2/26/2016 - Professional Services Agreement IOW and Kimley-Horn
Local RomGSoba!Reach ISLE OF WIGHT COUNTY,VIRGINIA Professional Services Agreement Between Isle of Wight County And Kimley-Horn PROFESSIONAL SERVICES AGREEMENT Page 1 of 16 PROFESSIONAL SERVICES AGREEMENT Page 2 of 16 Contents General Conditions 4 1. DEFINED TERMS AND ORDER OF PRECEDENCE 4 2. ENGINEER'S SCOPE OF WORK 5 3. INTERFACE AND SITE CONDITIONS 6 4. SCHEDULE 6 5. CHANGES 6 6. PAYMENT 7 7. RIGHTS OF OWNER AND CONSULTANT TO TERMINATE 8 8. PROJECT EXECUTION 8 9. WARRANTY 9 10. INSURANCE' 9 11. INDEMNITY' 9 12. DISPUTE RESOLUTION: 9 13. FORCE MAJEURE: 10 14. GENERAL PROVISIONS 10 EXHIBIT A 13 PROFESSIONAL SERVICES AGREEMENT Page 3 of 16 GENERAL CONDITIONS This Agreement, is made this day of February,2016,by and between Isle of Wight County,Virginia, a political subdivision of the Commonwealth of Virginia,having its main place of business at 17130 Monument Circle, P.O. Box 80, Isle of Wight, Virginia 23397 (hereinafter called the "Owner") and Kimley-Horn, a corporation organized and acting under and pursuant to the laws of the Commonwealth of Virginia, having its main place of business at 4500 Main Street, Suite 500, Virginia Beach, VA 23462 (hereinafter called the "Engineer"). Owner and Engineer may sometimes be referred to herein individually as a"Party"or jointly as the"Parties". WITNESSETH: WHEREAS, Engineer is engaged in the performance of design and engineering services; and, WHEREAS,Owner desires Engineer to furnish and perform certain design and engineering services; Now, THEREFORE, in consideration of the premises and the mutual covenants and conditions herein contained, it is agreed as follows: 1. DEFINED TERMS AND ORDER OF PRECEDENCE 1.1 DEFINED TERMS: The following words,when capitalized, shall have the meanings set forth below: 1.1.1 AGREEMENT: "Agreement"means these General Conditions, the attached Exhibit,and all additions or modifications thereto made in accordance with Section 14.4 below. 1.1.2 CONTRACT SUM: "Contract Sum" means the sum set forth in Section 6.1 below,or such greater or lesser amount as may be determined in accordance with Section 5 below. 1.1.3 ENGINEER'S PROJECT MANAGER: "Engineer's Project Manager" means the individual designated from time to time by Consultant in writing as having the responsibilities described at Section 8.1 below. 1.1.4 DATE OF COMMENCEMENT: "Date of Commencement"means the date of commencement of this Agreement,which shall be the later of the date that it has been executed by both Parties. 1.1.5 DAY: "Day"means a calendar day. 1.1.6 FINAL COMPLETION: "Final Completion" means that all drawings and other documents identified as documents to be delivered Kimley-Horn and Associates, Inc. to Owner have been delivered. PROFESSIONAL SERVICES AGREEMENT Page 4 of 16 1.1.7 GENERAL CONDITIONS: "General Conditions" means all portions of this Agreement other than the attached Exhibit. 1.1.8 OWNER'S REPRESENTATIVE: "Owner's Representative" means the individual designated from time to time by Owner in writing as having the responsibilities described at Section 8.2 below. 1.1.9 SCHEDULE:"Schedule"means any individual project schedule,as amended from time to time by mutual agreement of the Parties in accordance with this Agreement. 1.1.10 WORK: "Work" means the obligations of Engineer to be performed under this Agreement. 1.2 ORDER OF PRECEDENCE: In the event of any conflict between these General Conditions and the Exhibits hereto,these General Conditions shall be controlling. 2. ENGINEER'S SCOPE OF WORK 2.1 GENERAL DESCRIPTION OF WORK: Engineer shall perform professional services hereinafter stated which shall include customary civil, structural, mechanical and electrical engineering services and customary Engineering services incidental thereto for specifically defined projects, as may be agreed to by the Parties in writing (hereinafter a "Project Scope of Work"). Engineer shall perform all services hereunder: (i)expeditiously and consistent with the orderly progress of the particular project; (ii) in accordance with the standard of care and skill of the Engineering professions existing as of the date such services are provided; (iii) in accordance with all applicable laws,codes and regulations in effect at the time of Substantial Completion;and (iv) in accordance with current standard technology to complete the project as accepted within the industry as of the time of Substantial Completion. In addition to its obligations under these General Conditions, the Engineer shall provide such services as more specifically described in the Project Scope of Work,all in accordance with these General Conditions.Engineer shall be responsible for the quality,technical accuracy, timely completion, and coordination of all plans, studies,designs, drawings, specifications, reports,and other services furnished by Engineer under this Agreement. Engineer shall be responsible for the performance of consultants or persons retained by Engineer as if performed by it. The Owner's review of, or right to review, the work of Engineer shall not be construed as relieving Engineer from its professional and legal responsibility consistent with the services required under this Agreement. Engineer shall, without additional compensation, correct or revise any errors,omissions,or other deficiencies in its plans,studies,designs,drawings, specifications, reports, and other services. 2.2 PERMITS: All permits required by applicable law or regulation, including without limitation, permits related to environmental protection or activities of Owner or any of its contractors, if any, other than Engineer, shall be secured by Owner at Owner's expense. 2.3 DRAWINGS: All drawings shall comply with all applicable laws, statutes, ordinances, codes, rules and regulations ("Applicable Laws"). Engineer shall indemnify and hold the Owner harmless for any loss or damage resulting from the failure of such drawings to comply PROFESSIONAL SERVICES AGREEMENT Page 5 of 16 with Applicable Laws. Such loss or damage includes, but is not limited to, reasonable attorneys' fees, costs and expenses, including reasonable expert witness or consultant fees and expenses. Engineer shall, without additional compensation, correct any and all errors and omissions in its services including failure of the drawings to comply with Applicable Laws.Engineer shall,without additional compensation, assist the Owner in the review, analysis and defense, including any mediation, arbitration or court action for claims that arise from any and all errors or omissions in Engineer's services including, but not limited to, the failure of any drawings to comply with Applicable Laws. Engineer shall, upon completion of the.Work, deliver to Owner a complete set of appropriately stamped or sealed drawings as required under the applicable rules and regulations related to the practice of professional Engineering. Engineer shall grant Owner the non-exclusive right to use said drawings as Owner deems appropriate without any further requirements, restrictions or actions on the part of Owner. 3. INTERFACE AND SITE CONDITIONS 3.1 SITE CONDITIONS: Unless indicated otherwise in this Agreement, Engineer shall visit all Work sites and become familiar with the conditions of the site as it applies to performance of the Work.If conditions are encountered at the site that(1)were not readily observable by visual inspection of the site, or (2) are unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in Engineering activities of the character provided for in this Agreement,then notice by the observing Party shall be given to the other Party promptly before such conditions are further disturbed and in no event later than five (5) days after first observance of the conditions. If any such condition causes any increase or decrease in Engineer's cost of, or time required for, performance of any part of the Work,or any increase or decrease in any other obligation of Engineer,Owner shall,within fifteen (15)days of issuance or receipt of notice,as the case may be,under this Section 3.1,issue a change order in accordance with Section 5 below. 