Shirley T. Holland Intermodal Park Phase II Ditch Maintence IFB #16-1815-01 IFB # 16-1815-01 INVITATION FOR BID DEPARTMENT OF BUDGET AND FINANCE Shirley T. Holland Intermodal Park – Phase II Ditch Maintenance Section A (Submit with the bid) IFB # 16-1815-01 INVITATION FOR BID DEPARTMENT OF BUDGET AND FINANCE Shirley T. Holland Intermodal Park – Phase II Ditch Maintenance Sealed bids subject to the conditions and instructions contained herein, will be received at the office of the Purchasing Agent listed below, until the time and date shown below (local prevailing time), for furnishing the items or services described herein. SCOPE OF WORK: Contractor shall provide all labor, superintendence, materials, tools, equipment, and other ancillary items necessary as identified to complete the ditch maintenance at Shirley T. Holland Intermodal Park –Phase II. The project consists of the excavation and cleaning of existing ditches and culverts within the park. Two new culverts will be installed. Temporary erosion and sediment control features include silt fence (standard and wire back), inlet and outlet protection, construction road stabilization, timber matting, EC-2 matting and a standard construction entrance. Details included within the plans. Bid Due: 3:00 PM., August 7, 2015 Contract Officer: Michael Coburn, Sr., Purchasing Agent, Michael.coburn@isleofwightus.net ** SECTION "A" AND ONE ELECTRONIC CD COPY IS REQUESTED AT SUBMITTAL** In compliance with this invitation for bids, and subject to all the conditions thereof, the undersigned offers, if this bid is accepted within ninety (90) calendar days from the date of the opening, to furnish any or all of the items and/or services upon which prices are quoted, at the price set opposite each item, to be delivered at the time and place specified herein. The undersigned certifies he has read, understands, and agrees to all terms, conditions, and requirements of this bid, and is authorized to contract on behalf of firm named below. Company Name: Address: City / State / Zip: Telephone: FAX No.: E-mail: Print Name: Title: Signature: Date: Table of Contents Section A .................................................................................................................................................................. 1 Bid Due: 3:00 PM., August 7, 2015 .................................................................................................................. 2 BID SUBMITALS: .................................................................................................................................................. 4 QUESTIONS:........................................................................................................................................................... 4 BID OPENING: ....................................................................................................................................................... 4 LIQUIDATED DAMAGES: ................................................................................................................................... 4 PRE-BID MEETING: ............................................................................................................................................. 4 BID FORM ............................................................................................................................................................... 6 CONDITIONS AND INSTRUCTIONS ................................................................................................................. 9 Section B ................................................................................................................................................................ 20 AGREEMENT ....................................................................................................................................................... 21 Section C ................................................................................................................................................................ 24 GENERAL CONDITIONS ................................................................................................................................... 25 Technical Specifications .............................................................................................................................................. 71 INVITATION FOR BIDS Shirley T. Holland Intermodal Park, Phase II, Ditch Maintenance: Contractor shall provide all labor, superintendence, materials, tools, equipment, and other ancillary items necessary as identified to complete the ditch excavation and cleaning at Shirley T. Holland Intermodal Park, Phase II. The project consists of the excavation and cleaning of existing ditches and culverts at the Intermodal Park. The work will generate a total disturbed area of approximately 12 acres with an estimated volume of ditch excavation of 11,000 CY. New culverts associated with this improvement consists of approximately 40 LF of 18” HDPE pipe and 60 LF of 30” HDPE pipe. Temporary erosion and sediment control features include silt fence (standard and wire back), inlet and outlet protection, construction road stabilization, timber matting, EC-2 matting and a standard construction entrance. Bids received prior to the opening time specified below shall be publicly opened and read aloud at the specified opening time in the IOWC Department of Budget and Finance. Sealed bids, subject to the conditions and instructions contained herein, will be accepted at: Department of Budget and Finance Isle of Wight County 17090 Monument Circle, Suite 137 Isle of Wight, VA 23397 BID SUBMITALS: Bid Documents may be obtained on the Isle of Wight website under Budget and Finance: http://www.co.isle-of-wight.va.us/budget-and-finance/ and on the State’s eVA website: http://eva.virginia.gov/, or from the Purchasing office at: Isle of Wight County, Department of Budget and Finance, 17090 Monument Circle, Suite 137, Isle of Wight, Virginia, 23397 QUESTIONS: Questions concerning this project must be in writing and addressed to the Purchasing Agent as shown on the cover page; and, must be received no later than five (5) business days preceding the date that the bids are accepted. BID OPENING: Bids shall be publicly opened and read aloud on the date that the bids are accepted. Public opening will be held at 3:15 PM. (local prevailing time), in the Isle of Wight Purchasing Office at: 17090 Monument Circle, Isle of Wight, Virginia 23397. LIQUIDATED DAMAGES: If said work is not completed within the time stated in the Notice to Proceed, the Contractor shall be liable and hereby agrees to pay to the Owner as liquidated damages, and not as a penalty, the amount of five hundred dollars ($500.00) per calendar day for each and every part of a day thereafter that said work remains substantially incomplete. The County reserves the right, at its sole