Shirley T. Holland Intermodal Park Phase II Ditch Maintence IFB #16-1815-01
IFB # 16-1815-01
INVITATION FOR BID
DEPARTMENT OF BUDGET AND FINANCE
Shirley T. Holland Intermodal Park – Phase II
Ditch Maintenance
Section A
(Submit with the bid)
IFB # 16-1815-01
INVITATION FOR BID
DEPARTMENT OF BUDGET AND FINANCE
Shirley T. Holland Intermodal Park – Phase II
Ditch Maintenance
Sealed bids subject to the conditions and instructions contained herein, will be received at the office of the Purchasing Agent listed below, until
the time and date shown below (local prevailing time), for furnishing the items or services described herein.
SCOPE OF WORK: Contractor shall provide all labor, superintendence, materials, tools, equipment,
and other ancillary items necessary as identified to complete the ditch maintenance at Shirley T. Holland
Intermodal Park –Phase II. The project consists of the excavation and cleaning of existing ditches and
culverts within the park. Two new culverts will be installed. Temporary erosion and sediment control
features include silt fence (standard and wire back), inlet and outlet protection, construction road
stabilization, timber matting, EC-2 matting and a standard construction entrance. Details included within
the plans.
Bid Due: 3:00 PM., August 7, 2015
Contract Officer:
Michael Coburn, Sr., Purchasing Agent, Michael.coburn@isleofwightus.net
** SECTION "A" AND ONE ELECTRONIC CD COPY IS REQUESTED AT SUBMITTAL**
In compliance with this invitation for bids, and subject to all the conditions thereof, the undersigned offers, if this bid is accepted within ninety
(90) calendar days from the date of the opening, to furnish any or all of the items and/or services upon which prices are quoted, at the price set
opposite each item, to be delivered at the time and place specified herein. The undersigned certifies he has read, understands, and agrees to all
terms, conditions, and requirements of this bid, and is authorized to contract on behalf of firm named below.
Company Name:
Address:
City / State / Zip:
Telephone: FAX No.:
E-mail:
Print Name: Title:
Signature: Date:
Table of Contents
Section A .................................................................................................................................................................. 1
Bid Due: 3:00 PM., August 7, 2015 .................................................................................................................. 2
BID SUBMITALS: .................................................................................................................................................. 4
QUESTIONS:........................................................................................................................................................... 4
BID OPENING: ....................................................................................................................................................... 4
LIQUIDATED DAMAGES: ................................................................................................................................... 4
PRE-BID MEETING: ............................................................................................................................................. 4
BID FORM ............................................................................................................................................................... 6
CONDITIONS AND INSTRUCTIONS ................................................................................................................. 9
Section B ................................................................................................................................................................ 20
AGREEMENT ....................................................................................................................................................... 21
Section C ................................................................................................................................................................ 24
GENERAL CONDITIONS ................................................................................................................................... 25
Technical Specifications .............................................................................................................................................. 71
INVITATION FOR BIDS
Shirley T. Holland Intermodal Park, Phase II, Ditch Maintenance: Contractor shall provide all labor,
superintendence, materials, tools, equipment, and other ancillary items necessary as identified to complete
the ditch excavation and cleaning at Shirley T. Holland Intermodal Park, Phase II. The project consists of
the excavation and cleaning of existing ditches and culverts at the Intermodal Park. The work will
generate a total disturbed area of approximately 12 acres with an estimated volume of ditch excavation of
11,000 CY. New culverts associated with this improvement consists of approximately 40 LF of 18”
HDPE pipe and 60 LF of 30” HDPE pipe. Temporary erosion and sediment control features include silt
fence (standard and wire back), inlet and outlet protection, construction road stabilization, timber matting,
EC-2 matting and a standard construction entrance.
Bids received prior to the opening time specified below shall be publicly opened and read aloud at the
specified opening time in the IOWC Department of Budget and Finance. Sealed bids, subject to the
conditions and instructions contained herein, will be accepted at:
Department of Budget and Finance
Isle of Wight County
17090 Monument Circle, Suite 137
Isle of Wight, VA 23397
BID SUBMITALS:
Bid Documents may be obtained on the Isle of Wight website under Budget and Finance:
http://www.co.isle-of-wight.va.us/budget-and-finance/ and on the State’s eVA website:
http://eva.virginia.gov/, or from the Purchasing office at: Isle of Wight County, Department of Budget and
Finance, 17090 Monument Circle, Suite 137, Isle of Wight, Virginia, 23397
QUESTIONS:
Questions concerning this project must be in writing and addressed to the Purchasing Agent as shown on
the cover page; and, must be received no later than five (5) business days preceding the date that the bids
are accepted.
BID OPENING:
Bids shall be publicly opened and read aloud on the date that the bids are accepted. Public opening will be
held at 3:15 PM. (local prevailing time), in the Isle of Wight Purchasing Office at: 17090 Monument
Circle, Isle of Wight, Virginia 23397.
LIQUIDATED DAMAGES:
If said work is not completed within the time stated in the Notice to Proceed, the Contractor shall be liable
and hereby agrees to pay to the Owner as liquidated damages, and not as a penalty, the amount of five
hundred dollars ($500.00) per calendar day for each and every part of a day thereafter that said work
remains substantially incomplete. The County reserves the right, at its sole discretion, to deduct liquidated
damages from any outstanding amount due the Contractor.
IF YOU NEED ANY REASONABLE ACCOMMODATION FOR ANY TYPE OF DISABILITY IN
ORDER TO PARTICIPATE IN THIS PROCUREMENT, PLEASE CONTACT THIS DIVISION AS
SOON AS POSSIBLE.
PRE-BID MEETING:
A pre-bid meeting is not being held.
Bids must be submitted on the designated Bid Form, signed by an authorized representative, delivered in
a sealed opaque envelope bearing the Bidder's name, address, project name, acceptance date and time. An
electronic copy is requested and should be included with your submittal. Revisions, changes, and
deletions contained in the bid documents must be initialed by the Bidder. Failure to comply with this
instruction may result in the bid being deemed non-responsive.
Bidders should carefully examine the specifications and fully inform themselves to all conditions and
matters that could have an effect on the cost. Should a Bidder find discrepancies in or omissions from the
specifications or Invitation to Bid, or should be in doubt as to their meanings, he shall notify Procurement
personnel as noted above.
The right is reserved to revise or amend these specifications prior to the date set for receipt of bids as may
be required by the County. That date may be delayed if deemed necessary by the County. Any revisions
and/or amendments will be in the form of an addendum to this document.
The right is reserved to accept or reject any or all bids in whole or in part and to waive any informalities
in the IFB, and to enter into any contract deemed to be in the best interest of IOWC.
Bidder has examined copies of all the Bid Documents including the following Addenda:
Date Number
_____________
_
Bidder has made such independent investigations as Bidder deems necessary to fully inform himself as to
the conditions affecting cost and progress of performance of the Work.
BID FORM
TO: Isle of Wight County, Virginia
Director of Budget and Finance
17090 Monument Circle, Suite 137
Post Office Box 80
Isle of Wight, Virginia 23397
RE: Isle of Wight County, Virginia
Shirley T. Holland Intermodal Park, Phase II
Ditch Maintenance
Isle of Wight County IFB # 16-1815-01
The undersigned Bidder, , offers and agrees, if this Bid is
accepted, to enter into an Agreement with the Owner in the form included in the Contract Documents to
complete all Work as specified or indicated in the Contract Documents for the Lump Sum of
($ ).
Bidder agrees to begin the Work within ten (10) days of Notice to Proceed and that Final Completion
shall be within seventy (70) calendar days of Notice to Proceed. In submitting this bid, Bidder represents,
as more fully set forth in the Bid Documents, that:
Bidder has examined copies of all the Bid Documents including the following Addenda:
Date Number
_____________
Bidder has examined the site and locality where the Work is to be performed, the legal requirements
(federal, State and local laws, ordinance, rules and regulations) and has made such independent
investigations as Bidder deems necessary to fully inform himself as to the conditions affecting cost and
progress of performance of the Work.
The Method of Payment is invoice processing upon presentation with Terms of Net 30 days.
Not more than fifty percent (50%) of the work shall be subcontracted and the amount of any
subcontractors proposed by the bidder in excess of ten percent (10%) of the bid price shall be identified
on the Bid Form.
Subcontractor:____________________________________________________________
Subcontractor:____________________________________________________________
Bidders shall provide a list of at least three (3) references (1 each from the last 3 construction projects).
Each reference shall include the name of the organization, the complete mailing address, the name of the
contact person and telephone number.
ORGANIZATION ADDRESS CONTACT PERSON TELEPHONE
1._____________________________________________________________________________
2._____________________________________________________________________________
3._____________________________________________________________________________
Bidder accepts all terms and conditions of the Contract Documents.
I certify by my signature below that I have received the documents associated with this Bid and
understand that the review for completeness of these documents and the understanding and
comprehension of the specifications is solely my responsibility; based on this, by my signature below, I
waive all rights to future claims against Isle of Wight County that the documents were incomplete or not
understandable.
My signature below certifies that this Bid is not the result of or affected by, any act of collusion with
another person or company engaged in the same line of business or commerce, or any act of fraud
punishable under Section 18.2-498.1 et. seq. of the Code of Virginia (1950, as amended). Furthermore, I
understand that fraudulent bidding is a crime under the Virginia Governmental Frauds Act, the Virginia
Government Bid Rigging Act, the Virginia Anti-Trust Act, and federal law and can result in fines, prison
sentences, and civil damage awards.
I certify that the bidder represented herein is eligible to bid with respect to all applicable sections of State
and Local Government Conflict of Interest Act, Section 2.2-3100 Et Seq., of the Code of Virginia (1950,
as amended).
I agree to abide by all conditions of this Bid and certify that I am authorized to sign this Bid.
Virginia Contractor No.___________________________________________________________
Signature Date
Print __________________________________________________________________________
State Corporation Commission Identification No:
Or
Describe why the bidder or offeror is not required to be authorized by the State Corporation Commission:
______________________________________________________________________________
_____________________________________________________________________________________
_______________________________________________________________________
(An Individual, Partnership, or Non-Incorporated Organization)
Type/Print
Name_________________________________________________________________
Title ________________________________________________________________________
Name of Organization __________________________________________________________
Business Address________________________________________________________________
Phone Number_____________________________ Fax No.____________________________
(A Corporation)
Corporation Name _______________________________________________________________
State of Incorporation __________________________________________________________
Person Authorized to Sign_________________________________________________________
Title ________________________________________________________________________
(Corporate Seal)
Attest (Secretary)________________________________________________________________
Business Address________________________________________________________________
Phone Number_____________________________ Fax No.____________________________
(A Joint Venture)
By (Signature) _________________________________________________________________
Type/Print Name________________________________________________________________
Title _______________________________________________________________________
Virginia Contractor No.___________________________________________________________
Business Address________________________________________________________________
Phone Number__________________________ Fax No._______________________________
By (Signature) _________________________________________________________________
Type/PrintName_________________________________________________________________
Title__________________________________________________________________________
Virginia Contractor No.___________________________________________________________
Business Address________________________________________________________________
Phone Number__________________________ Fax No._______________________________
(Each joint venturer must sign. The name of signing for each individual, partnership and corporation that is a party to the joint
venture shall be in the manner indicated above.)
CONDITIONS AND INSTRUCTIONS
Rev: 07/29/2015
1. Use of Form: All bids shall be submitted on and in accordance with this form. If more space is
required to furnish a description of the goods and/or services bid, or delivery terms, the bidder
may attach a letter hereto that will be made a part of the bid. In case of a conflict with published
requirements, the bid may be considered non-responsive. The County’s published specifications
shall supersede any additional writings submitted with the bid. Such additional writings shall be
clearly marked and noted as an exception.
2. Submittals: All bids shall be submitted sealed, plainly marked showing the bid number, date and
time. The entire Section ‘A” of the document is to be returned when submitting a bid unless
otherwise directed by the bid document. Failure to return all pages may result in a determination
that the submittal is non-responsive.
3. Late Bids: Bids and amendments thereto, if received by Purchasing after the date and time
specified for bid opening, will not be considered. It will be the responsibility of the bidder to see
that their bid is received by Purchasing as specified. There will be no exceptions. Date of
postmark will not be considered. Telephone, facsimile, electronic and verbal bids will not be
accepted. Prices or changes shown on the outside of an envelope will not be considered in
determination of low bid.
4. County Offices Closure: If County Offices are closed for business at the time scheduled for the
bid opening, for whatever reasons, sealed bids will be accepted and opened on the next business
day of the County, at the original scheduled hour.
5. Acceptance of Bid: Receipt of the bid by the County is not to be construed as an award or an
order to ship.
6. Offer/Acceptance: Each bid is received with the understanding that the acceptance in writing by
the County of the bidder to furnish any or all of the goods and/or services described therein, shall
constitute a contract between the bidder and the County, which shall bind the bidder to furnish
and deliver the goods and/or services quoted at the prices stated and in accordance with the
conditions of the accepted bid; and the County on its part to order from such bidder, except for
causes beyond reasonable control; and pay for, at the agreed prices, all goods and/or services
specified and delivered.
7. Withdrawal of Bids: Bidder has the right to request withdrawal of their bids from consideration
due to error by giving notice not later than two business days after the bids are publicly opened.
Work papers showing evidence of error(s) may be required.
Bids may be withdrawn any time prior to the bid opening. Withdrawal of bids may be
accomplished by submitting such request in writing on the issuing company's letterhead in
person, electronically (email) or by certified mail.
8. Addenda: If issued, addenda to this solicitation will be posted on the Purchasing website
http://www.co.isle-of-wight.va.us/budget-and-finance/ It is the bidder’s responsibility to check
the website or to contact the Purchasing division prior to the submittal deadline to ensure that the
bidder has a complete, up-to-date package. Acknowledgement of all issued Addenda shall be
indicated on the bid form in the appropriate spaces.
9. Governing Document: The solicitation document maintained by Purchasing, in the bid file, shall
be considered the official copy. In the case of any inconsistency between bid documents
submitted to the County, but not clearly listed as an exception, the language of the official copy
shall prevail. Furthermore, any exception or change to the specifications made by the bidder may
be cause to disqualify your bid.
10. Award: Award will be made to the lowest responsive and responsible bidder. The quality of the
goods and/or services to be supplied, their conformity with the specifications, their suitability to
the requirements, the delivery, qualifications and references will be taken into consideration in
making the award. The County reserves the right to refuse all bids. Determination of low bid shall
be determined by the audited figure shown on the pricing page titled ‘Total Sum’ In case of error
in the extension of prices, the unit price shall govern.
11. Negotiation: Unless canceled or rejected, a responsive bid from the lowest responsible bidder
shall be accepted as submitted; except that if the bid from the lowest responsible bidder exceeds
available funds, the County may negotiate with the apparent low bidder to obtain a contract price
within the available funds.
12. Announcements: Upon the award or the announcement of the decision to award a contract, the
County will publicly post such notice on the bulletin board located outside of the Purchasing
Division and on the County’s web site: http://www.co.isle-of-wight.va.us/budget-and-finance/
13. County’s Rights: The County reserves the right to reject any and all bids, and to waive any
informality if it is determined to be in the best interest of the County.
14. Cooperative Agreements: If authorized by the bidder(s), the resultant contract(s) may be
extended to any jurisdiction within the Commonwealth of Virginia to purchase at the contract
prices in accordance with the contract terms. Any jurisdiction using such contracts shall place its
own order(s) directly with the successful contractor(s). The County of Isle of Wight acts only as
the contracting agent and is not responsible for placement of orders, payment, or discrepancies of
the participating jurisdictions. It is the contractor’s responsibility to notify the jurisdictions of the
availability of contract(s).
15. Prices: Prices shall be stated in units of quantity specified. No additional charges shall be passed
on to the County, including any applicable taxes, delivery, or surcharges. Prices quoted shall be
the final cost to the County. In case of error in the extension of prices, the unit price shall govern.
16. Corrections: All prices and notations should be in ink or typewritten. Mistakes may be crossed
out and corrections made in ink and must be initialed and dated by the person signing the bid.
17. Delivery: The time of delivery must be stated in definite terms. If time of delivery for different
goods and/or services varies, the bidder shall so state.
18. Samples: Samples, when requested, must be furnished free of expense, and upon request, if not
destroyed, will be returned at the bidder’s risk and expense.
19. Brand Names: The use of the name of a manufacturer, brand, make or catalog designation in
specifying an item shall restrict bidders to the manufacturer, brand, make or catalog designation
identified, unless qualified by the provision “or equal.” If qualified by the provision “or equal”
the Brand Names are used simply to indicate the character, quality and/or performance
equivalence of the goods and/or services desired. The goods and/or services on which bids are
submitted must be of such character, quality and/or performance equivalence that it will serve as
that specified. In submitting bids on goods and/or services other than as specified, bidder shall
furnish complete data and identification with respect to the alternate goods and/or services that
they propose to furnish. It shall be in the County’s sole judgment if a substitute product offered is
an approved equal and acceptable.
20. Standard equipment: Any equipment delivered must be standard, new and unused equipment,
latest model, except as otherwise specifically stated in the bid. Where any part or the normal
accessories of equipment is not described, it shall be understood that all the equipment and
accessories that are usually provided in the manufacturer’s stock model shall be furnished.
21. Silence of Specifications: The apparent silence of these specifications and any supplemental
specifications as to any detail or the omission from the specifications of a detailed description
concerning any point shall be regarded as meaning that only the best commercial practices are to
prevail and correct type, size and design are to be used. All interpretations of these specifications
shall be made on the basis of this statement.
22. Capacity of Bidder: All bids must be signed by a responsible officer or employee having the
authority to bind the firm in contract. The bidder agrees that its contract performance shall be in
strict conformance with the contract documents.
23. Rights to Damages: By signing this bid, the bidder assigns to the County any and all rights that it
may have under the antitrust laws of the United States and the Commonwealth of Virginia in any
way arising from or pertaining to this bid. This provision is remedial in nature and is to be
liberally construed by any court in favor of the County.
24. Anti-collusion: The bidder certifies by signing this Invitation of Bid that this bid is made without
prior understanding, agreement, or accord with any other person or firm submitting a bid for the
same goods and/or services and that this bid is in all respects bona fide, fair, and not the result of
any act of fraud or collusion with another person or firm engaged in the same line of business or
commerce. Any false statement hereunder may constitute a felony and can result in a fine and
imprisonment, as well as civil damages.
25. Indemnification: The Contractor shall defend, indemnify and hold the County, and the County’s
employees, agents, and volunteers, harmless, from and against any and all damage claim,
liability, cost, or expense (including, without limitation, attorney’s fees and court costs) of every
kind and nature (including, without limitation, those arising from any injury or damage to any
person, property or business) incurred by or claimed against the contractor, its employees, agents,
and volunteers, or incurred by or claimed against the County, the County’s employees, agents,
and volunteers, arising out of, or in connection with, the performance of all services hereunder by
the contractor. This indemnification and hold harmless includes, but is not limited to, any
financial or other loss including, but not limited to, any adverse regulatory, agency or
administrative sanction or civil penalties, incurred by the County due to the negligent, fraudulent
or criminal acts of the contractor or any of the Contractor’s officers, shareholders, employees,
agents, contractors, subcontractors, or any other person or entity acting on behalf of the
Contractor. Unless otherwise provided by law, the Contractor indemnification obligations
hereunder shall not be limited in any way by the amount or type of damages, compensation, or
benefits payable by or for the Contractor under worker’s compensation acts, disability benefit
acts, other employee benefit acts, or benefits payable under any insurance policy. This paragraph
shall survive the termination of the contract including any renewal or extension thereof.
26. Copyright Protection: The Contractor agrees to defend and save the County, its agents, officials,
and employees, harmless from liability of any nature or kind, for use of any copyright,
composition, secret process, patented or unpatented invention, articles or appliances furnished or
used in the performance of the contract, or which the Contractor is not the patentee, assignee, or
licensee, to the same extent as provided in the above paragraph.
27. Laws, Regulations: The Contractor shall keep fully informed of all federal, state, and local laws,
ordinances and regulations that in any manner affect the conduct of the work. The Contractor
shall at all times observe and comply with all such laws, ordinances and regulations.
28. Alien employment: The Contractor certifies that he does not and shall not during the
performance of the contract for goods and services in the Commonwealth, knowingly employ
unauthorized aliens as defined in the federal Immigration Reform and Control Act of 1986, as
amended.
29. SCC Authorization: All bidders or offerors organized or authorized to transact business in the
Commonwealth pursuant to Title 13.1 or Title 50, as amended, shall include the identification
number issued to it by the State Corporation Commission. Any bidder or offeror that is not
required to be authorized to transact business in the Commonwealth as a foreign business entity
under Title 13.1 or Title 50, as amended, or as otherwise required by law shall include in its bid
or proposal a statement describing why the bidder or offeror is not required to be so authorized.
SCC Number or Statement: _______________________________________________
Any business entity that enters into a contract with a public body pursuant to this chapter shall not
allow its existence to lapse or its certificate of authority or registration to transact business in the
Commonwealth, if so required under Title 13.1, or Title 50, as amended, to be revoked or
cancelled at any time during the term of the contract. The County may void any contract with a
business entity if the business entity fails to remain in compliance with the provisions of this
section.
30. Contractor’s License: If any of the services promulgated under this solicitation consist of
construction work, it is required under Title 54.1, Chapter 11, Code of Virginia, for a contractor
who performs or manages construction, removal, repair, or improvement when the total value
referred to in a single contract or project is:
One hundred twenty thousand dollars ($120,000) or more, or the total value of all such
construction, removal, repair or improvements undertaken by such person within any twelve-
month period is seven hundred fifty thousand dollars ($ 750,000) or more shall show evidence of
being licensed as a Class A Contractor.
Ten thousand dollars ($10,000) or more, but less than one hundred twenty thousand dollars
($120,000) or the total value of all such construction, removal, repair, or improvement undertaken
by such person within any twelve-month period is one hundred and fifty thousand dollars
($150,000) or more, but less than seven hundred fifty thousand dollars ($750,000) shall show
evidence of being licensed as a Class B Contractor.
Over one thousand ($1,000) but less than ten thousand ($10,000), or the total value of all such
construction, removal, repair, or improvements undertaken by such person within any twelve-
month period is one hundred and fifty thousand dollars ($150,000) shall show evidence of being
licensed as a Class C Contractor.
The County shall require master certification as a condition of licensure or certification of
electrical, plumbing and heating, ventilation and air conditions contractors.
A valid business license from the County may be required. The bidder shall complete whichever
of the following notations as appropriate:
“Licensed Class A Virginia Contractor Number .”
“Licensed Class B Virginia Contractor Number .”
“Licensed Class C Virginia Contractor Number .”
31. Payment Terms: Payment terms shall be ‘Net 30’days, from the date of Contractor invoice
approval by the County.
Payment terms, if offered, shall not be considered in determining the low bidder.
Discount period, if offered, shall be computed from the date of proper receipt of the contractor’s
correct invoice, or from the date of acceptable receipt of the goods and/or services, whichever is
latest.
The payment terms stated herein must appear on the contractor’s invoice. Failure to comply with
this requirement shall result in the invoice being returned to the contractor for correction.
Late payment charges shall not exceed the allowable rate specified by the Commonwealth of
Virginia Prompt Payment Act. (1% per month)
Contractor shall submit invoices in duplicate, such statement to include detailed breakdown of all
charges, and shall be based on completion of tasks or deliverables.
Individual Contractors shall provide their social security numbers, and proprietorships,
partnerships, and corporations shall provide their federal employer identification number on their
submittal.
The County prefers to make payment with the County’s Purchasing Card. Typically this enables
faster payments to the Contractor. Are you willing and able to accept this type of payment?
Yes____ No____
32. Default: In event of default by the Contractor, the County reserves the right to procure the goods
and/or services from other sources, and hold the Contractor liable for any excess cost occasioned
thereby. Such actions taken by the County shall not release the contractor from additional
remedies that may be allowed by law.
33. Availability of Funds: A contract shall be deemed in force only to the extent of appropriations
available to each department for the purchase of such goods and/or services. The County’s
extended obligations on those contracts that envision extended funding through successive fiscal
periods shall be contingent upon actual appropriations for the following years.
34. Appeals Procedure: Upon your request, administrative appeals information will be provided that
shall be used for hearing protests of a decision to award, or an award, appeals from refusal to
allow withdrawal of bids, appeals from disqualification, appeals for debarment or suspension, or
determination of non-responsibility and appeals from decision or disputes arising during the
performance of a contract. To be timely all appeals shall be made within the time periods set forth
by the Virginia Public Procurement Act, §2.2-4357, et seq. Contact the buyer at once for
assistance.
35. Faith-based Organizations: The County of Isle of Wight does not discriminate against faith-
based organizations.
36. Anti-Discrimination: By submitting their bids, bidders certify to the County that they will
conform to the provisions of the Federal Civil Rights Act of 1964, as amended, as well as the
Virginia Fair Employment Contracting Act of 1975, as amended, where applicable, the
Virginians with Disabilities Act, the Americans with Disabilities Act and 2.2-4311 of the Virginia
Public Procurement Act (VPPA). If the award is made to a faith-based organization, the
organization shall not discriminate against any recipient of goods, services, or disbursements
made pursuant to the contract on the basis of the recipient's religion, religious belief, refusal to
participate in a religious practice, or on the basis of race, age, color, gender or national origin and
shall be subject to the same rules as other organizations that contract with public bodies to
account for the use of the funds provided; however, if the faith-based organization segregates
public funds into separate accounts, only the accounts and programs funded with public funds
shall be subject to audit by the public body. (Code of Virginia 2.2.4343.1E).
In every contract over $10,000 shall include the following provisions:
1. During the performance of this contract, the Contractor agrees as follows:
a. The Contractor will not discriminate against any employee or applicant for employment
because of race, religion, color, sex, national origin, age, disability, service disabled
veterans or any other basis prohibited by state law relating to discrimination in
employment, except where there is a bona fide occupational qualification reasonably
necessary to the normal operation of the Contractor. The Contractor agrees to post in
conspicuous places, available to employees and applicants for employment, notices
setting forth the provisions of this nondiscrimination clause.
b. The Contractor, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, will state that such Contractor is an equal opportunity employer.
c. Notices, advertisements and solicitations placed in accordance with federal law, rule or
regulation shall be deemed sufficient for the purpose of meeting these requirements.
2. The Contractor will include the provisions of Section a, b, and c above in every subcontract
or purchase order over $10,000, so that the provisions will be binding upon each
subcontractor or vendor.
37. Drug-Free Workplace: During the performance of this contract, the Contractor agrees to (1)
provide a drug-free workplace for the Contractor's employees; (2) post in conspicuous place,
available to employees and applicants for employment, a statement notifying employees that the
unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled
substance or marijuana is prohibited in the Contractor's workplace and specifying the actions that
will be taken against employees for violations of such prohibition; (3) state in all solicitation or
advertisement for employees placed by or on behalf of the Contractor that the Contractor
maintains a drug-free workplace; and (4) include the provisions of the foregoing clauses in every
subcontract or purchase order of over $10,000, so that the provisions will be binding upon each
subcontractor or vendor.
For the purposes of this section, "drug-free workplace" means a site for the performance of work
done in connection with a specific contract awarded to a Contractor, the employees of whom are
prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession
or use of any controlled substance or marijuana during the performance of the contract.
38. Assignment of Contract: A contract shall not be assignable by the Contractor in whole or in part
without the written consent of the County.
39. Independent Contractor: The Contractor and any employees, agents, or other persons or entities
acting on behalf of the Contractor shall act in an independent capacity and not as officers,
employees, or agents of the County.
40. Scheduling and Delays: The parties to any contract resultant of this solicitation acknowledge
that all or part of the work to be performed hereunder may be delayed and extended at the option
of the County. Such delays may be caused by delays, denials and modifications of the various
state or federal permits, or for other reasons. The County shall not be required to pay any of the
Contractor’s direct or indirect costs, or claims for compensation, extended overhead, or other
damage or consequential damages arising out of or related to any delays or interruptions required
or ordered by the County. If the County delays the project for any reason for a continuous period
of ninety (90) days or more, the County and Contractor will negotiate a mutually agreeable
adjustment to the Contractor’s award amount. Notwithstanding the above, in construction
contracts, to the extent that an unreasonable delay is caused by the act or omissions of the County
due to causes within the County’s control, the above waiver or release shall not apply.
41. Governing Law: This Agreement is made, entered into, and shall be performed in the County of
Isle of Wight, Virginia, and shall be governed by the applicable laws of the Commonwealth of
Virginia without regard to its conflict of law rules. In the event of litigation concerning this
Agreement, the parties agree to the exclusive jurisdiction and venue of the Circuit Court of the
County of Isle of Wight, Virginia; however, in the event that the federal court has jurisdiction
over the matter, then the parties agree to the exclusive jurisdiction and venue of the U.S. District
Court for the Eastern District of Virginia, Norfolk Division.
The Contractor shall not cause a delay in services because of the pending or during litigation
proceedings, except with the express, written consent of the County or written instruction/order
from the Court.
42. Severability: If any provision of this contract or the application thereof to any person or
circumstances shall to any extent be invalid or unenforceable, the remainder of this contract, or
the application of such provision to persons or circumstances other than those which it is invalid
or unenforceable, shall not be affected hereby, and each provision of this contract shall be valid
and enforced to the full extent permitted by law.
43. Termination for Convenience: The County may at any time, and for any reason, terminate this
Contract by written notice to Contractor specifying the termination date, which shall be not less
than thirty (30) days from the date such notice is mailed.
Notice shall be given to Contractor by certified mail/return receipt requested at the address set
forth in Contractor’s Bid Proposal or as provided in this Contract. In the event of such
termination, Contractor shall be paid such amount as shall compensate Contractor for the work
satisfactorily completed, and accepted by the County, at the time of termination. If the County
terminates this Contract, Contractor shall withdraw its personnel and equipment, cease
performance of any further work under this Contract, and turn over to the County any work
completed or in process for which payment has been made.
44. Termination for Cause: In the event that Contractor shall for any reason or through any cause be
in default of the terms of this Contract, the County may give Contractor written notice of such
default by certified mail/return receipt requested at the address set forth in Contractor’s
Bid/Proposal or as provided in this Contract.
Unless otherwise provided, Contractor shall have ten (10) days from the date such notice is
mailed in which to cure the default. Upon failure of Contractor to cure the default, the County
may immediately cancel and terminate this Contract as of the mailing date of the default notice.
Upon termination, Contractor shall withdraw its personnel and equipment, cease performance of
any further work under the Contract, and turn over to the County any work in process for which
payment has been made. In the event of violations of law, safety or health standards and
regulations, this Contract may be immediately cancelled and terminated by the County and
provisions herein with respect to opportunity to cure default shall not be applicable.
45. Contact Prohibition: Direct contact with County departments other than Purchasing, on the
subject of this bid is expressly forbidden except with the foreknowledge and permission of
the Contract Officer. Violation may result in a determination that your firm is ineligible for
an award.
All questions shall be in writing to the Contract Officer shown on the title page of the bid. The
respondents to this IFB shall not contact, either directly or indirectly, any other employee or agent
of the County regarding this IFB. This prohibition shall also extend to the County Board of
Supervisors and locally elected officials. Any such unauthorized contact may disqualify the
bidder from this procurement.
46. Additional Conditions: The Conditions and Instructions in this solicitation are intended to apply
to the resulting contract and shall supersede any conflicting terms offered. Any additional
conditions a bidder intends be considered must be submitted with the bid and noted as an
exception. Such exceptions may result in a finding that the submittal is ‘non-responsive’ to the
bid, negating possibility of an award to that bidder. Contractual documents submitted by the
successful firm after an award will not be accepted.
47. Contractor Failure to Perform: Failure of the Contractor to perform the contract by reason of
the County’s non-acceptance of additional conditions submitted after the award shall result in
termination of the contract by the County, and may result in debarment of the Contractor for a
period of up to three (3) years. Termination and /or debarment of the Contractor shall not
constitute a waiver by the County of any other rights or remedies available to the County by law
or contract.
48. Conflict: In the event of a conflict between the contract documents, including these Conditions
and Instructions, and the terms of a purchase order or related document issued by Purchasing, the
contract documents shall control.
49. Records and Inspection: The Contractor shall maintain full and accurate records with respect to
all matters covered under this contract, including, without limitation, accounting records, written
policies, procedures, time records, telephone records, and any other supporting evidence used to
memorialize, reflect, and substantiate charges or fees related to this contract. The Contractor’s
records shall be open to inspection and subject to audit and/or reproduction, during normal
working hours, by the County and its employees, agents or authorized representatives after giving
at least three (3) days’ notice to the Contractor by the County. The County shall have access to
such records from the effective date of this contract, for the duration of the contract, and for five
(5) years after the date of final payment by the County to the Contractor pursuant to this contract
or any renewal or extension of this contract. The County’s employees, agents or authorized
representatives shall have access to the Contractor’s facilities, shall have access to all necessary
records and shall be provided adequate and appropriate work space, in order to conduct audits.
50. Rights and Remedies Not Waived: In no event shall the making by the County of any payment
to the Contractor, or the waiver by the County of any provision under this contract including any
obligation of the Contractor, constitute or be construed as a waiver by the County of any other
provision, obligation, breach of covenant, or any default which may exist under this contract on
the part of the Contractor, and the making of any such payment by the County while any such
breach or default exists shall not impair or prejudice any right or remedies available to the
County.
51. Entire Agreement: This contract and any additional or supplementary documents incorporated
herein by reference contain all the terms and conditions agreed upon by the parties hereto, and no
other agreements, oral or otherwise, regarding the subject matter of this contract or any part
thereof shall have any validity or bind any of the parties hereto. This contract shall not be
modified, altered, changed or amended unless in writing and signed by the parties hereto.
52. Conflicts of Interests: Contractor shall not accept or receive commissions or other payments
from third parties for soliciting, negotiating, procuring, or effecting insurance on behalf of the
County.
53. Responsibility of Contractor: The Contractor shall, without additional costs or fee to the
County, correct or revise any errors or deficiencies in his performance. Neither the County’s
review, approval or acceptance of, nor payment for any of the services required under this
Agreement shall be deemed a waiver of rights by the County, and the Contractor shall remain
liable to the County for all costs which are incurred by the County as a result of the Contractor’s
negligent performance of any of the services furnished under this Agreement.
54. Changes and Additions: It shall be the responsibility of the Contractor to notify the County, in
writing, of any necessary modifications or additions in the Scope of this Agreement.
Compensation for changes or additions in the Scope of this Agreement will be negotiated and
approved by the County, in writing.
It is understood and agreed to by both the County and the Contractor that such modifications or
additions to this Agreement shall be made only by the full execution of the County’s standard
Agreement change order form. Furthermore, it is understood and agreed by both parties that any
work done by the Contractor on such modification or addition to this Agreement prior to the
County’s execution of its standard Agreement change order form shall be at the total risk of the
Contractor and said work may not be compensated by the County.
55. Debarment Status: By submitting a bid, bidders certify that they are not currently debarred by
the Commonwealth of Virginia from submitting bids or proposals on contracts for the type of
goods and/or services covered by this solicitation, nor are they an agent of any person or entity
that is currently so debarred.
56. Safety: All Contractors and subcontractors performing services for the County are required and
shall comply with all Occupational Safety and Health Administration (OSHA), State and County
Safety and Occupational Health Standards and any other applicable rules and regulations. Also all
Contractors and subcontractors shall be held responsible for the safety of their employees and any
unsafe acts or conditions that may cause injury or damage to any persons or property within and
around the work site area under this contract.
57. License Requirement: All firms doing business in the County of Suffolk are required to be
licensed in accordance with the County of Isle of Wight business license ordinance. Wholesale
and retail merchants without a business location in the County of Isle of Wight are exempt from
this requirement. Any questions concerning business licenses should be directed to the
Commissioner of the Revenue’s Office.
58. Contractor’s Form: In cases where the County may accept the Contractor’s form agreement,
whereas certain standard clauses that may appear in the Contractor’s form agreement cannot be
accepted by the County, and in consideration of the convenience of using that form, and this
form, without the necessity of negotiating a separate contract document, the parties hereto
specifically agree that, notwithstanding any provisions appearing in the attached Contractor’s
form contract, the County’s contract addendum shall prevail over the terms of the Contractor’s
agreement in the event of a conflict.
59. Bidder Qualifications: Only bids from established contractors for work similar in scope to work
herein shall be considered; the County reserves the right to request specific reference information
prior to award. Bidder shall demonstrate that he has adequate and appropriate manpower, tools
and equipment to respond and perform in accordance with the provisions herein.
The County may, at its option, disqualify a bidder and reject his bid for cause. Reasons deemed to
be sufficient for this action shall include, but not be limited to, the following:
o Evidence of collusion among bidders.
o Receipt of more than one bid on any project from an individual, or from a corporation.