3.2 COOPERATION WITH OTHERS: Engineer will cooperate with Owner's other contractors, if any, to facilitate coordination of the Work with the work of others, but any changes to the Work or the Schedule required to do so shall be treated as a change under Section 5 below. 4. SCHEDULE 4.1 SCHEDULE: Engineer shall use its best reasonable efforts to perform the Work in accordance with the Schedule. In case of any delay other than a delay caused by Engineer, its employees, subcontractors or vendors, for reasons other than force majeure(which shall be treated in accordance with Section 13 below),the Schedule for completion of the Work,or any part of it, shall be automatically extended by a number of Days equal to the number of day of such delay. 5. CHANGES 5.1 ISSUANCE OF CHANGE ORDERS BY OWNER: Owner may, by its written order, require changes in the Work within the general scope of the Agreement consisting of additions, deletions or other revisions that do not result in any material change in the Work. PROFESSIONAL SERVICES AGREEMENT Page 6 of 16 5.2 NOTICE OF IMPACT OF CHANGE ORDER: If Engineer receives instructions from Owner, which in Engineer's opinion constitute a change in the Work, Engineer shall so advise Owner within five (5) Days of receipt of such instruction. If Engineer receives a change order under Section 5.1 above, then Engineer shall,within ten (10) Days thereafter submit to Owner a statement of the impact of such change on Contract Sum, Schedule,or any other provisions of the Agreement affected thereby.Engineer shall not delay prosecution of the Work not affected by the change.Any adjustment to the Contract Sum or Schedule,if any,as a result of such a change order shall be made by mutual agreement of the Parties. 6. PAYMENT 6.1 CONTRACT SUM: Owner shall pay Engineer for the full and satisfactory completion of Work a lump sum (the "Contract Sum") for each Project Scope of Work, or such other sum as may be determined in writing by the Parties and as may be modified in accordance with Section 5 above.The Contract Sum does not include any sales or other tax. For full terms and pricing see Exhibit B. 6.2 PAYMENT TERMS: Owner shall make payments to Engineer upon submittal of approved invoices with payment terms stated as Net 30. 6.3 FINAL PAYMENT: Engineer shall invoice Owner for the final amount due to it under this Agreement upon reaching Final Completion of a Project Scope of Work.Payment of all of the Contract Sum remaining unpaid, and any and all other amounts owing to Engineer under this Agreement shall be made within thirty(30) days after Final Completion. 6.4 SUBCONTRACTOR PAYMENTS AND INTEREST: Engineer is obligated to take one (1)of the following two(2)actions within seven(7)days after receipt of amounts paid to Engineer by Owner for work performed by any subcontractor under this Agreement: (a) pay the subcontractor for the proportionate share of the total payment received from the Owner attributable to the work performed by the subcontractor under this Agreement,or(b)notify the Owner and the subcontractor in writing of Engineer's intention to withhold all or a part of the payment with the reason for such nonpayment. Engineer is obligated to pay interest to the subcontractor on all amounts owed by Engineer that remain unpaid after seven(7)Days following receipt by Engineer of payment from the Owner for work performed by the subcontractor under this Agreement,except for amounts withheld as otherwise allowed. Engineer shall include language in its subcontracts and require such language to be included in contracts with lower-tier subcontractors that provides: "Unless otherwise provided under the terms of this Agreement, interest shall accrue at the rate of one percent (1%) per month." Individual contractors are required by law to provide their Social Security numbers to the Owner; proprietorships, partnerships and corporations are required to provide the Owner with their Federal Employer Identification Number. 6.5 NON-APPROPRIATION: All funds for payments after June 30th of the current fiscal year are subject to the availability of Owner's appropriation for this purpose. In the event funding for payment pursuant to this Agreement is not appropriated by Owner,for any reason,or is subject to the availability of federal or state funding and such federal or state funding is not made available, this Agreement may be terminated by the Owner pursuant to Section 7.1 below. PROFESSIONAL SERVICES AGREEMENT Page 7 of 16 7. RIGHTS OF OWNER AND CONSULTANT TO TERMINATE 7.1 OWNER'S RIGHT TO TERMINATE FOR CAUSE: Owner may terminate this Agreement if: (a)a petition in bankruptcy is filed by Engineer,and such filing materially impacts Engineer's ability to perform its obligations under this Agreement, or such a petitioner is filed against Engineer and it is not dismissed within thirty(30)days; (b) Engineer commits a material breach of a material obligation under this Agreement,or fails to make reasonable progress toward completion of the Work, and fails to cure such breach or failure within the longer of thirty (30) days of its receipt of written notice of such breach or such longer time as is reasonably required to cure such breach;or(c)as a result of events described in Section 6.5 above. Upon termination due to(a)or(b), Owner may take possession of the Work completed by Engineer,take assignment of all purchase orders and subcontracts related to the Work and complete the Work by whatever reasonable method Owner may deem expedient. In the event of termination for any of the reasons set forth in this Section 7.1,Engineer will be liable to Owner for any reasonable costs incurred by Owner to complete the Work in excess of the Contract Sum remaining unpaid to Engineer. In case of such termination,no further payments will be made to Engineer after termination until the Work is completed and upon completion of the Work,Owner shall pay Engineer the balance due under this Agreement, less the amounts required to be paid by Owner to third parties to complete the Work, and if the unpaid balance of the Contract Sum is less than the cost of finishing the Work, Engineer shall than pay such excess amount. 7.2 ENGINEER'S RIGHT TO TERMINATE: Engineer may terminate the Agreement on seven(7)Days written notice if the Work is stopped,without fault on the part of Engineer or any of its vendors or subcontractors, for more than fifteen (15)Days,for any of the following reasons: (a)issuance of any order of a court or other public authority having jurisdiction;(b)Owner has not made payment within five (5) Days of the date due; or (c) Owner commits any other material breach of a material obligation under this Agreement, and fails to cure such breach within the longer of thirty (30) Days of its receipt of written notice of such breach or such longer time as is reasonably required to cure such breach. Upon such termination Owner shall pay Engineer all amounts then due to it under this Agreement as of the date of termination. 8. PROJECT EXECUTION 8.1 ENGINEER REPRESENTATIVE: Engineer will keep Engineer's Project Manager assigned to the Work at all times during its progress. Engineer's Project Manager shall represent Engineer, and written communications given to Engineer's Project Manager by Owner shall be as binding as if given to Engineer itself. All communications to Engineer's Project Manager by Owner shall be confirmed in writing upon request by Engineer. Engineer 's Project Manager shall devote all of his/her time as necessary to the Project as may be appropriate to and consistent with the full and timely performance of this Agreement by Engineer. Engineer agrees that this individual shall not be relieved from their responsibilities on this Project without the written consent of the Owner, except in the event of their disability, death or departure from the employ of Engineer from the Commencement Date to Final Completion of the Project to the Owner's satisfaction, including completion of all punch list activities. Owner shall retain the right to approve any consultants hired by Engineer for this Project which approval shall not be PROFESSIONAL SERVICES AGREEMENT Page 8 of 16 unreasonably withheld,provided however,if the Owner does not provide such reasonable approval and Engineer is required to substitute a consultant, then Engineer 's compensation shall be adjusted to reflect any differences in Engineer's costs occasioned by such substitution. 