deduct liquidated damages from any outstanding amount due the Contractor. Also: Replace: Section 01100 - Summary; Paragraph 1.3-A-5 with the following " Remove the existing asphalt • shingles from the steep slope roof adjacent to Roof Section Al as necessary to remove and replace the deteriorated tongue and groove deck boards 12 inches up from the roof eave. Provide new replacement 3/4"plywood to match the thickness of the existing tongue and groove deck boards. Provide new self-adhered underlayment. Bid Due: 3:00 PM., February 2, 2016 Contract Officer: Michael Coburn,Sr.,Purchasing Agent,Michael.coburn(aisleofwightus.net Company Name: Address: City/State/ Zip: Telephone: FAX No.: E-mail: Print Name: Title: Signature: Date: oriP Local Roots,Global Reach ISLE OF WIGHT COUNTY.,VIRGINIA February 2,2016 IFB# 16-4110-01 INVITATION FOR BID ADDENDUM #3 Community Development Building Low Slope Roof Replacement Sealed bids subject to the conditions and instructions contained herein,will be received at the office of the Purchasing Agent listed below,until the time and date shown below(local prevailing time),for furnishing the items or services described herein. The Performance Bond in Section B, is changed to read as attached: Bid Due: 3:00 PM., February 2, 2016 Contract Officer: Michael Coburn,Sr.,Purchasing Agent,Michael.coburuaisleofwightus.net Company Name: Address: City/State/ Zip: Telephone: FAX No.: E-mail: Print Name: Title: Signature: Date: PERFORMANCE BOND (CONTRACT DOCUMENT TO BE COMPLETED AT TIME OF AWARD) Bond No. Amount: $ KNOW ALL PERSONS BY THESE PRESENTS,that of ,hereinafter called the Contractor and a corporation duly organized and existing under and by virtue of the laws of the State of ,hereinafter called the Surety,and authorized to transact business within the Commonwealth of Virginia as the Surety,are held and firmly bound unto Isle of Wight County,Virginia as Owner, in the sum of dollars($ ),lawful money of the United States of America, for payment of which,well and truly be made to the Owner,the Contractor and the Surety bind themselves and each of their heirs, executors,administrators,successors,and assigns,jointly and severally,firmly by these presents as follows: THE CONDITION OF THE ABOVE OBLIGATION IS SUCH THAT: WHEREAS, the Contractor has executed and entered into a certain Agreement, hereto attached,with the Owner dated ,2016, for roof replacement as described in the bid titled Community Development Building Low Slope Roof Replacement,IFB# 16-4110-01. NOW THEREFORE, if the Contractor, and its successors and assigns, shall at all times duly,promptly, and faithfully perform the Work and any alteration in or addition to the obligations of the Contractor arising there under, including the matter of infringement, if any, of patents or other proprietary rights, and shall assure all guarantees against defective workmanship and materials, including the first two years of the guarantee period following final completion by the Contractor and final acceptance by the Owner and comply with all the covenants therein contained in the Specifications, Drawings, and other Contract Documents required to be performed by the Contractor, in the manner and within the times provided in the Agreement, and shall fully indemnify and save harmless the Owner from all costs and damage which it may suffer by reason or failure to do so, and shall fully reimburse and repay it all outlay and expenses which it may incur in making good any default,and reasonable counsel fees incurred in the prosecution of or defense of any action arising out of or in connection with any such default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER,that the Surety,for value received, for itself and its successors and assigns, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract Documents or to the Work to be performed there under, or payment there under before the time required therein, or waiver of any provision thereof, or assignment, subletting or transfer thereof or any part thereof, shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration, addition to the terms of the Contract Documents or any such payment, waiver, assignment, subcontract or transfer. PROVIDED,FURTHER,that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder,whose claim may be unsatisfied. Whenever Contractor shall be declared by Owner to be in default under the Contract,the Owner having performed Owner's obligations there under,the Owner shall have the right, at its option, to require the Surety to promptly proceed to remedy the default within 30 days of notice by proceeding or procuring others to proceed with completing the Agreement with its terms and conditions; and all reserves, deferred payments, and other funds provided by the Agreement to be paid to Contractor shall be paid to Surety at the same times and under the same conditions as by the terms of that Agreement such fund would have been paid to Contractor had the Agreement been performed by Contractor; and Surety shall be entitled to such funds in preference to any assignee of Principal of any adverse claimant.Notwithstanding the above, the Owner shall have the right,with the approval of the Surety which shall not be unreasonably withheld, to take over and assume completion of the Agreement and be promptly paid in cash by the Surety for the cost of such completion less the balance of the Contract price. It is hereby expressly further understood and agreed that this Bond is also given and made against defective material and workmanship in the said work covered by the said Contract,provided, however, that no suit, action, or proceeding,by reason of any defect whatever, shall be brought upon this Bond after two (2)years following the date of final acceptance of the completed project by the Owner. IN WITNESS WHEREOF, all above parties bounded together have executed this instrument this day of , 2016,the name and corporate seal of each corporate party being hereto affixed and those presents duly signed by its undersigned representative,pursuant to authority of its governing body. CONTRACTOR By: (Seal) Name: Title: Attest SURETY By: (Seal) Attest APPROVED AS TO FORM: ,2016 Mark Popovich, County Attorney NOTE: Date of Bond shall not be prior to the date of the Agreement. If the Contractor is a partnership, all partners shall execute the Bond. IMPORTANT: The Surety named on this Bond shall be one who is licensed to conduct business in the Commonwealth of Virginia, and named in the current list of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies, as published in Circular 570 (amended)by the Audit Staff Bureau of Accounts,U.S. Treasury Department. All Bonds signed by an agent shall be accompanied by a certified copy of the authority to act for the Surety at the time of signing of this Bond. Community Development Building Roof Replacement IFB#16-4110-01 February 2, 2016 3:00 PM TST Roofing Block Roofing Old Dominion Shaddeau Roofing Roof Systems Air Tech Solutions Bidders Roofing $116,980. $79,533.00 $97,770.00 $74,025.00 $98,700.00 $98,000.00 Lump Sum Custom Roofing Roof Engineering Commercial Bofam J.D. Miles&Sons Roof Services Bidders T/A J. King Roofing Contractors Deshazzo Group $86,550.00 $71,942.00 $ 181,900.00 $89,500.00 $ 67,700.00 $133,950.00 Lump Sum try ISLE OF WIGHT COUNTY VIRGINIA February 4, 2016 Mr. Ray A. Coykendall, Vice President J.D. Miles &Sons, Inc. 210 B Street, P.O. Box 5008 Chesapeake, VA 23324 Dear Mr. Coykendall: This shall serve as Notice of Intent to award the Community Development Building Low Slope Roof Replacement, IFB#16-4110-01, project to your firm in response to your bid submittal of February 2, 2016 in the amount of$67,700. Section B, of the IFB contains the form that you must fill out and return. The addendum #3 has a replacement Performance Bond that should replace the original. Please return the bonds, insurance, and agreement so we can move this project forward. Also, to receive faster payments you have agreed to take payments via the County's Purchasing Card. To allow this to work through our accounts payable division, you must register at: www.bankofamerica.com/epayablesvendors Once you are registered and the required documents are returned and approved, we will schedule a preconstruction meeting, after which time we will likely issue a Notice to Proceed. From that time you will be expected to commence work within ten days and finish no later than seventy (70) calendars days. Should you have further questions or need assistance in any manner,the County will be pleased to speak with you. Sincerely yours, Michael Coburn Purchasing Agent •