This restriction does not apply to subcontractors
o Default on any previous contract.
o For unreasonable failure to complete a previous contract within the specified time or for
being in arrears on an existing contract without reasonable cause for being in arrears.
o Inability to perform as revealed by an investigation of the Bidder's financial statement,
experience and/or plant and equipment.
o Contractor does not meet project-specific requirements, as identified in the Contract
Documents
60. Pricing to be F.O.B. Destination – Freight Allowed: Pricing shall be F.O.B. destination-freight
included for all competitive bids. F.O.B. Destination-Freight Included shall include all shipping
costs to the County location(s) at the unit cost. No additional shipping charges shall be allowed.
61. Contract Quantities: The quantities specified in the Invitation for Bid are estimates only unless
otherwise clearly noted, and are given for the information of bidders and for the purpose of bid
evaluation. They do not indicate the actual quantity that will be required, since such volume will
depend upon requirements that may develop during the contract period. Quantities shown shall
not be construed to represent any amount which the County shall be obligated to purchase under
the contract, or relieve the Contractor of his obligation to fill all orders placed by the County,
except as clearly noted.
62. Competition Intended: It is the County’s intent that the Invitation for Bid (IFB) permits
competition. It shall be the bidder’s responsibility to advise the Buyer in writing if any language
requirement, specification, etc., or any combination thereof, inadvertently restricts or limits the
requirements stated in this IFB to a single source. Such notification must be received by the
Contract Officer prior to the date set for bids to close.
63. Default on Taxes: No bid or proposal will be accepted from, or any Contract awarded to, any
person, firm, or corporation that is in arrears, or in default to the County upon any debt or
Contract, or that is a defaulter as surety, or otherwise upon any obligation to the County.
Section B
(To be filled out and returned by Successful Bidder)
AGREEMENT
THIS AGREEMENT, made and entered into this day of ______________, 2015, by and between
the COUNTY OF ISLE OF WIGHT, VIRGINIA, whose principal office is 17090 Monument
Circle, Suite 137, Isle of Wight, Virginia 23397, hereinafter called "OWNER", party of the first
part, and
___________________________________________________________________________here
inafter referred to as "CONTRACTOR", party of the second part.
The CONTRACTOR did, on the ____ day of ____________ 2015, submit a sealed bid to
perform the services stipulated in accordance with plans and specifications prepared by the
OWNER entitled
______________________________________________________________________________
______________________________________which by reference is made a part hereof.
It is mutually understood and agreed by the parties hereto that the Invitation to Bid inviting
Contractors to bid as published, Instructions to Bidder, Schedule of Unit Prices, Bid Form, Bid
Bond, Contract Agreement, Hold Harmless Agreement, Certificate of Insurance, Scope of
Services and Drawings, all proceedings by the governing body of the OWNER pertaining to the
subject matter of this Contract, all of which documents are hereinafter referred to as Contract
Documents and are a part of this Contract by reference the same as if each had been fully set out
and attached hereto.
In consideration of the following mutual agreements and covenants to be kept by each party:
a. The CONTRACTOR agrees to furnish and pay for all labor, tools, equipment,
machinery, supplies, facilities, superintendence, insurance, taxes, utilities and
services necessary to perform all items set forth in the written Contract
Documents hereto attached and made a part hereof in strict compliance with the
Contract Documents and Total Base Bid for a sum of _______________ (the
“Contract Sum”), subject to adjustment as provided in said documents.
b. Invoice payments for work completed under this contract shall be made in strict
accordance with the project specifications and any special conditions attached
thereto.
c. It is understood and agreed that all work shall be accomplished in strict
compliance with the provisions of the Contract Documents. It is understood and
agreed by both the County and the Contractor that any modifications or additions
to this agreement shall be made only by the full execution of the County's
standard contract change order form. Furthermore, it is understood and agreed
by both parties that any work done by the CONTRACTOR on any such
modification or addition to this AGREEMENT prior to the County's execution of
its standard Contract Change Order form shall be at the total risk of the
CONTRACTOR and said work shall not be compensated by the County.
d. CONTRACTOR agrees to begin the work within ten (10) days of Notice to
Proceed and that final completion shall be within ninety (70) calendar days of
Notice to Proceed.
e. The parties agree that damages due to delay in completion of the work are
uncertain and not readily capable of ascertainment. Accordingly, if the
CONTRACTOR shall fail to complete the work or any part thereof within the
time stipulated, or an applicable extension thereof, the CONTRACTOR shall pay
to the OWNER as fixed and agreed, liquidated damages for each calendar day of
delay until the delayed work is corrected or accepted, an of $500 per day. The
parties agree that this sum is proportionate to the probable loss and is not a
penalty.
(a) The CONTRACTOR expressly waives any defense as to the validity of any
liquidated damages stated in this Agreement as they may appear on the
grounds that such liquidated damages are void as penalties or are not
reasonably related to actual damages.
IN WITNESS WHEREOF, the parties hereto have executed and sealed this Agreement as of the
day and year first above written.
OWNER: County of Isle of Wight, Virginia
By: _______________________________
H. Anne Seward, County Administrator
CONTRACTOR:
By: _______________________________
ATTEST:
By: ____________________
Title: ___________________
Approved as to form:
______________________________
Mark C. Popovich, Isle of Wight County Attorney
Section C
(Drawings and Technical Specifications)
GENERAL CONDITIONS
ARTICLE 1 DEFINITION OF TERMS GC - 3
ARTICLE 2 EXECUTION, CORRELATION, INTENT GC - 6
ARTICLE 3 CONTRACTOR'S UNDERSTANDING GC - 6
ARTICLE 4 CONSTRUCTION STANDARDS GC - 7
ARTICLE 5 DETAILED DRAWINGS AND INSTRUCTIONS GC - 7
ARTICLE 6 SHOP DRAWINGS GC - 8
ARTICLE 7 DISCREPANCIES GC - 10
ARTICLE 8 COPIES OF DRAWINGS FURNISHED GC - 10
ARTICLE 9 OWNERSHIP OF DRAWINGS GC - 10
ARTICLE 10 DRAWINGS AND SPECIFICATIONS GC - 11
ARTICLE 11 PROGRESS OF THE WORK GC - 11
ARTICLE 12 ORDER OF COMPLETION GC - 11
ARTICLE 13 SUPERINTENDENCE, SUPERVISION GC - 11
ARTICLE 14 MATERIALS, APPLIANCES, EMPLOYEES GC - 12
ARTICLE 15 ROYALTIES AND PATENTS GC - 13
ARTICLE 16 SURVEYS, PERMITS, AND REGULATIONS GC - 13
ARTICLE 17 POINTS AND INSTRUCTIONS GC - 14
ARTICLE 18 EXISTING STRUCTURES GC - 14
ARTICLE 19 CARE OF EXISTING STRUCTURES GC - 15
ARTICLE 20 PROTECTION OF WORK AND PROPERTY GC - 15
ARTICLE 21 PROJECT COORDINATION GC - 16
ARTICLE 22 INSPECTION OF SITE AND WORK GC - 17
ARTICLE 23 ENGINEER'S/OWNER'S STATUS GC - 18
ARTICLE 24 CORRECTION OF WORK BEFORE FINAL PAY GC - 18
ARTICLE 25 SUSPENSION OF WORK GC - 19
ARTICLE 26 CHANGED CONDITIONS GC - 19
ARTICLE 27 CHANGE OF PLANS GC - 20
ARTICLE 28 ENGINEER'S/OWNER'S DECISIONS GC - 20
ARTICLE 29 CLEANING UP AND RESTORATION OF SITE GC - 20
ARTICLE 30 FINAL INSPECTION GC - 21
ARTICLE 31 GUARANTEE OF WORK GC - 21
ARTICLE 32 STATUTE OF LIMITATIONS GC - 22
ARTICLE 33 USE OF COMPLETED PORTIONS GC - 22
ARTICLE 34 SUBMISSION OF DAILY PERFORMANCE RECORD GC - 23
ARTICLE 35 RECORD DOCUMENTS GC - 23
ARTICLE 36 PARTIAL PAYMENTS GC - 25
ARTICLE 37 ESCROW ACCOUNT PROCEDURE GC - 25
ARTICLE 38 METHOD OF MEASUREMENT GC - 26
ARTICLE 39 BASIS OF PAYMENT GC - 26
ARTICLE 40 INCREASED OR DECREASED QUANTITIES GC - 26
ARTICLE 41 EXTRA WORK AND METHOD OF PAYMENT GC - 26
ARTICLE 42 WORK OUTSIDE REGULAR HOURS GC - 30
ARTICLE 43 DEDUCTIONS FOR UNCORRECTED WORK GC - 30
ARTICLE 44 LIQUIDATED DAMAGES FOR DELAY GC - 30
ARTICLE 45 DAMAGES GC - 32
ARTICLE 46 LIENS GC - 32
ARTICLE 47 PAYMENTS WITHHELD GC - 32
ARTICLE 48 THE OWNER'S RIGHT TO DO WORK GC - 34
ARTICLE 49 THE OWNER'S RIGHT TO TERMINATE GC - 34
ARTICLE 50 CONTRACTOR'S RIGHT TO STOP/TERMINATE GC - 35
ARTICLE 51 REMOVAL OF MATERIALS AND EQUIPMENT GC - 35
ARTICLE 52 ASSIGNMENT GC - 35
ARTICLE 53 RIGHTS OF VARIOUS INTEREST GC - 35
ARTICLE 54 SEPARATE CONTRACTS GC - 36
ARTICLE 55 SUBCONTRACTS GC - 36
ARTICLE 56 EMPLOYMENT DISCRIMINATION PROHIBITED GC - 37
ARTICLE 57 DRUG FREE WORKPLACE GC - 38
ARTICLE 58 INSURANCE GC - 39
ARTICLE 59 PERFORMANCE AND LABOR/MATERIAL BONDS GC - 42
ARTICLE 60 CONTRACTUAL CLAIMS GC - 42
ARTICLE 61 LITIGATION GC - 43
ARTICLE 62 NON-APPROPRIATION GC - 43
ARTICLE 63 SEVERABILITY GC - 44
ARTICLE 64 AGREEMENT CONSTRUED VIRGINIA LAWS GC - 44
GENERAL CONDITIONS
ARTICLE 1. DEFINITION OF TERMS
(A) THE "CONTRACT DOCUMENTS" SHALL CONSIST OF INVITATION TO
BID, INSTRUCTIONS TO BIDDERS, BID CONTRACT AGREEMENT,
PERFORMANCE BOND, PAYMENT BOND, CONTRACTOR'S
CERTIFICATE OF INSURANCE AND ENDORSEMENTS, GENERAL
CONDITIONS, SUPPLEMENTARY CONDITIONS, SPECIFICATION
SECTIONS, CONSTRUCTION DETAILS, ADDENDA, THE DRAWINGS,
NOTICE OF AWARD, NOTICE TO PROCEED, INCLUDING ALL
MODIFICATIONS THERETO INCORPORATED IN ANY OF THE
DOCUMENTS BEFORE AND AFTER EXECUTION OF THE AGREEMENT.
(B) THE WORD "OWNER" IS USED TO DESIGNATE THE DULY
CONSTITUTED GOVERNMENT OF ISLE OF WIGHT COUNTY,
VIRGINIA, ACTING THROUGH THE PROPERLY AUTHORIZED
REPRESENTATIVES.
(C) THE WORD "ENGINEER" SHALL MEAN THE ENGINEER DESIGNATED
BY THE OWNER, WHETHER ACTING DIRECTLY OR THROUGH
PROPERLY AUTHORIZED AGENTS, INSPECTORS OR
REPRESENTATIVES OF THE ENGINEER, ACTING WITHIN THE SCOPE
OF DUTIES ENTRUSTED TO THEM. IN THE EVENT THE OWNER
SHOULD NOT REQUIRE THE SERVICES OF THE ENGINEER FOR
CONTRACT ADMINISTRATION OR INSPECTIONS, THEN THE POWERS,
DUTIES, AND RESPONSIBILITIES CONFERRED HEREIN TO THE
ENGINEER SHALL BE CONSTRUED TO BE THOSE OF THE OWNER.
(D) THE WORD "BIDDER" SHALL BE USED TO DESIGNATE ANY PARTY
OR PARTIES SUBMITTING IN PROPER FORM A BID TO PERFORM THE
WORK HEREINAFTER SPECIFIED. THE SUCCESSFUL BIDDER,
SELECTED BY THE OWNER TO PERFORM THE WORK SPECIFIED,
WILL THEREAFTER BE KNOWN AS THE CONTRACTOR.
(E) THE WORD "CONTRACTOR" IS USED TO DESIGNATE THE PARTY OR
PARTIES CONTRACTING TO PERFORM THE WORK OR HIS OR THEIR
HEIRS, EXECUTORS, ADMINISTRATORS, SUCCESSORS, OR ASSIGNS.
(F) THE WORD "SUPERINTENDENT" SHALL BE USED TO DESIGNATE
THE PERSON APPOINTED BY THE CONTRACTOR, ACTING UNDER HIS
INSTRUCTIONS AND IN DIRECT CHARGE OF THE WORK FOR THE
CONTRACTOR.
(G) THE TERM "SUBCONTRACTOR" SHALL MEAN ANY INDIVIDUAL,
FIRM OR CORPORATION HAVING A DIRECT CONTRACT, WITH THE
CONTRACTOR OR WITH ANY OTHER SUBCONTRACTOR FOR
PERFORMANCE OF ANY PART OF THE WORK.
(H) THE TERM "WORK" SHALL INCLUDE LABOR, MATERIALS,
EQUIPMENT, TRANSPORTATION, SUPERVISION, OR OTHER
FACILITIES, DUTIES, OR INCIDENTALS NECESSARY TO COMPLETE
THE PROJECT IN COMPLIANCE WITH THE TERMS OF THE CONTRACT
DOCUMENTS.
(I) THE WORD "PROJECT" SHALL MEAN THE ENTIRE CONSTRUCTION
TO BE PERFORMED AS PROVIDED IN THE CONTRACT DOCUMENTS.
(J) "PROJECT AREA" SHALL MEAN THE AREA WHERE WORK IS BEING
PERFORMED FOR ISLE OF WIGHT COUNTY, VIRGINIA.
(K) "WRITTEN NOTICE" SHALL BE DEEMED TO HAVE BEEN DULY
SERVED IF DELIVERED IN PERSON TO THE INDIVIDUAL OR TO A
MEMBER OF THE FIRM OR TO AN OFFICER OF THE CORPORATION
FOR WHOM IT IS INTENDED, OR IF DELIVERED AT OR SENT BY
REGISTERED MAIL TO THE LAST BUSINESS ADDRESS KNOWN TO
HIM WHO GIVES THE NOTICE.
(L) THE WORDS "AS DIRECTED," "AS REQUIRED," "AS PERMITTED,"
"AS ALLOWED," OR PHRASES OF LIKE EFFECT OR IMPORT AS USED
HEREIN SHALL MEAN THAT THE DIRECTION, REQUIREMENT,
PERMISSION OR ALLOWANCE OF THE ENGINEER OR OWNER IS
INTENDED, AND SIMILARLY THE WORDS "ACCEPTED,"
"APPROVED," "REASONABLE," "SUITABLE," "PROPERLY,"
"SATISFACTORY," OR WORDS OF LIKE EFFECT OR IMPORT, UNLESS
OTHERWISE PARTICULARLY SPECIFIED HERE, SHALL MEAN
ACCEPTABLE, APPROVED, REASONABLE, SUITABLE, PROPERLY OR
SATISFACTORY IN THE JUDGMENT OF THE ENGINEER OR OWNER.
(M) THE WORD "ADDENDUM" SHALL MEAN A MODIFICATION OF THE
CONTRACT DOCUMENTS ISSUED IN WRITING BY THE ENGINEER OR
OWNER PRIOR TO THE OPENING OF THE BIDS.
(N) THE TERM "FIELD ORDER" SHALL MEAN A WRITTEN ORDER
ISSUED BY THE OWNER SUBSEQUENT TO THE FORMAL EXECUTION
OF THE CONTRACT DOCUMENTS. WHICH ORDERS MINOR CHANGES
IN THE WORK WHICH ARE COMPATIBLE WITH THE DESIGN
CONCEPT OF THE COMPLETED PROJECT AS A FUNCTIONING WHOLE
AS INDICATED BY THE CONTRACT DOCUMENTS BUT WHICH DOES
NOT INVOLVE A CHANGE IN CONTRACT PRICE OR THE CONTRACT
TIMES.
(O) THE TERM "CHANGE ORDER" SHALL MEAN A MODIFICATION OF
THE CONTRACT REQUIREMENTS ISSUED IN WRITING BY THE
OWNER SUBSEQUENT TO THE FORMAL EXECUTION OF THE
CONTRACT DOCUMENTS WHICH INVOLVES A CHANGE IN
CONTRACT PRICE OR THE CONTRACT TIMES.
(P) ALL TIME LIMITS STATED IN THE CONTRACT DOCUMENTS ARE OF
THE ESSENCE OF THE CONTRACT. UNLESS SPECIFICALLY NOTED
OTHERWISE, ALL "DAYS" SHALL BE CONSTRUED TO MEAN
CALENDAR DAYS.
(Q) THE WORDS "SUBSTANTIAL COMPLETION" SHALL MEAN THE
WORK (OR A SPECIFIED PORTION THEREOF) HAS PROGRESSED TO
THE POINT WHERE, IN THE OPINION OF THE ENGINEER, IT IS
SUFFICIENTLY COMPLETED IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS, SO THAT THE WORK CAN BE UTILIZED FOR THE
PURPOSES FOR WHICH IT WAS INTENDED.
(R) THE TERM "OR APPROVED EQUAL" PERTAINS TO THE USE OF
MATERIALS CURRENTLY ACCEPTED BY THE DEPARTMENT OF
PUBLIC UTILITIES. ITEMS NOT CURRENTLY ACCEPTED MUST BE
SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO
INCORPORATION IN THE WORK.
(S) THE TERM "FORCE ACCOUNT" SHALL MEAN WORK NOT SHOWN
ON THE PLANS OR REQUIRED BY THE CONTRACT DOCUMENTS
THAT IS NECESSARY FOR THE COMPLETION OF THE CONTRACT,
WHICH SHALL BE CONSIDERED ADDITIONAL WORK AND WILL BE
PAID FOR IN THE MANNER SET FORTH HEREINAFTER.
ARTICLE 2. EXECUTION, CORRELATION, AND INTENT OF CONTRACT
DOCUMENTS. THE CONTRACT DOCUMENTS SHALL BE EXECUTED BY THE
OWNER AND THE CONTRACTOR IN SUCH NUMBERS AS REQUIRED BY THE
OWNER.
THE CONTRACT DOCUMENTS ARE COMPLEMENTARY AND WHAT IS CALLED FOR
BY ANY ONE SHALL BE AS BINDING AS IF CALLED FOR BY ALL. THE INTENTION
OF THE DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS, EQUIPMENT,
AND SUPPLIES NECESSARY FOR THE PROPER EXECUTION OF THE WORK. IT IS
NOT INTENDED, HOWEVER, THAT MATERIALS OR WORK NOT COVERED BY OR
PROPERLY INFERABLE FROM ANY HEADING, BRANCH, CLASS, OR TRADE OF THE
SPECIFICATIONS SHALL BE SUPPLIED UNLESS DISTINCTLY SO NOTED ON THE
DRAWINGS. MATERIALS OR WORK DESCRIBED IN WORDS WHICH SO APPLIED
HAVE A WELL-KNOWN TECHNICAL OR TRADE MEANING SHALL BE HELD TO
REFER TO SUCH RECOGNIZED STANDARDS. THE DESIGNATION
"ARCHITECTURAL," STRUCTURAL," ELECTRICAL," AND THE LIKE, IN THE
DRAWING TITLES ARE PROVIDED FOR CONVENIENCE ONLY, AND ARE NOT
INTENDED TO DEFINE THE WORK TO BE DONE BY ANY TRADES OR
SUBCONTRACTORS.
ARTICLE 3. CONTRACTOR'S UNDERSTANDING. IT IS UNDERSTOOD AND
AGREED THAT THE CONTRACTOR HAS, BY CAREFUL EXAMINATION, SATISFIED
HIMSELF AS TO THE NATURE AND LOCATION OF THE WORK, THE
CONFORMATION OF THE GROUND, THE CHARACTER, EQUIPMENT AND
FACILITIES NEEDED PRELIMINARY TO AND DURING THE PROSECUTION OF THE
WORK, THE GENERAL AND LOCAL CONDITIONS, AND ALL OTHER MATTERS
WHICH CAN IN ANY WAY AFFECT THE WORK UNDER THIS CONTRACT. NO
VERBAL AGREEMENT OR CONVERSATION WITH ANY OFFICER, AGENT OR
EMPLOYEE OF THE OWNER, EITHER BEFORE OR AFTER THE EXECUTION OF THIS
CONTRACT, SHALL AFFECT OR MODIFY ANY OF THE TERMS OR OBLIGATIONS
HEREIN CONTAINED.
THE SUBMISSION OF A BID SHALL BE PRIMA FACIE EVIDENCE THAT THE BIDDER
THOROUGHLY UNDERSTANDS THE DRAWINGS, TERMS OF THE SPECIFICATIONS,
AND HAS MADE HIMSELF FAMILIAR WITH ALL FEDERAL AND STATE LAWS,
LOCAL LAWS, ORDINANCES, AND REGULATIONS WHICH IN ANY MANNER AFFECT
THE WORK OR ITS PROSECUTION.
ARTICLE 4. CONSTRUCTION STANDARDS. THE CONTRACTOR WILL BE
RESPONSIBLE FOR COMPLYING WITH ISLE OF WIGHT COUNTY, DEPARTMENT OF
PUBLIC UTILITIES CONSTRUCTION SPECIFICATIONS AND STANDARDS FOR
WATERWORKS AND SANITARY SEWERAGE FACILITIES DATED OCTOBER, 1996,
AND ALL REVISIONS THERETO WHERE CONFLICTS OCCUR WITH THE
STANDARDS AND THE REQUIREMENTS SET FORTH HEREIN, THE STANDARDS
SHALL GOVERN. WAIVER OF ANY REQUIREMENTS SET FORTH BY THE
STANDARDS IS AT THE DISCRETION OF THE OWNER.
ARTICLE 5. DETAILED DRAWINGS AND INSTRUCTIONS. THE ENGINEER SHALL
FURNISH WITH REASONABLE PROMPTNESS, ADDITIONAL INSTRUCTION, BY
MEANS OF DRAWINGS OR OTHERWISE, NECESSARY FOR THE PROPER EXECUTION
OF THE WORK. ALL SUCH DRAWINGS AND INSTRUCTIONS SHALL BE
CONSISTENT WITH THE CONTRACT DOCUMENTS. WHERE SIZES ARE NOT
MARKED PLAINLY ON THE DRAWINGS, THE SIZE OF CORRESPONDING PARTS
MAY BE FOLLOWED, OR THE ENGINEER WILL DETERMINE THE SIZES WHEN
DIMENSIONS ARE ENTIRELY OMITTED.
THE CONTRACTOR SHALL VERIFY ALL FIGURES ON THE PLANS AND WILL BE
RESPONSIBLE FOR THE PROPER COORDINATION OF ALL DIMENSIONS AS WELL AS
THE DIFFERENT PARTS OF THE WORK.
ARTICLE 6. SHOP DRAWINGS.
(A) THE TERM "SHOP DRAWINGS," AS USED HEREIN SHALL INCLUDE
FABRICATION, ERECTION AND SETTING DRAWINGS,
MANUFACTURERS' STANDARD DRAWINGS, SCHEDULES,
DESCRIPTIVE LITERATURE, CATALOGS, BROCHURES,
PERFORMANCE AND TEST DATA, WIRING AND CONTROL DIAGRAMS
AND ALL OTHER DESCRIPTIVE DATA PERTAINING TO THE
MATERIALS AND EQUIPMENT AS REQUIRED TO DEMONSTRATE
COMPLIANCE WITH THE CONTRACT REQUIREMENTS.
(B) THE CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE
OWNER ALL SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS
OR REQUESTED BY THE OWNER. ALL SUCH SUBMISSIONS SHALL BE
MADE WITH SUCH PROMPTNESS AS TO CAUSE NO DELAY IN THIS
OR ANY OTHER CONTRACTOR ON THE PROJECT, AND TO ALLOW
REASONABLE TIME FOR REVIEW.
(C) SHOP DRAWINGS SHALL BE SUBMITTED IN SUCH NUMBER OF
COPIES THAT THREE (3) COPIES MAY BE RETAINED BY THE OWNER.
EACH SUBMISSION SHALL BE ACCOMPANIED BY A LETTER OF
TRANSMITTAL IN DUPLICATE, LISTING THE CONTENTS OF THE
SUBMISSION AND IDENTIFYING EACH ITEM BY REFERENCE TO
SPECIFICATION SECTION OR DRAWING. ALL SHOP DRAWINGS
SHALL BE CLEARLY LABELED WITH THE NAME OF THE PROJECT
AND OTHER NECESSARY INFORMATION. CATALOG PLATES AND
OTHER SIMILAR MATERIAL THAT CANNOT BE SO LABELED
CONVENIENTLY, SHALL BE BOUND IN SUITABLE COVERS BEARING
THE IDENTIFYING DATA.
(D) SHOP DRAWINGS SHALL BE ACCOMPANIED BY ALL REQUIRED
CERTIFICATIONS AND OTHER SUCH SUPPORTING MATERIAL, AND
SHALL BE SUBMITTED IN SUCH SEQUENCE OR IN SUCH GROUPS
THAT ALL RELATED ITEMS MAY BE REVIEWED TOGETHER. WHEN
SHOP DRAWINGS CANNOT BE REVIEWED BECAUSE THE
SUBMISSION IS NOT COMPLETE, OR BECAUSE SHOP DRAWINGS ON
RELATED ITEMS HAVE NOT BEEN RECEIVED, THEN SUCH SHOP
DRAWINGS WILL BE RETURNED WITHOUT ACTION OR WILL BE
HELD, AND NOT REVIEWED, UNTIL THE LACKING MATERIAL IS
RECEIVED.
(E) SHOP DRAWINGS SHALL HAVE BEEN CHECKED BY THE
CONTRACTOR AND COORDINATED WITH ALL OTHER RELATED OR
AFFECTED WORK BEFORE THEY ARE SUBMITTED FOR APPROVAL,
AND SHALL BEAR THE CONTRACTOR'S CERTIFICATION THAT HE
HAS CHECKED AND APPROVED THEM AS COMPLYING WITH THE
INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. SHOP
DRAWINGS SUBMITTED WITHOUT SUCH CERTIFICATION AND
COORDINATION WILL BE RETURNED TO THE CONTRACTOR
WITHOUT ACTION, AND WILL NOT BE CONSIDERED A FORMAL
SUBMISSION.
(F) IF THE SHOP DRAWINGS SHOW VARIATIONS FROM THE DRAWINGS
AND SPECIFICATIONS BECAUSE OF STANDARD SHOP PRACTICE OR
OTHER REASONS, THE CONTRACTOR SHALL MAKE SPECIFIC
MENTION OF SUCH VARIATION IN HIS LETTER OF TRANSMITTAL IN
ORDER THAT, IF ACCEPTABLE, SUITABLE ACTION MAY BE TAKEN
FOR PROPER ADJUSTMENT; OTHERWISE, THE CONTRACTOR WILL
NOT BE RELIEVED OF THE RESPONSIBILITY FOR EXECUTING THE
WORK IN ACCORDANCE WITH THE DRAWINGS AND
SPECIFICATIONS EVEN THOUGH SUCH SHOP DRAWINGS HAVE BEEN
APPROVED.
(G) THE OWNER SHALL PASS UPON THE SHOP DRAWINGS WITH
REASONABLE PROMPTNESS. REVIEWING AND/OR APPROVAL OF
SHOP DRAWINGS WILL BE GENERAL, FOR CONFORMANCE WITH
THE DESIGN CONCEPT OF THE PROJECT AND COMPLIANCE WITH
THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS, AND
WILL NOT INCLUDE QUANTITIES, DETAIL DIMENSIONS, NOR
ADJUSTMENTS OF DIMENSIONS TO ACTUAL FIELD CONDITIONS.
APPROVAL SHALL NOT BE CONSTRUED AS PERMITTING ANY
DEPARTURE FROM CONTRACT REQUIREMENTS, AUTHORIZATION
OF ANY INCREASE IN PRICE NOR AS RELIEVING THE CONTRACTOR
OF THE RESPONSIBILITY FOR ANY ERROR IN DETAILS, DIMENSIONS
OR OTHERWISE THAT MAY EXIST.
ARTICLE 7. DISCREPANCIES. ANY DISCREPANCIES FOUND BETWEEN THE
PLANS AND SPECIFICATIONS AND SITE CONDITIONS OR ANY INCONSISTENCIES
OR AMBIGUITIES IN THE PLANS OR SPECIFICATIONS SHALL BE IMMEDIATELY
REPORTED TO THE ENGINEER, IN WRITING, WHO SHALL PROMPTLY CORRECT
SUCH INCONSISTENCIES OR AMBIGUITIES IN WRITING. WORK DONE BY THE
CONTRACTOR AFTER HIS DISCOVERY OF SUCH DISCREPANCIES,
INCONSISTENCIES OR AMBIGUITIES SHALL BE DONE AT THE CONTRACTOR'S
RISK.
IF THE CONTRACTOR, IN THE COURSE OF THE WORK, FINDS ANY DISCREPANCY
BETWEEN THE DRAWINGS AND THE PHYSICAL CONDITIONS OF THE LOCALITY,
OR ANY ERRORS, OR OMISSIONS IN DRAWINGS OR IN THE LAYOUT AS GIVEN BY
POINTS AND INSTRUCTIONS, IT SHALL BE HIS DUTY TO IMMEDIATELY INFORM
THE ENGINEER AND THE OWNER IN WRITING, AND THE ENGINEER AND OWNER
SHALL PROMPTLY VERIFY THE SAME. ANY WORK DONE AFTER SUCH
DISCOVERY, UNTIL AUTHORIZED, WILL BE DONE AT THE CONTRACTOR'S RISK
AND EXPENSE.
ARTICLE 9. OWNERSHIP OF DRAWINGS. ALL DRAWINGS AND SPECIFICATIONS
FURNISHED BY THE ENGINEER ARE PROPERTY OF THE OWNER. THEY ARE NOT
TO BE USED ON OTHER WORK AND, WITH THE EXCEPTION OF THE SIGNED
CONTRACT SET, ARE TO BE RETURNED TO THE OWNER ON REQUEST, AT THE
COMPLETION OF THE WORK. ALL MODELS ARE THE PROPERTY OF THE OWNER.
ARTICLE 10. DRAWINGS AND SPECIFICATIONS ON THE WORK. THE
CONTRACTOR SHALL KEEP ONE (1) COPY OF ALL DRAWINGS AND THE
SPECIFICATIONS AT THE JOB SITE, IN GOOD ORDER, AVAILABLE TO THE OWNER.
ARTICLE 11. PROGRESS OF THE WORK. IT IS UNDERSTOOD AND AGREED THAT
THE CONTRACTOR WILL EXECUTE THE AGREEMENT WITHIN TEN (10) DAYS
AFTER WRITTEN NOTICE OF AWARD. THE CONTRACTOR SHALL PROVIDE AN
ADEQUATE FORCE OF LABOR AND EQUIPMENT TO PROSECUTE THE WORK AT AS
MANY DIFFERENT POINTS AS MAY BE NECESSARY TO INSURE THE COMPLETION
OF SAME WITHIN THE TIME LIMIT FOR THE COMPLETION AS SET FORTH IN THIS
AGREEMENT.
THE CONTRACTOR SHALL FURNISH A PROGRESS SCHEDULE FOR APPROVAL BY
THE OWNER AND THE ENGINEER. IT SHALL BE INCUMBENT UPON THE
CONTRACTOR TO PROVIDE THE MANPOWER AND EQUIPMENT TO MAINTAIN THIS
SCHEDULE. IN THE EVENT PERIODIC ESTIMATES INDICATE THE SCHEDULE IS
NOT BEING MET, THE CONTRACTOR MAY BE REQUIRED TO FURNISH IN WRITING
TO THE ENGINEER THE METHOD HE PROPOSES TO EMPLOY TO RETURN THE
PROJECT TO THE ORIGINAL SCHEDULE. THE OWNER MAY WITHHOLD PAYMENTS
IF THE WORK IS NOT PROCEEDING IN ACCORDANCE WITH TERMS OF THIS
AGREEMENT. ALL WORK SHALL BE FAITHFULLY UNDERTAKEN, PERFORMED
AND COMPLETED WITHIN THE TIME DESIGNATED IN THE CONTRACT, AS TIME IS
UNDERSTOOD TO BE THE ESSENCE OF THE CONTRACT.
ARTICLE 12. ORDER OF COMPLETION. THE CONTRACTOR SHALL SUBMIT AT
SUCH TIME AS MAY BE REQUESTED BY THE OWNER, SCHEDULES WHICH SHALL
SHOW THE ORDER IN WHICH THE CONTRACTOR WILL START THE SEVERAL
PARTS OF THE WORK AND ESTIMATED DATES OF COMPLETION OF THE SEVERAL
PARTS. WHEN APPROVED, SUCH SCHEDULE SHALL GOVERN THE WORK. THE
OWNER RESERVES THE RIGHT TO ESTABLISH AN ORDER OF PRECEDENCE FOR
THE COMPLETION OF THE WORK.
ARTICLE 13. SUPERINTENDENCE, SUPERVISION. THE CONTRACTOR SHALL
KEEP ON HIS WORK DURING ITS PROGRESS A COMPETENT SUPERINTENDENT AND
ANY NECESSARY ASSISTANTS, ALL SATISFACTORY TO THE OWNER. THE
SUPERINTENDENT SHALL NOT BE CHANGED EXCEPT WITH THE CONSENT OF THE
OWNER, UNLESS THE SUPERINTENDENT PROVES TO BE UNSATISFACTORY TO
THE CONTRACTOR AND CEASES TO BE IN HIS EMPLOY. THE SUPERINTENDENT
SHALL REPRESENT THE CONTRACTOR IN HIS ABSENCE AND ALL DIRECTIONS
GIVEN TO HIM SHALL BE AS BINDING AS IF GIVEN TO THE CONTRACTOR.
IMPORTANT DIRECTIONS SHALL BE CONFIRMED UPON WRITTEN REQUEST IN
EACH CASE. THE CONTRACTOR SHALL GIVE EFFICIENT SUPERVISION TO THE
WORK, USING HIS BEST SKILL AND ATTENTION.
ARTICLE 14. MATERIALS, APPLIANCES, EMPLOYEES. UNLESS OTHERWISE
STIPULATED, THE CONTRACTOR SHALL PROVIDE AND PAY FOR ALL MATERIALS,
LABOR, WATER, TOOLS, EQUIPMENT, LIGHT, POWER, TRANSPORTATION,
SANITARY FACILITIES, AND OTHER FACILITIES NECESSARY FOR THE EXECUTION
AND COMPLETION OF THE WORK.
UNLESS OTHERWISE SPECIFIED, ALL MATERIALS SHALL BE NEW AND BOTH
WORKMANSHIP AND MATERIALS SHALL BE OF GOOD QUALITY. THE
CONTRACTOR SHALL, IF REQUIRED, FURNISH SATISFACTORY EVIDENCE AS TO
THE KIND AND QUALITY OF MATERIALS.
THE CHARACTER, CONDITIONS, ADAPTABILITY, AND QUANTITY OF EQUIPMENT
USED BY THE CONTRACTOR SHALL BE SUCH AS MAY BE NECESSARY FOR THE
PROPER EXECUTION OF THE WORK WITHIN THE SPECIFIED WORKING TIME. THE
EQUIPMENT USED SHALL BE MAINTAINED IN GOOD CONDITION AND SHALL BE
SUBJECT TO APPROVAL OF THE OWNER PRIOR TO AND DURING ITS USE IN
CONNECTION WITH THE WORK TO BE PERFORMED UNDER THIS CONTRACT.
THE CONTRACTOR SHALL AT ALL TIMES ENFORCE STRICT DISCIPLINE AND GOOD
ORDER AMONG HIS EMPLOYEES. NO PERSON UNDER THE AGE OF SIXTEEN (16)
YEARS, NO PERSON WHO, AT THE TIME, IS SERVING A SENTENCE IN A PENAL OR
CORRECTIONAL INSTITUTION, AND NO PERSON WHO HAS BEEN CONVICTED OF
COMMISSION OF FRAUD OR A CRIMINAL OFFENSE IN CONNECTION WITH
OBTAINING, ATTEMPTING TO OBTAIN, OR PERFORMING A PUBLIC CONTRACT OR
SUBCONTRACT, SHALL BE EMPLOYED ON THE WORK COVERED BY THIS
CONTRACT.