8.2 OWNER REPRESENTATIVE: Owner will have at all times during the progress of the Work a competent representative assigned to the Work. Owner's Representative shall represent Owner, and written communications given to Owner's Representative shall be as binding as if given to Owner itself. Owner shall have its Owner's Representative available during normal business hours at all times during the progress of the Work. 9. WARRANTY 9.1 SERVICES: Engineer warrants, for a period ending two (2) years after Final Completion, or the last date on which Engineer performed work under this Agreement if this Agreement is terminated for any reason prior to Final Completion,that the services provided by it hereunder will be provided with reasonable skill and care of the type normally exercised by other Engineering professionals under similar circumstances. 9.2 NOTICE OF WARRANTY CLAIM:Owner shall notify Engineer of any defect covered by the warranty set forth in Section 9.1 above within thirty(30)Days after discovering such defect. 10. INSURANCE: 10.1 Engineer shall carry the insurance coverage described in Exhibit A as insurance to be carried by it. 11. INDEMNITY: 11.1 Engineer shall indemnify and hold harmless Owner and its agents and employees from and against all claims made by a third party for any damages, losses and expenses,including, but not limited to attorney's fees, arising out of or resulting from Engineer 's performance of the Work,provided that any such damage,loss or expense:(I)is attributable to bodily injury,sickness, disease or death,or to injury to or destruction of tangible property and (2)is caused in whole or in part by any negligent act or omission of Engineer , its subcontractors, or anyone for whose acts Engineer is liable. In the event that any such damage, loss or expense was caused in part by Owner or by any other person or entity,however,then Engineer shall be obligated to pay only the portion of the damage,loss or expense,including reasonable attorney's fees,as is attributable to its relative share of the negligence or omission which caused such damage, loss or expense. 12. DISPUTE RESOLUTION: 12.1 Contractual claims shall be processed in accordance with the procedure in Section 2.2-4363 of the Code of Virginia 1950 as amended.Engineer shall submit its claim,whether for . g ( )� g money or other relief, in writing to the Owner no later than sixty (60) Days after final payment. The Owner will meet at the next regularly scheduled Board meeting, after due notice, to discuss PROFESSIONAL SERVICES AGREEMENT Page 9 of 16 the claim. The Owner shall issue its final decision on the claim in writing ninety (90) Days after the Board meeting. 13. FORCE MAJEURE: 13.1 No delay in, or failure of, performance by either Party under this Agreement will constitute default hereunder or give rise to any claim for damages if and to the extent caused by an occurrence beyond the control of the Party affected, to include but not limited to, acts of governmental authority, acts of God, strikes or other concerted acts of workmen, fire, flood, explosions,riots,war,rebellion or sabotage. 14. GENERAL PROVISIONS 14.1 EQUAL EMPLOYMENT: During the performance of this Agreement, for itself, its assigns and successors in interest, Engineer agrees as follows: 14.1.1 NONDISCRIMINATION: Engineer will not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, except where religion, sex, or natural origin is a bona fide occupational qualification, reasonably necessary to the normal operation of Engineer. Engineer agrees to post in conspicuous places, available to employees and applicants for employment,notices setting forth the provisions of this nondiscrimination clause. 14.1.2 SOLICITATIONS: Engineer, in all solicitations or advertisements for employees placed by or on behalf of Engineer, will state that Engineer is an equal opportunity employer. 14.1.3 NOTICES AND ADVERTISEMENTS:Notices,advertisements and solicitations placed in accordance with federal law,rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this Section 14.1. 14.1.4 CIVIL RIGHTS: Engineer agrees to conduct all services in compliance with all of the requirements imposed by or pursuant to Title VI of the Civil Rights Act of 1964, Part 21 of the Regulations of the Secretary of Transportation and Executive Order No. 11246 "Equal Employment Opportunity: as supplemented in Department of Labor Regulations (41 CFR, Part 60)". 14.2 DRUG-FREE WORKPLACE: During the performance of this Agreement, Engineer agrees to (i) provide a drug-free workplace for Engineer 's employees; (ii) post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Engineer 's workplace and specifying the actions that will be taken against employees for violations of such prohibition; (iii)state in all solicitations or advertisements for employees placed by or on behalf of Engineer that Engineer maintains a drug- free workplace; and (iv) include the provisions of the foregoing clauses in every subcontract or purchase order of over Ten Thousand Dollars ($10,000), so that the provisions will be binding PROFESSIONAL SERVICES AGREEMENT Page 10 of 16 5 upon each subcontractor or vendor. For the purposes of this Section 14.2, "drug-free workplace" means a site for the performance of work done in connection with a specific contract awarded to Engineer, the employees of whom are prohibited from engaging in the manufacture, sale, distribution, dispensation, possession or use of any controlled substance or marijuana during the performance of the contract. 14.3 ASSIGNMENT: Neither Engineer nor Owner shall assign or transfer its duties or obligations hereunder without the prior written consent of the other. This Agreement shall be binding upon and shall inure to the benefit of the Parties and the successors and permitted assigns of Owner and Engineer. 14.4 ENTIRE AGREEMENT;WAIVER;AMENDMENT: These General Conditions and the attached Exhibits constitute the full and complete contract between the Parties hereto with respect to the subject matter hereof. There are no statements, agreements,understandings,representations or trade customs of any kind, express or implied, concerning the subject matter which are not merged herein or superseded hereby.A waiver of any of the terms of this Agreement shall not bind either Party unless signed by one of its duly authorized representatives. Waiver by either Party of any default by the other Party hereunder shall not be deemed a waiver by such Party of any default by the other which may occur thereafter.This Agreement may only be modified or amended by an agreement in writing executed by both Parties hereto. 14.5 GOVERNING LAW: The Parties agree that this Agreement shall be deemed to have been made in Virginia and the validity and construction of this Agreement shall be governed by the laws of the Commonwealth of Virginia. The Parties further agree that any legal action or proceeding arising out of this Agreement shall be commenced and tried in the Circuit Court of Isle of Wight County to the express exclusion of any otherwise permissible forum. 14.6 NOTICES: All notices provided for herein will be considered properly given if in writing and delivered personally or, by fax or sent properly addressed,postage pre-paid: If to Consultant,to: Kimley-Horn and Associates, Inc. 4500 Main Street, Suite 500 Virginia Beach, Virginia 23462 If to Owner,to: Isle of Wight County Department of Budget&Finance • Attn:Michael Terry, Director Isle of Wight County P.O. Box 80 Isle of Wight, Virginia 23397 With a copy to: Mark,Popovich, County Attorney Isle of Wight County P.O. Box 80 Isle of Wight,Virginia.23397 PROFESSIONAL SERVICES AGREEMENT Page 11 of 16 Notices shall be deemed effective upon actual receipt, or in the case of posting in the U.S. mail, on the fourth Day after mailing. 