NEITHER PARTY SHALL EMPLOY OR HIRE ANY EMPLOYEES OF THE OTHER PARTY
WITHOUT HIS CONSENT. THE CONTRACTOR SHALL AT ALL TIMES ENFORCE
STRICT DISCIPLINE AND GOOD ORDER AMONG HIS EMPLOYEES. IF THE
CONTRACTOR OR ANY OF HIS EMPLOYEES AT ANY TIME IN ANY WAY ABUSES
PHYSICALLY OR VERBALLY ANY COUNTY EMPLOYEE ENGAGED IN
PERFORMANCE OF HIS DUTIES WITH REFERENCE TO SUPERVISION OR
INSPECTION OF THE PROJECT OR PERFORMANCE OF ANY OTHER DUTIES
RELATED TO THE COUNTY, THE CONTRACTOR MAY BE ORDERED BY THE
COUNTY TO REMOVE HIS PERSON AND/OR ANY OF HIS EMPLOYEES ENGAGING IN
SUCH CONDUCT FROM THE JOB SITE FOR THE DURATION OF THE CONTRACT.
SHOULD THE CONTRACTOR REFUSE TO DO SO, THE CONTRACT MAY
IMMEDIATELY AND WITHOUT ADVANCE NOTICE TO SURETIES BE TERMINATED
BY THE COUNTY.
ARTICLE 15. ROYALTIES AND PATENTS. THE CONTRACTOR SHALL PAY
ROYALTIES AND LICENSE FEES. HE SHALL DEFEND ALL SUITS OR CLAIMS FOR
THE INFRINGEMENT OF ANY PATENT RIGHTS AND SHALL SAVE THE OWNER
HARMLESS FROM LOSS ON ACCOUNT THEREOF, EXCEPT THAT THE OWNER
SHALL BE RESPONSIBLE FOR ALL SUCH LOSS WHEN A PARTICULAR PROCESS OR
THE PRODUCT OF A PARTICULAR MANUFACTURER OR MANUFACTURERS IS
SPECIFIED, BUT IF THE CONTRACTOR HAS INFORMATION THAT THE PROCESS OR
ARTICLE SPECIFIED IS INFRINGEMENT OF A PATENT, HE SHALL BE RESPONSIBLE
FOR SUCH LOSS UNLESS HE PROMPTLY GIVES SUCH INFORMATION IN WRITING
TO THE ENGINEER AND OWNER.
ARTICLE 16. SURVEYS, PERMITS, AND REGULATIONS. PERMITS AND LICENSES
NECESSARY FOR THE PROSECUTION OF THE WORK SHALL BE SECURED AND PAID
FOR BY THE CONTRACTOR. EASEMENTS AND RIGHT-OF-WAY FOR PERMANENT
STRUCTURES OR PERMANENT CHANGES IN EXISTING FACILITIES SHALL BE
SECURED AND PAID FOR BY THE OWNER, UNLESS OTHERWISE SPECIFIED.
THE CONTRACTOR WILL HAVE IN HAND, ON SITE, AN APPROVED TRAFFIC
CONTROL PLAN AND AN APPROVED HIGHWAY PERMIT PRIOR TO
COMMENCEMENT OF CONSTRUCTION. NO CONSTRUCTION WILL BE PERFORMED
UNTIL THESE REQUIREMENTS ARE MET.
THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS,
ORDINANCES, RULES, AND REGULATIONS BEARING ON THE CONDUCT OF THE
WORK AS DRAWN AND SPECIFIED. IF THE CONTRACTOR OBSERVES THAT THE
DRAWINGS AND SPECIFICATIONS ARE AT VARIANCE THEREWITH, HE SHALL
PROMPTLY NOTIFY THE ENGINEER AND OWNER IN WRITING, AND ANY
NECESSARY CHANGES SHALL BE ADJUSTED AS PROVIDED IN THE CONTRACT
FOR CHANGES IN THE WORK. IF THE CONTRACTOR PERFORMS ANY WORK
KNOWING IT TO BE CONTRARY TO SUCH LAWS, ORDINANCES, RULES AND
REGULATIONS AND WITHOUT SUCH NOTICE TO THE ENGINEER AND OWNER, HE
AGREES TO BEAR ALL COSTS AND PENALTIES ARISING THEREFROM.
UNLESS OTHERWISE SPECIFIED, THE OWNER SHALL FURNISH ALL LAND
SURVEYS AND ESTABLISH ALL BASE LINES FOR LOCATING THE PRINCIPAL
COMPONENT PARTS OF THE WORK TOGETHER WITH A SUITABLE NUMBER OF
BENCH MARKS ADJACENT TO THE WORK. FROM THE INFORMATION PROVIDED
BY THE OWNER, THE CONTRACTOR SHALL DEVELOP AND MAKE ALL DETAIL
SURVEYS NEEDED FOR CONSTRUCTION.
ARTICLE 17. POINTS AND INSTRUCTIONS. THE CONTRACTOR SHALL PROVIDE
REASONABLE AND NECESSARY OPPORTUNITIES AND FACILITIES FOR SETTING
POINTS AND MAKING MEASUREMENTS. HE SHALL NOT PROCEED UNTIL HE HAS
MADE TIMELY DEMAND UPON THE OWNER FOR, AND HAS RECEIVED FROM HIM,
SUCH POINTS AND INSTRUCTIONS AS MAY BE NECESSARY AS THE WORK
PROGRESSES. THE WORK SHALL BE DONE IN STRICT CONFORMITY WITH SUCH
POINTS AND INSTRUCTIONS.
ARTICLE 18. EXISTING STRUCTURES. THE LOCATION OF EXISTING SEWERS,
WATER AND GAS PIPES, CONDUITS AND OTHER STRUCTURES ACROSS OR ALONG
THE LINE OF THE PROPOSED WORK ARE NOT NECESSARILY SHOWN ON THE
PLANS, AND IF SHOWN, THE LOCATION, DEPTH AND DIMENSION OF SUCH
STRUCTURE ARE ONLY APPROXIMATELY CORRECT. THE CONTRACTOR SHALL
HAVE A WORKING PIPE LOCATOR ON THE JOB AT ALL TIMES.
THE CONTRACTOR SHALL DIG THE NECESSARY TEST HOLES FOR THE PURPOSE
OF LOCATING EXISTING UNDERGROUND STRUCTURES. SUCH EXCAVATION
SHALL NOT BE UNDERTAKEN WITHOUT FORTY-EIGHT (48) HOURS PRIOR NOTICE
TO THE OWNER.
NO CLAIMS FOR DAMAGES OR EXTRA COMPENSATION SHALL ACCRUE TO THE
CONTRACTOR FROM THE PRESENCE OF SUCH PIPE OR OTHER OBSTRUCTION OR
FROM ANY DELAY DUE TO REMOVAL OR REARRANGEMENT OF SAME.
ARTICLE 19. CARE OF EXISTING STRUCTURES. THE CONTRACTOR SHALL BE
LIABLE FOR ALL DAMAGE DONE TO ANY STRUCTURES OR PROPERTY ARISING
THROUGH HIS NEGLIGENCE OR CARELESSNESS. HE SHALL TAKE CARE OF AND
MAINTAIN ALL UNDERGROUND, OVERHEAD OR SURFACE UTILITIES
ENCOUNTERED IN THE PERFORMANCE OF THE WORK. PRIOR TO COMMENCING
WORK, CONTRACTOR SHALL CONTACT THE UTILITY INFORMATION CENTER
("MISS UTILITY"), TELEPHONE 1-800-552-7001 FOR ASSISTANCE IN LOCATING
EXISTING UNDERGROUND UTILITIES.
THE CONTRACTOR SHALL OBSERVE ALL PRECAUTIONS WITH RESPECT TO FIRE
AND AVOID THE INDISCRIMINATE MUTILATION, OR CUTTING DOWN OF TREES,
WITHIN AND OUTSIDE OF PROJECT WORK AREAS OR EASEMENTS. ANY DAMAGE
TO PROPERTY OR EASEMENTS NOT IN THE WORK AREA ARISING FROM THE
CONTRACTOR'S NEGLIGENCE OR CARELESSNESS IN PERFORMANCE OF THE
WORK WILL BE THE CONTRACTOR'S RESPONSIBILITY.
THE CONTRACTOR SHALL NOT USE PRIVATE PROPERTY IN CONNECTION WITH
THE WORK UNLESS PRIOR WRITTEN PERMISSION IS OBTAINED FROM THE
PROPERTY OWNER. A COPY OF THE WRITTEN PERMISSION SHALL BE FURNISHED
TO THE COUNTY ENGINEERING DIVISION. THE WRITTEN STATEMENT OF
PERMISSION SHALL ALSO INDICATE THE NAME, ADDRESS, AND PHONE NUMBER
OF THE PROPERTY OWNER. IT WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO TAKE PHOTOGRAPHS OF THE PROPERTY PRIOR TO ITS USE IN
CASE OF DISPUTES ARISING FROM THE USE OF THE PROPERTY. VERIFICATION OF
OWNERSHIP SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
ARTICLE 20. PROTECTION OF WORK AND PROPERTY. THE CONTRACTOR
SHALL PROVIDE AND MAINTAIN ALL NECESSARY WATCHMEN, BARRICADES,
LIGHTS AND WARNING SIGNS, AND TAKE ALL NECESSARY PRECAUTIONS FOR
THE PROTECTION AND SAFETY OF THE PUBLIC. HE SHALL CONTINUOUSLY
MAINTAIN ADEQUATE PROTECTION OF ALL WORK FROM DAMAGE AND SHALL
TAKE ALL REASONABLE PRECAUTIONS TO PROTECT THE OWNER'S PROPERTY
FROM INJURY OR LOSS ARISING IN CONNECTION WITH THIS CONTRACT. HE
SHALL MAKE GOOD ANY DAMAGE, INJURY OR LOSS TO HIS WORK AND TO THE
PROPERTY OF THE OWNER RESULTING FROM LACK OF REASONABLE
PROTECTIVE PRECAUTIONS, EXCEPT SUCH AS MAY BE DUE TO ERRORS IN THE
CONTRACT DOCUMENTS, OR CAUSED BY AGENT OR EMPLOYEES OF THE OWNER.
HE SHALL ADEQUATELY PROTECT ADJACENT PRIVATE AND PUBLIC PROPERTY,
AS PROVIDED BY LAW AND THE CONTRACT DOCUMENTS.
IN AN EMERGENCY AFFECTING THE SAFETY OF LIFE OR LOSS OR DAMAGE TO
THE WORK OR TO THE ADJOINING PROPERTY, THE CONTRACTOR WITHOUT
SPECIAL INSTRUCTION OR AUTHORIZATION FROM THE ENGINEER OR OWNER, IS
HEREBY PERMITTED TO ACT, AT HIS DISCRETION, TO PREVENT SUCH
THREATENED LOSS OR INJURY, AND HE SHALL SO ACT, WITHOUT APPEAL AS IF
INSTRUCTED OR AUTHORIZED. THE CONTRACTOR SHALL PROVIDE WRITTEN
DOCUMENTATION CONCERNING THE CIRCUMSTANCES OF THE EMERGENCY TO
THE OWNER AS SOON AS PRACTICAL. ANY COMPENSATION, CLAIMED BY THE
CONTRACTOR ON ACCOUNT OF EMERGENCY WORK, SHALL BE DETERMINED BY
AGREEMENT OR LITIGATION AS PROVIDED FOR IN ARTICLE 59 HEREIN.
THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCH MARKS, REFERENCE
POINTS AND STAKES, AND IN CASE OF WILLFUL OR CARELESS DESTRUCTION, HE
SHALL BE CHARGED WITH THE RESULTING EXPENSE AND SHALL BE
RESPONSIBLE FOR ANY MISTAKES THAT MAY BE CAUSED BY THEIR
UNNECESSARY LOSS OR DISTURBANCE.
ARTICLE 21. PROJECT COORDINATION. WHERE REQUIRED BY STATE,
FEDERAL, OR LOCAL REGULATIONS, THE CONTRACTOR SHALL COORDINATE HIS
CONSTRUCTION PLAN WITH THE VIRGINIA DEPARTMENT OF TRANSPORTATION
AND WILL OBTAIN THEIR APPROVALS TO DATE OF WORK, PERMITS, TYPE OF
TEMPORARY PATCHING, TRAFFIC CONTROL, TYPE AND PLACEMENT OF TRAFFIC
CONTROLS, SAFETY DEVICES, AND FLAGMEN. EXISTING COUNTY WATER AND
SEWER VALVES MAY ONLY BE OPENED AND CLOSED BY OR UNDER THE DIRECT
SUPERVISION OF DEPARTMENT OF PUBLIC UTILITIES PERSONNEL. THE ONLY
EXCEPTION IS AN EMERGENCY SITUATION AFFECTING PUBLIC HEALTH OR
SAFETY IN WHICH CASE THE CONTRACTOR WOULD ACT IN ACCORDANCE WITH
ARTICLE 20.
ANY CONTRACTOR FOUND VIOLATING THIS PROVISION MAY BE SUBJECT TO
PROSECUTION FOR TAMPERING WITH COUNTY PROPERTY.
WHEN THE CONTRACTOR REQUIRES VALVE OPERATING SERVICES, HE SHALL
VERBALLY INFORM THE DEPARTMENT OF PUBLIC UTILITIES AND GIVE WRITTEN
NOTICE OF THE REQUIREMENT TO THE PROJECT ENGINEER. THE WRITTEN AND
DATED REQUEST SHALL BE DELIVERED TO THE OFFICE OF THE PROJECT
ENGINEER AT LEAST FORTY-EIGHT (48) HOURS IN ADVANCE OF THE SERVICE.
ARTICLE 22. INSPECTION OF SITE AND WORK. THE OWNER AND HIS
REPRESENTATIVES SHALL AT ALL TIMES HAVE ACCESS TO THE WORK
WHEREVER AND WHENEVER IT IS, IN PREPARATION OR PROGRESS, AND THE
CONTRACTOR SHALL PROVIDE FOR SUCH ACCESS AND FOR INSPECTION.
THE OWNER WILL APPOINT SUCH PERSON OR PERSONS AS HE MAY DEEM
NECESSARY TO PROPERLY INSPECT THE MATERIALS FURNISHED AND WORK
DONE UNDER THE CONTRACT, AND TO SEE THAT THE SAME STRICTLY
CORRESPONDS WITH THE DRAWINGS AND SPECIFICATIONS. WORK AND
MATERIALS WILL BE INSPECTED PROMPTLY, BUT IF, FOR ANY REASON DELAY
SHOULD OCCUR, THE CONTRACTOR SHALL HAVE NO CLAIM FOR DAMAGES OR
EXTRA COMPENSATION.
THE FAILURE OF THE INSPECTOR TO REJECT OR CONDEMN IMPROPER
MATERIALS AND WORKMANSHIP SHALL NOT PREVENT THE OWNER FROM
REJECTING MATERIALS AND WORKMANSHIP FOUND DEFECTIVE AT ANY TIME
PRIOR TO THE FINAL ACCEPTANCE OF THE COMPLETED WORK, NOR SHALL IT BE
CONSIDERED AS A WAIVER OF ANY DEFECTS WHICH MAY BE DISCOVERED
LATER, OR AS PREVENTING THE COUNTY AT ANY TIME PRIOR TO THE
EXPIRATION OF THE GUARANTEE PERIOD FROM RECOVERING DAMAGES FOR
WORK ACTUALLY DEFECTIVE.
IF THE SPECIFICATIONS, OWNER'S INSTRUCTIONS, LAWS, ORDINANCES, OR ANY
PUBLIC AUTHORITY REQUIRE ANY WORK TO BE SPECIFICALLY TESTED OR
APPROVED, THE CONTRACTOR SHALL GIVE THE OWNER TIMELY NOTICE OF ITS
READINESS FOR INSPECTION AND, IF THE INSPECTION IS BY ANOTHER
AUTHORITY THAN THE OWNER, OF THE DATE FIXED FOR SUCH INSPECTION.
INSPECTIONS BY THE OWNER SHALL BE PROMPTLY MADE, AND WHERE
PRACTICABLE AT THE SOURCE OF SUPPLY. IF ANY WORK SHOULD BE COVERED
UP WITHOUT APPROVAL OR CONSENT OF THE OWNER, IT MUST, IF REQUIRED BY
THE OWNER, BE UNCOVERED FOR EXAMINATION.
REEXAMINATION OF QUESTIONED WORK MAY BE ORDERED BY THE OWNER AND
IF SO ORDERED, THE WORK MUST BE UNCOVERED BY THE CONTRACTOR. IF
SUCH WORK BE FOUND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, THE
OWNER SHALL PAY THE COST OF REEXAMINATION AND REPLACEMENT. IF SUCH
WORK BE FOUND NOT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, THE
CONTRACTOR SHALL PAY SUCH COST, UNLESS HE SHALL SHOW THAT THE
DEFECT IN THE WORK WAS CAUSED BY ANOTHER CONTRACTOR, AND IN THAT
EVENT THE OWNER SHALL SEEK CORRECTIVE ACTION FROM THE OTHER
CONTRACTOR.
ARTICLE 23. ENGINEER'S/OWNER'S STATUS. THE ENGINEER AND/OR OWNER
SHALL MAKE PERIODIC VISITS TO THE JOB TO FAMILIARIZE HIMSELF
GENERALLY WITH THE PROGRESS AND QUALITY OF THE WORK BEING
CONSTRUCTED. HE WILL CARRY OUT REASONABLE INSPECTIONS OF THE WORK
TO DETERMINE IF, IN GENERAL, THE CONTRACTOR IS PROCEEDING IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE OWNER MAY STOP THE
PROCEEDING IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE OWNER
MAY STOP THE WORK WHENEVER SUCH STOPPAGE MAY BE NECESSARY TO
INSURE THE PROPER EXECUTION OF THE CONTRACT. HE SHALL ALSO HAVE
AUTHORITY TO REJECT ALL WORK AND MATERIALS WHICH DO NOT CONFORM
TO THE CONTRACT, TO REQUIRE THE APPLICATION OF FORCES TO ANY PORTION
OF THE WORK AS IN HIS JUDGEMENT IS NECESSARY, AND TO DECIDE QUESTIONS
WHICH ARISE IN THE EXECUTION OF THE WORK.
ARTICLE 24. CORRECTION OF WORK BEFORE FINAL PAYMENT. THE
CONTRACTOR SHALL PROMPTLY REMOVE FROM THE PREMISES ALL MATERIALS
CONDEMNED BY THE OWNER AS FAILING TO CONFORM TO THE CONTRACT,
WHETHER INCORPORATED IN THE WORK OR NOT, AND THE CONTRACTOR SHALL
PROMPTLY REPLACE AND RE-EXECUTE HIS OWN WORK IN ACCORDANCE WITH
THE CONTRACT AND WITHOUT EXPENSE TO THE OWNER AND SHALL BEAR THE
EXPENSE OF MAKING GOOD ALL WORK OF OTHERS DESTROYED OR DAMAGED
BY SUCH REMOVAL OR REPLACEMENT.
IF THE CONTRACTOR DOES NOT REMOVE SUCH CONDEMNED WORK AND
MATERIALS WITHIN A REASONABLE TIME, FIXED BY WRITTEN NOTICE, THE
OWNER MAY REMOVE AND THEN MAY STORE THE MATERIALS AT THE EXPENSE
OF THE CONTRACTOR. IF THE CONTRACTOR DOES NOT PAY THE EXPENSE OF
SUCH REMOVAL AND STORAGE WITHIN TEN (10) DAYS TIME THEREAFTER, THE
OWNER MAY UPON TEN (10) DAYS WRITTEN NOTICE, SELL SUCH MATERIALS AT
AUCTION OR AT PRIVATE SALE AND SHALL ACCOUNT FOR THE NET PROCEEDS
THEREOF AFTER DEDUCTING ALL THE COSTS AND EXPENSES THAT SHOULD
HAVE BEEN BORNE BY THE CONTRACTOR.
ARTICLE 25. SUSPENSION OF WORK. THE OWNER MAY AT ANY TIME SUSPEND
THE WORK, OR ANY PART THEREOF BY GIVING TEN (10) DAYS NOTICE TO THE
CONTRACTOR IN WRITING. THE WORK SHALL BE RESUMED BY THE
CONTRACTOR WITHIN TEN (10) DAYS AFTER THE DATE FIXED IN THE WRITTEN
NOTICE FROM THE OWNER TO THE CONTRACTOR TO DO SO. THE OWNER SHALL
REIMBURSE THE CONTRACTOR FOR EXPENSES INCURRED BY THE CONTRACTOR
IN CONNECTION WITH THE WORK UNDER HIS CONTRACT AS A RESULT OF SUCH
SUSPENSION.
BUT IF THE WORK OR ANY PART THEREOF SHALL BE STOPPED BY THE NOTICE IN
WRITING AFORESAID, AND IF THE OWNER DOES NOT GIVE NOTICE IN WRITING
TO THE CONTRACTOR TO RESUME WORK AT A DATE WITHIN NINETY (90) DAYS
OF THE DATE FIXED IN THE WRITTEN NOTICE TO SUSPEND, THE CONTRACTOR
MAY ABANDON THAT PORTION OF THE WORK SO SUSPENDED AND HE WILL BE
ENTITLED TO PAYMENT FOR ALL WORK COMPLETED UP TO THE DATE OF NOTICE
TO SUSPEND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
ARTICLE 26. CHANGED CONDITIONS. NOTWITHSTANDING ANY OTHER
PROVISION OR CONDITION SET FORTH IN THE CONTRACT DOCUMENTS AS
HEREIN DEFINED, IT IS UNDERSTOOD AND AGREED THAT SHOULD THE
CONTRACTOR ENCOUNTER OR THE OWNER DISCOVER, DURING THE PROGRESS
OF THE WORK, SUBSURFACE AND/OR LATENT CONDITIONS AT THE SITE
MATERIALLY DIFFERING FROM THOSE SHOWN ON THE DRAWINGS OR INDICAT-
ED IN THE SPECIFICATIONS, OR UNKNOWN CONDITIONS OF AN UNUSUAL
NATURE DIFFERING MATERIALLY FROM THOSE ORDINARILY ENCOUNTERED
AND GENERALLY RECOGNIZED AS INHERENT IN WORK OF THE CHARACTER
PROVIDED FOR IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL
IMMEDIATELY INFORM THE PROJECT ENGINEER VERBALLY AND SHALL THEN
FOLLOW UP IN WRITING WITHIN TEN (10) DAYS OF THE FIRST OBSERVATION OF
ANY SUCH CONDITION. IF THE CONTRACTOR SHOULD FAIL TO NOTIFY THE
PROJECT ENGINEER AS REQUIRED ABOVE, THEN ANY WORK PERFORMED SHALL
BE DONE AT THE CONTRACTOR'S RISK AND EXPENSE. IF IT IS FOUND
CONDITIONS DO MATERIALLY DIFFER, THE CONTRACT SHALL BE MODIFIED VIA
WRITTEN CHANGE ORDER TO PROVIDE ANY INCREASE OR DECREASE OF COST
AND/OR DIFFERENCE IN TIME RESULTING FROM SUCH CONDITION; THE OWNER
MAY TERMINATE THE CONTRACT DUE TO CHANGED CONDITIONS BY DELIVERY
OF WRITTEN NOTICE TO THE CONTRACTOR AND THE CONTRACTOR WILL BE
ENTITLED ONLY TO PAYMENT FOR WORK COMPLETED IN ACCORDANCE WITH
THE CONTRACT DOCUMENTS AS OF THE RECEIPT OF SUCH NOTICE.
ARTICLE 27. CHANGE OF PLANS. IT IS AGREED THAT THE ENGINEER, WITH THE
APPROVAL OF THE OWNER, MAY MAKE ALTERATIONS FOR LINE, GRADE, PLAN
POSITIONS, DIMENSIONS OR MATERIALS OF WORK HEREIN CONTEMPLATED OR
ANY PART THEREOF, EITHER BEFORE OR AFTER COMMENCEMENT OF THE
CONSTRUCTION UNDER THIS AGREEMENT SO LONG AS SUCH CHANGES DO NOT
RENDER THE TERMS OF THE AGREEMENT INAPPLICABLE.
ARTICLE 28. ENGINEER'S/OWNER DECISIONS. THE OWNER SHALL WITHIN
FIFTEEN (15) DAYS TIME AFTER PRESENTATION TO HIM IN WRITING, RENDER
DECISIONS, IN WRITING, ON ALL CLAIMS OF THE CONTRACTOR, OR OTHER
MATTERS RELATING TO THE EXECUTION AND PROGRESS OF THE WORK.
QUESTIONS WHICH ARISE AND PERTAIN TO THE INTERPRETATION OF THE
CONTRACT DOCUMENTS SHALL BE SUBMITTED IN WRITING TO THE ENGINEER.
THE ENGINEER SHALL WITHIN FIFTEEN (15) DAYS TIME RENDER A DECISION AS
TO THE INTERPRETATION OF THE CONTRACT DOCUMENTS.
ARTICLE 29. CLEANING UP AND RESTORATION OF SITE. THE CONTRACTOR
SHALL, DURING THE PROGRESS OF THE WORK AND AS DIRECTED BY THE
OWNER, REMOVE FROM THE OWNER'S PROPERTY AND FROM ALL PUBLIC AND
PRIVATE PROPERTY AND RIGHTS-OF-WAY, AT HIS OWN EXPENSE, ALL
TEMPORARY STRUCTURES, RUBBISH, DEBRIS, PILES OF EARTH, FOREIGN
MATTER, AND WASTE MATERIALS RESULTING FROM HIS OPERATIONS. THE SITE
OF THE WORK SHALL BE RESTORED TO THE CONDITIONS EXISTING BEFORE THE
WORK WAS STARTED, TO THE SATISFACTION OF THE OWNER. LAWNS,
PAVEMENTS, SIDEWALKS, AND OTHER SURFACES SHALL BE PRESERVED WHERE
PRACTICABLE BUT IF DAMAGED SHALL BE FULLY RESTORED.
IF THE CONTRACTOR FAILS TO PERFORM CLEANUP AND RESTORATION IN AN
ORDERLY, CONTINUOUS, AND EXPEDITIOUS MANNER, THE OWNER MAY TAKE
CORRECTIVE ACTION THREE (3) DAYS AFTER DELIVERY OF NOTICE TO DO SO TO
THE CONTRACTOR; ANY EXPENSE RESULTING FROM CORRECTIVE ACTION
TAKEN BY THE OWNER FOR CLEANUP OR RESTORATION SHALL BE DEDUCTED
FROM PAYMENTS DUE TO THE CONTRACTOR.
ARTICLE 30. FINAL INSPECTION. THE OWNER SHALL SCHEDULE A FINAL
INSPECTION OF THE WORK INCLUDED IN THE CONTRACT WITHIN TEN (10) DAYS
AFTER RECEIPT OF WRITTEN NOTIFICATION FROM THE CONTRACTOR THAT THE
WORK IS COMPLETED. IF THE WORK IS NOT ACCEPTABLE TO THE ENGINEER OR
OWNER, THE CONTRACTOR SHALL BE ADVISED AS TO THE PARTICULAR DEFECTS
TO BE REMEDIED BEFORE FINAL ACCEPTANCE CAN BE MADE.
FAILURE OF THE OWNER TO MAKE THIS INSPECTION WITHIN THE TIME SPECIFIED
IN NO WAY RELIEVES THE CONTRACTOR OF ANY OF HIS OBLIGATIONS UNDER
THE CONTRACT.
ONLY WRITTEN NOTIFICATION FROM THE OWNER WILL CONSTITUTE FINAL
ACCEPTANCE OF ANY PART OF THE WORK UNDER THIS CONTRACT.
ARTICLE 31. GUARANTEE OF WORK. CONTRACTOR WARRANTS AND
GUARANTEES TO THE OWNER AND TO THE ENGINEER THAT ALL WORK WILL BE
IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND WILL BE WITHOUT
DEFECT. THE GUARANTEE PERIOD SHALL BE NOT LESS THAN ONE YEAR AFTER
THE DATE OF SUBSTANTIAL COMPLETION. SHOULD ANY MANUFACTURER'S
WARRANTY BE GREATER THAN ONE YEAR OR SHOULD ANY PERMIT,
SPECIFICATION, OR REGULATORY WARRANTY REQUIREMENT BE GREATER THAN
ONE YEAR, THE CONTRACTOR SHALL GUARANTEE THE WORK FOR THE LONGER
PERIOD. IF DURING THE GUARANTEE PERIOD ANY WORK IS FOUND TO BE
DEFECTIVE, CONTRACTOR SHALL PROMPTLY, WITHOUT COST TO OWNER, AND IN
ACCORDANCE WITH OWNER'S WRITTEN INSTRUCTION, EITHER CORRECT SUCH
DEFECTIVE WORK OR REMOVE IT FROM THE SITE AND REPLACE IT WITH NON-
DEFECTIVE WORK. IF CONTRACTOR DOES NOT PROMPTLY COMPLY WITH THE
TERM OF SUCH INSTRUCTION, OR IN AN EMERGENCY WHERE DELAY WOULD
CAUSE SERIOUS RISK OF LOSS OR DAMAGE, OWNER MAY HAVE THE DEFECTIVE
WORK CORRECTED OR THE REJECTED WORK REMOVED AND REPLACED, AND
ALL DIRECT AND INDIRECT COSTS OF SUCH REMOVAL AND REPLACEMENT,
INCLUDING COMPENSATION FOR ADDITIONAL PROFESSIONAL SERVICES, SHALL
BE PAID BY CONTRACTOR.
ARTICLE 32. STATUTE OF LIMITATIONS; WARRANTIES; AS BETWEEN THE
OWNER AND THE CONTRACTOR:
(A) ANY APPLICABLE STATUE OF LIMITATIONS SHALL COMMENCE TO
RUN AND ANY ALLEGED CAUSE OF ACTION SHALL BE DEEMED TO
HAVE ACCRUED IN ANY AND ALL EVENTS NO EARLIER THAN THE
DATE OF FINAL PAYMENT.
(B) AS TO ACTS OR FAILURES TO ACT OCCURRING AFTER THE DATE OF
FINAL PAYMENT, ANY APPLICABLE STATUE OF LIMITATIONS
SHALL COMMENCE TO RUN AND ANY ALLEGED CAUSE OF ACTION
SHALL BE DEEMED TO HAVE ACCRUED IN ANY AND ALL EVENTS
NO EARLIER THAN THE DATE OF ANY ACT OR FAILURE TO ACT BY
THE CONTRACTOR PURSUANT TO ANY REQUIRED OR OTHERWISE
PROVIDED WARRANTY, THE DATE OF ANY CORRECTION OF THE
WORK OR FAILURE TO CORRECT THE WORK BY THE CONTRACTOR,
OR THE DATE OF ACTUAL COMMISSION OF ANY OTHER ACT OR
FAILURE TO PERFORM ANY DUTY OR OBLIGATION BY THE
CONTRACTOR OR OWNER, WHICHEVER OCCURS LAST.
ARTICLE 33. USE OF COMPLETED PORTIONS. THE OWNER SHALL HAVE THE
RIGHT TO TAKE POSSESSION OF AND USE ANY COMPLETED OR PARTIALLY
COMPLETED PORTIONS OF THE WORK, NOTWITHSTANDING THAT THE TIME FOR
COMPLETING THE ENTIRE WORK OR SUCH PORTIONS MAY NOT HAVE EXPIRED,
BUT SUCH TAKING POSSESSION AND USE SHALL NOT BE DEEMED AN
ACCEPTANCE OF ANY WORK NOT COMPLETED IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS. IF SUCH PRIOR USE INCREASES THE COST OF OR
DELAYS THE WORK, THE CONTRACTOR SHALL BE ENTITLED TO SUCH EXTRA
COMPENSATION OR EXTENSION OF TIME OR BOTH AS THE OWNER MAY
DETERMINE.
ARTICLE 34. SUBMISSION OF DAILY PERFORMANCE RECORDS. THE
CONTRACTOR SHALL AT THE START OF EACH WORK DAY PROVIDE THE PROJECT
INSPECTOR A COPY OF HIS DAILY PERFORMANCE RECORD FOR WORK
PERFORMED ON THE PRECEDING WORK DAY. THE PERFORMANCE RECORD
SHALL BE SUBMITTED IN FORMAT AS PRESCRIBED BY THE COUNTY
ENGINEERING DIVISION.
A COPY OF THE PRESCRIBED FORMAT WILL BE PROVIDED TO THE CONTRACTOR
BY THE OWNER.
THE SUBMISSION OF THE DAILY RECORD DOES NOT PRECLUDE THE SUBMISSION
OF ADDITIONAL DOCUMENTATION, REPORTS, INFORMATION WHEN REQUESTED
BY THE OWNER; OR AS SPECIFICALLY PROVIDED FOR OR REQUIRED BY THE
CONTRACT DOCUMENTS.
ARTICLE 35. RECORD DOCUMENTS. THE CONTRACTOR SHALL AT THE END OF
CONSTRUCTION PROVIDE THE OWNER WITH ONE COMPLETE SET OF DRAWINGS
RECORDING THE INSTALLATION OF THE PROJECT. DURING THE COURSE OF THE
CONSTRUCTION THE AS-BUILTS SHALL BE UPDATED DAILY BY THE END OF EACH
WORKING DAY. UNDER ARTICLE 47, PARTIAL PAYMENTS MAY BE WITHHELD
FOR FAILURE TO KEEP NEAT, ACCURATE AND COMPLETE AS-BUILTS. UNDER
ARTICLE 43, THE OWNER MAY ELECT TO PREPARE THE AS-BUILTS AT THE
EXPENSE OF THE CONTRACTOR SHOULD THE CONTRACTOR FAIL TO PERFORM
UNDER THIS PROVISION OF THE CONTRACT.
AS-BUILT INFORMATION SHALL INCLUDE THE FOLLOWING AS A MINIMUM,
WHERE APPLICABLE:
(A) Pond and outlet structure as-built survey documenting the pond volume is as
required per the construction plans, to include as-constructed gabion basket
elevation and outlet structure rim and inverts.
THESE RECORDS ARE A SPECIFIC CONTRACT REQUIREMENT OF THE
CONTRACTOR. FINAL PAYMENT WILL NOT BE ISSUED UNTIL SAID DOCUMENTS
HAVE BEEN SUBMITTED IN AN ACCEPTABLE FORM.
ARTICLE 36. PARTIAL PAYMENTS. PARTIAL PAYMENTS WILL BE MADE EACH
MONTH FOR THE QUANTITY OF WORK PERFORMED IN THE PRECEDING MONTH
LESS FIVE PERCENT (5%) TO BE RETAINED UNTIL FINAL COMPLETION OF THE
WORK.
REQUESTS FOR PAYMENTS SHALL BE SUBMITTED TO THE OWNER BY THE 1ST OF
THE MONTH FOR PAYMENT BY MID-MONTH. REQUESTS FOR PAYMENTS SHALL
BE SUBMITTED USING THE APPLICATION FOR PAYMENT AND SUBMITTED TO THE
COUNTY PROJECT LEADER FOR REVIEW AND SIGNATURE APPROVALS;
ADDITIONAL INFORMATION MAY BE REQUESTED DEPENDING ON PROJECT:
ARTICLE 37. ESCROW ACCOUNT PROCEDURE. IN ACCORDANCE WITH SECTION
2.2-4334 OF THE CODE OF VIRGINIA (1950) AS AMENDED, ON PUBLIC CONTRACTS
OF $200,000 OR MORE, THE CONTRACTOR WILL HAVE THE OPTION TO USE AN
ESCROW ACCOUNT PROCEDURE FOR UTILIZATION OF RETAINAGE FUNDS. IN THE
EVENT THE CONTRACTOR ELECTS TO USE THE ESCROW ACCOUNT PROCEDURE,
THE "ESCROW AGREEMENT" FORM SHALL BE EXECUTED AND SUBMITTED TO
THE OWNER WITHIN FIFTEEN CALENDAR DAYS AFTER NOTIFICATION OF INTENT
TO AWARD. IF THE "ESCROW AGREEMENT' FORM IS NOT SUBMITTED WITHIN THE
FIFTEEN-DAY PERIOD, THE CONTRACTOR SHALL FORFEIT HIS RIGHTS TO USE OF
THE ESCROW ACCOUNT PROCEDURE. THE "ESCROW AGREEMENT" AND ALL
REGULATIONS PERTAINING THERETO SHALL BE IN SUBSTANTIAL ACCORDANCE
WITH THE AGREEMENT USED BY COMMONWEALTH OF VIRGINIA, DEPARTMENT
OF TRANSPORTATION. THE CONTRACTOR'S ESCROW AGENT SHALL BE A TRUST
COMPANY, BANK OR A SAVINGS INSTITUTION WITH ITS PRINCIPAL OFFICE
LOCATED IN THE COMMONWEALTH.