14.7 SURVIVAL: Section 9.1 shall survive termination of this Agreement WITNESS WHEREOF, the Parties hereto have executed this Agreement on the ZLO day of FebrikRrt- ,2016. OWNER: CONTRACTOR: ISLE OF WIGHT COUNTY,VIRGINIA KIMLEY-HORN AND ASSOCIATES,INC. • By: gri u. ,L' �� ►�._ By . Sanford . Wanner . ,,P.E.,Vice President Interim County Administrator oma4 J. ATTES FOR CONSULTANT: c,Lce.A By: fa _ °Z. APPROV D S T!} ORM: A..� M. 'opovich, I of Wight County Attorney PROFESSIONAL SERVICES AGREEMENT Page 12 of 16 Kimley>>>Horn February 12, 2016 Mr. Michael Coburn Purchasing Agent, Budget and Finance Isle of Wight County 13048 Poor House Road Isle of Wight County, VA 23397 RE: Shirley T. Holland Intermodal Park Permit-Ready Site Design Preliminary Engineering and Initial Infrastructure Tasks Dear Mr. Coburn, Kimley-Horn and Associates, Inc. ("Kimley-Horn" or"the Consultant") is pleased to submit this Agreement (the"Agreement") to Isle of Wight County ("the Client" or"the County"), to provide permitting and engineering services for preliminary engineering and initial infrastructure at the Shirley T. Holland Intermodal Park. This work will be performed as a result of selection under the solicitation RFP#16-1815-03. It will be subject to the terms and conditions of the Professional Services Agreement between the Isle of Wight County Board of Supervisors and Kimley-Horn and Associates, Inc.,dated March 31, 2014. Below is our understanding of the project and our anticipated scope of work. Project Understanding The County would like to initiate the design and construction of permit-ready sites in the Shirley T. Holland Intermodal Park. The goal is to prepare site(s) within the park to allow future facility construction to begin within 60 days of the sale of the property. The County intends to immediately prepare and execute a Clearing Plan for an 80+1- acre site which encompasses a development area as shown on Concept 2 (see Attachment A). The Clearing Plans and oversight of that effort is the sole responsibility of the County. Once they are completed, the County will provide the Clearing Plans to Kimley-Horn so that we may consider them in our work under this Task Order. Completion of the Clearing Plan work is a prerequisite to commencing the Topographic Survey that is scoped under this Task Order. This Task Order will include Preliminary Engineering studies. These studies will evaluate water, sewer, storm water and franchise utility availability to the site and immediately adjacent areas served by the existing and proposed utilities. kimley-horn.com 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 Kim ey>>>Horn Page 2 This Task Order will include field studies and engineering. A new topographic and boundary survey will be prepared by our sub-consultant Canada Land Surveying for the entire 80+/- acre property. Our sub-consultant GET Solutions will conduct soil borings and analysis and will prepare a geotechnical engineering report to support the engineering design work being performed under this Task Order for the initial 32 acre PH-1 building site. This will supplement the previously prepared preliminary geotechnical engineering report. This Task Order will include Initial Infrastructure construction documents. These construction documents will include mass grading and erosion and sediment control plans for building site PH-1 as shown on the attached Concept 2 drawing (approximately 32 acres). They will include a storm water management facility to support at minimum the future development of building B-1. They will include a new park access road "Road A" and extension of that roadway approximately 900 feet. Within the Road A right of way will be designed the utilities to serve the sites as planned under the Preliminary Engineering studies completed under this Task Order. BASIC SERVICES Task 1 — Concept Plan Task 1A—Sanitary Sewer Master Plan Kimley-Horn will prepare a Sanitary Sewer Master Plan using SewerCAD or similar modeling software. The master plan will consider phased development of the project, size the proposed system, and check the capacity of the existing system. The Master Plan will consider the entire 80-acre property. We will have one initial meeting with County staff to obtain record drawings and boundary conditions. We will prepare an initial model and summarize the results for staff review. We will incorporate up to three (3) rounds of staff comments into the model. Results of the model will be incorporated into a conceptual site utility exhibit (Task 1D) and will be the basis for the design efforts in Task 4 Task 1B–Water Master Plan Kimley-Horn will prepare a bound Water Master plan using WaterCAD or similar modeling software. The master plan will consider phased development of the project, size the proposed system, and check the capacity of the existing system. The Master Plan will consider the entire 80-acre property. kimley-horn.com 4500 Main Street, Suite 500,Virginia Beach, VA 23462 757 213 8600 Kimley>>>Horn Page 3 We will have one initial meeting with County staff to obtain record drawings and boundary conditions. We will prepare an initial model and summarize the results for staff review. We will incorporate up to three (3) rounds of staff comments into the model. Results of the model will be incorporated into a conceptual site utility exhibit (Task 1D) and will be the basis for the design efforts in Task 4. Task 1C—Storm Water Master Plan Kimley-Horn will prepare a regional storm water model in ICPR or similar modeling software to establish a combined approach to the storm water management requirements of the ultimate development. The report will include detailed design calculations to establish pond sizes and locations, design elevations for water surfaces, temporary and permanent outfall locations, preliminary pipe alignments and hydraulic grade line calculations, and pollutant removal compliance. The report will address phasing of the development. We will have one initial meeting with County staff to obtain record drawings and boundary conditions. We will prepare an initial model and summarize the results for staff review. We will incorporate up to three (3) rounds of staff comments into the model. Results of the model will be incorporated into a conceptual site utility exhibit (Task 1 D). A storm water exhibit will also be created that will show the locations of the park storm water ponds, storm sewer pipe infrastructure, proposed pond sections, and summary tabulations of quality and quantity associated with the facilities (Task 1 D). The results of the modeling will be the basis for the design efforts in Task 4 Task 1D— Concept Plan Kimley-Horn will develop a Concept Utility Plan that will show the intended locations of public water, sewer, gas, and electric as well as franchise utilities for the 80-acre site. We will also develop a Concept Storm Water Management Plan that will show the locations of park storm water ponds and infrastructure for the 80-acre site. Both exhibits will be based on "Concept 2" previously prepared by Kimley-Horn and the master planning efforts undertaken under Tasks 1A to 1C. The exhibits will be produced in color at 24"x36"size. Five (5) hard copies of the final exhibits will be provided as well as one (1) electronic copy in PDF, CADD, and/or GIS format as applicable. kimley-horn.com 4500 Main Street, Suite 500,Virginia Beach, VA 23462 757 213 8600 Kimley>>>Horn Page 4 Task 2 — Reports Task 2A— Geotechnical Engineering Report The purpose of the Geotechnical engineering services will be to determine pertinent information regarding the subsurface soil and groundwater conditions at the site in order to provide conclusions and recommendations for foundation, pavement, storm water, and earthwork design/construction and