ARTICLE 38. METHOD OF MEASUREMENT. EXCEPT WHEN STIPULATED
OTHERWISE, ALL QUANTITIES OF WORK PERFORMED AND TO BE PAID FOR
UNDER THIS CONTRACT SHALL BE CONSTRUED AS THOSE MEASURED IN PLACE
BY THE OWNER.
ARTICLE 39. BASIS OF PAYMENT. THE PRICES TO BE PAID FOR THE WORK
PERFORMED UNDER THIS CONTRACT SHALL BE THE PRICES STIPULATED IN THE
CONTRACTOR'S BID.
ARTICLE 40. INCREASED OR DECREASED QUANTITIES AND METHOD OF
PAYMENT - UNIT PRICES. THE OWNER RESERVES THE RIGHT TO INCREASE OR
DECREASE THE ESTIMATED VALUE OF THE CONTRACT IN AN AMOUNT NOT TO
EXCEED TWENTY-FIVE PERCENT (25%). SUCH INCREASE OR DECREASE MAY BE
BROUGHT ABOUT EITHER BY VARYING QUANTITIES WITHIN THE ORIGINAL
UNITS OF THE CONTRACT OR BY AN EXTENSION OR REDUCTION IN THE
ORIGINAL LIMITS OF THE PROJECT.
NO CLAIM FOR EXTRA COMPENSATION WILL BE ALLOWED FOR SUCH INCREASE
OR DECREASE IN THE VALUE OF THE CONTRACT NOT EXCEEDING TWENTY-FIVE
PERCENT (25%).
CHANGES IN THE ESTIMATED VALUE OF ANY MAJOR OR MINOR ITEM OF MORE
THAN TWENTY-FIVE PERCENT (25%) NOT CONSISTENT WITH THE ABOVE, OR
CHANGES IN EITHER TOTAL COST OR THE AMOUNT OF ANY ITEM MAJOR OR
MINOR WHICH ARE THE RESULTS OF MORE ACCURATE MEASUREMENTS AND
ARE NOT DUE TO ANY CHANGE IN PLAN OR IN CHARACTER OF THE WORK SHALL
NOT BE CONSIDERED A BASIS OF DEMAND FOR REVISION IN CONTRACT PRICE BY
EITHER PARTY TO THE CONTRACT.
FOR ANY INCREASED OR DECREASED QUANTITIES, SETTLEMENT SHALL BE
MADE FOR THE ACTUAL AMOUNT OF WORK PERFORMED AT THE UNIT PRICES
SHOWN IN THE PROPOSAL FOR THE WORK UNDER CONSIDERATION.
ARTICLE 41. EXTRA WORK AND METHOD OF PAYMENT. THE OWNER MAY AT
ANY TIME BY A WRITTEN ORDER, AND WITHOUT NOTICE TO SURETIES, MAKE
CHANGES IN DRAWINGS OR SPECIFICATIONS, WITHIN THE GENERAL SCOPE
THEREOF. ANY EXTRA WORK DONE PRIOR TO THE EXECUTION OF THE COUNTY'S
STANDARD CHANGE ORDER FORM BY THE CHAIRMAN OF THE BOARD OF
SUPERVISORS IS DONE AT THE CONTRACTOR'S TOTAL RISK AND WITH NO
OBLIGATION ON THE PART OF THE COUNTY TO PAY FOR THE WORK.
THE CONTRACTOR SHALL PERFORM UNFORESEEN WORK OR WORK WHICH MAY
EXCEED THE TWENTY-FIVE PERCENT (25%) STATED IN ARTICLE 40 OR WORK FOR
WHICH THERE IS NO PRICE INCLUDED IN THE CONTRACT, WHENEVER IT IS
DEEMED NECESSARY OR DESIRABLE IN ORDER TO COMPLETE FULLY THE WORK
AS CONTEMPLATED. SUCH WORK SHALL BE PERFORMED IN ACCORDANCE WITH
THE SPECIFICATIONS AND AS DIRECTED BY THE OWNER, AND WILL BE PAID FOR
AS STIPULATED HEREINAFTER.
EXTRA WORK SHALL BE PAID FOR AT THE UNIT PRICES OR LUMP SUM AS
AGREED TO BY THE CONTRACTOR AND THE OWNER, OR IN LIEU OF SUCH
AGREEMENT, THE OWNER MAY REQUIRE THE CONTRACTOR TO DO SUCH WORK
ON A FORCE ACCOUNT BASIS TO BE COMPENSATED FOR IN THE FOLLOWING
MANNER.
(A) LABOR. FOR ALL LABOR AND FOREMEN IN DIRECT CHARGE OF THE
SPECIFIC OPERATIONS, THE CONTRACTOR SHALL RECEIVE THE
RATE OF WAGE (OR SCALE) AS SET FORTH IN HIS MOST RECENT
PAYROLL ON WHICH THE APPLICABLE CLASS OF LABOR AND
FOREMEN WERE USED FOR EACH HOUR OF REGULAR TIMES AND 1-
1/2 TIMES SUCH RATES FOR OVERTIME WHEN SUCH OVERTIME
WORK IS AUTHORIZED, THAT SAID LABOR AND FOREMEN ARE
ACTUALLY ENGAGED IN SUCH WORK. IN THE EVENT THE CLASS OF
LABOR NEEDED HAS NOT BEEN EMPLOYED ON THE PROJECT,
MUTUALLY AGREED UPON RATES WILL BE ESTABLISHED,
PROVIDED, HOWEVER, THAT THE RATES SHALL CONFORM TO
PREDETERMINED RATES AUTHORIZED FOR THE PROJECT. AN
AMOUNT EQUAL TO TEN PERCENT (10%) OF THE SUM THEREFORE
SHALL BE ADDED TO THESE RATES.
(B) BOND, INSURANCE, AND TAX, FOR PROPERTY DAMAGE, LIABILITY,
AND WORKMEN'S COMPENSATION INSURANCE PREMIUMS,
UNEMPLOYMENT INSURANCE CONTRIBUTIONS AND SOCIAL
SECURITY TAXES ON FORCE ACCOUNT WORK, THE CONTRACTOR
SHALL RECEIVE AN AMOUNT EQUAL TO TWENTY PERCENT (20%)
THE BASE COST FOR LABOR.
(C) MATERIALS. FOR MATERIALS ACCEPTED BY THE OWNER AND
USED, THE CONTRACTOR SHALL RECEIVE THE ACTUAL COST OF
SUCH MATERIALS DELIVERED ON THE WORK, INCLUDING
TRANSPORTATION, AND HANDLING CHARGES PAID BY HIM
(EXCLUSIVE OF EQUIPMENT RENTALS AS HEREINAFTER SET
FORTH), TO WHICH COST TEN PERCENT (10%) WILL BE ADDED.
(D) EQUIPMENT. FOR ANY MACHINERY OR SPECIAL EQUIPMENT
(OTHER THAN SMALL TOOLS AND OPERATOR) INCLUDING FUEL,
LUBRICANTS AND REPAIRS, THE CONTRACTOR SHALL RECEIVE
HOURLY RENTAL RATES WHICH SHALL NOT EXCEED THE RENTAL
RATES BASED ON 1/40TH OF THE WEEKLY RATE OF THE CURRENT
SCHEDULE PUBLISHED BY THE ASSOCIATED EQUIPMENT
DISTRIBUTORS (AED) PLUS TRANSPORTATION COST FOR
EQUIPMENT NOT ALREADY ON THE PROJECT. SUCH RATE WILL BE
PAID FOR THE ACTUAL TIME THE EQUIPMENT IS IN OPERATION ON
THE FORCE ACCOUNT WORK.
THE RATES FOR LICENSED TRUCKS AND SPECIAL EQUIPMENT NOT
LISTED IN THE AED SCHEDULE USED ON THE FORCE ACCOUNT
WORK SHALL NOT EXCEED THE HOURLY RATE BEING PAID FOR
SUCH TRUCKS AND EQUIPMENT BY THE CONTRACTOR AT THE TIME
OF THE FORCE ACCOUNT AUTHORIZATION. IN THE ABSENCE OF
SUCH RATES, THE PREVAILING RATES BEING PAID IN THE AREA
WHERE THE WORK IS CONTEMPLATED SHALL BE USED.
(E) MISCELLANEOUS. NO ADDITIONAL ALLOWANCE WILL BE MADE
FOR GENERAL SUPERINTENDENCE, THE USE OF SMALL TOOLS, OR
OTHER COSTS FOR WHICH NO SPECIFIC ALLOWANCE IS HEREIN
PROVIDED.
(F) COMPENSATION. THE COMPENSATION AS SET FORTH IN THIS
SECTION SHALL BE ACCEPTED BY THE CONTRACTOR AS PAYMENT
IN FULL INCLUDING PROFIT FOR EXTRA WORK DONE ON A FORCE
ACCOUNT BASIS. AT THE END OF EACH DAY THE CONTRACTOR'S
REPRESENTATIVE AND THE INSPECTOR SHALL COMPARE RECORDS
OF THE COST OF WORK DONE AS ORDERED ON A FORCE ACCOUNT
BASIS.
(G) STATEMENTS. NO PAYMENT WILL BE MADE FOR WORK
PERFORMED ON A FORCE ACCOUNT BASIS UNTIL THE
CONTRACTOR HAS FURNISHED THE ENGINEER OR OWNER WITH
DUPLICATE ITEMIZED STATEMENTS OF THE COST OF SUCH FORCE
ACCOUNT WORK DETAILED AS FOLLOWS:
1. NAME, CLASSIFICATION, DATE, DAILY HOURS, TOTAL
HOURS, RATE AND EXTENSION FOR EACH LABORER, AND
FOREMAN
2. DESIGNATION, DATES, DAILY HOURS, TOTAL HOURS,
RENTAL RATE, AND EXTENSION FOR EACH UNIT OF
EQUIPMENT
3. QUANTITIES OF MATERIALS, PRICES AND EXTENSIONS
4 TRANSPORTATION OF MATERIAL
5. COST OF PROPERTY DAMAGE, LIABILITY AND WORKERS'
COMPENSATION INSURANCE PREMIUMS, UNEMPLOYMENT
INSURANCE CONTRIBUTIONS, AND SOCIAL SECURITY TAX
STATEMENTS SHALL BE ACCOMPANIED AND SUPPORTED BY RECEIPTED
INVOICES FOR ALL MATERIALS USED AND TRANSPORTATION CHARGES.
HOWEVER, IF MATERIALS USED ON THE FORCE ACCOUNT WORK ARE NOT
SPECIFICALLY PURCHASED FOR SUCH WORK BUT ARE TAKEN FROM THE
CONTRACTOR'S STOCK THEN, IN LIEU OF THE INVOICES, THE CONTRACTOR
SHALL FURNISH AN AFFIDAVIT CERTIFYING THAT SUCH MATERIALS WERE
TAKEN FROM HIS STOCK, THAT THE QUANTITY CLAIMED WAS ACTUALLY USED
AND THAT THE PRICE AND TRANSPORTATION AND HANDLING CLAIMED
REPRESENT THE ACTUAL COST TO THE CONTRACTOR.
ARTICLE 42. WORK OUTSIDE REGULAR HOURS. IF THE CONTRACTOR DESIRES
TO PERFORM WORK OUTSIDE THE REGULAR HOURS OR ON SATURDAY, HE SHALL
REQUEST PERMISSION TO WORK FORTY-EIGHT (48) HOURS IN ADVANCE TO
ALLOW ARRANGEMENTS TO BE MADE FOR PROPER INSPECTION. THE OWNER
MAY REFUSE THE CONTRACTOR PERMISSION TO WORK IF THE 48-HOUR NOTICE
IS NOT GIVEN OR FOR OTHER JUST CAUSE. REASONABLE EFFORTS SHALL BE
MADE BY THE CONTRACTOR TO AVOID UNDUE NOISE DURING THE NIGHT AND
ON SUNDAYS, IF IT IS NECESSARY TO WORK AT SUCH TIMES. UNDER NORMAL
CIRCUMSTANCES THE CONTRACTOR WILL NOT BE PERMITTED TO WORK ON
SUNDAYS OR COUNTY HOLIDAYS.
UNLESS SPECIFICALLY SCHEDULED TO WORK OUTSIDE NORMAL HOURS BY THE
OWNER IN THE INTEREST OF PUBLIC SAFETY OR CONVENIENCE, THE
CONTRACTOR WILL BE LIABLE FOR THE EXPENSE OF OVERTIME WORK
REQUIRED BY COUNTY EMPLOYEES. THIS EXPENSE INCLUDES BUT IS NOT
LIMITED TO COUNTY EMPLOYEES' PERFORMING INSPECTIONS OUTSIDE NORMAL
WORKING HOURS AS WELL AS EMPLOYEES BEING CALLED TO THE JOB SITE
OUTSIDE NORMAL WORKING HOURS TO RESOLVE PROBLEMS DIRECTLY
RELATED TO THIS CONTRACT. NORMAL WORKING HOURS ARE DEFINED AS 8:30
A.M. TO 5:00 P.M. MONDAY THROUGH FRIDAY, EXCLUDING COUNTY HOLIDAYS.
THE OWNER RESERVES THE RIGHT TO SCHEDULE THE CONTRACTOR TO WORK
OUTSIDE NORMAL WORKING HOURS IN THE INTEREST OF PUBLIC SAFETY OR
CONVENIENCE. NO CLAIM FOR ADDITIONAL COMPENSATION SHALL BE MADE
BY THE CONTRACTOR WHEN SUCH OCCASIONS OCCUR.
ARTICLE 43. DEDUCTIONS FOR UNCORRECTED WORK. IF THE OWNER DEEMS
IT INEXPEDIENT TO CORRECT WORK DAMAGED OR NOT DONE IN ACCORDANCE
WITH THE CONTRACT, AN EQUITABLE DEDUCTION FROM THE CONTRACT PRICE
SHALL BE MADE THEREFOR.
ARTICLE 44. LIQUIDATED DAMAGES FOR DELAY AND EXTENSION OF THE
TIME. IF THE CONTRACTOR SHALL FAIL TO COMPLETE THE WORK OR ANY PART
THEREOF WITHIN THE TIME STIPULATED IN THESE SPECIFICATIONS AND IN THE
CONTRACT AGREEMENT, OR AN APPLICABLE EXTENSION THEREOF, IT WILL BE
DIFFICULT OR IMPOSSIBLE TO ASCERTAIN THE ACTUAL DAMAGES FOR THE
DELAY, AND IN LIEU THEREOF, THE CONTRACTOR SHALL PAY TO THE OWNER AS
FIXED AND AGREED, LIQUIDATED DAMAGES FOR EACH CALENDAR DAY OF
DELAY UNTIL THE DELAYED WORK IS CORRECTED OR ACCEPTED, AN AMOUNT
EQUAL TO THE CONTRACT PRICE DIVIDED BY THE TOTAL NUMBER OF DAYS
UNTIL FINAL COMPLETION PER DAY OF DELAY. THE CONTRACTOR AND OWNER
AGREE THAT THIS SUM IS PROPORTIONATE TO THE PROBABLE LOSS AND IS NOT
A PENALTY. THE CONTRACTOR EXPRESSLY WAIVES ANY DEFENSE AS TO THE
VALIDITY OF ANY LIQUIDATED DAMAGES STATED IN THESE CONTRACT
DOCUMENTS AS THEY MAY APPEAR ON THE GROUNDS THAT SUCH LIQUIDATED
DAMAGES ARE VOID AS PENALTIES OR ARE NOT REASONABLY RELATED TO
ACTUAL DAMAGES. IF, AFTER THE EXPIRATION OF THE TIME STIPULATED IN
THESE CONTRACT DOCUMENTS AND IN THE CONTRACT AGREEMENT, OR
APPLICABLE EXTENSION THEREOF, THE OWNER TERMINATES THE RIGHT OF THE
CONTRACTOR TO PROCEED AND DOES NOT ELECT TO COMPLETE THE WORK,
LIQUIDATED DAMAGES SHALL BE PAID AS ABOVE PROVIDED FOR EACH
CALENDAR DAY AFTER THE TIME SO STIPULATED, UNTIL THE EFFECTIVE DATE
OF THE TERMINATION OF THE CONTRACTOR'S RIGHT TO PROCEED. IF THE
OWNER TERMINATES THE CONTRACTOR'S RIGHT TO PROCEED AND ELECTS TO
COMPLETE THE WORK AS PROVIDED ELSEWHERE IN THE SPECIFICATIONS,
LIQUIDATED DAMAGES SHALL BE PAID AS PROVIDED FOR EACH CALENDAR DAY
AFTER THE TIME SO STIPULATED, OR APPLICABLE EXTENSION THEREOF, UNTIL
THE DELAYED WORK IS COMPLETED, PROVIDED THE OWNER EXERCISES DUE
DILIGENCE IN COMPLETING THE WORK. THE CONTRACTOR AND HIS SURETIES
SHALL BE LIABLE FOR ALL SUCH LIQUIDATED DAMAGES OCCURRING
HERETOFORE DESCRIBED. IT IS AGREED, HOWEVER, THE CONTRACTOR SHALL
NOT BE CHARGED WITH LIQUIDATED DAMAGES OR ACTUAL DAMAGES FOR
DELAYS DUE TO CAUSES BEYOND HIS CONTROL AND WITHOUT HIS FAULT OR
NEGLIGENCE, INCLUDING BUT NOT RESTRICTED TO: ACTS OF THE OWNER OR OF
HIS EMPLOYEES, OR OF ANY OTHER CONTRACTOR EMPLOYED BY THE OWNER;
CHANGES ORDERED IN THE WORK; STRIKES; LOCKOUTS; FIRE; UNUSUAL DELAY
IN TRANSPORTATION; UNAVOIDABLE CASUALTIES; DELAY AUTHORIZED BY
OWNER PENDING LITIGATION AS PROVIDED BY ARTICLE 59.
NO SUCH EXTENSION SHALL BE MADE FOR DELAY OCCURRING MORE THAN
SEVEN (7) DAYS BEFORE CLAIM IS MADE IN WRITING TO THE OWNER. IN THE
CASE OF A CONTINUING CAUSE OF DELAY ONLY ONE CLAIM IS NECESSARY.
IF NO SCHEDULE OR AGREEMENT STATING THE DATES UPON WHICH DRAWINGS
SHALL BE FURNISHED IS MADE, THEN NO CLAIM FOR DELAY SHALL BE
ALLOWED ON ACCOUNT OF FAILURE TO FURNISH DRAWINGS UNTIL TEN (10)
DAYS AFTER RECEIPT BY THE ENGINEER OF A WRITTEN DEMAND FOR SUCH
DRAWINGS.
ARTICLE 45. DAMAGES. ANY CLAIM FOR DAMAGE ARISING UNDER THIS
CONTRACT SHALL BE MADE IN WRITING TO THE PARTY LIABLE WITHIN FIFTEEN
(15) DAYS TIME OF THE FIRST OBSERVANCE OF SUCH DAMAGE AND NOT LATER
THAN THE TIME OF FINAL PAYMENT EXCEPT AS EXPRESSLY STIPULATED
OTHERWISE IN GUARANTEE OF WORK AS IN THE CASE OF THE DEFECTIVE WORK
OR MATERIALS, AND SHALL BE ADJUSTED BY AGREEMENT OR LITIGATION AS
PROVIDED BY ARTICLE 59.
ARTICLE 46. LIENS. NEITHER THE FINAL PAYMENT NOR ANY PART OF THE
RETAINED PERCENTAGE SHALL BECOME DUE UNTIL THE CONTRACTOR, IF
REQUIRED, SHALL DELIVER TO THE OWNER A COMPLETE RELEASE OF ALL LIENS
ARISING OUT OF THIS CONTRACT, OR RECEIPTS IN FULL IN LIEU THEREOF, AND IF
REQUIRED IN EITHER CASE AN AFFIDAVIT THAT SO FAR AS HE HAS KNOWLEDGE
OR INFORMATION THE RELEASES AND RECEIPTS INCLUDE ALL THE LABOR AND
MATERIAL FOR WHICH A LIEN COULD BE FILED; BUT THE CONTRACTOR MAY IF
ANY SUBCONTRACTOR REFUSES TO FURNISH A RELEASE OR RECEIPT IN FULL,
FURNISH A BOND SATISFACTORY TO THE OWNER TO INDEMNIFY THE OWNER
AGAINST ANY LIEN. IF ANY LIEN REMAINS UNSATISFIED AFTER ALL PAYMENTS
ARE MADE, THE CONTRACTOR SHALL REFUND TO THE OWNER ALL MONIES
THAT THE LATTER MAY BE COMPELLED TO PAY IN DISCHARGING SUCH A LIEN,
INCLUDING ALL COST AND A REASONABLE ATTORNEY'S FEE.
ARTICLE 47. PAYMENTS WITHHELD. THE OWNER MAY WITHHOLD OR, ON
ACCOUNT OF SUBSEQUENTLY DISCOVERED EVIDENCE, NULLIFY THE WHOLE OR
PART OF ANY PAYMENT TO SUCH EXTENT AS MAY BE NECESSARY TO PROTECT
HIMSELF FROM LOSS ON ACCOUNT OF:
(A) DEFECTIVE WORK NOT REMEDIED
(B) CLAIMS OR LIENS THAT HAVE BEEN FILED OR EVIDENCE
INDICATING THAT THERE IS REASONABLE CAUSE TO BELIEVE SUCH
MAY BE FILED
(C) FAILURE OF THE CONTRACTOR TO PAY FOR LABOR OR MATERIALS,
OR TO MAKE PAYMENTS PROPERLY TO SUBCONTRACTORS
(D) A REASONABLE DOUBT THAT THE CONTRACT CAN BE COMPLETED
FOR THE BALANCE THEN UNPAID
(E) DAMAGE TO ANOTHER CONTRACTOR
(F) THE OWNER HAVING BEEN REQUIRED TO CORRECT DEFECTIVE
WORK, COMPLETE ANY WORK, PERFORM EMERGENCY WORK, OR
PERFORM OTHER WORK
(G) UNSATISFACTORY PROSECUTION OF THE WORK, INCLUDING
FAILURE TO FURNISH ACCEPTABLE SUBMITTALS, FAILURE TO
MAKE ADEQUATE PROGRESS TOWARDS COMPLETING THE WORK
WITHIN THE CONTRACT TIME OR FAILURE TO MAINTAIN THE WORK
SITE AT ALL TIMES IN A NEAT, ORDERLY, AND WORKMAN-LIKE
APPEARANCE.
(H) FAILURE TO KEEP NEAT, ACCURATE, AND COMPLETE SET OF "AS-
BUILTS" UPDATED ON A DAILY BASIS.
(I) FAILURE TO SUBMIT A DAILY PERFORMANCE RECORD IN SUITABLE
FORMAT.
WHEN THE ABOVE GROUNDS ARE REMOVED, PAYMENT SHALL BE MADE FOR
AMOUNTS WITHHELD BECAUSE OF THEM.
ARTICLE 48. THE OWNER'S RIGHT TO DO WORK. IF THE CONTRACTOR
SHOULD FAIL TO PROSECUTE THE WORK OR FAITHFULLY PERFORM ANY
PROVISIONS OF THIS CONTRACT, IT SHALL BE CONSTRUED AS GROUNDS FOR THE
OWNER'S RIGHT TO PERFORM WORK. THE OWNER, HAVING DULY SERVED
WRITTEN NOTICE TO THE CONTRACTOR OF HIS INTENT TO PERFORM WORK, MAY
REMEDY SUCH DEFICIENCIES AFTER THREE (3) DAYS FROM DELIVERY OF SAID
NOTICE TO THE CONTRACTOR. THE COSTS INCURRED BY THE OWNER IN
CORRECTING THE DEFICIENCY SHALL BE PAID FOR BY THE CONTRACTOR.
ARTICLE 49. THE OWNER'S RIGHT TO TERMINATE CONTRACT. IF THE
CONTRACTOR SHOULD BE ADJUDGED BANKRUPT, OR IF HE SHOULD MAKE A
GENERAL ASSIGNMENT FOR THE BENEFIT OF HIS CREDITORS, OR A RECEIVER
SHOULD BE APPOINTED ON ACCOUNT OF HIS INSOLVENCY, OR IF HE SHOULD
PERSISTENTLY OR REPEATEDLY REFUSE OR SHOULD FAIL, EXCEPT IN CASES FOR
WHICH EXTENSION OF TIME IS PROVIDED, TO SUPPLY ENOUGH PROPERLY
SKILLED WORKMEN OR PROPER MATERIALS, OR IF HE SHOULD FAIL TO MAKE
PROMPT PAYMENT TO SUBCONTRACTORS OR FOR MATERIALS OR LABOR OR
PERSISTENTLY DISREGARD LAWS, ORDINANCES, OR THE INSTRUCTIONS OF THE
OWNER, OR OTHERWISE BE GUILTY OF A VIOLATION OF ANY PROVISION OF THE
CONTRACT, THEN THE OWNER, UPON THE CERTIFICATE OF THE ENGINEER THAT
CAUSE EXISTS TO JUSTIFY SUCH ACTIONS, MAY, WITHOUT PREJUDICE TO ANY
OTHER RIGHT OF REMEDY AND AFTER GIVING THE CONTRACTOR SEVEN (7)
DAYS WRITTEN NOTICE, TERMINATE THE EMPLOYMENT OF THE CONTRACTOR
AND TAKE POSSESSION OF THE PREMISES AND ALL OF THE MATERIALS, TOOLS,
AND EQUIPMENT THEREON AND FINISH THE WORK BY WHATEVER METHOD HE
MAY DEEM EXPEDIENT. IN SUCH CASE THE CONTRACTOR SHALL NOT BE
ENTITLED TO RECEIVE ANY FURTHER PAYMENT UNTIL THE WORK IS FINISHED.
IF THE UNPAID BALANCE OF THE CONTRACT PRICE SHALL EXCEED THE EXPENSE
OF FINISHING THE WORK INCLUDING COMPENSATION FOR ADDITIONAL
MANAGERIAL AND ADMINISTRATIVE SERVICES, SUCH EXCESS SHALL BE PAID TO
THE CONTRACTOR. IF SUCH EXPENSE SHALL EXCEED SUCH UNPAID BALANCE
THE CONTRACTOR SHALL PAY THE DIFFERENCE TO THE OWNER. THE EXPENSE
INCURRED BY THE OWNER AS HEREIN PROVIDED, AND THE DAMAGE INCURRED
THROUGH THE CONTRACTOR'S DEFAULT, SHALL BE CERTIFIED BY THE
ENGINEER.
ARTICLE 50. CONTRACTOR'S RIGHT TO STOP WORK OR TERMINATE
CONTRACT. IF THE WORK SHOULD BE STOPPED UNDER AN ORDER OF ANY
COURT, OR OTHER PUBLIC AUTHORITY, FOR A PERIOD OF NINETY (90) DAYS,
THROUGH NO ACT OR FAULT OF THE CONTRACTOR OR OF ANYONE EMPLOYED
BY HIM, OR IF THE ENGINEER SHOULD FAIL TO ISSUE ANY ESTIMATE FOR
PAYMENT WITHIN THIRTY (30) DAYS AFTER IT IS DUE, OR IF THE OWNER SHOULD
FAIL TO PAY THE CONTRACTOR WITHIN THIRTY (30) DAYS OF ITS MATURITY
AND PRESENTATION, ANY SUM CERTIFIED BY THE ENGINEER OR AWARDED BY
ARBITRATORS; THEN THE CONTRACTOR MAY, UPON SEVEN (7) DAYS WRITTEN
NOTICE TO THE OWNER AND THE ENGINEER, STOP WORK OR TERMINATE THIS
CONTRACT AND RECOVER FROM THE OWNER PAYMENT OF ALL WORK
EXECUTED AND ANY LOSS SUSTAINED UPON ANY PLANT OR MATERIAL AND
REASONABLE PROFIT AND DAMAGES.
ARTICLE 51. REMOVAL OF MATERIALS AND EQUIPMENT. IN THE CASE OF
ANNULMENT OF THIS CONTRACT BEFORE COMPLETION FROM ANY CAUSE
WHATEVER OR IN THE CASE OF ACCEPTANCE OF THE WORK AFTER
COMPLETION, THE CONTRACTOR WHEN NOTIFIED BY THE OWNER IN WRITING,
SHALL WITHIN FIVE (5) DAYS AFTER RECEIPT OF NOTIFICATION REMOVE ALL OR
ANY PORTION AS DIRECTED OF HIS EQUIPMENT AND MATERIALS FROM THE
PROPERTY OF THE OWNER. SHOULD THE CONTRACTOR BE UNABLE OR
UNWILLING TO COMPLY WITH THE OWNER'S REQUEST, THEN THE OWNER
RESERVES THE RIGHT TO REMOVE AND/OR STORE SUCH EQUIPMENT AND
MATERIALS AT THE CONTRACTOR'S EXPENSE.
ARTICLE 52. ASSIGNMENT. NEITHER PARTY TO THE CONTRACT SHALL ASSIGN
THE CONTRACT OR SUBLET IT AS A WHOLE WITHOUT THE WRITTEN CONSENT OF
THE OTHER, NOR SHALL THE CONTRACTOR ASSIGN ANY MONIES DUE OR TO
BECOME DUE TO HIM HEREUNDER, WITHOUT THE PREVIOUS WRITTEN CONSENT
OF THE OWNER. SUCH CONSENT SHALL NOT BE UNREASONABLY WITHHELD.
ARTICLE 53. RIGHTS OF VARIOUS INTEREST. WHEREVER WORK BEING DONE
BY THE OWNER'S FORCES OR OTHER CONTRACTORS IS CONTIGUOUS TO WORK
COVERED BY THIS CONTRACT, THE RESPECTIVE RIGHTS OF THE VARIOUS
INTERESTS INVOLVED SHALL BE ESTABLISHED BY THE OWNER, TO SECURE THE
COMPLETION OF THE VARIOUS PORTIONS OF THE WORK IN GENERAL HARMONY.
ARTICLE 54. SEPARATE CONTRACT. THE OWNER RESERVES THE RIGHT TO LET
OTHER CONTRACTS IN CONNECTION WITH THIS WORK. THE CONTRACTOR
SHALL AFFORD OTHER CONTRACTORS REASONABLE OPPORTUNITY FOR THE
INTRODUCTION AND STORAGE OF THEIR MATERIALS AND THE EXECUTION OF
THEIR WORK, AND SHALL PROPERLY CONNECT AND COORDINATE HIS WORK
WITH THEIRS.
IF ANY PART OF THE CONTRACTOR'S WORK DEPENDS FOR PROPER EXECUTION
OR RESULTS UPON THE WORK OF ANY OTHER CONTRACTOR, THE CONTRACTOR
SHALL INSPECT AND PROMPTLY REPORT TO THE OWNER ANY DEFECTS IN SUCH
WORK THAT RENDER IT UNSUITABLE FOR SUCH PROPER EXECUTION AND
RESULTS. HIS FAILURE SO TO INSPECT AND REPORT SHALL CONSTITUTE AN
ACCEPTANCE OF THE OTHER CONTRACTOR'S WORK, AS FIT AND PROPER FOR
THE RECEPTION OF HIS WORK, EXCEPT AS TO DEFECTS WHICH MAY DEVELOP IN
THE OTHER CONTRACTOR'S WORK AFTER THE EXECUTION OF HIS WORK.
TO INSURE THE PROPER EXECUTION OF HIS SUBSEQUENT WORK, THE
CONTRACTOR SHALL MEASURE WORK ALREADY IN PLACE AND SHALL AT ONCE
REPORT IN WRITING TO THE OWNER ANY DISCREPANCY BETWEEN THE
EXECUTED WORK AND THE DRAWINGS.
ARTICLE 55. SUBCONTRACTS. THE CONTRACTOR SHALL, WITHIN TEN (10) DAYS
AFTER THE SIGNATURE OF THE CONTRACT, NOTIFY THE OWNER IN WRITING OF
THE NAMES OF SUBCONTRACTORS PROPOSED FOR THE WORK AND SHALL NOT
EMPLOY ANY THAT THE OWNER MAY WITHIN TEN (10) DAYS AFTER RECEIPT OF
NOTIFICATION OBJECT TO AS INCOMPETENT OR UNFIT OR ANY THAT APPEAR ON
THE HUD AREA OFFICE CONSOLIDATED LIST OF DEBARRED, SUSPENDED, AND
INELIGIBLE CONTRACTORS.
THE CONTRACTOR AGREES THAT HE IS AS FULLY RESPONSIBLE TO THE OWNER
FOR THE ACTS AND OMISSIONS OF HIS SUBCONTRACTORS AND PERSONS EITHER
DIRECTLY OR INDIRECTLY EMPLOYED BY THEM AS HE IS FOR THE ACTS OR
OMISSIONS OF PERSONS DIRECTLY EMPLOYED BY HIM.
WITH THE EXCEPTION OF SUBCONTRACTS FOR LESS THAN $10,000 EACH, AND
SUBCONTRACTS WITH A MANUFACTURER OR A FABRICATOR, ANY AGREEMENT
BETWEEN THE CONTRACTOR AND ANY SUBCONTRACTOR SHALL REQUIRE OF
THE SUBCONTRACTOR A PAYMENT BOND WITH SURETY THEREON IN THE
AMOUNT OF ONE HUNDRED PERCENT (100%) OF THE WORK SUBLET TO THE
SUBCONTRACTOR, WHICH SHALL BE CONDITIONED UPON THE PAYMENT TO ALL
PERSONS WHO HAVE AND FULFILL, CONTRACTS WHICH ARE DIRECTLY WITH
THE SUBCONTRACTOR FOR PERFORMING LABOR AND/OR FURNISHING
MATERIALS IN THE PROSECUTION OF THE WORK PROVIDED FOR IN THE
SUBCONTRACT, AND TO PAY THOSE PERSONS WHO FURNISH LABOR AND/OR
MATERIALS AS AFORESAID. IN THE EVENT THE CONTRACTOR FAILS TO REQUIRE
SAID BOND, ANY PERSON WHO HAS AND FULFILLS A CONTRACT DIRECTLY WITH
SUCH SUBCONTRACTOR IN PERFORMING LABOR AND/OR FURNISHING
MATERIALS IN THE PROSECUTION OF THE WORK PROVIDED FOR IN THE
SUBCONTRACT SHALL HAVE A DIRECT RIGHT OF ACTION AGAINST THE
OBLIGORS AND SURETIES ON THE PAYMENT BOND REQUIRED OF THE
CONTRACTOR.
PAYMENTS TO SUBCONTRACTORS SHALL BE MADE IN ACCORDANCE WITH THE
TERMS OF VIRGINIA CODE SECTION 2.2-4354, WHICH ARE INCORPORATED HEREIN
BY REFERENCE.
NOTHING CONTAINED IN THE CONTRACT DOCUMENTS SHALL CREATE ANY
CONTRACTUAL RELATION BETWEEN ANY SUBCONTRACTOR AND THE OWNER.
ARTICLE 56. EMPLOYMENT DISCRIMINATION PROHIBITED. IN ACCORDANCE
WITH SECTION 2.2-4311 OF THE CODE OF VIRGINIA, EVERY CONTRACT FOR
GOODS OR SERVICES OVER $10,000 SHALL INCLUDE THE FOLLOWING PROVISIONS
DURING THE PERFORMANCE OF THIS CONTRACT.
(A) THE CONTRACTOR WILL NOT DISCRIMINATE AGAINST ANY EMPLOYEE OR
APPLICANT FOR EMPLOYMENT BECAUSE OF RACE, RELIGION, COLOR, SEX OR
NATIONAL ORIGIN EXCEPT WHERE RELIGION, SEX OR NATIONAL ORIGIN IS A
BONA FIDE OCCUPATIONAL QUALIFICATION REASONABLY NECESSARY TO
THE NORMAL OPERATION OF THE CONTRACTOR. THE CONTRACTOR AGREES
TO POST IN CONSPICUOUS PLACES, AVAILABLE TO EMPLOYEES AND
APPLICANTS FOR EMPLOYMENT, NOTICES SETTING FORTH THE PROVISIONS
OF THIS NON-DISCRIMINATION CLAUSE.
B) THE CONTRACTOR, IN ALL SOLICITATION OR ADVERTISEMENTS
FOR EMPLOYEES PLACED BY OR ON BEHALF OF THE CONTRACTOR,
WILL STATE THAT SUCH CONTRACTOR IS AN EQUAL OPPORTUNITY
EMPLOYER.
(C) NOTICES, ADVERTISEMENTS AND SOLICITATIONS PLACED IN
ACCORDANCE WITH FEDERAL LAW, RULE OR REGULATION SHALL
BE DEEMED SUFFICIENT FOR THE PURPOSE OF MEETING THE
REQUIREMENTS OF THIS SECTION.
THE CONTRACTOR WILL INCLUDE THE PROVISIONS OF THE FOREGOING
PARAGRAPHS A, B, AND C IN EVERY SUBCONTRACT OR PURCHASE ORDER OF
OVER $10,000 SO THAT THE PROVISIONS WILL BE BINDING UPON EACH
SUBCONTRACTOR OR VENDOR.
FURTHER, ALL INDIVIDUALS OR FIRMS CONTRACTING WITH ISLE OF WIGHT
COUNTY ARE ENCOURAGED TO USE MINORITY BUSINESS ENTERPRISES AS
SUBCONTRACTORS AND SUPPLIERS TO THE FULLEST EXTENT POSSIBLE IN
PROVIDING SERVICES OR PRODUCTS TO ISLE OF WIGHT COUNTY.
ARTICLE 57. DRUG FREE WORKPLACE. DURING THE PERFORMANCE OF THIS
CONTRACT, THE CONTRACTOR AGREES TO (I) PROVIDE A DRUG-FREE
WORKPLACE FOR THE CONTRACTOR’S EMPLOYEES; (II) POST IN CONSPICUOUS
PLACES, AVAILABLE TO EMPLOYEES AND APPLICANTS FOR EMPLOYMENT, A
STATEMENT NOTIFYING EMPLOYEES THAT THE UNLAWFUL MANUFACTURE,
SALE DISTRIBUTION, DISPENSATION, POSSESSION, OR USE OF CONTROLLED
SUBSTANCE OR MARIJUANA IS PROHIBITED IN THE CONTRACTOR’S WORKPLACE
AND SPECIFYING THE ACTIONS THAT WILL BE TAKEN AGAINST EMPLOYEES FOR
VIOLATIONS OF SUCH PROHIBITION; (III) STATE IN ALL SOLICITATIONS OR
ADVERTISEMENTS FOR EMPLOYEES PLACED BY OR ON BEHALF OF THE
CONTRACTOR THAT THE CONTRACTOR MAINTAINS A DRUG-FREE WORKPLACE;
AND (IV) INCLUDE THE PROVISIONS OF THE FOREGOING CLAUSES IN EVERY
SUBCONTRACT OR PURCHASE ORDER OF OVER TEN THOUSAND DOLLARS
($10,000), SO THAT THE PROVISIONS WILL BE BINDING UPON EACH
SUBCONTRACTOR OR VENDOR.
FOR THE PURPOSES OF THIS SECTION, “DRUG-FREE WORKPLACE” MEANS A SITE
FOR THE PERFORMANCE OF WORK DONE IN CONNECTION WITH A SPECIFIC
CONTRACT AWARDED TO A CONTRACTOR IN ACCORDANCE WITH THIS CHAPTER,
THE EMPLOYEES OF WHOM ARE PROHIBITED FROM ENGAGING IN THE
UNLAWFUL MANUFACTURE, SALE, DISTRIBUTION, DISPENSATION, POSSESSION
OR USE OF ANY CONTROLLED SUBSTANCE OR MARIJUANA DURING THE
PERFORMANCE OF THE CONTRACT.
ARTICLE 58. INSURANCE. CONTRACTOR SHALL PURCHASE AND MAINTAIN
INSURANCE WITH THE LIMITS OF LIABILITY NOT LESS THAN THE FOLLOWING
AMOUNTS OR GREATER WHERE REQUIRED BY LAW:
(A) WORKMAN'S COMPENSATION INCLUDING EMPLOYER'S LIABILITY
INSURANCE COMPLYING WITH STATE REQUIREMENTS.
EMPLOYER'S LIABILITY INSURANCE SHALL BE PROVIDED WITH A
LIMIT OF NOT LESS THAN $500,000 PER OCCURRENCE.
(B) COMMERCIAL GENERAL LIABILITY INSURANCE INCLUDING:
PREMISES AND OPERATIONS; INDEPENDENT CONTRACTORS'
PROTECTION; PRODUCTS AND COMPLETED OPERATIONS; BROAD
FORM PROPERTY DAMAGE; AND ENDORSEMENTS TO THE
AGGREGATE LIMIT OF INSURANCE SPECIFYING AGGREGATE
APPLIES SEPARATELY TO EACH PROJECT AND EACH LOCATION.
THE GENERAL LIABILITY COVERAGE SHALL NAME THE OWNER
AND ENGINEER AS ADDITIONAL INSURED.
(1) LIMITS OF LIABILITY
AGGREGATE LIMITS:
$2,000,000 PRODUCTS/COMPLETED OPERATIONS
$2,000,000 GENERAL AGGREGATE
COVERAGE A:
BODILY INJURY AND PROPERTY DAMAGE $1,000,0000 ANY ONE
OCCURRENCE
FIRE DAMAGE LIMIT $50,000 ANY ONE FIRE
COVERAGE B:
PERSONAL & ADVERTISING INJURY
$1,000,000 ANY ONE PERSON OR ORGANIZATION
COVERAGE C:
MEDICAL EXPENSE LIMIT $5,000 ANY ONE PERSON
(C) COMPREHENSIVE AUTOMOBILE LIABILITY INSURANCE:
(1) COMBINED SINGLE LIMIT
(BODILY INJURY & PROPERTY DAMAGE) $1,000,000 EACH
OCCURRENCE
(D) CONTRACTUAL LIABILITY:
(1) BODILY INJURY $1,000,000 EACH OCCURRENCE
(2) PROPERTY DAMAGE $1,000,000 EACH OCCURRENCE
$ 2,000,000 ANNUAL AGGREGATE
(E) CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS ISLE OF
WIGHT COUNTY, THE ENGINEER, CONSULTANTS OF THE ENGINEER,
AND EMPLOYEES OR AGENTS OF ANY OF THEM FROM ANY AND
ALL LOSSES, DAMAGES, CLAIMS, FINES, PENALTIES, SUITS AND
COSTS, INCLUDING INJURY OR DEATH OF ANY PERSONS, OR
DAMAGE TO OR LOSS OF PROPERTY, AS WELL AS FINES,
ASSESSMENTS AND PENALTIES IMPOSED BY ANY AUTHORITY
WHICH ARISE OUT OF ANY VIOLATION OF LAW BY, AND ALL ACTS
AND OMISSION OF THE CONTRACTOR, THE CONTRACTOR'S AGENTS,
EMPLOYEES, OR CUSTOMERS, OCCURRING IN CONNECTION WITH
THE PRODUCTS AND SERVICES COVERED HEREIN.
(F) COMMERCIAL UMBRELLA (EXCESS) LIABILITY
(1) LIMIT OF LIABILITY
AGGREGATE LIMIT: $3,000,000 PRODUCTS AND
COMPLETED OPERATIONS
COVERAGE A: BODILY INJURY AND PROPERTY
DAMAGE
$3,000,000 ANY ONE OCCURRENCE
COVERAGE B: PERSONAL & ADVERTISING
INJURY
$3,000,000 ANY ONE PERSON OR
ORGANIZATION
RETAINED LIMIT: $10,000 ANY ONE OCCURRENCE OR OFFENSE
A CERTIFICATE EVIDENCING INSURANCE COVERAGE AS ABOVE SHALL BE
PROVIDED BY THE CONTRACTOR TO ISLE OF WIGHT COUNTY. THE COUNTY AND
ITS CONSULTING ENGINEERS SHALL BE NAMED AS ADDITIONAL INSURES UNDER
GENERAL LIABILITY COVERAGE; ENDORSEMENT OF SAME SHALL BE SUBMITTED
WITH THE CERTIFICATE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
KEEP SAID INSURANCE COVERAGE IN FULL FORCE AND EFFECT UNTIL FINAL
PAYMENT AND AT ALL TIMES THEREAFTER WHEN CONTRACTOR MAY BE
CORRECTING, REMOVING OR REPLACING DEFECTIVE WORK IN ACCORDANCE
WITH TERMS OF THIS AGREEMENT. SUCH CERTIFICATE SHALL PROVIDE THAT
THIRTY (30) DAYS ADVANCE WRITTEN NOTICE SHALL BE GIVEN TO THE COUNTY
IN THE EVENT OF ANY CHANGE IN, OR CANCELLATION OF SUCH INSURANCE.
ALL INSURANCE SHALL BE WRITTEN BY INSURANCE COMPANIES LICENSED TO
DO BUSINESS IN THE COMMONWEALTH OF VIRGINIA.
ARTICLE 59. PERFORMANCE BOND AND LABOR AND MATERIALS BOND. THE
SUCCESSFUL BIDDER WILL BE REQUIRED TO FURNISH A PERFORMANCE BOND
AND LABOR AND MATERIALS BOND PAYABLE TO THE TREASURER OF ISLE OF
WIGHT COUNTY, EACH IN THE AMOUNT OF ONE HUNDRED PERCENT (100%) OF
THE TOTAL AMOUNT OF THE CONTRACT, AS A GUARANTEE FOR THE FAITHFUL
PERFORMANCE THEREOF. SUCH BONDS MUST BE FURNISHED TO THE COUNTY
WITHIN TWENTY (20) DAYS AFTER REQUESTED BY THE COUNTY. THE
SUCCESSFUL BIDDER UPON FAILURE OR REFUSAL TO FURNISH THE REQUIRED
BONDS OR DEPOSIT WITHIN THE TIME SPECIFIED SHALL PAY TO ISLE OF WIGHT
COUNTY AS LIQUIDATED DAMAGES FOR SUCH FAILURE OR REFUSAL AN
AMOUNT EQUAL TO THE BID SECURITY DEPOSITED WITH BID.
ALL BONDS MUST BE FURNISHED BY SUCH SURETY COMPANY OR COMPANIES AS
ARE AUTHORIZED AND LICENSED TO TRANSACT BUSINESS IN THE
COMMONWEALTH OF VIRGINIA.
ARTICLE 60. CONTRACTUAL CLAIMS. CONTRACTUAL CLAIMS, WHETHER FOR
MONEY OR OTHER RELIEF, SHALL BE SUBMITTED IN WRITING NO LATER THAN
SIXTY (60) DAYS AFTER FINAL PAYMENT; HOWEVER, WRITTEN NOTICE OF THE
CONTRACTOR’S INTENTION TO FILE SUCH CLAIM SHALL HAVE BEEN GIVEN AT
THE TIME OF THE OCCURRENCE OR BEGINNING OF THE WORK UPON WHICH THE
CLAIM IS BASED. ANY NOTICE OR CLAIM SHALL BE DELIVERED TO EDDIE
WRIGHTSON, DIRECTOR OF GENERAL SERVICES, COUNTY OF ISLE OF WIGHT, P.O.
BOX 80, ISLE OF WIGHT, VIRGINIA 23397 AND SHALL INCLUDE A DESCRIPTION OF
THE FACTUAL BASIS FOR THE CLAIM AND A STATEMENT OF THE ACCOUNTS
CLAIMED OR OTHER RELIEF REQUESTED. THE DIRECTOR OF GENERAL SERVICES
SHALL RENDER A DECISION ON THE CLAIM AND SHALL NOTIFY THE
CONTRACTOR WITHIN THIRTY (30) DAYS OF RECEIPT OF THE CLAIM. THE
CONTRACTOR MAY APPEAL THE DECISION OF THE DIRECTOR OF PUBLIC
UTILITIES TO THE COUNTY ADMINISTRATOR BY PROVIDING WRITTEN NOTICE TO
THE DIRECTOR OF PUBLIC UTILITIES WITHIN FIFTEEN (15) DAYS OF THE DATE OF
THE DECISION. THE COUNTY ADMINISTRATOR SHALL RENDER A DECISION ON
THE CLAIM WITHIN SIXTY (60) DAYS OF THE DATE OF RECEIPT OF THE APPEAL
NOTICE AND SUCH DECISION SHALL BE FINAL UNLESS THE CONTRACTOR
APPEALS THE DECISION IN ACCORDANCE WITH THE VIRGINIA PUBLIC
PROCUREMENT ACT (VPPA). INVOICES FOR ALL SERVICES OR GOOD PROVIDED
BY THE CONTRACTOR SHALL BE DELIVERED TO THE COUNTY NO LATER THAN
TIRTY (30) DAYS FOLLOWING THE CONCLUSION OF THE WORK OR DELIVERY OF
THE GOODS.
ARTICLE 61. LITIGATION. IN ANY CLAIM OR DISPUTE BETWEEN THE PARTIES
TO THIS AGREEMENT, ARISING OUT OF OR RELATING TO THIS AGREEMENT OR
THE BREACH THEREOF, THE PARTIES CONSENT TO THE JURISDICTION AND SOLE
VENUE OF THE CIRCUIT COURT OF ISLE OF WIGHT COUNTY, VIRGINIA.
ACCEPTANCE OF FINAL PAYMENT SHALL BE DEEMED A WAIVER OF
CONTRACTOR'S RIGHT TO FILE CLAIM FOR DISPUTE OR BREACH RELATING TO
THIS AGREEMENT.
THE CONTRACTOR SHALL NOT CAUSE A DELAY OF WORK BECAUSE OF THE
PENDING LITIGATION PROCEEDINGS, EXCEPT WITH THE EXPRESS, WRITTEN
CONSENT OF THE OWNER OR WRITTEN INSTRUCTION FROM THE COURT.
ARTICLE 62. NON-APPROPRIATION. NOTWITHSTANDING ANYTHING
CONTAINED HEREIN TO THE CONTRARY, THIS CONTRACT SHALL BE
TERMINATED IF ALL OF THE FOLLOWING EVENT SHALL HAVE OCCURRED:
(A) FUNDS ARE NOT APPROPRIATED FOR A SUBSEQUENT FISCAL
PERIOD DURING THE TERM OF THIS CONTRACT FOR THE
ACQUISITION OF SUBSTANTIALLY THE SAME FUNCTIONS AS
PROVIDE FOR HEREIN, AND WRITTEN NOTICE THEREOF IS GIVEN TO
THE CONTRACTOR AT LEAST THIRTY (30) DAYS PRIOR TO THE FIRST
DAY OF SUCH SUBSEQUENT FISCAL PERIOD OR WITHIN FIVE (5)
DAYS OF THE APPROVAL OF THE FINAL BUDGET FOR SUCH FISCAL
YEAR, WHICHEVER OCCURS LATER.
(B) COUNTY HAS EXHAUSTED ALL FUNDS LEGALLY AVAILABLE FOR
PAYMENT UNDER THIS CONTRACT.
UPON SUCH TERMINATION, CONTRACTOR'S ONLY REMEDY SHALL BE TO
TERMINATE THE CONTRACT AT THE END OF THE FISCAL PERIOD DURING WHICH
NOTICE IS GIVEN; AND PAYMENT IN COMPLIANCE WITH THE CONTRACT FOR
MATERIALS, GOODS, AND SERVICES RENDERED THEREUNDER DURING THE
FISCAL YEAR AT THE END OF WHICH TERMINATION OCCURS, WITHOUT
PENALTY, TERMINATION, PROFIT OR OVERHEAD EXPENSES OF ANY KIND, SHALL
CONSTITUTE FULL PERFORMANCE ON THE PART OF THE OWNER.
ARTICLE 63. SEVERABILITY. IN THE EVENT THAT ANY PROVISION OR PORTION
THEREOF OF ANY CONTRACT DOCUMENT SHALL BE FOUND TO BE LEGALLY
INVALID OR UNENFORCEABLE, THEN SUCH PROVISION OR PORTION THEREOF,
SHALL BE REFORMED IN ACCORDANCE WITH APPLICABLE LAW. THE
INVALIDITY OR UNENFORCEABILITY OF ANY PROVISION OR PORTION OF ANY
CONTRACT DOCUMENT SHALL NOT AFFECT THE VALIDITY OR ENFORCEABILITY
OF ANY OTHER PROVISION OR PORTION OF THE CONTRACT DOCUMENTS.
ARTICLE 64. AGREEMENT CONSTRUED UNDER VIRGINIA LAWS. THE
AGREEMENT AND BOND GIVEN TO SECURE IT ARE TO BE EXECUTED AND
PERFORMED IN THE COMMONWEALTH OF VIRGINIA AND SHALL BE CONSTRUED
IN ACCORDANCE WITH THE LAWS OF THE COMMONWEALTH OF VIRGINIA.
END OF SECTION
CHANGE ORDER FORM
CHANGE NO:
DATE:
PROJECT: ___________________________________________________________________
CONTRACTOR: ______________________________________________________________
The following changes are hereby made to the CONTRACT DOCUMENTS (Use Additional
Sheets if Necessary):
Original Contract Date: .........................................................................................................
Original Contract Price: ....................................................................................................... $
Amount of Prior Change Orders: ........................................................................................ $
This Change Order: ............................................................................................................. $
Cumulative Change Orders: ................................................................................................ $
(% of original contract amount)
Revised Contract Amount: .................................................................................................. $
Reason For Change Order:
Original Contract completion date was:
The new completion date for all work is:
REQUIRED APPROVALS:
Submitted by: Contractor
Recommended by: Construction Administrator
Accepted by: Engineering Division
Funds Available: Finance Director
Procurement Requires _____________________ Purchasing Agent
Approved: _____________________ County Administrator
Any work done on this project prior to the execution of this change order by the County is done at
the contractor’s total risk and with no obligation on the part of the Isle of Wight County to pay for
the work.
Technical Specifications
TABLE OF CONTENTS
Tab Content
1 SWPPP TITLE SHEET
2 TABLE OF CONTENTS
3 REQUIRED SWPPP COMPONENTS
4 NARRATIVE
5 DELEGATION OF AUTHORITY
6 IDENTIFICATION OF QUALIFIED PERSONNEL
7 ENVIRONMENTAL COMPLIANCE PLAN AND OTHER INCORPORATED PLANS
8 POLLUTION PREVENTION PLAN INFORMATION
9 TMDL INFORMATION
10 SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
11 PUBLIC NOTICE, AVAILABILITY AND IMPLEMENTATION OF THE SWPPP
12 SWPPP INSPECTIONS
13 CORRECTIVE ACTIONS
14 SWPPP TERMINATION
15 REGISTRATION STATEMENT FOR THE PROJECT
16 NOTICE OF COVERAGE FOR THE PROJECT
17 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM
CONSTRUCTION ACTIVITIES
18 NOTICE OF TERMINATION FOR GENERAL VPDES PERMIT FOR DISCHARGES
OF STORMWATER FROM CONSTRUCTION ACTIVITIES FORM
19 GCP TRANSFER AGREEMENT FORM
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) for
ISLE OF WIGHT COUNTY INDUSTRIAL DEVELOPMENT AUTHORITY
SHIRLEY T. HOLLAND INTERMODAL PARK – PHASE II
DITCH RESTORATION
Located in
Isle of Wight County, Virginia
Developed in compliance with:
General VPDES Permit for Discharges of Stormwater from Construction Activities (9VAC25-880)
DELEGATED AUTHORITY
Name: _________________________________
Title: _________________________________
Company: _________________________________
Phone #: _________________________________
Fax #: _________________________________
E-mail: _________________________________
I certify the individual or position named above has the delegated authority to sign inspection reports
and/or amend or modify this SWPPP.
“I certify under penalty of law that I have read and understand this document and that this document and all
attachments were prepared in accordance with a system designed to assure that qualified personnel properly
gathered and evaluated the information submitted. Based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the information, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine and imprisonment for
knowing violations.”
OPERATOR
Signature: Date: ________________
Name:
Title:
SECTION 3
REQUIRED SWPPP COMPONENTS
In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities,
the SWPPP must include the following information:
1. General Information
a. A signed copy of the registration statement for coverage under the GCP;
b. Upon receipt, a copy of the notice of coverage under the GCP (i.e., notice
of coverage letter);
c. Upon receipt, a copy of the GCP;
d. A narrative description of the nature of the construction activity, including
the function of the project (e.g., low density residential, shopping mall,
highway, etc.);
e. A legible site plan identifying:
1) Directions of stormwater flow and approximate slopes anticipated after
major grading activities;
2) Limits of land disturbance including steep slopes and natural buffers
around surface waters that will not be disturbed;
3) Locations of major structural and nonstructural control measures
including sediment basins and traps, perimeter dikes, sediment
barriers, and other measures intended to filter, settle, or similarly treat
sediment that will be installed between disturbed areas and the
undisturbed vegetated areas, in order to increase sediment removal
and maximize stormwater infiltration;
4) Locations of surface waters;
5) Locations where concentrated stormwater is discharged;
6) Locations of support activities, when applicable and when required by
the VSMP authority, including but not limited to: (i) areas where
equipment and vehicle washing, wheel wash water, and other wash
water is to occur; (ii) storage areas for chemicals such as acids, fuels,
fertilizers and other lawn care chemicals; (iii) concrete wash out areas;
(iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities,
including those temporarily placed on the construction site; and (vi)
construction waste storage; and
7) When applicable, the location of the on-site rain gauge, or the methodology
established in consultation with the VSMP authority, used to identify
measurable storm events for inspection purposes.
2. An Erosion and Sediment Control (ESC) Plan developed and approved in accordance
with Chapter 8 of this manual.
3. A Stormwater Management (SWM) Plan developed and approved in accordance with
Chapter 9 of this manual.
4. A Pollution Prevention Plan (PPP).
5. Information demonstrating compliance with the Total Maximum Daily Load (TMDL)
Requirements.
6. Qualified personnel responsible for conducting on-site and off-site inspections
required by the GCP shall be identified by the Operator in the SWPPP. The Operator
is responsible for insuring that the qualified personnel conduct inspections.
7. The SWPPP must identify individuals or positions with delegated authority to sign
inspection reports and/or amend or modify the SWPPP.
8. The SWPPP shall be signed and dated in accordance with the signatory requirements.
9. The SWPPP must contain documentation of all amendments, modifications, and
updates.
10. The SWPPP must include documentation of inspections conducted in accordance
with the inspection requirements.
11. The SWPPP must contain documentation of corrective actions taken in accordance
with the requirements.
SECTION 4
NARRATIVE
In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the
SWPPP must include a narrative description of the nature of the construction activity, including the function of the
project (e.g., low density residential, shopping mall, highway, etc.).
Shirley t. Holland Intermodal Park – Phase II is located in Isle of Wight County, Virginia, northwest of the
intersection of Old Mill Road (State Route 607) and William A. Gwaltney Way. The Isle of Wight County
Industrial Development Authority is continuing the development of the Shirley T. Holland Intermodal Park - Phase
II. As part of ongoing maintenance of the property, the County must maintain the existing drainage ditches to
ensure proper drainage of the site. Maintenance shall include dredging of sediment deposits within the ditches and
removal of vegetation (trees and shrubs) which would impede the flow. Periodic maintenance shall be provided in
accordance with this plan. Land disturbance will be approximately 12 acres.
SECTION 5
REVISIONS TO DELEGATION OF AUTHORITY
In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the
individuals or positions with delegated authority to sign inspection reports and/or amend this SWPPP must be
identified. If the individual or position identified on the Title Sheet of the SWPPP changes or additional individuals
or positions are given this responsibility after the preconstruction meeting occurs, the changes/additions must be
noted below.
Print Name: _____________________________________________
Title: _____________________________________________
Company: _____________________________________________
Phone #: _____________________________________________
I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend
or modify this SWPPP.
Operator
Signature: ___________________________ Date: ____________
Print Name: _____________________________________________
Title: _____________________________________________
Company: _____________________________________________
Phone #: _____________________________________________
I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend
or modify this SWPPP.
Operator
Signature: ___________________________ Date: ____________
Print Name: _____________________________________________
Title: _____________________________________________
Company: _____________________________________________
Phone #: _____________________________________________
I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend
or modify this SWPPP.
Operator
Signature: ___________________________ Date: ____________
Print Name: _____________________________________________
Title: _____________________________________________
Company: _____________________________________________
Phone #: _____________________________________________
I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend
or modify this SWPPP.
Operator
Signature: ___________________________ Date: ____________
SECTION 6
IDENTIFICATION OF QUALIFIED PERSONNEL
In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the
individuals responsible for conducting on-site and off-site inspections must be identified. If the identified individual
changes or additional individuals are given this responsibility after the preconstruction meeting occurs, the
changes/additions must be noted below.
Print Name: _____________________________________________
Company: _____________________________________________
Address: _____________________________________________
Phone #: _____________________________________________
Qualifications: Responsible Land Disturber # ________________
Certified ESC Inspector # ___________________
Certified SWM Inspector # ___________________
Licensed Professional (P.E., L.S., etc.)
Other: _________________________
Print Name: _____________________________________________
Company: _____________________________________________
Address: _____________________________________________
Phone #: _____________________________________________
Qualifications: Responsible Land Disturber # ________________
Certified ESC Inspector # ___________________
Certified SWM Inspector # ___________________
Licensed Professional (P.E., L.S., etc.)
Other: _________________________
Print Name: _____________________________________________
Company: _____________________________________________
Address: _____________________________________________
Phone #: _____________________________________________
Qualifications: Responsible Land Disturber # ________________
Certified ESC Inspector # ___________________
Certified SWM Inspector # ___________________
Licensed Professional (P.E., L.S., etc.)
Other: _________________________
Print Name: _____________________________________________
Company: _____________________________________________
Address: _____________________________________________
Phone #: _____________________________________________
Qualifications: Responsible Land Disturber # ________________
Certified ESC Inspector # ___________________
Certified SWM Inspector # ___________________
Licensed Professional (P.E., L.S., etc.)
Other: _________________________
SECTION 7
EROSION AND SEDIMENT CONTROL PLAN, STORMWATER MANAGEMENT PLAN, POLLUTION
PREVENTION PLAN, AND TMDLS
Erosion and Sediment Control Plan
The preconstruction meeting was held on: __________________
An Erosion and Sediment Control (ESC) Plan was developed and approved as authorized by the Virginia Erosion
and Sediment Control Regulations (9VAC25-840). When properly implemented, the approved ESC plan has been
determined to adequately address the following effluent limit guidelines:
1. Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion;
2. Controls stormwater discharges, including peak flow rates and total stormwater volume, to minimize
erosion at outlets and to minimize downstream channel and stream bank erosion;
3. Minimizes the amount of soil exposed during the construction activity;
4. Minimizes the disturbance of steep slopes;
5. Minimizes sediment discharges from the site in a manner that addresses (i) the amount, frequency,
intensity, and duration of precipitation, (ii)the nature of resulting stormwater runoff, and (iii) soil
characteristics, including the range of soil particle sizes present on the site;
6. Provides and maintains natural buffers around surface waters, directs stormwater to vegetated areas to
increase sediment removal, and maximized infiltration, unless infeasible;
7. Minimizes soil compaction and, unless infeasible, preserves topsoil;
8. Ensures that stabilization of disturbed areas will be initiated immediately whenever any clearing,
grading, or excavating, or other land-disturbing activities have permanently ceased on any portion of
the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14
days;
9. Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or
wet storage water surface elevation), unless infeasible, when discharging from sediment basins or
sediment traps.
The following individual(s) will implement and maintain the control measures identified in the ESC plan (if
other than the Operator or Delegated Authority):
Name(s): ____________________________________
Company: ____________________________________
Stormwater Management Plan
A Stormwater Management Plan (SWM) plan was developed as a required component of the ECP and was approved
as authorized by the Virginia Stormwater Management Program Regulations (9VAC25-870).
The following individual(s) will implement and maintain the control measures identified in the SWM plan (if
other than the Operator or Delegated Authority):
Name(s): ____________________________________
Company: ____________________________________
Pollution Prevention Plan
The individuals responsible for implementing and maintaining the control measures identified in the Pollution
Prevention Plan are listed in the Appendix.
Total Maximum Daily Load (TMDL) Requirements
All projects requiring coverage under the GCP are subject to the following requirements associated with discharges
to impaired waters, surface waters with an applicable TMDL wasteload allocation established and approved prior to
the term of this GCP, or exceptional waters:
1. Identify the impaired water(s), approved TMDL(s), pollutants of concern, and exceptional waters identified
in 9VAC25-260-30.A.3.c, when applicable;
2. Provide clear direction that:
a. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after
final grade is reached on any portion of the site;
b. Nutrients shall be applied in accordance with manufacturer’s recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
c. A modified inspection schedule shall be implemented in accordance with Part I B.4 or Part I B.5.
These requirements are addressed on the Pollution Prevention Plan sheet of the ECP and in Tab 9 of the SWPPP
Binder.
The following individual(s) will implement and maintain these control measures (if other than the Operator or
Delegated Authority):
Name(s): ____________________________________
Company: ____________________________________
Other Incorporated Plans
Plans from other projects have not been used or incorporated into this design.
Off-site areas of land disturbance activities associated with this project must have such locations noted below and
approved prior to use.
Additional off-site areas to be used during construction:
Location Plan Title Approval
Date Purpose
SECTION 8
POLLUTION PREVENTION PLAN INFORMATION
In accordance with Part II A.4 of the General VPDES Permit for Discharges of Stormwater from
Construction Activities:
1. Identify potential pollutant-generating activities and pollutants expected to be
exposed to stormwater;
2. Describe the location where the potential pollutant generating activity will occur;
3. Identify all authorized non-stormwater discharges that are or will be comingled
with stormwater discharges from the construction activity, including any
applicable support activity;
4. Identify the person responsible for implementing the pollution prevention
practice(s) for each pollutant generating activity, if other than the person listed as
the qualified personnel;
5. Describe pollution prevention procedures and practices that will be implemented
to:
a. Prevent and respond to leaks, spills and other releases including (i)
procedures for expeditiously stopping, containing, and cleaning up spills,
leaks and other releases; and (ii) procedures for reporting leaks, spills, and
other releases;
b. Prevent the discharge of spilled or leaked fuels and chemicals from vehicle
fueling and maintenance activities (e.g., providing secondary containment
such as spill berms, decks, spill containment pallets, providing cover where
appropriate, and having spill kits readily available);
c. Prevent the discharge of soaps, detergents, solvents, and wash water from
construction materials, including the cleanup of stucco, paint, form release
oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or
temporary roofs) to prevent contact with stormwater; (ii) collection and
proper disposal in a manner to contact with stormwater; and (iii) a similarly
effective means designed to prevent discharge of these pollutants;
d. Minimize the discharge of pollutants from equipment and vehicle washing,
wheel wash water, and other types of washing (e.g., locating activities away
from surface waters and stormwater inlets or conveyance and directing wash
waters to sediment basins/traps, using filtration devices such as filter bags or
sand filters or using similarly effective controls);
e. Direct concrete wash water into a leak-proof container or leak-proof settling
basin. The container or basin must be designed so that no overflows can
occur due to inadequate sizing or precipitation. Hardened concrete wastes
must be removed and disposed of in a manner consistent with the handling of
other construction wastes. Liquid concrete wastes must be removed and
disposed of in a manner consistent with the handling of other construction
wash waters and shall not be discharged to surface waters;
f. Minimize the discharge of pollutants from storage, handling, and disposal of
construction products, materials, and wastes, including (i) building products
such as asphalt sealants, copper flashing, roofing materials, adhesives,
concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and
landscape materials; and (iii) construction and domestic wastes such as
packaging materials, scrap construction materials, masonry products, timber,
pipe and electrical cuttings, plastics, styrofoam, concrete, and other trash or
building materials;
g. Prevent discharges of fuels, oils, and other petroleum products, hazardous or
toxic waste, and sanitary wastes; and
h. Address any other discharges from potential pollutant generating activity not
addressed above.
6. Describe procedures for providing pollution prevention awareness of all
applicable wastes, including any wash water, disposal practices, and applicable
disposal locations of such wastes, to personnel in order to comply with the
conditions of the GCP.
The information required in Items 1, 2, and 4 can be found in Table 8.1 of this section of the SWPPP.
The information required in Item 3 can be found in Table 8.2 of this section of the SWPPP.
Table 8.1 – Pollutant-Generating Activities, Potential Pollutants and Responsible Parties
Pollutant
Generating
Activity
Check if
Present
Potential Pollutants
Responsible
Party
(if other than the person(s)
identified as the qualified
personnel) Se
d
i
m
e
n
t
Nu
t
r
i
e
n
t
s
,
F
e
r
t
i
l
i
z
e
r
He
a
v
y
M
e
t
a
l
s
pH
(
a
c
i
d
s
a
n
d
b
a
s
e
s
)
Pe
s
t
i
c
i
d
e
s
o
r
H
e
r
b
i
c
i
d
e
s
Oi
l
o
r
G
r
e
a
s
e
Ba
c
t
e
r
i
a
o
r
V
i
r
u
s
e
s
Tr
a
s
h
,
D
e
b
r
i
s
o
r
S
o
l
i
d
s
To
x
i
c
C
h
e
m
i
c
a
l
s
Pa
i
n
t
s
o
r
P
l
a
s
t
e
r
Ad
h
e
s
i
v
e
s
,
s
o
l
v
e
n
t
s
o
r
c
u
r
i
n
g
c
o
m
p
o
u
n
d
s
As
p
h
a
l
t
o
r
C
o
n
c
r
e
t
e
Ve
h
i
c
l
e
o
r
he
a
v
y
e
q
u
i
p
m
e
n
t
w
a
s
h
w
a
t
e
r
Ga
s
o
l
i
n
e
,
d
i
e
s
e
l
o
r
k
e
r
o
s
e
n
e
Wo
o
d
p
r
e
s
e
r
v
a
t
i
v
e
s
An
t
i
f
r
e
e
z
e
o
r
c
o
o
l
a
n
t
Clearing, grading or
excavating
Paving operations
Concrete washout and
concrete waste
disposal
Structure
construction, stucco,
painting or cleaning
Dewatering operations
Material delivery and
storage
Material use during
building process
Pollutant
Generating
Activity
Check if
Present
Potential Pollutants
Responsible
Party
(if other than the person(s)
identified as the qualified
personnel) Se
d
i
m
e
n
t
Nu
t
r
i
e
n
t
s
,
F
e
r
t
i
l
i
z
e
r
He
a
v
y
M
e
t
a
l
s
pH
(
a
c
i
d
s
a
n
d
b
a
s
e
s
)
Pe
s
t
i
c
i
d
e
s
o
r
H
e
r
b
i
c
i
d
e
s
Oi
l
o
r
G
r
e
a
s
e
Ba
c
t
e
r
i
a
o
r
V
i
r
u
s
e
s
Tr
a
s
h
,
D
e
b
r
i
s
o
r
S
o
l
i
d
s
To
x
i
c
C
h
e
m
i
c
a
l
s
Pa
i
n
t
s
o
r
P
l
a
s
t
e
r
Ad
h
e
s
i
v
e
s
,
s
o
l
v
e
n
t
s
o
r
c
u
r
i
n
g
c
o
m
p
o
u
n
d
s
As
p
h
a
l
t
o
r
C
o
n
c
r
e
t
e
Ve
h
i
c
l
e
o
r
he
a
v
y
e
q
u
i
p
m
e
n
t
w
a
s
h
w
a
t
e
r
Ga
s
o
l
i
n
e
,
d
i
e
s
e
l
o
r
k
e
r
o
s
e
n
e
Wo
o
d
p
r
e
s
e
r
v
a
t
i
v
e
s
An
t
i
f
r
e
e
z
e
o
r
c
o
o
l
a
n
t
Solid waste disposal
Sanitary waste
disposal
Landscaping
operations
Vehicle Fueling or
Maintenance
Other (describe)
Other (describe)
Other (describe)
Table 8.2 – Authorized Non-stormwater Discharges Anticipated from the Construction Activity or Support Activities
Authorized Non-stormwater Discharges
Anticipated from the Construction
Activity or support Activities
(check if applicable)
Discharges from firefighting activities
Fire hydrant flushings
Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has
been filtered, settled, or similarly treated prior to discharge
Water used to control dust that has been filtered, settled, or similarly treated prior to discharge
Potable water sources, including uncontaminated waterline flushings
Routine external building wash down where soaps, solvents, or detergents have not been used and the wash water has been
filtered, settled, or similarly treated prior to discharge
Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurrs (or where all spilled or leaked
material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash
water has been filtered, settled, or similarly treated prior to discharge
Uncontaminated air conditioning or compressor condensate
Uncontaminated ground water or spring water
Foundation or footing drains where flows are not contaminated with process materials such as solvents
Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or
similarly treated prior to discharge
Landscape irrigation
SECTION 9
TOTAL MAXIMUM DAILY LOAD INFORMATION
In accordance with Part II A.5 of the General VPDES Permit for Discharges of Stormwater from Construction Activities, the SWPPP must note the following:
1. The impaired water(s), approved TMDL(s) and pollutants of concern are identified in Tables 9.1 and 9.2 below.
2. The Responsible Land Disturber shall understand that:
a. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site;
b. Nutrients shall be applied in accordance with manufacturer’s recommendations or an approved nutrient management plan and shall not be applied
during rainfall events; and
c. Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later
than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between
business days, the inspection shall be conducted on the next business day.