other Geotechnical aspects. The efforts will be focused on the Phase 1 site not the entire 80-acre development. G E T Solutions previously prepared, under direct contract to the Owner, scatter borings on the balance of the site. For this project, Kimley-Horn's sub-consultant G E T Solutions, Inc. will perform the following tasks: • Contact the local underground utility service company prior to beginning our field services, in order to identify the location of underground utilities in the work area. Also, stake the proposed boring locations in the field. We cannot accept liability for damage to unidentified utilities. If private utilities are located on site, the client will be notified for assistance in identifying the private utilities. If required, we can coordinate a private utility contractor at an extra cost. • Foundation Design: Locate and advance eleven (11)40-foot deep Standard Penetration Test (SPT) borings within the proposed building footprint"B-1". This boring depth is considered sufficient as it extends beneath the anticipated shallow foundation influence zone. • Collect at least two (2) undisturbed "Shelby" tube samples from the very soft CLAY soils expected to be encountered at various elevations and return them to our laboratory for extrusion and testing (Consolidation testing). • Pavement Design: Locate and advance eight(8) 10-foot deep SPT borings within the proposed pavement areas of PH-1. In addition, collect five (5) bulk soil samples from the approximate subgrade levels of the pavement areas at locations determined during the field investigation. These samples will be returned to our laboratory for Proctor and CBR testing, pursuant to VTM standards. • Perform one (1) pavement core at a location identified by the client on Old Mill Road to determine the pavement section composition and thickness. In addition, advance a 10-foot deep SPT boring at the core location to observe the underlying soil conditions. • BMP Design: Locate and advance five (5) 15-foot deep SPT borings within the proposed BMP ponds at locations identified by the engineer. Also, a temporary groundwater monitoring well will be installed at each location to obtain stabilized groundwater readings. Additionally, infiltration testing will be performed at the BMP locations. • The SPT borings will be performed with the use of a power drill rig, using rotary wash "mud" and hollow stem drilling procedures. The soil samples will be obtained with a Split-Spoon Sampler in general accordance with the Standard Penetration Test(SPT) method ASTM D 1586. These samples will be taken continuously from the ground surface to depths of 10 to 12 feet and at 5-foot intervals thereafter. kimley-horn.com 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 Kimley >>Horn Page 5 • Perform limited laboratory classification tests on selected soil samples collected from the borings in order to determine in-situ moisture content, moisture-plasticity relationships (Atterberg Limits), sieve analysis and consolidation testing, as deemed necessary. • Conduct a Geotechnical engineering evaluation of the available data with respect to foundation, pavement, stormwater, and earthwork related design. Also, provide discussions related to groundwater conditions and its impact on the construction, if any. • Prepare an engineering report signed by a registered professional engineer. The report will include the following data: • Allowable Soil Bearing Pressure • Estimated Settlements (Total & Differential) • Slab-on-grade Design information (drainage course, modulus of subgrade, vapor barrier, etc.) • Min Frost Depth • Soil/foundation coefficient of friction • Water table elevation • Construction Recommendations (cut and fill, subgrade prep, foundation, slab-on-grade, drainage course, compaction, lift heights, etc.) • CBR / Pavement design Task 2B — Preliminary Wetland Assessment and Permitting Recommendations Kimley-Horn will perform a preliminary wetland assessment to compare the previously confirmed wetland delineation that has expired to the current ground conditions and potential for wetlands to occur in consideration of the new Army Corps of Engineers Regional Supplement used to delineate wetlands. As part of the assessment, Kimley-Horn will review the previous wetland delineation and supporting background material consisting of topographic and National Wetland Inventory mapping, aerial photography, and Natural Resources Conservation Service (NRCS) soil survey data to identify potential wetland areas. Kimley-Horn will then conduct a site visit limited to one day of field effort to review the previous wetland delineation, background material and determine the general location and extent of wetlands and waters on site. Kimley-Horn will prepare a preliminary map depicting the approximate location of wetlands. A formal wetland delineation, collection of data at observation points (data forms) and flagging the wetland boundary will not be conducted. Kimley-Horn will meet with the client to discuss the findings of the assessment and permitting implications. kirnley-horn.com 4500 Main Street, Suite 500, Virginia Beach,VA 23462 757 213 8600 Kimley>>)Horn Page 6 Task 3 — Base Survey Task 3A—Topographic and Boundary Survey Kimley-Horn's sub-consultant Canada Land Surveying will perform adequate field and office computations to confirm the outside perimeter property lines of the subject 80-acre project area. The meridian source of this survey will be based on the appropriate datum as required by County standards for plats. All outside perimeter missing corner monumentation will be set during the preparation of the boundary solution as described herein. Prior to commencing the boundary work, the sub-consultant will obtain a current title binder, along with copies of all available plats, deeds and legal descriptions for the exceptions indicated in Schedule "B" of the binder, so we they may address the pertinent easements, rights-of-way, etc., that impact the property during the boundary survey. The survey will be drawn at a scale of 1"=30'. The survey limit of the topographic survey is approximately 90 acres, encompassing the project area and necessary adjoining property. The topographic survey will be performed after the County completes tree clearing, and the fee is predicated on the site being clear of trees at the time of the survey. The topographic survey will denote or address the following: 1. North arrow, vicinity map, and title to create a survey base sheet. 2. The horizontal control will be based on the Virginia Coordinate System of 1983, South Zone (NAD83)(1993). The vertical control (elevations) will be based on the North American Vertical Datum of 1988 "NAVD 88". Control information will be provided per County requirements. 3. The following visible planimetric features within the subject property will be located and plotted on the survey: overhead utility lines, utility poles and guys, sidewalks, curbs; valley gutters; paved roadways; signs; access to public rights-of-ways such as curb cuts and paved entrances; manhole covers, yard inlets, valve; boxes, light posts; traffic signal support wires or arms; telephone pedestals; electric transformers; cable TV pedestals. 4. The following topographic data will be shown on the survey: storm drain manholes, curb drop inlets, yard basins, etc., with rim and invert elevations, pipe sizes and pipe material; gravity sanitary sewer system manholes and mainline cleanouts with rim and invert elevations and pipe sizes; flow line elevations; ground surface elevations at approximate 50' grid; elevations on public streets at 50' intervals showing top of curb, gutter, contours at 1' intervals, edge of pavement and center of road encompassing the limits stated in the portion above. 5. Canada will provide approximate locations of underground utilities based on available public records researched and obtained by them. The exact locations of underground utilities are not included within this agreement. kimley-horn.com 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 Kimley>>>Horn Page 7 Task 4 — Grading and Utility Plan Task 4A— E&S and Mass Grading Plan Kimley-Horn will develop construction plans for an early earthwork package. This Erosion and Sediment Control Plan will provide construction plans and details for land disturbance and clearing of the Phase 1 construction limits and the Phase 1 temporary sediment basins which will ultimately be converted to permanent best management practices (BMPs). The Plan will include grading plans and details for land disturbance, E&S controls, building pad and pond excavation for the 32-acre area "Phase 1" area to include the Building 1 project site based on Concept Plan 2 provided previously by Kimley-Horn to the Client. The Erosion and Sediment Control and Mass Grading Plan will be developed as an independent plan set. Kimley-Horn will prepare a mass grading model utilizing 3-D CAD tools for the entire 80-acre property in order to assist the Client in developing an earthwork approach that seeks a balance of soil materials. This model will address future building pad, parking areas and storm water management features in accordance with the current Concept Plan, and on the efforts that are completed under Task 1 of this agreement. Once the mass grading model for the 80-acre site is completed, Kimley-Horn will prepare construction documents E&S and mass grading for the first phase; the 32-acre site for Building 1. Kimley-Horn will identify on the plans the clearing limits, tree protection, silt fence, temporary surface drainage, construction staging areas, stockpile locations and other typical erosion controls in accordance with current County and State regulations, and the master planning completed under Task 1 of this agreement. Plans and calculations for temporary sediment basins at the future location of permanent storm water management ponds will be prepared as well as the design of the temporary outfall control devices and outfall piping associated with those facilities. To the greatest extent practical, temporary features will be designed and sited in such a way as to facilitate conversion to permanent use, avoid future construction conflict, and promote overall positive drainage of the subject 80-acre property. In those locations where temporary measures are intended to become permanent, adequate design and planning will be provided to facilitate conversion from temporary to permanent, though it is understood that these features are normally not converted to permanent until such time as building and site construction has been completed, which is work that is not contemplated under this current task order. Permanent stormwater management design will be in accordance with Technical Criteria B (including Runoff Reduction Method or "RRM" calculations) and the County's Stormwater Management ordinance. kimley-horn.com 4500 Main Street, Suite 500,Virginia Beach, VA 23462 757 213 8600 Kimley >>Horn Page 8 Task 4B— Phase 1 Infrastructure Plan Kimley-Horn will develop construction plans for a Phase 1 Infrastructure Plan. In order to advance the development, on and off-site infrastructure elements are required to bring access and utilities to the Phase 1 development area, the balance of development of the 80-acre site and the residual lands adjacent to the Green Mountain project. The Phase 1 Infrastructure - Plan will advance these elements. The on-site roadway included will be designed with a proposed 60-foot right-of-way for a distance of approximately 900 linear feet. The road will begin at the Old Mill Road intersection and continue east to a temporary cul-de-sac at the proposed truck entrance to future building B-1. The on-site roads will follow a typical section with two through lanes and one center two-way left turn lane. During the Preliminary Engineering phase, KHA will develop proposed locations for franchise and public utilities within the typical section and will identify required easements. The typical section and locations of proposed public utilities will be identified on the Infrastructure Plan. The plan will include a pavement marking and signage plan, alignment and profile of the proposed roads, including grading, curb and gutter and sidewalks within the right of way. The roadways will be designed to meet County and VDOT standards in order to allow for dedication of the road as public. Water mains, as proposed in the Water Master Plan developed in Task 1, will be shown in plan and profile. The water mains shown on the plan will identify proposed hydrants and tap locations for proposed development sites and future road extensions. Sewer mains, as proposed in the Sewer Master Plan developed in Task 1, will be shown in plan and profile. The sewer force mains and gravity mains shown on the plan will identify lateral locations for proposed development sites and future road extensions. Storm sewer, as proposed in the Stormwater Master Plan, will be shown in plan along the proposed Section. Additional storm sewer as required to tie the storm sewer system to the proposed stormwater management ponds will be shown in plan as well. Storm sewers will be shown in profile only where they cross water and sewer lines. Erosion and sediment control plans will be incorporated into the infrastructure plans. A separate E&S and Mass Grading Plan is detailed under Task 4A. The temporary sediment basins and other erosion controls designed in that plan set will be incorporated into the Infrastructure Plan as necessary for consistency. Through our internal landscape architecture group, Kimley-Horn will prepare planting plans to meet the minimum requirements of County Ordinance and the Park Design Criteria (if kimley-horn.com 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 Kimley >)Horn Page 9 applicable). The computer-generated base sheets for the infrastructure plans will be utilized to prepare the planting plans, which will show the locations of all proposed plant material. Existing vegetation to be retained will also be illustrated. Proposed shrubs and trees will be drawn individually and ground covers will be drawn as masses. All proposed plant material will be labeled on the plans by quantity and a keyed identification system. A keyed plant schedule listing common and botanical names, quantities for each plant type, on-center spacing, minimum size at installation and other pertinent information will also be provided on the drawings. The design of an irrigation system is not included in our scope. Kimley-Horn will perform ground light level calculations supporting light pole locations, heights, and standard Dominion Virginia Power fixtures in accordance with County and VDOT criteria for height, spacing, minimum light levels, and maximum light levels. The light levels will be in foot-candles and be shown on the layout plan for the roadway Section. A tabulation of the lights and poles used will be provided on the plan. Pole foundation design and design of electrical service and connections are not included in our scope. Pavement sections will be based on soil borings, tests, and recommendations from the geotechnical engineering reports completed under Task 2. We will coordinate location of the proposed borings, and will correspond with the geotechnical engineer with respect to the required testing and design recommendations. The geotechnical engineer will be responsible for providing pavement design, CBR testing, foundation designs, and special bedding designs for storm pipes greater than 36" in diameter. Kimley-Horn will schedule a utility coordination meeting with representatives from all private utility companies that are known to have services in the vicinity. At this meeting the project scope and schedule will be presented to the utility companies. Items for discussion in this meeting will include: location of new utilities within the typical section, easement requirements for each utility, and verification and documentation of prior rights. (existing private utility easements). Also discussed will be the relocation of existing