Table 9.1 – Identification of the Impaired Waters the Project Discharges Into
Waterbody Location / Length Pollutant of Concern
Cohoon Creek Begins at the confluence with Cohoon Creek and continues downstream until the confluence with
Lake Mead.
Lake Prince Begins at the confluence with Lake Prince and continues downstream until the confluence with
Western Branch Reservoir.
Table 9.2 – Identification of the Surface Waters with Applicable TMDL Wasteload Allocations the Project Discharges Into
Waterbody Pollutants of Concern
Does the project
discharge to the
waterbody?
Chesapeake Bay
Phosphorus
Nitrogen
Sediment
YES
SECTION 10
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
In accordance with Part II B of the General VPDES Permit for Discharges of Stormwater from
Construction Activities:
1. The operator or their designee shall amend the SWPPP whenever there is a
change in the design, construction, operation, or maintenance that has a
significant effect on the discharge of pollutants to surface waters and that has
not been previously addressed in the SWPPP.
2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified
personnel, or by local, state, or federal officials, it is determined that the existing control measures are
ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the
SWPPP shall include additional or modified control measures designed and implemented to correct
problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary
for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days
following approval. Implementation of these additional of modified control measures must be
accomplished as described in Section 13.
3. The SWPPP must clearly identify the contractor(s) that will implement and
maintain each control measure identified in the SWPPP. The SWPPP shall be
amended to identify any new contractor that will implement and maintain a
control measure.
4. The operator or their designee shall update the SWPPP no later than seven
days following any modification to its implementation. All modifications or
updates to the SWPPP shall be noted and shall include the following items;
a. A record of dates when:
(1) Major grading activities occur;
(2) Construction activities temporarily or permanently cease on a portion
of the site; and
(3) Stabilization measures are initiated.
b. Documentation of replaced or modified controls where periodic
inspections or other information have indicated that the controls have
been used inappropriately or incorrectly and where modified as soon as
possible;
c. Areas that have reached final stabilization and where no further SWPPP
inspection requirements apply;
d. All properties that are no longer under the legal control of the operator and
the dates on which the operator no longer had legal control over each
property;
e. The date of any prohibited discharges, the discharge volume released,
and what actions were taken to minimize the impact of the release;
f. Measures taken to prevent the reoccurrence of any prohibited discharge;
and
g. Measures taken to address any evidence identified as a result of an
inspection.
5. All amendments, modifications, or updates to the SWPPP shall be signed by the Operator or their
designee.
The following Amendment, Modification, and Update Log form must be used to document all
amendments, modification, and updates.
SWPPP AMENDMENT, MODIFICATION AND UPDATE LOG
Date Description of Amendment, Modification or Update
_________ ________________________________
Responsible Party
_______________________________________
"I certify under penalty of law that I have read and understand this
document and that this document and all attachments were prepared
in accordance with a system designed to assure that qualified
personnel properly gathered and evaluated the information submitted.
Based on my inquiry of the person or persons who manage the system,
or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties
for submitting false information, including the possibility of fine and
imprisonment for knowing violations."
______________________________________________________
Operator or Delegated Authority Signature
SECTION 11
PUBLIC NOTICE, AVAILABLITY AND IMPLEMENTATION OF THE SWPPP
In accordance with Part II C of the General VPDES Permit for Discharges of Stormwater from
Construction Activities:
Upon commencement of land disturbance, the operator shall post conspicuously a copy of the
notice of coverage letter near the main entrance of the construction activity. For linear projects,
the operator shall post the notice of coverage letter at a publically accessible location near an
active part of the construction project. The operator shall maintain the posted information until
termination of general permit coverage.
In accordance with Part II D of the General VPDES Permit for Discharges of Stormwater from
Construction Activities:
Operators with day-to-day operational control over SWPPP
implementation shall have a copy of the SWPPP available at a central
location on-site for use by those identified as having responsibilities under
the SWPPP whenever they are on the construction site.
The operator shall make the SWPPP and all amendments, modifications,
and updates available upon request to the department, the VSMP
authority, the EPA, the VESCP authority, local government officials, or the
operator of a municipal separate storm sewer system receiving discharges
from the construction activity. If an on-site location is unavailable to store
the SWPPP when no personnel are present, notice of the SWPPP's
location must be posted near the main entrance of the construction site.
The operator shall make the SWPPP available for public review in an
electronic format or in hard copy. Information for public access to the
SWPPP shall be posted and maintained in accordance with Part II C. If
not provided electronically, public access to the SWPPP may be arranged
upon request at a time and at a publicly accessible location convenient to
the operator or his designee but shall be no less than once per month and
shall be during normal business hours. Information not required to be
contained within the SWPPP by this general permit is not required to be
released.
In accordance with Part II E of the General VPDES Permit for Discharges of Stormwater from
Construction Activities:
The operator shall implement the SWPPP and subsequent amendments,
modifications, and updates from commencement of land disturbance until
termination of general permit coverage.
All control measures must be properly maintained in effective operating
condition in accordance with good engineering practices and, where
applicable, manufacturer specifications. If a site inspection identifies a
control measure that is not operating effectively, corrective action(s) shall
be completed as soon as practicable, but no later than seven days after
discovery or a longer period as established by the VSMP authority, to
maintain the continued effectiveness of the control measures.
If site inspections identify an existing control measure that needs to be
modified or if an additional control measure is necessary for any reason,
implementation shall be completed prior to the next anticipated
measurable storm event. If implementation prior to the next anticipated
measurable storm event is impracticable, then alternative control
measures shall be implemented as soon as practicable, but no later than
seven days after discovery or a longer period as established by the VSMP
authority.
SECTION 12
SWPPP INSPECTIONS
In accordance with Part I B.4.d and Part II F of the General VPDES Permit for Discharges of Stormwater
from Construction Activities:
1. Personnel responsible for on-site and off-site inspections. Inspections
required by this general permit shall be conducted by the qualified
personnel identified by the operator in the SWPPP. The operator is
responsible for insuring that the qualified personnel conduct the
inspection.
2. The applicable SWPPP inspection requirements specified in Part II F 2
shall be amended as follows:
a. Inspections shall be conducted at a frequency of (i) at least once every
four business days or (ii) at least once every five business days and no
later than 48 hours following a measurable storm event. In the event
that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted on
the next business day, and
b. Representative inspections used by utility line installation, pipeline
construction, or other similar linear construction activities shall inspect
all outfalls discharging to surface waters identified as impaired or for
which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit.
3. Inspection requirements.
a. As part of the inspection, the qualified personnel shall:
(1) Record the date and time of the inspection and when applicable
the date and rainfall amount of the last measurable storm event;
(2) Record the information and a description of any discharges
occurring at the time of the inspection;
(3) Record any land-disturbing activities that have occurred outside of
the approved erosion and sediment control plan;
(4) Inspect the following for installation in accordance with the
approved erosion and sediment control plan, identification of any
maintenance needs, and evaluation of effectiveness in minimizing
sediment discharge, including whether the control has been
inappropriately or incorrectly used:
(a) All perimeter erosion and sediment controls, such as silt fence;
(b) Soil stockpiles, when applicable, and borrow areas for
stabilization or sediment trapping measures;
(c) Completed earthen structures, such as dams, dikes, ditches,
and diversions for stabilization;
(d) Cut and fill slopes;
(e) Sediment basins and traps, sediment barriers, and other
measures installed to control sediment discharge from
stormwater;
(f) Temporary or permanent channel, flume, or other slope drain
structures installed to convey concentrated runoff down cut
and fill slopes;
(g) Storm inlets that have been made operational to ensure that
sediment laden stormwater does not enter without first being
filtered or similarly treated; and
(h) Construction vehicle access routes that intersect or access
paved roads for minimizing sediment tracking;
(5) Inspect areas that have reached final grade or that will remain
dormant for more than 14 days for initiation of stabilization
activities;
(6) Inspect areas that have reached final grade or that will remain
dormant for more than 14 days for completion of stabilization
activities within seven days of reaching grade or stopping work;
(7) Inspect for evidence that the approved erosion and sediment
control plan, "agreement in lieu of a plan," or erosion and
sediment control plan prepared in accordance with department-
approved annual standards and specifications has not been
properly implemented. This includes but is not limited to:
(a) Concentrated flows of stormwater in conveyances such as
rills, rivulets or channels that have not been filtered, settled, or
similarly treated prior to discharge , or evidence thereof;
(b) Sediment laden or turbid flows of stormwater that have not
been filtered or settled to remove sediments prior to discharge;
(c) Sediment deposition in areas that drain to unprotected
stormwater inlets or catch basins that discharge to surface
waters. Inlets and catch basins with failing sediments controls
due to improper installation, lack of maintenance, or
inadequate design are considered unprotected;
(d) Sediment deposition on any property (including public and
private streets) outside of the construction activity covered by
this general permit;
(e) Required stabilization has not been initiated or completed on
portions of the site;
(f) Sediment basins without adequate wet or dry storage volume
or sediment basins that allow the discharge of stormwater
from below the surface of the wet storage portion of the basin;
(g) Sediment traps without adequate wet or dry storage or
sediment traps that allow the discharge of stormwater from
below the surface of the wet storage portion of the trap; and
(h) Land disturbance outside of the approved area to be
disturbed;
(8)Inspect pollutant generating activities identified in the pollution
prevention plan for the proper implementation, maintenance and
effectiveness of the procedures and practices;
(9)Identify any pollutant generating activities not identified in the
pollution prevention plan; and
(10)Identify and document the presence of any evidence of the
discharge of pollutants prohibited by this general permit.
4. Inspection report. Each inspection report shall include the following
items:
a. The date and time of the inspection and when applicable, the date
and rainfall amount of the last measurable storm event;
b. Summarized findings of the inspection;
c. The location(s) of prohibited discharges;
d. The location(s) of control measures that require maintenance;
e. The location(s) of control measures that failed to operate as
designed or proved inadequate or inappropriate for a particular
location;
f. The location(s) where any evidence identified under Part II F 3 a (7)
exists;
g. The location(s) where any additional control measure is needed
that did not exist at the time of inspection;
h. A list of corrective actions required (including any changes to the
SWPPP that are necessary ) as a result of the inspection or to
maintain permit compliance;
i. Documentation of any corrective actions required from a previous
inspection that have not been implemented; and
j. The date and signature of the qualified personnel and the operator
or its duly authorized representative.
The inspection report and any actions taken in accordance with Part II
must be retained by the operator as part of the SWPPP for at least three
years from the date that general permit coverage expires or is terminated.
The inspection report shall identify any incidents of noncompliance. Where
an inspection report does not identify any incidents of noncompliance, the
report shall contain a certification that the construction activity is in
compliance with the SWPPP and this general permit. The report shall be
signed in accordance with Part III K of this general permit.
VSMP INSPECTION REPORT
Project:
GCP Number:
Notice of Coverage posted? YES NO SWPPP available for review? YES NO
Inspection
Date/Time Inspection Conducted By
(must be the Qualified Personnel identified in the SWPPP)
Date of Last
Measureable
Storm Event
Rainfall
Amount Not applicable since inspection frequency is at least once every four business days
Record the information and a description
of any discharges occurring at the time of
the inspection
Record any land-disturbing activities that
have occurred outside the approved
erosion and sediment control plan
Inspection requirements:
Have controls
been installed in
accordance with
the approved
ECP?
Are controls
effectively
minimizing
sediment
discharges?
Have controls
been
inappropriately
or incorrectly
used?
Describe any maintenance needs or other deficiencies that
were identified and the location of the deficiencies
All perimeter erosion and sediment controls
(silt fence, etc.) YES NO YES NO YES NO
Soil stockpiles and borrow areas (for
stabilization or sediment trapping measures) YES NO YES NO YES NO
Completed earthen structures, such as dams,
dikes, ditches, and diversions for stabilization YES NO YES NO YES NO
Cut and fill slopes YES NO YES NO YES NO
Sediment basins and traps, sediment barriers,
and other measures (installed to control
sediment discharges from stormwater)
YES NO YES NO YES NO
Temporary or permanent channels, flumes, or
other slope drain structures (installed to convey
concentrated runoff down cut and fill slopes)
YES NO YES NO YES NO
Storm inlets (to ensure that sediment laden
stormwater does not enter without first being
filtered or similarly treated)
YES NO YES NO YES NO
Construction entrances and access routes (for
minimizing mud/sediment tracking) YES NO YES NO YES NO
Have stabilization activities begun on areas that have reached final grade or that will remain dormant for more than 14 days? YES NO
Were stabilization activities completed within seven days of reaching final grade or stopping work on areas that have reached final grade or
that will remain dormant for more than 14 days? YES NO
Inspect for the presence of the following: Present? Location
Concentrated flows of stormwater in conveyances (such as rills, rivulets or
channels) that have not been filtered, settled, or similarly treated prior to
discharge, (or evidence thereof)
YES NO
Sediment laden runoff that has not been filtered or settled to remove sediments
prior to discharge YES NO
Sediment deposition in areas that drain to unprotected stormwater inlets or
catch basins that discharge to surface waters. YES NO
Inlets and catch basins with failing sediment controls due to improper
installation, lack of maintenance, or inadequate design YES NO
Sediment deposition on any property (including public and private streets)
outside of the construction activity covered by the general permit YES NO
Required stabilization (initiated or completed on portions of the site?) YES NO
Sediment basins/traps without adequate wet or dry storage volume YES NO
Sediment basins where the riser appears to be leaking, water appears to be
leaving the basin around the barrel pipe (rather than through it), or the
dewatering device appears to be dewatering basin from below the water surface
YES NO
Sediment traps that allow stormwater to discharge from below the surface of the
wet storage portion of the trap YES NO
Land disturbance outside of the approved limits of disturbance YES NO
Inspect the pollution prevention controls associated with the pollutant generating activities identified in the Pollution Prevention Plan
Inspect the pollution prevention controls associated with
the pollution generating activities identified in Table 8.1
of the SWPPP
Have the controls been
properly implemented as
outlined on the PPP
sheet?
Are controls effectively
minimizing pollutant
discharges?
Describe any maintenance needs or other
deficiencies that were identified and the location of
the deficiencies
Clearing, grading or excavating N/A YES NO YES NO
Paving operations N/A YES NO YES NO
Concrete washout and concrete waste
disposal N/A YES NO YES NO
Structure construction, stucco, painting or
cleaning N/A YES NO YES NO
Dewatering operations N/A YES NO YES NO
Material delivery and storage N/A YES NO YES NO
Material use during building process N/A YES NO YES NO
Solid waste disposal N/A YES NO YES NO
Sanitary waste disposal (porta-johns) N/A YES NO YES NO
Landscaping operations N/A YES NO YES NO
Vehicle Fueling or Maintenance N/A YES NO YES NO
Other (describe) YES NO YES NO
Other (describe) YES NO YES NO
Other (describe) YES NO YES NO
Other (describe) YES NO YES NO
Other (describe) YES NO YES NO
Identify the material(s) and document the location or presence of
any evidence of pollutant discharges that are not authorized by the
general permit
Identify the location(s) where any additional control measures are
needed that did not exist at the time of the inspection
List the corrective actions required (including any changes to the
SWPPP that are necessary) as a result of the inspection or to
maintain permit compliance
Document any corrective action(s) required from a previous
inspection that have not been implemented
“I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to
assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”
Signature: _____________________________ Date: ________________
Name: _____________________________ Title: ________________
(must be either the Operator or Delegated Authority, not necessarily the person who conducted the inspection)
I-103
SECTION 13
CORRECTIVE ACTIONS
In accordance with Part II F.4 of the General VPDES Permit for Discharges of Stormwater from Construction,
documentation of any corrective actions taken shall be retained by the operator as part of the SWPPP for at least
three years from the date that general permit coverage expires or is terminated.
In accordance with Part II G of the General VPDES Permit for Discharges of Stormwater from Construction
Activities
The operator shall implement the corrective action(s) identified as a result of an
inspection as soon as practicable but no later than seven days after discovery or
a longer period as approved by the VSMP authority. If approval of a corrective
action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the
department) is necessary, additional control measures shall be implemented to
minimize pollutants in stormwater discharges until such approvals can be
obtained.
The operator may be required to remove accumulated sediment deposits located
outside of the construction activity covered by this general permit as soon as
practicable in order to minimize environmental impacts. The operator shall notify
the VSMP authority and the department as well as obtain all applicable federal,
state, and local authorizations, approvals, and permits prior to the removal of
sediments accumulated in surface waters including wetlands.
I-104
CORRECTIVE ACTION LOG
Correction Action
Date Description of Corrective Action
_________ ________________________________
Responsible Party
_______________________________________
"I certify under penalty of law that I have read and understand this
document and that this document and all attachments were prepared
in accordance with a system designed to assure that qualified
personnel properly gathered and evaluated the information submitted.
Based on my inquiry of the person or persons who manage the system,
or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties
for submitting false information, including the possibility of fine and
imprisonment for knowing violations."
______________________________________________________
Operator or Delegated Authority Signature
I-105
SECTION 14
SWPPP TERMINATION
In accordance with Part I F of the General VPDES Permit for Discharges of Stormwater from Construction
Activities:
The operator of the construction activity shall submit a notice of termination in
accordance with 9VAC25-880-60 to the VSMP authority after one or more of the
following conditions have been met:
a. Necessary permanent control measures included in the SWPPP for the site
are in place and functioning effectively and final stabilization has been
achieved on all portions of the site for which the operator is responsible.
When applicable, long term responsibility and maintenance requirements
shall be recorded in the local land records prior to the submission of a notice
of termination;
b. Another operator has assumed control over all areas of the site that have
not been finally stabilized and obtained coverage for the ongoing discharge;
c. Coverage under an alternative VPDES or state permit has been obtained;
or
d. For residential construction only, temporary soil stabilization has been
completed and the residence has been transferred to the homeowner.
The notice of termination should be submitted no later than 30 days after one of
the above conditions in subdivision 1 of this subsection are met. Authorization to
discharge terminates at midnight on the date that the notice of termination is
submitted for the conditions set forth in subdivisions 1 b through 1 d of this
subsection. Termination of authorizations to discharge for the conditions set forth
in subdivision 1 a of this subsection shall be effective upon notification from the
department that the provisions of subdivision 1 a of this subsection have been
met or 60 days after submittal of the notice of termination, whichever occurs first.
The notice of termination shall be signed in accordance with Part III K of the
general permit.
I-106
PERMANENT STORMWATER MANAGEMENT FACILITIES INSTALLED
(information will need to reflect data requirements of online permitting system)
Stormwater
Management Facility
(Designation/Type)
N/A
Location Isle of Wight County
6th
Order
Hydrolo
gic Unit
Code
JL45 and JL46
Waterbody the SWM
Facility discharges to:
N/A
Drainage Area Served
_________________ acres
Impervious Area Served
_________________ acres
Managed Turf Area Served
_________________ acres
I-107
SECTION 15
CONSTRUCTION GENERAL PERMIT
REGISTRATION STATEMENT
I-108
SECTION 16
CONSTRUCTION GENERAL PERMIT
NOTICE OF COVERAGE
I-109
SECTION 17
GENERAL VPDES PERMIT FOR DISCHARGES OF
STORMWATER FROM CONSTRUCTION ACTIVITIES
I-110
SECTION 18
CONSTRUCTION GENERAL PERMIT
TERMINATION
I-111
SECTION 19
CONSTRUCTION GENERAL PERMIT
TRANSFER
I-112
POLLUTION PREVENTION PLAN
INTRODUCTION
This Stormwater Pollution Prevention Plan (SWPPP) has been developed as a requirement of the General VPDES
Permit for Discharges of Stormwater from Construction Activities (GCP), as defined in 9VAC25-880. The purpose
of this SWPPP is to:
1) Identify potential sources of pollution that may reasonably be expected to affect the quality of storm water
discharges from the construction site, and
2) To describe and ensure the implementation of practices that will be used to reduce pollutants in stormwater
discharges from the construction site and to assure compliance with the conditions of the Permit.
Implementation of the components of this SWPPP is required as a condition of the GCP.
The GCP has a fixed term of 5 years from the effective date of July 1, 2014 and permit coverage is required for all
VSMP land-disturbing activities.
The GCP authorizes the discharge of stormwater from construction activities until the expiration date. The GCP also
authorizes the discharge of stormwater from offsite support activities, provided that certain conditions are met as
outlined in Part I A. 2 of the GCP. Certain non-stormwater discharges are also authorized and are described in Part I
E of the GCP.
The SWPPP must be prepared, updated and amended, implemented as written, made available to
the public according to the requirements of the General Permit for Discharges of Stormwater
from Construction Activities (9VAC25-880).
I-113
PURPOSE
4VAC50-60-54 of the Virginia Stormwater Management Program (VSMP) Permit Regulations requires that
Stormwater Pollution Prevention Plan (SWPPP) be developed for all regulated land disturbing activities. The
SWPPP must include, but not be limited to, an approved erosion and sediment control plan, an approved stormwater
management plan, and this Pollution Prevention Plan (PPP) for regulated land disturbing activities, and a
description of any additional control measures necessary to address a TMDL as applicable.
The plan for implementing pollution prevention measures during construction activities developed on this sheet
must be implemented and updated as necessary. Any PPP requirements not included on this sheet must be
incorporated into the SWPPP required by 4VAC50-60-54 that must be developed before land disturbance
commences. This PPP identifies potential sources of pollutants that may reasonable be expected to affect the quality
stormwater discharges from the construction site (both on- and off-site activities) and describes control measures
that will be used to minimize pollutants in stormwater discharges from the construction site.
OTHER REFERENCED PLANS
SWPPP requirements may be fulfilled by incorporating, by reference, other plans. All plans incorporated by
reference become enforceable under the VSMP Permit Regulations and General Permit VAR10 for Discharges of
Stormwater from Construction Activities. If a plan incorporated by reference does not contain all of the required
elements of the PPP, the operator must develop the missing elements and include them in the SWPPP.
Independent Plans
Incorporated by Reference Date Approved
Stormwater Management Plans (Regional or Master) N/A
Spill Prevention, Control, and Countermeasure Plans N/A
Off-Site Stockpile N/A
Off-Site Borrow Area N/A
POTENTIAL POLLUTANT SOURCES
The following sources of potential pollutants must be addressed in the Pollution Prevention Plan. Various controls
and/or measures designed to prevent and/or minimize pollutants in stormwater discharges from the project site must
be applied to the sources found on the site. Additional information concerning the following controls and/or
measures may be found in the SWPPP. Deviations from the location criteria may be approved by the County
Environmental Inspector.
LEAKS, SPILLS, AND OTHER RELEASES
I-114
The operator(s) shall ensure procedures are in place to prevent and respond to all leaks, spills and other releases
of pollutants.
The operator(s) shall ensure all leaks, spills and other releases of pollutant are contained and cleaned
immediately upon discovery. Any contaminated materials are to be disposed in accordance with federal, state,
and/or local requirements.
The operator(s) shall ensure spill containment kits containing appropriate materials (e.g., absorbent material and
pads, brooms, gloves, sand, etc.) are available at appropriate locations, including, but not limited to: designated
areas for vehicle and equipment maintenance; vehicle and equipment fueling; storage and disposal of
construction materials, products, and waste; and storage and disposal of hazardous and toxic materials; and
sanitary waste facilities.
The locations of the spill containment kits are identified as described below:
Date Shown on Plan
Sheet #(s) Location
Approved
Plan N/A MOBILE
REVISIONS TO LOCATIONS
Date Shown on Plan
Sheet #(s) Location Operator(s)
Initials
The operator(s) shall notify the Department of Environmental Quality of leaks, spills, and other releases that
discharge to or have the potential to discharge to surface waters immediately upon discovery of the discharge
but in no case later than 24 after the discovery.
The operator(s) shall notify the Department of Environmental Quality (DEQ) of leaks, spills, and other releases
that discharge to or have the potential to discharge to surface waters immediately upon discovery of the
discharge but in no case later than 24 after the discovery. Written notice of the discharge must be sent to DEQ
and Hanover County Department of Public Works within five (5) days of the discovery.
VA Department of Environmental Quality
5636 Southern Boulevard
Virginia Beach, VA 22362
(757) 518-2000 (phone)
(757) 518-2009 (fax)
(800) 468-8892 (outside normal working hours)
Isle of Wight County
General Services Department
P. O. Box 80
Isle of Wight County, VA 23397
(757) 365-6388 (phone)
EQUIPMENT / VEHICLE WASHING
I-115
Washing must be conducted in a dedicated area that is located to maximize the distance from
storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those
features.
All wash water used in vehicle wheel washing must be directed to a sediment basin/trap.
All vehicle washing activities other than wheel washing must have secondary containment.
Each facility must have appropriate signage to inform users where the dedicated area(s) are
located.
Activity Location of
Dedicated Area(s)
Shown on
Plan Sheet
#(s)
Water Source
Location
Wheel Wash Construction Entrance C-3 Portable Tank
Other Wash Areas N/A
REVISIONS TO LOCATIONS
Activity Location of
Dedicated Area(s)
Shown on
Plan Sheet
#(s)
Water Source
Location
Operator’s
Initials
VEHICLE FUELING AND MAINTENANCE
Conduct regular maintenance in a dedicated area that is located to maximize the distance
from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from
those features.
If fueling is conducted at a dedicated area, the location must be located to maximize the
distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet
from those features.
The dedicated areas must be designed to eliminate the discharge of spilled and leaked
fuels and chemicals from vehicle fueling and maintenance activities by providing
secondary containment (spill berms, decks, spill containment pallets, providing cover
where appropriate, and having spill kits readily available).
Each facility must have appropriate signage to inform users where the dedicated area(s)
are located.
Date
Shown on
Plan Sheet
#(s)
Location of Dedicated Area(s)
Approved Plan N/A
I-116
REVISIONS TO LOCATIONS
Date
Shown on
Plan Sheet
#(s)
Location of Dedicated Area(s) Operator’s
Initials
If mobile fueling will be used, the fueling must be done in an area that located to
maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but
no less than 50 feet from those features.
Spill kits must be readily available at all mobile fueling locations.
On-site storage tanks must have a means of secondary containment (spill berms, decks,
spill containment pallets, etc.) and must be covered where appropriate.
All vehicles on site must be monitored for leaks and receive regular preventive
maintenance to reduce the chance of leakage.
DISCHARGE FROM STORAGE, HANDLING, AND DISPOSAL
OF CONSTRUCTION PRODUCTS, MATERIALS, AND WASTE
Storage of construction products, materials, and waste is to be conducted in dedicated areas.
The dedicated area must be located to maximize the distance from storm drain inlets, ditches, waterbodies
or wetlands but no less than 50 feet from those features. Separations of less than 50 feet may be approved
by the Environmental Inspector.
The dedicated areas must be designed to minimize the discharge of pollutants from storage, handling, and
disposal of construction products, materials and wastes including (i) building products such as asphalt
sealants, copper flashing, roofing materials, adhesives, concrete admixtures; (ii) pesticides, herbicides,
insecticides, fertilizers, and landscape materials; and (iii) construction and domestic wastes such as
packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings,
plastics, Styrofoam, concrete and other trash or building products..
Each facility must have appropriate signage to inform users where the dedicated area(s)
are located.
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for storage of construction products and
materials
Approved
Plan N/A
I-117
REVISIONS TO LOCATIONS
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for storage of construction
products and materials
Operator(s)
Initials
Follow all federal, state, and local requirements that apply to the use, handling and disposal of pesticides,
herbicides, and fertilizers.
Keep chemicals on-site in small quantities and in closed, well marked containers.
Ensure that containers have lids or are otherwise protected from exposure to precipitation.
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for waste from construction products and
materials
Approved
Plan N/A
REVISIONS TO LOCATIONS
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for waste from construction
products and materials
Operator(s)
Initials
Follow all federal, state, and local requirements that apply to the use, handling and disposal of pesticides,
herbicides, and fertilizers.
Clean up solid waste, including building materials, garbage, and debris on a daily basis and deposit into
covered dumpsters that are periodically emptied.
Schedule waste collection to prevent exceeding the capacity of onsite containers. Additional containers
may be necessary depending on the phase of construction (e.g., demolition, etc.)
Dispose of all solid waste at an authorized disposal site.
I-118
DISCHARGES FROM OTHER POTENTIAL POLLUTANT
SOURCES
Discharges from other pollutant sources (e.g., water line flushing, storm sewer flushing, above ground
storage tanks, etc.) not mentioned elsewhere must be addressed.
Other Potential Pollutant Sources Location(s) of Potential Pollutant Sources
Above ground oil storage tanks with a storage capacity exceeding 1,320 gallons and have a reasonable
expectation of a discharge into or upon Waters of the United States are required to have a Spill Prevention
Control and Countermeasure (SPCC) Plan.
The discharge of contaminated flush water and material removed during flushing operations must be
collected and disposed of in accordance with appropriate federal, state, and local requirements.
I-119
DISCHARGES FROM CONCRETE RELATED
WASH ACTIVITIES
Concrete trucks are not allowed to wash out or discharge surplus concrete or drum wash
water on site except in a dedicated area(s) that is located to prevent discharge to storm
drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.
Each facility must have a stabilized access to prevent mud tracking into the street.
Each facility must have appropriate signage to inform users where the dedicated area(s)
are located.
Date
Shown on
Plan Sheet
#(s)
Location of Dedicated Area(s)
Approved Plan N/A
REVISIONS TO LOCATIONS
Date
Shown on
Plan Sheet
#(s)
Location of Dedicated Area(s) Operator’s
Initials
Facilities must be cleaned, or new facilities constructed, once the washout area is two-
thirds (2/3) full.
I-120
I-121
I-122
CONCRETE WASHOUT AREA NOTES
The facility must be lined with 10 mil plastic lining that is free from holes, tears, or other defects that might
compromise the material’s impermeability.
The lining must be anchored with staples (2’ spacing) or sandbags.
Side slopes must be 1:1 (horizontal:vertical) or flatter.
Stone access must be provided between the street and the concrete washout area.
A “Concrete Washout” sign must be installed within 30 feet of the washout facility. The sign must be no
smaller than 2’ tall by 4’ wide.
DISCHARGES OF SOAPS, DETERGENTS, SOLVENTS, AND
WASH WATER FROM CONSTRUCTION ACTIVITIES SUCH
AS CLEANUP OF STUCCO, PAINT, FORM RELEASE OILS,
AND CURING COMPOUNDS
Washing activities associated with construction activities other than vehicle and equipment washing, such
as clean up of stucco, paint, form release oils, and curing compounds are to be conducted in a dedicated
area.
The dedicated area must be located to maximize the distance from storm drain inlets, ditches, waterbodies
or wetlands but no less than 50 feet from those features. Separations of less than 50 feet may be approved
by the Environmental Inspector.
The dedicated areas must be designed to prevent the discharge of soaps, detergents, solvents, and wash
water.
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s)
Approved
Plan N/A
REVISIONS TO LOCATIONS
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) Operator(s)
Initials
The dedicated area must be covered (e.g., plastic sheeting, temporary roof, etc.) to prevent contact with
stormwater.
I-123
The contaminated wastewater from the dedicated area must be collected for disposal by a waste hauler or
discharged to the sanitary sewer.
In situations where these pollutants are or could be generated at locations other than at the designated area
(e.g., concrete pours, building washing, etc.), cover (e.g., plastic sheeting, temporary roof, etc.) must be
provided to prevent contact with stormwater and the contaminated wastewater from the activity must be
collected for disposal by a waste hauler or discharged to the sanitary sewer.
DISCHARGES OF HAZARDOUS, TOXIC,
AND SANITARY WASTE
Storage and disposal of hazardous, toxic and sanitary wastes are to be conducted in dedicated areas.
The dedicated areas must be located to maximize the distance from storm drain inlets, ditches, waterbodies
or wetlands but no less than 50 feet from those features. Separations of less than 50 feet may be approved
by the Environmental Inspector.
The dedicated areas must be designed to prevent the discharge of hazardous, toxic and sanitary waste by
avoiding contact with precipitation
Each facility must have appropriate signage to inform users where the dedicated area(s)
are located.
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for storage and disposal of hazardous and toxic
wastes
Approved
Plan N/A
REVISIONS TO LOCATIONS
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for storage and disposal of
hazardous and toxic wastes
Operator(s)
Initials
Consult with local waste management authorities or private firms about the requirements for disposing of
hazardous materials and/or soils that may be contaminated with hazardous materials.
Never remove the original product label from the container. Follow the manufacturer’s recommended
method of disposal.
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for portable toilets
Approved
Plan C-3 Near Construction Entrance
I-124
REVISIONS TO LOCATIONS
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for portable toilets Operator(s)
Initials
Schedule periodic pumping of portable toilets and dispose of waste
Dispose of all solid waste at an authorized disposal site.
SWPPP MODIFICATIONS AND REVISIONS
The operator(s) shall ensure the SWPPP is modified and/or revised to reflect:
Changes in qualified personnel; delegated authorities or other personnel required as a condition of the General
Construction Permit;
Changes in site conditions;
Changes in the design, construction, operation, or maintenance of the construction site that affect the potential
for discharges of pollutants that are not addressed in the normal implementation of the plan; and
Ineffective control measures identified during inspections or investigations conducted by the operator’s
qualified personnel or local, state or federal officials.
Modifications/revisions to the SWPPP shall include additional or modified control measures to address the
identified deficiencies.
If the necessary modifications/revisions require approval by the Administrator or DEQ, the modifications/revisions
must be implemented no later than seven (7) calendar days following approval.
If the necessary modifications/revisions do not require approval by the Administrator, the modifications/revisions
must be implemented prior to the next anticipated storm event or as soon as practicable.
I-125
SWPPP UPDATES
The operator(s) shall update the SWPPP to include:
A record of dates when 1) major grading activities occur, 2) construction activities
temporarily or permanently cease on a portion of the site, and 3) stabilization measures are
initiated;
Documentation of modifications and revisions to the SWPPP;
Areas that have reached final stabilization where no further SWPPP or inspection
requirements apply;
All properties that are no longer under the legal control of the operator and the dates on
which the operator no longer had legal control over each property; and
The date, volume, and corrective/preventative actions implemented for any prohibited
discharge.
The operator(s) shall update the SWPPP no later than seven (7) days following any of the situations identified
above.
OPERATOR INSPECTIONS
The operator(s) identified below shall provide for inspections of the permitted land-disturbing activities by the
qualified personnel identified below. The inspections will be conducted (select one the following options):
at least once every four (4) business days; or
at least once every five (5) business days and no later than 48 hours following any measurable storm
event.
Where areas are in a stabilized condition or runoff is unlikely due to winter conditions, the inspection frequency may
be reduced to once every 30 days while these conditions exist. Otherwise, the operator(s) shall resume the regular
inspection frequency identified above.
The operator(s) shall provide for inspections of the permitted land-disturbing activity to ensure implementation and
continued maintenance of all requirements of the Stormwater Pollution Prevention Plan (Erosion and Sediment
Control Plan, Stormwater Management Plan, Pollution Prevention Plan, TMDL requirements, etc.).
Records of the required inspections must be maintained and included in the SWPPP binder. The qualified personnel
are encouraged to use the Operator Inspection form provided in the SWPPP binder to document the required
inspections. If inspections are conducted once every five (5) business days and no later than 48 hours following any
measureable storm event, the location of the rain gauge used to determine the amount of rain must be included in the
SWPPP and documented in the inspection report.
I-126
ACKNOWLEDGMENTS
QUALIFIED PERSONNEL ACKNOWLEDGEMENTS
I certify under penalty of law that I:
a. have been designated by the Operator to conduct inspections of the permitted site;
b. am knowledgeable in the principles and practices of erosion and sediment control and stormwater
management;
c. possess the skills to assess conditions at the permitted site for the Operator(s) that could impact
stormwater quality and quantity;
d. will assess the effectiveness of any erosion and sediment control measures or stormwater management
facilities selected to control the stormwater discharges from the permitted site; and
e. will conduct inspections in accordance with the frequency noted above in the OPERATOR
INSPECTIONS.
QUALIFIED PERSONNEL
Name (print)
Signature
Company or
Organization
Address
Phone
Certificates / #s
As the Operator(s), I/we understand that prior to initiating land disturbance, the potential pollutant sources,
appropriate control measures, and all responsible parties (operator, qualified inspection personnel, contractors, etc.)
required as a condition of the General Construction Permit (GCP) and the Stormwater Pollution Prevention Plan
(SWPPP) must be identified. I also understand this information must be updated as necessary throughout all phases
of construction until the GCP is terminated.
Furthermore,
I/we certify under penalty of law that I/we have read and understand all requirements of the SWPPP (erosion and
sediment control plan, stormwater management plan, pollution prevention plan, TMDL provisions, administrative
requirements, etc.) and GCP and that the information herein is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting false information, including
the possibility of fine or imprisonment for knowing violations.