facilities along the proposed route, electrical service requirements for the proposed lighting systems and attendant booth, and the known and potential traffic signals at the intersections. At the conclusion of this meeting, an action item list will be developed for each of the utility companies outlining their required responsibilities and schedule so that their work will not create an adverse impact to the project schedule. Subsequent to this meeting, up to three additional periodic progress updates with the utility representatives will be held to inform them of any changes in the project scope or schedule and to monitor their progress with their scope of work. Kimley-Horn will send copies of the plans at each review stage to the private utility companies in electronic (PDF) format. kimley-horn.corn 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 Kimley>>>Horn Page 10 ADDITIONAL SERVICES Task 5— Meetings Consultant attendance at all meetings and teleconferences will be on an on-call basis at the direction of the Client. The fee presented for this task assumes forty (40) hours of meetings for one senior professional over the course of the Design Phase. Meetings may require the attendance by multiple design team members to adequately address subject matter. Should this budget be fully utilized on behalf of the Client's requests, we will notify the Client and will either negotiate a change to the contract or will gain authorization to bill against Task 9. Task 6 - Expenses Direct reimbursable expenses such as express delivery services, fees, mileage, and other direct expenses will be billed at 1.15 times cost. All permitting, application, and similar project fees will be paid directly by the Client. Any fee projections in this Agreement are for general budgeting purposes only. Actual fees may be less or more than the projections. OPTIONAL SERVICES Task 7 — Bid Documents KHA will provide bidding phase services consisting of the following: • Compiling the Owner-provided front-end documents into a Project Manual • Assisting the Owner with advertising and distribution of plans • Responding to RFI's during the bidding phase • Preparation of one addenda during the bidding phase • Review bid results and recommendation for award Because the extent of our support required for the above services is impossible to anticipate and is largely dependent on circumstances outside our control, included in this task are up to 80 hours of professional consulting in the Basic Services. When this budget is expended we will cease providing these services until such time as the Client authorizes additional funding for the Consultant's efforts as an Additional Service. Task 8 — Construction Phase Services The services we provide during construction vary based on the size and complexity of the project, the Client's requirements, and the low bid contractor's qualifications and approach. The following is a listing of the services that we have developed our agreement upon for this project: • Attendance at pre-construction meetings kimley-horn.corn 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 Kimley>>>Horn Page 11 • Twice-monthly site visits and progress meetings during site construction • Review of RFI's during construction • Review of one change orders • Monthly payment request reviews • Punch list development Because the extent of our support required for the above services is impossible to anticipate and is largely dependent on construction circumstances, included in this task are up to 80 hours of professional consulting in the Basic Services. When this budget is expended we will cease providing these services until such time as the Client authorizes additional funding for the Consultant's efforts as an Additional Service. Task 9 — As-Needed Consulting Services The Client hereby reserves the right to authorize the Consultant in writing to perform optional design services to be billed on an hourly-not-to-exceed basis. The Client and Consultant shall agree to the scope and compensation prior to authorization. The Consultant shall describe the Task(s) to be performed and provide a rough estimate of the effort required and the timeframe for completion. The total amount of optional services shall not exceed the value shown in the "Fee and Billing" section. The items below provide a general list of services that may be performed by the Consultant. This list is not intended to be all inclusive, nor is it intended to imply that other tasks may not be included or exchanged upon mutual agreement by the parties involved. Furthermore, this list of services does not imply that any or all of the services will necessarily be provided during the term of the agreement. 1. Project Administration 2. Project Management 3. Project Coordination/Attendance at meetings with VDOT 4. Environmental Document Program Assistance 5. Program support for environmental documentation and permitting, including but not limited to review of NEPA and SERP documents done by County staff or consultants FEE AND BILLING The Consultant shall be paid in accordance with Section 6 of the referenced agreement for a total not to exceed fee of$259,752.00 See "Attachment B— Basis of Compensation"for fees by task and "Attachment C—Statement of Billing Rates" for current hourly rates. kimley-horn.com 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 Kimley>>>Horn Page 12 The Consultant will notify and obtain acknowledgement from the Client prior to beginning work on any Task. Notification will be in writing and may be conveyed by email or other means necessary to sufficiently document the acknowledgement. SERVICES NOT INCLUDED Any services not specifically provided for in the above scope of services, as well as any changes in the scope the County requests, will be considered additional services and will be performed under a separate task order. CLOSURE We appreciate the opportunity to provide these services to you. We can begin work immediately upon receipt of authorization from Isle of Wight County. Please contact us if you have any questions. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. W. David France, P.E. Vice-President ATTACHMENTS: Attachment A—Concept Plan 2, dated 8/21/2015 Attachment B—Basis of Compensation, dated 2/11/2016 Attachment C—Schedule of Billing Rates, dated 2/11/2016 kimley-horn.com 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 il KiPage 13 ley*Horn m :,, ,.... ATTACHMENT CONCEPT PLAN 2A –....– -- I _.., ap.u1)1 oHt . ,..„,,r."... 00 w c A dc,,,,,,,,4'43-4-0.:70-wl irils ilQn 7 V 7 a Z 5 a '-r. ..;.:e .=, -.41,, tit54 "w 117:iE "7''YV &veil Al:- 9 ...; ,f.i lil 11 91`E' - 2 tii„ t',251 Aigae g.' .:-,,,,,,:: •.. ,, .,..: -.,. a ..,...-. 1, -1 _.. • l ',,■11 ,....-c .....— ','i s•■,,.L..:Z. :, .1 ' '' '''''' --- .--..: "./7"'",s...,-, ,. ., . a ' - -' ,. ::.i0S011 ,, • .1 l' ' ', . 31; .•''-.. :1; :Pe074 't :::-.:'.•:,... ...s. - .. ''';-= ‘'';:,;,'It,.°;!:4V%.• ' . _,„ : .:;,..,:',,,,; , ",4;''''' 1:•:::'''41.:?:.141. To. . .,. . !,.:`,. v I-- . '',.,•-•-• ‘,.., •,DS002,5 °.,,.,(:°,, ' ,.., . ... ,..,.1.. ,. - . . .. . . ? . ° tAll ' ... ,..... •. [ '• ,.";'':,'-': i'. _,...... ,...,......... '. ;•.,.., .,... . ....... ,, --......- .-..-,-.- --... 757 213 8600 • kimley-horn.com • 4500 Main Street, Suite 500, Virginia Beach, VA 23462 KimIey >Horn Page 14 • ATTACHMENT B BASIS OF COMPENSATION SHIRLEY T.HOLLAND INTERMODAL PARK-PERMIT-READY SITE DESIGN SENIOR SENIOR TECH. SUPPORT TOTAL TASK DESCRIPTION PROF. PROF. TECHNICAL SUPPORT STAFF HOURS FEE SUPPORT Task 1'-Cancept;Plao ., '-ifi ", 1"` U, , , ' .,,. ,.,,a e„... Task IA-Sanitary Sewer Master Plan 10 30 2 24 10 76 $ 10250.00 Task LB-Water Master Plan 10 30 2 24 10 76 $ 10250.00 Task IC-Storm Water Master Plan 16 30 2 40 10 ' 98 $ 13360.00 Task ID-Concept Plan 8 4 16 8 2 ' 38 $ 5,890.00 SUBTOTAL ' 44 94 22 96 ' 32 288 TASK TOTALS 'S 9,900.00'$ 13,160.00'$ 3,410.00'$10,560.00'SS 2,720.00 $ 39,750.00 Task 2-Reports,t, ,. .. w, .. x Task 2A-Geotechnical Engineering Report(sub expense) $ 23562.00 Task 2B-Preliminary Wetland Assessment and Permitting Recommendations 2 9 2 9 2 24 $ 3.180.00 SUBTOTAL 2 ' 9 2 9 2 24 TASK TOTALS 'S 450.00 3 1,260.00'S 310.00'0 990.00 $ 170.00 $ 26,742.00 ., ... '.9 . .- Task3-.Base,Survey,' ,...a<. �� ,l�de . ` �; 1,;, .__....., Task 3A-Topographic and Boundary Survey(sub expense) $ 16500.00 SUBTOTAL 0 0 2 0 0 '0 $ 310.00 TASK TOTALS '$ - 58 - 'S 310.00 $ - $ - $ 16,810.00 Task 4A-E&S and Mass Grading Plan 36 20 60 40 10 166 $ 25.450.00 Task 4B-Phase I Infrastructure Plan 80 120 120 200 40 560 $ 78.800.00 SUBTOTAL ' 116 140 ' 180 240 50 726 TASK TOTALS '$26,100.00.$ 19,600.00.$ 27,900.00'$26,400.00'$ 4,250.00 $104,250.00 Tasks-Meetings ;„? .. Task 5-Meetings 40 0 0 0 0 $ .9,000.00 SUBTOTAL 40 0 ' 0 0 ' 0 ' 0 TASK TOTALS 'S 9,000.005 - 'S - 'S - 'S - 'S - $ 9,000.00 Task 6=Ex peuses _ „ ,�.., . ,.,d ,,."�i„i :�'„ Task 6-Expenses N/A N/A N/A N/A N/A N/A $ 12.000.00 SUBTOTAL N/A N/A N/A N/A N/A N/A TASK TOTALS N/A N/A N/A N/A N/A N/A $ 12,000.00 :>. „,. Task 7-Bid+Documents ,» _ ,,,x..,. _. _ .. `,t`r, .. a na . Task 7-Bid Documents 20 20 20 10 10 80 $ 12350.00 SUBTOTAL 20 20 ' 20 ' 10 10 80 TASK TOTALS $ 12,350.00 Task 8-Coo"ostructioni.Pfiase Servnees�,,,u;. ,:,,'.,. ,. �., ."2,. '_ �hs�- '_.,. .��a Task 8-Construction Phase Services 20 20 20 10 10 ' 80 $ 12350.00 _ SUBTOTAL ' 20 20 ' 20 10 10 ' 80 TASK TOTALS 5 12,350.00 Task 9-Asyeeded m .., �,„ , Task 9-As-Needed Consulting Services N/A N/A N/A N/A N/A N/A $ 26500.00 SUBTOTAL N/A N/A N/A N/A N/A N/A TASK TOTALS N/A N/A N/A N/A N/A N/A $ 26,500.00 PROJECT TOTAL 1$45,490.001$ 34.060.00 i$ 31,970.00 I$ 37970.001$ 7.160.00 I $259,752.00 kimley-horn•.com 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 • Kimley>>>Horn Page 15 ATTACHMENT C SCHEDULE OF BILLING RATES KIMLEY-HORN AND ASSOCIATES, INC. HOURLY BILLING RATES (EFFECTIVE CONTRACT DATE) DISCIPLINE HOURLY RATE ($) 2016 Support Staff $70/hr- $100/hr Technical Support $80/hr- $110/hr Senior Technical Support $130/hr- $155/hr Professional $90/hr- $150/hr Senior Professional $150/hr- $240/hr Principal $210/hr- $260/hr LABOR COSTS: The above hourly rates represent all direct salary costs, overhead, and profit. These rates are subject to periodic adjustment 1YR from the date of original contract execution for merit and cost of living increases. The time charged for services performed will be the actual number of hours worked. kirnley-horn.com 4500 Main Street, Suite 500, Virginia Beach, VA 23462 757 213 8600 Client#: 25320 KIMLHORN • ACORD,. CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD/YYYY)2/24/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAME CT Jerry Noyola Greyling Ins. Brokerage/EPIC PHONE 552 770- -4225 FAx (A/C,No,at):770-552-4225 No): 866-550-4082 3780 Mansell Road,Suite 370 E-MAIL er oa re n ADDRESS: 1 ry no l y �g Ilg tom y Alpharetta,GA 30022 INSURER(S)AFFORDING COVERAGE NAIL# INSURERA:National Union Fire Ins Co of P 19445 INSURED INSURER B:Commerce&Industry Ins. Co. 19410 Kimley-Horn and Associates,Inc. INSURER C:New Hampshire Ins.Co. 23841 P.O. Box 33068 Lloyds of London 085202 Raleigh, NC 27636 INSURER D: Y INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR TYPE OF INSURANCE INSR WVD POLICY NUMBER POLICY EFF POLICY EXP LIMITS • (MM/DD/YYYY) (MM/DD/YYYY) A GENERAL LIABILITY 9645227 04/01/2015 04/01/2016 EACH OCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIABILITY PREMISES(Ea RENTED $500,000 CLAIMS-MADE X OCCUR MED EXP(Any one person) $25,000 X Contractual Liab PERSONAL&ADVINJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $2,000,000 POLICY X PRO X LOC $ JECT A AUTOMOBILE LIABILITY 4982985 04/01/2015 04/01/2016 COMBINED SINGLE LIMIT (Ea accident) $1,000,000 X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE _ AUTOS (Per accident) B X UMBRELLA LIAB X OCCUR BE020733086 04/01/2015 04/01/2016 EACH OCCURRENCE $5,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $5,000,000 DED X RETENTION$10,000 $ C WORKERS COMPENSATION 39901450 04/01/2015 04/01/2016 X WC STATU- 0TH- AND EMPLOYERS'LIABILITY TORY LIMITS ER Y/N ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? N N/A A (Mandatory in NH) 39901451 04/01/2015 04/01/2016 E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 D Prof. Liab P070831500 04/01/2015 04/01/2016 Per Claim $2,000,000 Aggregate$2,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more space is required) Re: Shirley T Holland Park Phase II.County of Isle of Wight, its officers,employees,agents,assigns& volunteers are named as Additional Insureds with respects to General&Automobile Liability where required by written contract.The above referenced liability policies with the exception of professional liability are primary&non-contributory where required by written contract.Waiver of Subrogation is applicable where required by written contract&allowed by law. CERTIFICATE HOLDER CANCELLATION Isle of Wight County SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE g ty THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Michael Coburn ACCORDANCE WITH THE POLICY PROVISIONS. P.O. Box 80 Isle Of Wight,VA 23397 AUTHORIZED REPRESENTATIVE ©1988-2010 ACORD CORPORATION.All rights reserved. ACORD 25(2010/05) 1 of 1 The ACORD name and logo are registered marks of ACORD #S444122/M395703 JNOY1 COMMERCIAL GENERAL LIABILITY CG 20 33 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS WHEN REQUIRED IN CONSTRUCTION AGREEMENT WITH YOU This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured any person or or- additional insureds, the following additional exclu- ganization for whom you are performing operations sions apply: when you and such person or organization have This insurance does not apply to: agreed in writing in a contract or agreement that such person or organization be added as an addi- 1. "Bodily injury", "property damage" or "personal tional insured on your policy. Such person or or- and advertising injury"arising out of the render- ganization is an additional insured only with re- ing of, or the failure to render, any professional spect to liability for "bodily injury", "property architectural, engineering or surveying ser- damage" or "personal and advertising injury" vices, including: caused, in whole or in part, by: a. The preparing, approving, or failing to pre- 1. Your acts or omissions;or pare or approve, maps, shop drawings, opinions, reports, surveys, field orders, 2. The acts or omissions of those acting on your change orders or drawings and specifica- behalf; tions; or in the performance of your ongoing operations for b. Supervisory, inspection, architectural or the additional insured. engineering activities. A person's or organization's status as an additional 2. "Bodily injury" or "property damage" occurring insured under this endorsement ends when your after operations for that additional insured are com- pleted. a. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than ser- vice, maintenance or repairs) to be per- formed by or on behalf of the additional in- sured(s) at the location of the covered operations has been completed; or b. That portion of"your work"out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontrac- tor engaged in performing operations for a principal as a part of the same project. CG 20 33 07 04 ©ISO Properties, Inc., 2004 Page 1 of 1 0 POLICY NUMBER: COMMERCIAL GENERAL LIABILITY CG 20 37 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s): Location And Description Of Completed Operations AS REQUIRED BY WRITTEN CONTRACT AS REQUIRED BY WRITTEN CONTRACT Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Section II - Who Is An Insured is amended to designated and described in the schedule of this include as an additional insured the person(s) or endorsement performed for that additional insured organization(s) shown in the Schedule, but only and included in the "products-completed operations with respect to liability for "bodily injury" or hazard." "property damage" caused, in whole or in part, by "your work" at the location CG 20 37 07 04 ® ISO Properties, Inc.,2004 Page 1 of 1 ❑