I/we understand that I/we are ultimately responsible for compliance with all conditions and requirements of the
SWPPP and GCP and for ensuring all contractors and subcontractors on the permitted site are aware of the
conditions and requirements of the SWPPP and GCP.
I/we shall comply with all conditions and requirements of the SWPPP and shall at all times properly operate and
maintain all measures and control (and related appurtenances) which are installed or used to achieve compliance
I-127
with the conditions of the GCP. Proper operation and maintenance also includes adequate funding and adequate
staffing.
I/we shall take all reasonable steps to minimize or prevent any discharge in violation of the SWPPP and/or GCP.
I/we understand that if it determined by the Department of Environmental Quality (DEQ) in consultation with the
State Water Control Board at any time that stormwater discharges are causing, have reasonable potential to cause, or
contribute to and excursion above any applicable water quality standard, the DEQ may, in consultation with the
Administrator, take appropriate enforcement action and require:
a. Modification of control measures to adequately address water quality concerns;
b. Submission of valid and verifiable data and information that are representative of ambient conditions
and indicate that the receiving water is attaining water quality standards; or
c. Cessation of discharges of pollutants from construction activity and submit an individual permit
application according to 4VAC25-870-410.
OPERATOR(S)
Name (print) Signature Company or Organization Date
I-128
SECTION 02020
EROSION AND SEDIMENT CONTROL
PART 1 - GENERAL
1.1 INTENT
A. The Department of Conservation and Recreation (DCR) of the Commonwealth of
Virginia requires the preparation and implementation of a plan for the prevention of accelerated
soil erosion and sediment of the streams of the Commonwealth. Such plans are required for all
earth-moving activities and it is intended that this document, when used in conjunction with the
Erosion and Sediment Control plan, the Stormwater Pollution Prevention Plan (SWPPP) and the
Pollution Prevention Plan (PPP), will fulfill this requirement and prevent sediment.
B. It shall be the responsibility of the Contractor to implement this plan in the field and meet
all state and local regulations. The Contractor shall assign this responsibility to a “Responsible
Land Disturber” certified by the Commonwealth of Virginia. Modifications or deviations from
this plan will be allowed only if the Contractor first obtains written permission from the County
Erosion Control Administrator.
C. The Virginia Department of Environmental Quality (DEQ) requires a VSMP, of which
includes the SWPPP and the PPP.
D. The County has the right to require additional measures deemed necessary.
1.2 APPLICABLE STANDARDS
A. Virginia Erosion and Sediment Control Regulations, VR 625-02-00.
B. Virginia Erosion and Sediment Control Handbook, Third Edition, 1992 Virginia
Department of Conservation and Recreation, Division of Soil and Water Conservation.
1. Std. & Spec. 3.02, Temporary Construction Entrance
2. Std. & Spec. 3.03, Construction Road Stabilization
3. Std. & Spec. 3.08, Culvert Inlet Protection
4. Std. & Spec. 3.18, Outlet Protection
5. Std. & Spec. 3.05, Silt Fence (Standard and Wire-backed)
6. Std. & Spec. 3.31, Temporary Seeding
7. Std. & Spec. 3.32, Permanent Seeding
8. Std. & Spec. 3.35, Blankets and Matting
1.3 RELATED WORK
A. SECTION 02200 - EARTHWORK
PART 2 - PRODUCTS
I-129
2.1 GENERAL
A. All products and materials shall meet the requirements of the Virginia Erosion and
Sediment Control Handbook.
PART 3 - EXECUTION
3.1 PLANNING AND DESIGN FOR CONSTRUCTION
A. Construction of projects that involve land disturbance such as this project shall be
planned and designed with soil erosion and sediment control in mind. While erosion and sediment
controls are important on all sites, particular attention should be given to areas adjacent to
wetlands and highly erodible soils. Denuded areas shall be kept to a minimum and for the shortest
time practical.
B. Where practical, a schedule of earth-moving activities shall be included in the above.
C. Restoration work shall be accomplished as the project progresses and not be left until the
end of the project. No excavated ditch shall be left unprotected for more than a day without
temporary seeding and EC-2 matting. Other disturbed areas, such as stockpiles, shall be stabilized
in accordance with the seeding standards.
3.2 STOCKPILES
A. Stockpile areas shall also be maintained by on-site personnel. Stockpile design shall
incorporate erosion and sediment control facilities to prevent production and delivery of sediment
to waterways and damage to vegetation. Temporary or interim stabilization of soil stockpiles shall
be promptly instituted. Stockpiling in, or within 50 feet of, ditches or wetlands will not be
allowed. Silt fences, as shown on the plan, shall be installed around the stockpiles.
B. Temporary vegetative measures planned for implementation on stockpile areas shall be
established immediately after the stockpile operation is. Proper mulching and soil stabilization in
conjunction with seeding operations shall also be carried out.
3.3 EXCAVATION AND BACKFILL
A. Ditch excavation shall be closely controlled. The material removed from the ditch shall
be hauled immediately to the existing stockpiles. The adjacent ditch must be protected at all times
and the piling of soil in any ditch will not be allowed.
3.4 FINAL GRADING AND SEEDING
A. Final grading and seeding shall be performed as specified on the Drawings. Types and
quantities of seed mixtures shall be as specified in accordance with the specifications. Blankets
and matting shall be installed on all excavated ditch slopes.
B. After the maintenance work is complete, carefully remove all mats and reestablish
permanent vegetation on the areas that have been disturbed as rapidly as possible. If the
completion of the construction activities does not coincide with a season in which permanent
vegetation can be started an interim or temporary program is required. This shall include soil
stabilization, mulching, or the establishment of filter strips. In any case sediment and erosion
controls shall be installed promptly and their maintenance assured.
3.5 MAINTENANCE
I-130
A. Sediment and erosion control measures and facilities shall be maintained so that they will
individually and collectively perform the functions for which they were designed. Inspection shall
be made at intervals to detect any impairment in the ability of the erosion control facilities to
continue to function effectively, but no longer than 4 days apart. Responsibility for maintenance
shall be assigned to an individual who has access to equipment, material, and funds required to
sustain the maintenance schedule.
B. Maintenance shall be performed on control structures after each storm or rainfall event to
allow them to continue to perform the function for which they were designed.
C. Information shall be distributed to all persons on the construction site describing and
stressing the importance of the proper installation and maintenance of the erosion and sediment
control procedures included in this plan.
D. The approved erosion and sediment control plan and any other documents and plans
relating to VPDES/VSMP permits shall be available at the site of maintenance activity at all times.
E. The maintenance of the soil and erosion control measures shall continue throughout the
life of the project.
* * * * * END OF SECTION * * * * *
I-131
SECTION 02200
EARTHWORK
PART 1 GENERAL
1.1 The Contract Documents apply to this Section.
1.2 Related work specified elsewhere includes the following:
A. Section 02020 – Erosion and Sediment Control
1.3 Locate existing utilities, culverts and structures, above or below ground, before any excavation starts.
Protect, maintain in service, and prevent damage to utilities, culverts and structures. When such are
encountered and are not shown on drawings, or when locations differ from those shown on drawings, notify
Engineer for instructions before proceeding.
1.4 Grading excavation is unclassified and includes excavation to elevations indicated, regardless of character
of materials and obstructions encountered.
1.5 Unauthorized excavation consists of removal of materials beyond indicated subgrade elevations or side
dimensions. Without specific approval of Engineer, unauthorized excavation shall be replaced at
Contractor's expense.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 Preparation.
A. Cut trees where timber matting is shown. Do not grub stumps in the wetland area. Deposit trees
onsite as directed by Owner or Engineer.
B. Confirm culvert inverts, as shown on the plans. Notify engineer is the inverts are significantly
different from the plans.
3.2 Excavation.
A. Remove trees and roots from ditch banks.
B. Excavate to elevations shown.
C. Stockpile clean soil material.
D. Place unclean soil in a separate stockpile from the clean soil.
E. Trees, stumps and debris shall be removed from the site. Burning will not be allowed.
F. Excavate ditch to original cross-section. Ensure positive drainage.
3.3 Where unauthorized excavations have been carried below or beyond points required, restore these areas to
the elevations and dimensions shown on the drawings with granular fill or material approved by Engineer
and compact as specified. No payment will be made where unauthorized excavations have been made
below the required elevations.
I-132
3.4 Grading.
A. Uniformly grade all ditches within the limits of disturbance designated on the drawings. Finished
grades shall be of uniform slope between points where proposed elevations are shown.
B. Protect newly graded ditches from erosion. Repair and reestablish grade in settled, eroded, or
rilled areas to the specified elevations.
3.5 Finished Construction
A. Seed and install EC-2 matting on newly excavated ditches.
B. Remove all trash and debris from the site.
C. Remove remaining erosion control measures when authorized by the County to do so.
***END OF SECTION***
IFB # 16-1815-01
ADDENDUM 1
DEPARTMENT OF BUDGET AND FINANCE
Shirley T. Holland Intermodal Park – Phase II
Ditch Maintenance
Sealed bids subject to the conditions and instructions contained herein, will be received at the office of the Purchasing Agent listed below, until the
time and date shown below (local prevailing time), for furnishing the items or services described herein.
The Schedule of Unit Prices is added to Section A. It is required bidders include these prices with
their submittal.
Bid Due: 3:00 PM., August 12, 2015
Contract Officer:
Michael Coburn, Sr., Purchasing Agent, Michael.coburn@isleofwightus.net
** SECTION "A" AND ONE ELECTRONIC CD COPY IS REQUESTED AT SUBMITTAL**
In compliance with this invitation for bids, and subject to all the conditions thereof, the undersigned offers, if this bid is accepted within ninety (90)
calendar days from the date of the opening, to furnish any or all of the items and/or services upon which prices are quoted, at the price set opposite
each item, to be delivered at the time and place specified herein. The undersigned certifies he has read, understands, and agrees to all terms,
conditions, and requirements of this bid, and is authorized to contract on behalf of firm named below.
Company Name:
Address:
City / State / Zip:
Telephone: FAX No.:
E-mail:
Print Name: Title:
Signature: Date:
SCHEDULE OF UNIT PRICES
Project: Shirley T. Holland Intermodal Park, Phase II
Ditch Maintenance
IFB# 16-1815-01
Bid Submitted By:
Lump Sum Prices shall include the furnishing of labor, material, where specified, excavation, installation,
laying jointing, connecting, backfilling, testing and all incidental work called for in the Contract
Documents. In case of discrepancy, Unit Price will govern; if stated in words and figures, the price in words
shall govern.
Item No. Description Est. Quantity Unit Prices Total Price
Item 1 Mobilization LS $___________ $ ___________
Item 2 General Conditions LS $____________ $ ___________
Item 3 Excavation 11,000 CY $ ____________ $ ___________
Item 4 Construction Entrance LS $ ___________ $ ___________
Item 5 Construction Road Stabilization 375 Tons $ _____________ $ ___________
Item 6 Silt Fence (Std) 6,000LF $ _____________ $ ___________
Item 7 Silt Fence (Wire Back) 800LF $ _____________ $ ___________
Item 8 EC-2 Matting 7400 SY $ _____________ $ ___________
Item 9 Permanent Seeding 800 LBS $ _____________ $ ___________
Item 10 Outlet Protection 32 Tons $ _____________ $ ___________
Item 11 Culvert Inlet Protection 9 EA $ ______________ $ ___________
Item 12 Timber Logging Mats LS $ ______________ $ ___________
Item 13 18” HDPE 60 LF $ _______________ $ ___________
Item 14 30” HDPE 40 LF $ ________________ $ ___________
DEPARTMENT OF BUDGET AND FINANCE
August 10, 2015
ADDENDUM 2
Shirley T. Holland Intermodal Park – Phase II
Ditch Maintenance, IFB # 16-1815-01
Sealed bids subject to the conditions and instructions contained herein, will be received at the office of the Purchasing Agent listed below, until the
time and date shown below (local prevailing time), for furnishing the items or services described herein.
Questions & Answers on next sheet.
Bid Due Date Changed to: 3:00 PM., August 19, 2015
Contract Officer:
Michael Coburn, Sr., Purchasing Agent, Michael.coburn@isleofwightus.net
** SECTION "A" AND ONE ELECTRONIC CD COPY IS REQUESTED AT SUBMITTAL**
In compliance with this invitation for bids, and subject to all the conditions thereof, the undersigned offers, if this bid is accepted within ninety (90)
calendar days from the date of the opening, to furnish any or all of the items and/or services upon which prices are quoted, at the price set opposite
each item, to be delivered at the time and place specified herein. The undersigned certifies he has read, understands, and agrees to all terms,
conditions, and requirements of this bid, and is authorized to contract on behalf of firm named below.
Company Name:
Address:
City / State / Zip:
Telephone: FAX No.:
E-mail:
Print Name: Title:
Signature: Date:
1. What is the size and type of timber Matts required and will they be left in place?
Answer: The size and types of timber matting is up to the contractor, based on the size of the
equipment to be used. The mats shall not remain in place after construction is complete. The
intent of the matting is to prevent disturbance of the wetlands adjacent to the excavation.
2. Will all Excavation and Clearing debris be stockpiled onsite? I read the specs and
want to confirm.
Answer: All bush may remain on site with the exception of the stumps which must be hauled
off-site. The bush shall be burned per the County ordinance.
Ditch Maintenance
IFB # 16-1815-01
August 19 2015, 3:000 PM
Bidders
Carolina Marine
Structures, Inc.
Bryant’s
Excavation, Inc.
Northwest
Contractors
Lump Sum (A)
$369,125.00
321,749.90
$262,030.00
Bidders
Lump Sum (A)
BY:
Date: 6/23/2015
TIME: __3:01________________
TABLE OF CONTENTS
Tab Content
1 SWPPP TITLE SHEET
2 TABLE OF CONTENTS
3 REQUIRED SWPPP COMPONENTS
4 NARRATIVE
5 DELEGATION OF AUTHORITY
6 IDENTIFICATION OF QUALIFIED PERSONNEL
7 ENVIRONMENTAL COMPLIANCE PLAN AND OTHER
INCORPORATED PLANS
8 POLLUTION PREVENTION PLAN INFORMATION
9 TMDL INFORMATION
10 SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
11 PUBLIC NOTICE, AVAILABILITY AND IMPLEMENTATION OF
THE SWPPP
12 SWPPP INSPECTIONS
13 CORRECTIVE ACTIONS
14 SWPPP TERMINATION
15 REGISTRATION STATEMENT FOR THE PROJECT
16 NOTICE OF COVERAGE FOR THE PROJECT
17 GENERAL VPDES PERMIT FOR DISCHARGES OF
STORMWATER FROM CONSTRUCTION ACTIVITIES
18
NOTICE OF TERMINATION FOR GENERAL VPDES PERMIT
FOR DISCHARGES OF STORMWATER FROM
CONSTRUCTION ACTIVITIES FORM
19 GCP TRANSFER AGREEMENT FORM
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
for
ISLE OF WIGHT COUNTY INDUSTRIAL DEVELOPMENT AUTHORITY
SHIRLEY T. HOLLAND INTERMODAL PARK – PHASE II
DITCH RESTORATION
Located in
Isle of Wight County, Virginia
Developed in compliance with:
General VPDES Permit for Discharges of Stormwater from Construction
Activities (9VAC25-880)
DELEGATED AUTHORITY
Name: _________________________________
Title: _________________________________
Company: _________________________________
Phone #: _________________________________
Fax #: _________________________________
E-mail: _________________________________
I certify the individual or position named above has the delegated authority to
sign inspection reports and/or amend or modify this SWPPP.
“I certify under penalty of law that I have read and understand this document and
that this document and all attachments were prepared in accordance with a system
designed to assure that qualified personnel properly gathered and evaluated the
information submitted. Based on my inquiry of the person or persons who manage
the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment for knowing
violations.”
OPERATOR
Signature: Date: ________________
Name:
Title:
SECTION 3
REQUIRED SWPPP COMPONENTS
In accordance with the General VPDES Permit for Discharges of Stormwater from
Construction Activities, the SWPPP must include the following information:
1. General Information
a. A signed copy of the registration statement for coverage under the GCP;
b. Upon receipt, a copy of the notice of coverage under the GCP (i.e., notice
of coverage letter);
c. Upon receipt, a copy of the GCP;
d. A narrative description of the nature of the construction activity, including
the function of the project (e.g., low density residential, shopping mall,
highway, etc.);
e. A legible site plan identifying:
1) Directions of stormwater flow and approximate slopes anticipated after
major grading activities;
2) Limits of land disturbance including steep slopes and natural buffers
around surface waters that will not be disturbed;
3) Locations of major structural and nonstructural control measures
including sediment basins and traps, perimeter dikes, sediment barriers,
and other measures intended to filter, settle, or similarly treat sediment
that will be installed between disturbed areas and the undisturbed
vegetated areas, in order to increase sediment removal and maximize
stormwater infiltration;
4) Locations of surface waters;
5) Locations where concentrated stormwater is discharged;
6) Locations of support activities, when applicable and when required by
the VSMP authority, including but not limited to: (i) areas where
equipment and vehicle washing, wheel wash water, and other wash
water is to occur; (ii) storage areas for chemicals such as acids, fuels,
fertilizers and other lawn care chemicals; (iii) concrete wash out areas;
(iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities,
including those temporarily placed on the construction site; and (vi)
construction waste storage; and
7) When applicable, the location of the on-site rain gauge, or the
methodology established in consultation with the VSMP authority, used
to identify measurable storm events for inspection purposes.
2. An Erosion and Sediment Control (ESC) Plan developed and approved in
accordance with Chapter 8 of this manual.
3. A Stormwater Management (SWM) Plan developed and approved in
accordance with Chapter 9 of this manual.
4. A Pollution Prevention Plan (PPP).
5. Information demonstrating compliance with the Total Maximum Daily Load
(TMDL) Requirements.
6. Qualified personnel responsible for conducting on-site and off-site inspections
required by the GCP shall be identified by the Operator in the SWPPP. The
Operator is responsible for insuring that the qualified personnel conduct
inspections.
7. The SWPPP must identify individuals or positions with delegated authority to
sign inspection reports and/or amend or modify the SWPPP.
8. The SWPPP shall be signed and dated in accordance with the signatory
requirements.
9. The SWPPP must contain documentation of all amendments, modifications,
and updates.
10. The SWPPP must include documentation of inspections conducted in
accordance with the inspection requirements.
11. The SWPPP must contain documentation of corrective actions taken in
accordance with the requirements.
SECTION 4
NARRATIVE
In accordance with the General VPDES Permit for Discharges of Stormwater from
Construction Activities, the SWPPP must include a narrative description of the nature of
the construction activity, including the function of the project (e.g., low density residential,
shopping mall, highway, etc.).
Shirley t. Holland Intermodal Park – Phase II is located in Isle of Wight County, Virginia,
northwest of the intersection of Old Mill Road (State Route 607) and William A.
Gwaltney Way. The Isle of Wight County Industrial Development Authority is continuing
the development of the Shirley T. Holland Intermodal Park - Phase II. As part of
ongoing maintenance of the property, the County must maintain the existing drainage
ditches to ensure proper drainage of the site. Maintenance shall include dredging of
sediment deposits within the ditches and removal of vegetation (trees and shrubs)
which would impede the flow. Periodic maintenance shall be provided in accordance
with this plan. Land disturbance will be approximately 12 acres.
SECTION 5
REVISIONS TO DELEGATION OF AUTHORITY
In accordance with the General VPDES Permit for Discharges of Stormwater from
Construction Activities, the individuals or positions with delegated authority to sign
inspection reports and/or amend this SWPPP must be identified. If the individual or
position identified on the Title Sheet of the SWPPP changes or additional individuals or
positions are given this responsibility after the preconstruction meeting occurs, the
changes/additions must be noted below.
Print Name: _____________________________________________
Title: _____________________________________________
Company: _____________________________________________
Phone #: _____________________________________________
I certify the individual or position named above has the delegated authority to sign
inspection reports and/or amend or modify this SWPPP.
Operator
Signature: ___________________________ Date: ____________
Print Name: _____________________________________________
Title: _____________________________________________
Company: _____________________________________________
Phone #: _____________________________________________
I certify the individual or position named above has the delegated authority to sign
inspection reports and/or amend or modify this SWPPP.
Operator
Signature: ___________________________ Date: ____________
Print Name: _____________________________________________
Title: _____________________________________________
Company: _____________________________________________
Phone #: _____________________________________________
I certify the individual or position named above has the delegated authority to sign
inspection reports and/or amend or modify this SWPPP.
Operator
Signature: ___________________________ Date: ____________
Print Name: _____________________________________________
Title: _____________________________________________
Company: _____________________________________________
Phone #: _____________________________________________
I certify the individual or position named above has the delegated authority to sign
inspection reports and/or amend or modify this SWPPP.
Operator
Signature: ___________________________ Date: ____________
SECTION 6
IDENTIFICATION OF QUALIFIED PERSONNEL
In accordance with the General VPDES Permit for Discharges of Stormwater from
Construction Activities, the individuals responsible for conducting on-site and off-site
inspections must be identified. If the identified individual changes or additional individuals
are given this responsibility after the preconstruction meeting occurs, the
changes/additions must be noted below.
Print Name: _____________________________________________
Company: _____________________________________________
Address: _____________________________________________
Phone #: _____________________________________________
Qualifications: Responsible Land Disturber # ________________
Certified ESC Inspector # ___________________
Certified SWM Inspector # ___________________
Licensed Professional (P.E., L.S., etc.)
Other: _________________________
Print Name: _____________________________________________
Company: _____________________________________________
Address: _____________________________________________
Phone #: _____________________________________________
Qualifications: Responsible Land Disturber # ________________
Certified ESC Inspector # ___________________
Certified SWM Inspector # ___________________
Licensed Professional (P.E., L.S., etc.)
Other: _________________________
Print Name: _____________________________________________
Company: _____________________________________________
Address: _____________________________________________
Phone #: _____________________________________________
Qualifications: Responsible Land Disturber # ________________
Certified ESC Inspector # ___________________
Certified SWM Inspector # ___________________
Licensed Professional (P.E., L.S., etc.)
Other: _________________________
Print Name: _____________________________________________
Company: _____________________________________________
Address: _____________________________________________
Phone #: _____________________________________________
Qualifications: Responsible Land Disturber # ________________
Certified ESC Inspector # ___________________
Certified SWM Inspector # ___________________
Licensed Professional (P.E., L.S., etc.)
Other: _________________________
SECTION 7
EROSION AND SEDIMENT CONTROL PLAN, STORMWATER MANAGEMENT
PLAN, POLLUTION PREVENTION PLAN, AND TMDLS
Erosion and Sediment Control Plan
The preconstruction meeting was held on: __________________
An Erosion and Sediment Control (ESC) Plan was developed and approved as authorized
by the Virginia Erosion and Sediment Control Regulations (9VAC25-840). When properly
implemented, the approved ESC plan has been determined to adequately address the
following effluent limit guidelines:
1. Controls the volume and velocity of stormwater runoff within the site to minimize
soil erosion;
2. Controls stormwater discharges, including peak flow rates and total stormwater
volume, to minimize erosion at outlets and to minimize downstream channel
and stream bank erosion;
3. Minimizes the amount of soil exposed during the construction activity;
4. Minimizes the disturbance of steep slopes;
5. Minimizes sediment discharges from the site in a manner that addresses (i) the
amount, frequency, intensity, and duration of precipitation, (ii)the nature of
resulting stormwater runoff, and (iii) soil characteristics, including the range of
soil particle sizes present on the site;
6. Provides and maintains natural buffers around surface waters, directs
stormwater to vegetated areas to increase sediment removal, and maximized
infiltration, unless infeasible;
7. Minimizes soil compaction and, unless infeasible, preserves topsoil;
8. Ensures that stabilization of disturbed areas will be initiated immediately
whenever any clearing, grading, or excavating, or other land-disturbing
activities have permanently ceased on any portion of the site, or temporarily
ceased on any portion of the site and will not resume for a period exceeding 14
days;
9. Utilizes outlet structures that withdraw stormwater from the surface (i.e., above
the permanent pool or wet storage water surface elevation), unless infeasible,
when discharging from sediment basins or sediment traps.
The following individual(s) will implement and maintain the control measures identified
in the ESC plan (if other than the Operator or Delegated Authority):
Name(s): ____________________________________
Company: ____________________________________
Stormwater Management Plan
A Stormwater Management Plan (SWM) plan was developed as a required component
of the ECP and was approved as authorized by the Virginia Stormwater Management
Program Regulations (9VAC25-870).
The following individual(s) will implement and maintain the control measures identified
in the SWM plan (if other than the Operator or Delegated Authority):
Name(s): ____________________________________
Company: ____________________________________
Pollution Prevention Plan
The individuals responsible for implementing and maintaining the control measures
identified in the Pollution Prevention Plan are listed in the Appendix.
Total Maximum Daily Load (TMDL) Requirements
All projects requiring coverage under the GCP are subject to the following requirements
associated with discharges to impaired waters, surface waters with an applicable TMDL
wasteload allocation established and approved prior to the term of this GCP, or
exceptional waters:
1. Identify the impaired water(s), approved TMDL(s), pollutants of concern, and
exceptional waters identified in 9VAC25-260-30.A.3.c, when applicable;
2. Provide clear direction that:
a. Permanent or temporary soil stabilization shall be applied to denuded areas
within seven days after final grade is reached on any portion of the site;
b. Nutrients shall be applied in accordance with manufacturer’s
recommendations or an approved nutrient management plan and shall not
be applied during rainfall events; and
c. A modified inspection schedule shall be implemented in accordance with
Part I B.4 or Part I B.5.
These requirements are addressed on the Pollution Prevention Plan sheet of the ECP
and in Tab 9 of the SWPPP Binder.
The following individual(s) will implement and maintain these control measures (if
other than the Operator or Delegated Authority):
Name(s): ____________________________________
Company: ____________________________________
Other Incorporated Plans
Plans from other projects have not been used or incorporated into this design.
Off-site areas of land disturbance activities associated with this project must have such
locations noted below and approved prior to use.
Additional off-site areas to be used during construction:
Location Plan Title Approval
Date Purpose
SECTION 8
POLLUTION PREVENTION PLAN INFORMATION
In accordance with Part II A.4 of the General VPDES Permit for Discharges of
Stormwater from Construction Activities:
1. Identify potential pollutant-generating activities and pollutants expected to
be exposed to stormwater;
2. Describe the location where the potential pollutant generating activity will
occur;
3. Identify all authorized non-stormwater discharges that are or will be
comingled with stormwater discharges from the construction activity,
including any applicable support activity;
4. Identify the person responsible for implementing the pollution prevention
practice(s) for each pollutant generating activity, if other than the person
listed as the qualified personnel;
5. Describe pollution prevention procedures and practices that will be
implemented to:
a. Prevent and respond to leaks, spills and other releases including (i)
procedures for expeditiously stopping, containing, and cleaning up
spills, leaks and other releases; and (ii) procedures for reporting leaks,
spills, and other releases;
b. Prevent the discharge of spilled or leaked fuels and chemicals from
vehicle fueling and maintenance activities (e.g., providing secondary
containment such as spill berms, decks, spill containment pallets,
providing cover where appropriate, and having spill kits readily
available);
c. Prevent the discharge of soaps, detergents, solvents, and wash water
from construction materials, including the cleanup of stucco, paint, form
release oils, and curing compounds (e.g., providing (i) cover (e.g.,
plastic sheeting or temporary roofs) to prevent contact with stormwater;
(ii) collection and proper disposal in a manner to contact with
stormwater; and (iii) a similarly effective means designed to prevent
discharge of these pollutants;
d. Minimize the discharge of pollutants from equipment and vehicle
washing, wheel wash water, and other types of washing (e.g., locating
activities away from surface waters and stormwater inlets or
conveyance and directing wash waters to sediment basins/traps, using
filtration devices such as filter bags or sand filters or using similarly
effective controls);
e. Direct concrete wash water into a leak-proof container or leak-proof
settling basin. The container or basin must be designed so that no
overflows can occur due to inadequate sizing or precipitation.
Hardened concrete wastes must be removed and disposed of in a
manner consistent with the handling of other construction wastes.
Liquid concrete wastes must be removed and disposed of in a manner
consistent with the handling of other construction wash waters and
shall not be discharged to surface waters;
f. Minimize the discharge of pollutants from storage, handling, and
disposal of construction products, materials, and wastes, including (i)
building products such as asphalt sealants, copper flashing, roofing
materials, adhesives, concrete admixtures; (ii) pesticides, herbicides,
insecticides, fertilizers, and landscape materials; and (iii) construction
and domestic wastes such as packaging materials, scrap construction
materials, masonry products, timber, pipe and electrical cuttings,
plastics, styrofoam, concrete, and other trash or building materials;
g. Prevent discharges of fuels, oils, and other petroleum products,
hazardous or toxic waste, and sanitary wastes; and
h. Address any other discharges from potential pollutant generating
activity not addressed above.
6. Describe procedures for providing pollution prevention awareness of all
applicable wastes, including any wash water, disposal practices, and
applicable disposal locations of such wastes, to personnel in order to
comply with the conditions of the GCP.
The information required in Items 1, 2, and 4 can be found in Table 8.1 of this
section of the SWPPP.
The information required in Item 3 can be found in Table 8.2 of this section of the
SWPPP.
Table 8.1 – Pollutant-Generating Activities, Potential Pollutants and Responsible Parties
Pollutant
Generating
Activity
Check if
Present
Potential Pollutants
Responsible
Party
(if other than the person(s)
identified as the qualified
personnel)
Se
d
i
m
e
n
t
Nu
t
r
i
e
n
t
s
,
F
e
r
t
i
l
i
z
e
r
He
a
v
y
M
e
t
a
l
s
pH
(
a
c
i
d
s
a
n
d
b
a
s
e
s
)
Pe
s
t
i
c
i
d
e
s
o
r
H
e
r
b
i
c
i
d
e
s
Oi
l
o
r
G
r
e
a
s
e
Ba
c
t
e
r
i
a
o
r
V
i
r
u
s
e
s
Tr
a
s
h
,
D
e
b
r
i
s
o
r
S
o
l
i
d
s
To
x
i
c
C
h
e
m
i
c
a
l
s
Pa
i
n
t
s
o
r
P
l
a
s
t
e
r
Ad
h
e
s
i
v
e
s
,
s
o
l
v
e
n
t
s
o
r
c
u
r
i
n
g
c
o
m
p
o
u
n
d
s
As
p
h
a
l
t
o
r
C
o
n
c
r
e
t
e
Ve
h
i
c
l
e
o
r
h
e
a
v
y
e
q
u
i
p
m
e
n
t
w
a
s
h
w
a
t
e
r
Ga
s
o
l
i
n
e
,
d
i
e
s
e
l
o
r
k
e
r
o
s
e
n
e
Wo
o
d
p
r
e
s
e
r
v
a
t
i
v
e
s
An
t
i
f
r
e
e
z
e
o
r
c
o
o
l
a
n
t
Clearing, grading or
excavating
Paving operations
Concrete washout
and concrete waste
disposal
Structure
construction,
stucco, painting or
cleaning
Dewatering
operations
Material delivery
and storage
Pollutant
Generating
Activity
Check if
Present
Potential Pollutants
Responsible
Party
(if other than the person(s)
identified as the qualified
personnel)
Se
d
i
m
e
n
t
Nu
t
r
i
e
n
t
s
,
F
e
r
t
i
l
i
z
e
r
He
a
v
y
M
e
t
a
l
s
pH
(
a
c
i
d
s
a
n
d
b
a
s
e
s
)
Pe
s
t
i
c
i
d
e
s
o
r
H
e
r
b
i
c
i
d
e
s
Oi
l
o
r
G
r
e
a
s
e
Ba
c
t
e
r
i
a
o
r
V
i
r
u
s
e
s
Tr
a
s
h
,
D
e
b
r
i
s
o
r
S
o
l
i
d
s
To
x
i
c
C
h
e
m
i
c
a
l
s
Pa
i
n
t
s
o
r
P
l
a
s
t
e
r
Ad
h
e
s
i
v
e
s
,
s
o
l
v
e
n
t
s
o
r
c
u
r
i
n
g
c
o
m
p
o
u
n
d
s
As
p
h
a
l
t
o
r
C
o
n
c
r
e
t
e
Ve
h
i
c
l
e
o
r
h
e
a
v
y
e
q
u
i
p
m
e
n
t
w
a
s
h
w
a
t
e
r
Ga
s
o
l
i
n
e
,
d
i
e
s
e
l
o
r
k
e
r
o
s
e
n
e
Wo
o
d
p
r
e
s
e
r
v
a
t
i
v
e
s
An
t
i
f
r
e
e
z
e
o
r
c
o
o
l
a
n
t
Material use during
building process
Solid waste disposal
Sanitary waste
disposal
Landscaping
operations
Vehicle Fueling or
Maintenance
Other (describe)
Other (describe)
Other (describe)
Table 8.2 – Authorized Non-stormwater Discharges Anticipated from the Construction Activity or Support Activities
Authorized Non-stormwater Discharges
Anticipated from the
Construction Activity or
support Activities
(check if applicable)
Discharges from firefighting activities
Fire hydrant flushings
Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not
been used and the wash water has been filtered, settled, or similarly treated prior to discharge
Water used to control dust that has been filtered, settled, or similarly treated prior to discharge
Potable water sources, including uncontaminated waterline flushings
Routine external building wash down where soaps, solvents, or detergents have not been used
and the wash water has been filtered, settled, or similarly treated prior to discharge
Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurrs
(or where all spilled or leaked material has been removed prior to washing); where soaps,
solvents, or detergents have not been used; and where the wash water has been filtered,
settled, or similarly treated prior to discharge
Uncontaminated air conditioning or compressor condensate
Uncontaminated ground water or spring water
Foundation or footing drains where flows are not contaminated with process materials such as
solvents
Uncontaminated excavation dewatering, including dewatering of trenches and excavations that
have been filtered, settled, or similarly treated prior to discharge
Landscape irrigation
SECTION 9
TOTAL MAXIMUM DAILY LOAD INFORMATION
In accordance with Part II A.5 of the General VPDES Permit for Discharges of Stormwater from Construction Activities, the
SWPPP must note the following:
1. The impaired water(s), approved TMDL(s) and pollutants of concern are identified in Tables 9.1 and 9.2 below.
2. The Responsible Land Disturber shall understand that:
a. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is
reached on any portion of the site;
b. Nutrients shall be applied in accordance with manufacturer’s recommendations or an approved nutrient
management plan and shall not be applied during rainfall events; and
c. Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once
every five business days and no later than 48 hours following a measurable storm event. In the event that a
measurable storm event occurs when there are more than 48 hours between business days, the inspection shall
be conducted on the next business day.
Table 9.1 – Identification of the Impaired Waters the Project Discharges Into
Waterbody Location / Length Pollutant of Concern
Cohoon Creek Begins at the confluence with Cohoon Creek and continues downstream until the confluence with
Lake Mead.
Lake Prince Begins at the confluence with Lake Prince and continues downstream until the confluence with
Western Branch Reservoir.
Table 9.2 – Identification of the Surface Waters with Applicable TMDL Wasteload Allocations the Project Discharges Into
Waterbody Pollutants of Concern
Does the project
discharge to the
waterbody?
Chesapeake Bay
Phosphorus
Nitrogen
Sediment
YES
SECTION 10
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
In accordance with Part II B of the General VPDES Permit for Discharges of
Stormwater from Construction Activities:
1. The operator or their designee shall amend the SWPPP whenever there is a
change in the design, construction, operation, or maintenance that has a
significant effect on the discharge of pollutants to surface waters and that has
not been previously addressed in the SWPPP.
2. The SWPPP must be amended if, during inspections or investigations by the
operator's qualified personnel, or by local, state, or federal officials, it is
determined that the existing control measures are ineffective in minimizing
pollutants in discharges from the construction activity. Revisions to the SWPPP
shall include additional or modified control measures designed and
implemented to correct problems identified. If approval by the VESCP authority,
VSMP authority, or department is necessary for the control measure, revisions
to the SWPPP shall be completed no later than seven calendar days following
approval. Implementation of these additional of modified control measures
must be accomplished as described in Section 13.
3. The SWPPP must clearly identify the contractor(s) that will implement and
maintain each control measure identified in the SWPPP. The SWPPP shall be
amended to identify any new contractor that will implement and maintain a
control measure.
4. The operator or their designee shall update the SWPPP no later than seven
days following any modification to its implementation. All modifications or
updates to the SWPPP shall be noted and shall include the following items;
a. A record of dates when:
(1) Major grading activities occur;
(2) Construction activities temporarily or permanently cease on a portion of
the site; and
(3) Stabilization measures are initiated.
b. Documentation of replaced or modified controls where periodic inspections
or other information have indicated that the controls have been used
inappropriately or incorrectly and where modified as soon as possible;
c. Areas that have reached final stabilization and where no further SWPPP
inspection requirements apply;
d. All properties that are no longer under the legal control of the operator and
the dates on which the operator no longer had legal control over each
property;
e. The date of any prohibited discharges, the discharge volume released, and
what actions were taken to minimize the impact of the release;
f. Measures taken to prevent the reoccurrence of any prohibited discharge;
and
g. Measures taken to address any evidence identified as a result of an
inspection.
5. All amendments, modifications, or updates to the SWPPP shall be signed by
the Operator or their designee.
The following Amendment, Modification, and Update Log form must be used to
document all amendments, modification, and updates.
SWPPP AMENDMENT, MODIFICATION AND UPDATE LOG
Date Description of Amendment, Modification or Update
_________ ________________________________
Responsible
Party
_______________________________________
"I certify under penalty of law that I have read and understand
this document and that this document and all attachments
were prepared in accordance with a system designed to
assure that qualified personnel properly gathered and
evaluated the information submitted. Based on my inquiry of
the person or persons who manage the system, or those
persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including
the possibility of fine and imprisonment for knowing
violations."
______________________________________________________
Operator or Delegated Authority Signature
SECTION 11
PUBLIC NOTICE, AVAILABLITY AND IMPLEMENTATION OF THE SWPPP
In accordance with Part II C of the General VPDES Permit for Discharges of
Stormwater from Construction Activities:
Upon commencement of land disturbance, the operator shall post
conspicuously a copy of the notice of coverage letter near the main entrance
of the construction activity. For linear projects, the operator shall post the
notice of coverage letter at a publically accessible location near an active
part of the construction project. The operator shall maintain the posted
information until termination of general permit coverage.
In accordance with Part II D of the General VPDES Permit for Discharges of
Stormwater from Construction Activities:
Operators with day-to-day operational control over SWPPP implementation
shall have a copy of the SWPPP available at a central location on-site for
use by those identified as having responsibilities under the SWPPP
whenever they are on the construction site.
The operator shall make the SWPPP and all amendments, modifications,
and updates available upon request to the department, the VSMP authority,
the EPA, the VESCP authority, local government officials, or the operator
of a municipal separate storm sewer system receiving discharges from the
construction activity. If an on-site location is unavailable to store the SWPPP
when no personnel are present, notice of the SWPPP's location must be
posted near the main entrance of the construction site.
The operator shall make the SWPPP available for public review in an
electronic format or in hard copy. Information for public access to the
SWPPP shall be posted and maintained in accordance with Part II C. If not
provided electronically, public access to the SWPPP may be arranged upon
request at a time and at a publicly accessible location convenient to the
operator or his designee but shall be no less than once per month and shall
be during normal business hours. Information not required to be contained
within the SWPPP by this general permit is not required to be released.
In accordance with Part II E of the General VPDES Permit for Discharges of
Stormwater from Construction Activities:
The operator shall implement the SWPPP and subsequent amendments,
modifications, and updates from commencement of land disturbance until
termination of general permit coverage.
All control measures must be properly maintained in effective operating
condition in accordance with good engineering practices and, where
applicable, manufacturer specifications. If a site inspection identifies a
control measure that is not operating effectively, corrective action(s) shall
be completed as soon as practicable, but no later than seven days after
discovery or a longer period as established by the VSMP authority, to
maintain the continued effectiveness of the control measures.
If site inspections identify an existing control measure that needs to be
modified or if an additional control measure is necessary for any reason,
implementation shall be completed prior to the next anticipated measurable
storm event. If implementation prior to the next anticipated measurable
storm event is impracticable, then alternative control measures shall be
implemented as soon as practicable, but no later than seven days after
discovery or a longer period as established by the VSMP authority.
SECTION 12
SWPPP INSPECTIONS
In accordance with Part I B.4.d and Part II F of the General VPDES Permit for
Discharges of Stormwater from Construction Activities:
1. Personnel responsible for on-site and off-site inspections. Inspections
required by this general permit shall be conducted by the qualified
personnel identified by the operator in the SWPPP. The operator is
responsible for insuring that the qualified personnel conduct the inspection.
2. The applicable SWPPP inspection requirements specified in Part II F 2 shall
be amended as follows:
a. Inspections shall be conducted at a frequency of (i) at least once every
four business days or (ii) at least once every five business days and no
later than 48 hours following a measurable storm event. In the event that
a measurable storm event occurs when there are more than 48 hours
between business days, the inspection shall be conducted on the next
business day, and
b. Representative inspections used by utility line installation, pipeline
construction, or other similar linear construction activities shall inspect
all outfalls discharging to surface waters identified as impaired or for
which a TMDL wasteload allocation has been established and approved
prior to the term of this general permit.
3. Inspection requirements.
a. As part of the inspection, the qualified personnel shall:
(1) Record the date and time of the inspection and when applicable
the date and rainfall amount of the last measurable storm event;
(2) Record the information and a description of any discharges
occurring at the time of the inspection;
(3) Record any land-disturbing activities that have occurred outside of
the approved erosion and sediment control plan;
(4) Inspect the following for installation in accordance with the
approved erosion and sediment control plan, identification of any
maintenance needs, and evaluation of effectiveness in minimizing
sediment discharge, including whether the control has been
inappropriately or incorrectly used:
(a) All perimeter erosion and sediment controls, such as silt fence;
(b) Soil stockpiles, when applicable, and borrow areas for
stabilization or sediment trapping measures;
(c) Completed earthen structures, such as dams, dikes, ditches,
and diversions for stabilization;
(d) Cut and fill slopes;
(e) Sediment basins and traps, sediment barriers, and other
measures installed to control sediment discharge from
stormwater;
(f) Temporary or permanent channel, flume, or other slope drain
structures installed to convey concentrated runoff down cut and
fill slopes;
(g) Storm inlets that have been made operational to ensure that
sediment laden stormwater does not enter without first being
filtered or similarly treated; and
(h) Construction vehicle access routes that intersect or access
paved roads for minimizing sediment tracking;
(5) Inspect areas that have reached final grade or that will remain
dormant for more than 14 days for initiation of stabilization
activities;
(6) Inspect areas that have reached final grade or that will remain
dormant for more than 14 days for completion of stabilization
activities within seven days of reaching grade or stopping work;
(7) Inspect for evidence that the approved erosion and sediment
control plan, "agreement in lieu of a plan," or erosion and sediment
control plan prepared in accordance with department-approved
annual standards and specifications has not been properly
implemented. This includes but is not limited to:
(a) Concentrated flows of stormwater in conveyances such as rills,
rivulets or channels that have not been filtered, settled, or
similarly treated prior to discharge , or evidence thereof;
(b) Sediment laden or turbid flows of stormwater that have not been
filtered or settled to remove sediments prior to discharge;
(c) Sediment deposition in areas that drain to unprotected
stormwater inlets or catch basins that discharge to surface
waters. Inlets and catch basins with failing sediments controls
due to improper installation, lack of maintenance, or inadequate
design are considered unprotected;
(d) Sediment deposition on any property (including public and
private streets) outside of the construction activity covered by
this general permit;
(e) Required stabilization has not been initiated or completed on
portions of the site;
(f) Sediment basins without adequate wet or dry storage volume
or sediment basins that allow the discharge of stormwater from
below the surface of the wet storage portion of the basin;
(g) Sediment traps without adequate wet or dry storage or
sediment traps that allow the discharge of stormwater from
below the surface of the wet storage portion of the trap; and
(h) Land disturbance outside of the approved area to be disturbed;
(8)Inspect pollutant generating activities identified in the pollution
prevention plan for the proper implementation, maintenance and
effectiveness of the procedures and practices;
(9)Identify any pollutant generating activities not identified in the
pollution prevention plan; and
(10)Identify and document the presence of any evidence of the discharge
of pollutants prohibited by this general permit.
4. Inspection report. Each inspection report shall include the following
items:
a. The date and time of the inspection and when applicable, the date
and rainfall amount of the last measurable storm event;
b. Summarized findings of the inspection;
c. The location(s) of prohibited discharges;
d. The location(s) of control measures that require maintenance;
e. The location(s) of control measures that failed to operate as
designed or proved inadequate or inappropriate for a particular
location;
f. The location(s) where any evidence identified under Part II F 3 a (7)
exists;
g. The location(s) where any additional control measure is needed that
did not exist at the time of inspection;
h. A list of corrective actions required (including any changes to the
SWPPP that are necessary ) as a result of the inspection or to
maintain permit compliance;
i. Documentation of any corrective actions required from a previous
inspection that have not been implemented; and
j. The date and signature of the qualified personnel and the operator
or its duly authorized representative.
The inspection report and any actions taken in accordance with Part II must
be retained by the operator as part of the SWPPP for at least three years
from the date that general permit coverage expires or is terminated. The
inspection report shall identify any incidents of noncompliance. Where an
inspection report does not identify any incidents of noncompliance, the
report shall contain a certification that the construction activity is in
compliance with the SWPPP and this general permit. The report shall be
signed in accordance with Part III K of this general permit.
VSMP INSPECTION REPORT
Project:
GCP Number:
Notice of Coverage posted? YES NO SWPPP available for review? YES NO
Inspection
Date/Time Inspection Conducted By
(must be the Qualified Personnel identified in the SWPPP)
Date of Last
Measureable
Storm Event
Rainfall
Amount Not applicable since inspection frequency is at least once every four business days
Record the information and a
description of any discharges
occurring at the time of the inspection
Record any land-disturbing activities
that have occurred outside the
approved erosion and sediment
control plan
Inspection requirements:
Have controls
been installed in
accordance with
the approved
ECP?
Are controls
effectively
minimizing
sediment
discharges?
Have controls
been
inappropriately
or incorrectly
used?
Describe any maintenance needs or other
deficiencies that were identified and the location of
the deficiencies
All perimeter erosion and sediment
controls (silt fence, etc.) YES NO YES NO YES NO
Soil stockpiles and borrow areas (for
stabilization or sediment trapping
measures)
YES NO YES NO YES NO
Completed earthen structures, such as
dams, dikes, ditches, and diversions for
stabilization
YES NO YES NO YES NO
Cut and fill slopes
YES NO YES NO YES NO
Sediment basins and traps, sediment
barriers, and other measures (installed to
control sediment discharges from
stormwater)
YES NO YES NO YES NO
Temporary or permanent channels, flumes,
or other slope drain structures (installed to
convey concentrated runoff down cut and
fill slopes)
YES NO YES NO YES NO
Storm inlets (to ensure that sediment laden
stormwater does not enter without first
being filtered or similarly treated)
YES NO YES NO YES NO
Construction entrances and access routes
(for minimizing mud/sediment tracking) YES NO YES NO YES NO
Have stabilization activities begun on areas that have reached final grade or that will remain dormant for more than 14 days? YES NO
Were stabilization activities completed within seven days of reaching final grade or stopping work on areas that have reached
final grade or that will remain dormant for more than 14 days? YES NO
Inspect for the presence of the following: Present? Location
Concentrated flows of stormwater in conveyances (such as rills, rivulets
or channels) that have not been filtered, settled, or similarly treated prior
to discharge, (or evidence thereof)
YES NO
Sediment laden runoff that has not been filtered or settled to remove
sediments prior to discharge YES NO
Sediment deposition in areas that drain to unprotected stormwater inlets
or catch basins that discharge to surface waters. YES NO
Inlets and catch basins with failing sediment controls due to improper
installation, lack of maintenance, or inadequate design YES NO
Sediment deposition on any property (including public and private
streets) outside of the construction activity covered by the general permit YES NO
Required stabilization (initiated or completed on portions of the site?) YES NO
Sediment basins/traps without adequate wet or dry storage volume YES NO
Sediment basins where the riser appears to be leaking, water appears to
be leaving the basin around the barrel pipe (rather than through it), or YES NO
the dewatering device appears to be dewatering basin from below the
water surface
Sediment traps that allow stormwater to discharge from below the
surface of the wet storage portion of the trap YES NO
Land disturbance outside of the approved limits of disturbance YES NO
Inspect the pollution prevention controls associated with the pollutant generating activities identified in the Pollution Prevention Plan
Inspect the pollution prevention controls
associated with the pollution generating activities
identified in Table 8.1 of the SWPPP
Have the controls
been properly
implemented as
outlined on the PPP
sheet?
Are controls
effectively minimizing
pollutant discharges?
Describe any maintenance needs or other
deficiencies that were identified and the
location of the deficiencies
Clearing, grading or excavating N/A YES NO YES NO
Paving operations N/A YES NO YES NO
Concrete washout and concrete waste
disposal N/A YES NO YES NO
Structure construction, stucco, painting
or cleaning N/A YES NO YES NO
Dewatering operations N/A YES NO YES NO
Material delivery and storage N/A YES NO YES NO
Material use during building process N/A YES NO YES NO
Solid waste disposal N/A YES NO YES NO
Sanitary waste disposal (porta-johns) N/A YES NO YES NO
Landscaping operations N/A YES NO YES NO
Vehicle Fueling or Maintenance N/A YES NO YES NO
Other (describe) YES NO YES NO
Other (describe) YES NO YES NO
Other (describe) YES NO YES NO
Other (describe) YES NO YES NO
Other (describe) YES NO YES NO
Identify the material(s) and document the location or
presence of any evidence of pollutant discharges that are
not authorized by the general permit
Identify the location(s) where any additional control
measures are needed that did not exist at the time of the
inspection
List the corrective actions required (including any changes to
the SWPPP that are necessary) as a result of the inspection
or to maintain permit compliance
Document any corrective action(s) required from a previous
inspection that have not been implemented
“I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared
in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,
the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”
Signature: _____________________________ Date: ________________
Name: _____________________________ Title: ________________
(must be either the Operator or Delegated Authority, not necessarily the person who conducted the inspection)
SECTION 13
CORRECTIVE ACTIONS
In accordance with Part II F.4 of the General VPDES Permit for Discharges of Stormwater
from Construction, documentation of any corrective actions taken shall be retained by the
operator as part of the SWPPP for at least three years from the date that general permit
coverage expires or is terminated.
In accordance with Part II G of the General VPDES Permit for Discharges of Stormwater
from Construction Activities
The operator shall implement the corrective action(s) identified as a result of an
inspection as soon as practicable but no later than seven days after discovery or
a longer period as approved by the VSMP authority. If approval of a corrective
action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the
department) is necessary, additional control measures shall be implemented to
minimize pollutants in stormwater discharges until such approvals can be obtained.
The operator may be required to remove accumulated sediment deposits located
outside of the construction activity covered by this general permit as soon as
practicable in order to minimize environmental impacts. The operator shall notify
the VSMP authority and the department as well as obtain all applicable federal,
state, and local authorizations, approvals, and permits prior to the removal of
sediments accumulated in surface waters including wetlands.
CORRECTIVE ACTION LOG
Correction Action
Date Description of Corrective Action
_________ ________________________________
Responsible Party
_______________________________________
"I certify under penalty of law that I have read and understand
this document and that this document and all attachments were
prepared in accordance with a system designed to assure that
qualified personnel properly gathered and evaluated the
information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly
responsible for gathering the information, the information
submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations."
______________________________________________________
Operator or Delegated Authority Signature
SECTION 14
SWPPP TERMINATION
In accordance with Part I F of the General VPDES Permit for Discharges of Stormwater
from Construction Activities:
The operator of the construction activity shall submit a notice of termination in
accordance with 9VAC25-880-60 to the VSMP authority after one or more of the
following conditions have been met:
a. Necessary permanent control measures included in the SWPPP for the site
are in place and functioning effectively and final stabilization has been achieved
on all portions of the site for which the operator is responsible. When
applicable, long term responsibility and maintenance requirements shall be
recorded in the local land records prior to the submission of a notice of
termination;
b. Another operator has assumed control over all areas of the site that have not
been finally stabilized and obtained coverage for the ongoing discharge;
c. Coverage under an alternative VPDES or state permit has been obtained; or
d. For residential construction only, temporary soil stabilization has been
completed and the residence has been transferred to the homeowner.
The notice of termination should be submitted no later than 30 days after one of
the above conditions in subdivision 1 of this subsection are met. Authorization to
discharge terminates at midnight on the date that the notice of termination is
submitted for the conditions set forth in subdivisions 1 b through 1 d of this
subsection. Termination of authorizations to discharge for the conditions set forth
in subdivision 1 a of this subsection shall be effective upon notification from the
department that the provisions of subdivision 1 a of this subsection have been met
or 60 days after submittal of the notice of termination, whichever occurs first.
The notice of termination shall be signed in accordance with Part III K of the
general permit.
PERMANENT STORMWATER MANAGEMENT FACILITIES INSTALLED
(information will need to reflect data requirements of online permitting system)
Stormwater
Management Facility
(Designation/Type)
N/A
Location Isle of Wight County
6th
Order
Hydrolo
gic Unit
Code
JL45 and JL46
Waterbody the SWM
Facility discharges to:
N/A
Drainage Area Served
_________________ acres
Impervious Area Served
_________________ acres
Managed Turf Area Served
_________________ acres
SECTION 15
CONSTRUCTION GENERAL PERMIT
REGISTRATION STATEMENT
SECTION 16
CONSTRUCTION GENERAL PERMIT
NOTICE OF COVERAGE
SECTION 17
GENERAL VPDES PERMIT FOR DISCHARGES OF
STORMWATER FROM CONSTRUCTION ACTIVITIES
SECTION 18
CONSTRUCTION GENERAL PERMIT
TERMINATION
SECTION 19
CONSTRUCTION GENERAL PERMIT
TRANSFER
POLLUTION PREVENTION PLAN
INTRODUCTION
This Stormwater Pollution Prevention Plan (SWPPP) has been developed as a
requirement of the General VPDES Permit for Discharges of Stormwater from
Construction Activities (GCP), as defined in 9VAC25-880. The purpose of this SWPPP is
to:
1) Identify potential sources of pollution that may reasonably be expected to affect the
quality of storm water discharges from the construction site, and
2) To describe and ensure the implementation of practices that will be used to reduce
pollutants in stormwater discharges from the construction site and to assure
compliance with the conditions of the Permit.
Implementation of the components of this SWPPP is required as a condition of the GCP.
The GCP has a fixed term of 5 years from the effective date of July 1, 2014 and permit
coverage is required for all VSMP land-disturbing activities.
The GCP authorizes the discharge of stormwater from construction activities until the
expiration date. The GCP also authorizes the discharge of stormwater from offsite support
activities, provided that certain conditions are met as outlined in Part I A. 2 of the GCP.
Certain non-stormwater discharges are also authorized and are described in Part I E of
the GCP.
The SWPPP must be prepared, updated and amended, implemented as written, made
available to the public according to the requirements of the General Permit for Discharges
of Stormwater from Construction Activities (9VAC25-880).
PURPOSE
4VAC50-60-54 of the Virginia Stormwater Management Program (VSMP) Permit
Regulations requires that Stormwater Pollution Prevention Plan (SWPPP) be developed
for all regulated land disturbing activities. The SWPPP must include, but not be limited
to, an approved erosion and sediment control plan, an approved stormwater management
plan, and this Pollution Prevention Plan (PPP) for regulated land disturbing activities,
and a description of any additional control measures necessary to address a TMDL as
applicable.
The plan for implementing pollution prevention measures during construction activities
developed on this sheet must be implemented and updated as necessary. Any PPP
requirements not included on this sheet must be incorporated into the SWPPP required
by 4VAC50-60-54 that must be developed before land disturbance commences. This
PPP identifies potential sources of pollutants that may reasonable be expected to affect
the quality stormwater discharges from the construction site (both on- and off-site
activities) and describes control measures that will be used to minimize pollutants in
stormwater discharges from the construction site.
OTHER REFERENCED PLANS
SWPPP requirements may be fulfilled by incorporating, by reference, other plans. All
plans incorporated by reference become enforceable under the VSMP Permit
Regulations and General Permit VAR10 for Discharges of Stormwater from Construction
Activities. If a plan incorporated by reference does not contain all of the required elements
of the PPP, the operator must develop the missing elements and include them in the
SWPPP.
Independent Plans
Incorporated by Reference
Date
Approved
Stormwater Management Plans (Regional or Master) N/A
Spill Prevention, Control, and Countermeasure Plans N/A
Off-Site Stockpile N/A
Off-Site Borrow Area N/A
POTENTIAL POLLUTANT SOURCES
The following sources of potential pollutants must be addressed in the Pollution
Prevention Plan. Various controls and/or measures designed to prevent and/or minimize
pollutants in stormwater discharges from the project site must be applied to the sources
found on the site. Additional information concerning the following controls and/or
measures may be found in the SWPPP. Deviations from the location criteria may be
approved by the County Environmental Inspector.
LEAKS, SPILLS, AND OTHER RELEASES
The operator(s) shall ensure procedures are in place to prevent and respond to all
leaks, spills and other releases of pollutants.
The operator(s) shall ensure all leaks, spills and other releases of pollutant are
contained and cleaned immediately upon discovery. Any contaminated materials are
to be disposed in accordance with federal, state, and/or local requirements.
The operator(s) shall ensure spill containment kits containing appropriate materials
(e.g., absorbent material and pads, brooms, gloves, sand, etc.) are available at
appropriate locations, including, but not limited to: designated areas for vehicle and
equipment maintenance; vehicle and equipment fueling; storage and disposal of
construction materials, products, and waste; and storage and disposal of hazardous
and toxic materials; and sanitary waste facilities.
The locations of the spill containment kits are identified as described below:
Date
Shown on
Plan Sheet
#(s)
Location
Approved
Plan N/A MOBILE
REVISIONS TO LOCATIONS
Date
Shown on
Plan Sheet
#(s)
Location Operator(s)
Initials
The operator(s) shall notify the Department of Environmental Quality of leaks, spills,
and other releases that discharge to or have the potential to discharge to surface
waters immediately upon discovery of the discharge but in no case later than 24 after
the discovery.
The operator(s) shall notify the Department of Environmental Quality (DEQ) of leaks,
spills, and other releases that discharge to or have the potential to discharge to surface
waters immediately upon discovery of the discharge but in no case later than 24 after
the discovery. Written notice of the discharge must be sent to DEQ and Hanover
County Department of Public Works within five (5) days of the discovery.
VA Department of Environmental Quality
5636 Southern Boulevard
Virginia Beach, VA 22362
(757) 518-2000 (phone)
(757) 518-2009 (fax)
(800) 468-8892 (outside normal working
hours)
Isle of Wight County
General Services Department
P. O. Box 80
Isle of Wight County, VA 23397
(757) 365-6388 (phone)
EQUIPMENT / VEHICLE WASHING
Washing must be conducted in a dedicated area that is located to maximize the
distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50
feet from those features.
All wash water used in vehicle wheel washing must be directed to a sediment
basin/trap.
All vehicle washing activities other than wheel washing must have secondary
containment.
Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Activity Location of
Dedicated Area(s)
Shown on
Plan
Sheet
#(s)
Water Source
Location
Wheel Wash Construction
Entrance C-3 Portable Tank
Other Wash
Areas N/A
REVISIONS TO LOCATIONS
Activity Location of
Dedicated Area(s)
Shown on
Plan
Sheet
#(s)
Water Source
Location
Operator’s
Initials
VEHICLE FUELING AND MAINTENANCE
Conduct regular maintenance in a dedicated area that is located to maximize the
distance from storm drain inlets, ditches, waterbodies or wetlands but no less than
50 feet from those features.
If fueling is conducted at a dedicated area, the location must be located to
maximize the distance from storm drain inlets, ditches, waterbodies or wetlands
but no less than 50 feet from those features.
The dedicated areas must be designed to eliminate the discharge of spilled and
leaked fuels and chemicals from vehicle fueling and maintenance activities by
providing secondary containment (spill berms, decks, spill containment pallets,
providing cover where appropriate, and having spill kits readily available).
Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Date
Shown on
Plan
Sheet #(s)
Location of Dedicated Area(s)
Approved
Plan N/A
REVISIONS TO LOCATIONS
Date
Shown on
Plan
Sheet #(s)
Location of Dedicated Area(s) Operator’s
Initials
If mobile fueling will be used, the fueling must be done in an area that located
to maximize the distance from storm drain inlets, ditches, waterbodies or
wetlands but no less than 50 feet from those features.
Spill kits must be readily available at all mobile fueling locations.
On-site storage tanks must have a means of secondary containment (spill
berms, decks, spill containment pallets, etc.) and must be covered where
appropriate.
All vehicles on site must be monitored for leaks and receive regular preventive
maintenance to reduce the chance of leakage.
DISCHARGE FROM STORAGE, HANDLING, AND DISPOSAL
OF CONSTRUCTION PRODUCTS, MATERIALS, AND WASTE
Storage of construction products, materials, and waste is to be conducted in
dedicated areas.
The dedicated area must be located to maximize the distance from storm drain
inlets, ditches, waterbodies or wetlands but no less than 50 feet from those
features. Separations of less than 50 feet may be approved by the Environmental
Inspector.
The dedicated areas must be designed to minimize the discharge of pollutants
from storage, handling, and disposal of construction products, materials and
wastes including (i) building products such as asphalt sealants, copper flashing,
roofing materials, adhesives, concrete admixtures; (ii) pesticides, herbicides,
insecticides, fertilizers, and landscape materials; and (iii) construction and
domestic wastes such as packaging materials, scrap construction materials,
masonry products, timber, pipe and electrical cuttings, plastics, Styrofoam,
concrete and other trash or building products..
Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for storage of
construction products and materials
Approved
Plan N/A
REVISIONS TO LOCATIONS
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for storage
of construction products and materials
Operator(s)
Initials
Follow all federal, state, and local requirements that apply to the use, handling and
disposal of pesticides, herbicides, and fertilizers.
Keep chemicals on-site in small quantities and in closed, well marked containers.
Ensure that containers have lids or are otherwise protected from exposure to
precipitation.
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for waste from
construction products and materials
Approved
Plan N/A
REVISIONS TO LOCATIONS
Date
Shown on
Plan Sheet
#(s)
Location(s) of Dedicated Area(s) for waste
from construction products and materials
Operator(s)
Initials
Follow all federal, state, and local requirements that apply to the use, handling and
disposal of pesticides, herbicides, and fertilizers.
Clean up solid waste, including building materials, garbage, and debris on a daily
basis and deposit into covered dumpsters that are periodically emptied.
Schedule waste collection to prevent exceeding the capacity of onsite containers.
Additional containers may be necessary depending on the phase of construction
(e.g., demolition, etc.)
Dispose of all solid waste at an authorized disposal site.
DISCHARGES FROM OTHER POTENTIAL POLLUTANT
SOURCES
Discharges from other pollutant sources (e.g., water line flushing, storm sewer
flushing, above ground storage tanks, etc.) not mentioned elsewhere must be
addressed.
Other Potential Pollutant Sources Location(s) of Potential Pollutant Sources
Above ground oil storage tanks with a storage capacity exceeding 1,320 gallons
and have a reasonable expectation of a discharge into or upon Waters of the
United States are required to have a Spill Prevention Control and Countermeasure
(SPCC) Plan.
The discharge of contaminated flush water and material removed during flushing
operations must be collected and disposed of in accordance with appropriate
federal, state, and local requirements.
DISCHARGES FROM CONCRETE RELATED
WASH ACTIVITIES
Concrete trucks are not allowed to wash out or discharge surplus concrete or drum
wash water on site except in a dedicated area(s) that is located to prevent
discharge to storm drain inlets, ditches, waterbodies or wetlands but no less than
50 feet from those features.
Each facility must have a stabilized access to prevent mud tracking into the street.
Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Date
Shown on
Plan
Sheet #(s)
Location of Dedicated Area(s)
Approved
Plan N/A
REVISIONS TO LOCATIONS
Date
Shown on
Plan
Sheet #(s)
Location of Dedicated Area(s) Operator’s
Initials
Facilities must be cleaned, or new facilities constructed, once the washout area is
two-thirds (2/3) full.
CONCRETE WASHOUT AREA NOTES
The facility must be lined with 10 mil plastic lining that is free from holes, tears, or
other defects that might compromise the material’s impermeability.
The lining must be anchored with staples (2’ spacing) or sandbags.
Side slopes must be 1:1 (horizontal:vertical) or flatter.
Stone access must be provided between the street and the concrete washout area.
A “Concrete Washout” sign must be installed within 30 feet of the washout facility.
The sign must be no smaller than 2’ tall by 4’ wide.
DISCHARGES OF SOAPS, DETERGENTS, SOLVENTS, AND
WASH WATER FROM CONSTRUCTION ACTIVITIES SUCH AS
CLEANUP OF STUCCO, PAINT, FORM RELEASE OILS, AND
CURING COMPOUNDS
Washing activities associated with construction activities other than vehicle and
equipment washing, such as clean up of stucco, paint, form release oils, and curing
compounds are to be conducted in a dedicated area.
The dedicated area must be located to maximize the distance from storm drain
inlets, ditches, waterbodies or wetlands but no less than 50 feet from those
features. Separations of less than 50 feet may be approved by the Environmental
Inspector.
The dedicated areas must be designed to prevent the discharge of soaps,
detergents, solvents, and wash water.
Date
Shown on
Plan
Sheet #(s)
Location(s) of Dedicated Area(s)
Approved
Plan N/A
REVISIONS TO LOCATIONS
Date
Shown on
Plan
Sheet #(s)
Location(s) of Dedicated Area(s) Operator(s)
Initials
The dedicated area must be covered (e.g., plastic sheeting, temporary roof, etc.)
to prevent contact with stormwater.
The contaminated wastewater from the dedicated area must be collected for
disposal by a waste hauler or discharged to the sanitary sewer.
In situations where these pollutants are or could be generated at locations other
than at the designated area (e.g., concrete pours, building washing, etc.), cover
(e.g., plastic sheeting, temporary roof, etc.) must be provided to prevent contact
with stormwater and the contaminated wastewater from the activity must be
collected for disposal by a waste hauler or discharged to the sanitary sewer.
DISCHARGES OF HAZARDOUS, TOXIC,
AND SANITARY WASTE
Storage and disposal of hazardous, toxic and sanitary wastes are to be conducted
in dedicated areas.
The dedicated areas must be located to maximize the distance from storm drain
inlets, ditches, waterbodies or wetlands but no less than 50 feet from those
features. Separations of less than 50 feet may be approved by the Environmental
Inspector.
The dedicated areas must be designed to prevent the discharge of hazardous,
toxic and sanitary waste by avoiding contact with precipitation
Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Date
Shown on
Plan
Sheet #(s)
Location(s) of Dedicated Area(s) for storage and disposal of
hazardous and toxic wastes
Approved
Plan N/A
REVISIONS TO LOCATIONS
Date
Shown on
Plan
Sheet #(s)
Location(s) of Dedicated Area(s) for storage
and disposal of hazardous and toxic wastes
Operator(s)
Initials
Consult with local waste management authorities or private firms about the
requirements for disposing of hazardous materials and/or soils that may be
contaminated with hazardous materials.
Never remove the original product label from the container. Follow the
manufacturer’s recommended method of disposal.
Date
Shown on
Plan
Sheet #(s)
Location(s) of Dedicated Area(s) for portable toilets
Approved
Plan C-3 Near Construction Entrance
REVISIONS TO LOCATIONS
Date
Shown on
Plan
Sheet #(s)
Location(s) of Dedicated Area(s) for portable
toilets
Operator(s)
Initials
Schedule periodic pumping of portable toilets and dispose of waste
Dispose of all solid waste at an authorized disposal site.
SWPPP MODIFICATIONS AND REVISIONS
The operator(s) shall ensure the SWPPP is modified and/or revised to reflect:
Changes in qualified personnel; delegated authorities or other personnel required as
a condition of the General Construction Permit;
Changes in site conditions;
Changes in the design, construction, operation, or maintenance of the construction
site that affect the potential for discharges of pollutants that are not addressed in the
normal implementation of the plan; and
Ineffective control measures identified during inspections or investigations conducted
by the operator’s qualified personnel or local, state or federal officials.
Modifications/revisions to the SWPPP shall include additional or modified control
measures to address the identified deficiencies.
If the necessary modifications/revisions require approval by the Administrator or DEQ,
the modifications/revisions must be implemented no later than seven (7) calendar days
following approval.
If the necessary modifications/revisions do not require approval by the Administrator, the
modifications/revisions must be implemented prior to the next anticipated storm event or
as soon as practicable.
SWPPP UPDATES
The operator(s) shall update the SWPPP to include:
A record of dates when 1) major grading activities occur, 2) construction activities
temporarily or permanently cease on a portion of the site, and 3) stabilization
measures are initiated;
Documentation of modifications and revisions to the SWPPP;
Areas that have reached final stabilization where no further SWPPP or inspection
requirements apply;
All properties that are no longer under the legal control of the operator and the dates
on which the operator no longer had legal control over each property; and
The date, volume, and corrective/preventative actions implemented for any prohibited
discharge.
The operator(s) shall update the SWPPP no later than seven (7) days following any of
the situations identified above.
OPERATOR INSPECTIONS
The operator(s) identified below shall provide for inspections of the permitted land-
disturbing activities by the qualified personnel identified below. The inspections will be
conducted (select one the following options):
at least once every four (4) business days; or
at least once every five (5) business days and no later than 48 hours following
any measurable storm event.
Where areas are in a stabilized condition or runoff is unlikely due to winter conditions, the
inspection frequency may be reduced to once every 30 days while these conditions exist.
Otherwise, the operator(s) shall resume the regular inspection frequency identified above.
The operator(s) shall provide for inspections of the permitted land-disturbing activity to
ensure implementation and continued maintenance of all requirements of the Stormwater
Pollution Prevention Plan (Erosion and Sediment Control Plan, Stormwater Management
Plan, Pollution Prevention Plan, TMDL requirements, etc.).
Records of the required inspections must be maintained and included in the SWPPP
binder. The qualified personnel are encouraged to use the Operator Inspection form
provided in the SWPPP binder to document the required inspections. If inspections are
conducted once every five (5) business days and no later than 48 hours following any
measureable storm event, the location of the rain gauge used to determine the amount
of rain must be included in the SWPPP and documented in the inspection report.
ACKNOWLEDGMENTS
QUALIFIED PERSONNEL ACKNOWLEDGEMENTS
I certify under penalty of law that I:
a. have been designated by the Operator to conduct inspections of the permitted
site;
b. am knowledgeable in the principles and practices of erosion and sediment
control and stormwater management;
c. possess the skills to assess conditions at the permitted site for the
Operator(s) that could impact stormwater quality and quantity;
d. will assess the effectiveness of any erosion and sediment control measures
or stormwater management facilities selected to control the stormwater
discharges from the permitted site; and
e. will conduct inspections in accordance with the frequency noted above in the
OPERATOR INSPECTIONS.
QUALIFIED PERSONNEL
Name (print)
Signature
Company or
Organization
Address
Phone
Certificates / #s
As the Operator(s), I/we understand that prior to initiating land disturbance, the potential
pollutant sources, appropriate control measures, and all responsible parties (operator,
qualified inspection personnel, contractors, etc.) required as a condition of the General
Construction Permit (GCP) and the Stormwater Pollution Prevention Plan (SWPPP) must
be identified. I also understand this information must be updated as necessary
throughout all phases of construction until the GCP is terminated.
Furthermore,
I/we certify under penalty of law that I/we have read and understand all requirements of
the SWPPP (erosion and sediment control plan, stormwater management plan, pollution
prevention plan, TMDL provisions, administrative requirements, etc.) and GCP and that
the information herein is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine or imprisonment for knowing violations.
I/we understand that I/we are ultimately responsible for compliance with all conditions and
requirements of the SWPPP and GCP and for ensuring all contractors and subcontractors
on the permitted site are aware of the conditions and requirements of the SWPPP and
GCP.
I/we shall comply with all conditions and requirements of the SWPPP and shall at all times
properly operate and maintain all measures and control (and related appurtenances)
which are installed or used to achieve compliance with the conditions of the GCP. Proper
operation and maintenance also includes adequate funding and adequate staffing.
I/we shall take all reasonable steps to minimize or prevent any discharge in violation of
the SWPPP and/or GCP.
I/we understand that if it determined by the Department of Environmental Quality (DEQ)
in consultation with the State Water Control Board at any time that stormwater discharges
are causing, have reasonable potential to cause, or contribute to and excursion above
any applicable water quality standard, the DEQ may, in consultation with the
Administrator, take appropriate enforcement action and require:
a. Modification of control measures to adequately address water quality concerns;
b. Submission of valid and verifiable data and information that are representative
of ambient conditions and indicate that the receiving water is attaining water
quality standards; or
c. Cessation of discharges of pollutants from construction activity and submit an
individual permit application according to 4VAC25-870-410.
OPERATOR(S)
Name (print) Signature Company or
Organization Date