discretion, to deduct liquidated damages from any outstanding amount due the Contractor. IF YOU NEED ANY REASONABLE ACCOMMODATION FOR ANY TYPE OF DISABILITY IN ORDER TO PARTICIPATE IN THIS PROCUREMENT, PLEASE CONTACT THIS DIVISION AS SOON AS POSSIBLE. PRE-BID MEETING: A pre-bid meeting is not being held. Bids must be submitted on the designated Bid Form, signed by an authorized representative, delivered in a sealed opaque envelope bearing the Bidder's name, address, project name, acceptance date and time. An electronic copy is requested and should be included with your submittal. Revisions, changes, and deletions contained in the bid documents must be initialed by the Bidder. Failure to comply with this instruction may result in the bid being deemed non-responsive. Bidders should carefully examine the specifications and fully inform themselves to all conditions and matters that could have an effect on the cost. Should a Bidder find discrepancies in or omissions from the specifications or Invitation to Bid, or should be in doubt as to their meanings, he shall notify Procurement personnel as noted above. The right is reserved to revise or amend these specifications prior to the date set for receipt of bids as may be required by the County. That date may be delayed if deemed necessary by the County. Any revisions and/or amendments will be in the form of an addendum to this document. The right is reserved to accept or reject any or all bids in whole or in part and to waive any informalities in the IFB, and to enter into any contract deemed to be in the best interest of IOWC. Bidder has examined copies of all the Bid Documents including the following Addenda: Date Number _____________ _ Bidder has made such independent investigations as Bidder deems necessary to fully inform himself as to the conditions affecting cost and progress of performance of the Work. BID FORM TO: Isle of Wight County, Virginia Director of Budget and Finance 17090 Monument Circle, Suite 137 Post Office Box 80 Isle of Wight, Virginia 23397 RE: Isle of Wight County, Virginia Shirley T. Holland Intermodal Park, Phase II Ditch Maintenance Isle of Wight County IFB # 16-1815-01 The undersigned Bidder, , offers and agrees, if this Bid is accepted, to enter into an Agreement with the Owner in the form included in the Contract Documents to complete all Work as specified or indicated in the Contract Documents for the Lump Sum of ($ ). Bidder agrees to begin the Work within ten (10) days of Notice to Proceed and that Final Completion shall be within seventy (70) calendar days of Notice to Proceed. In submitting this bid, Bidder represents, as more fully set forth in the Bid Documents, that: Bidder has examined copies of all the Bid Documents including the following Addenda: Date Number _____________ Bidder has examined the site and locality where the Work is to be performed, the legal requirements (federal, State and local laws, ordinance, rules and regulations) and has made such independent investigations as Bidder deems necessary to fully inform himself as to the conditions affecting cost and progress of performance of the Work. The Method of Payment is invoice processing upon presentation with Terms of Net 30 days. Not more than fifty percent (50%) of the work shall be subcontracted and the amount of any subcontractors proposed by the bidder in excess of ten percent (10%) of the bid price shall be identified on the Bid Form. Subcontractor:____________________________________________________________ Subcontractor:____________________________________________________________ Bidders shall provide a list of at least three (3) references (1 each from the last 3 construction projects). Each reference shall include the name of the organization, the complete mailing address, the name of the contact person and telephone number. ORGANIZATION ADDRESS CONTACT PERSON TELEPHONE 1._____________________________________________________________________________ 2._____________________________________________________________________________ 3._____________________________________________________________________________ Bidder accepts all terms and conditions of the Contract Documents. I certify by my signature below that I have received the documents associated with this Bid and understand that the review for completeness of these documents and the understanding and comprehension of the specifications is solely my responsibility; based on this, by my signature below, I waive all rights to future claims against Isle of Wight County that the documents were incomplete or not understandable. My signature below certifies that this Bid is not the result of or affected by, any act of collusion with another person or company engaged in the same line of business or commerce, or any act of fraud punishable under Section 18.2-498.1 et. seq. of the Code of Virginia (1950, as amended). Furthermore, I understand that fraudulent bidding is a crime under the Virginia Governmental Frauds Act, the Virginia Government Bid Rigging Act, the Virginia Anti-Trust Act, and federal law and can result in fines, prison sentences, and civil damage awards. I certify that the bidder represented herein is eligible to bid with respect to all applicable sections of State and Local Government Conflict of Interest Act, Section 2.2-3100 Et Seq., of the Code of Virginia (1950, as amended). I agree to abide by all conditions of this Bid and certify that I am authorized to sign this Bid. Virginia Contractor No.___________________________________________________________ Signature Date Print __________________________________________________________________________ State Corporation Commission Identification No: Or Describe why the bidder or offeror is not required to be authorized by the State Corporation Commission: ______________________________________________________________________________ _____________________________________________________________________________________ _______________________________________________________________________ (An Individual, Partnership, or Non-Incorporated Organization) Type/Print Name_________________________________________________________________ Title ________________________________________________________________________ Name of Organization __________________________________________________________ Business Address________________________________________________________________ Phone Number_____________________________ Fax No.____________________________ (A Corporation) Corporation Name _______________________________________________________________ State of Incorporation __________________________________________________________ Person Authorized to Sign_________________________________________________________ Title ________________________________________________________________________ (Corporate Seal) Attest (Secretary)________________________________________________________________ Business Address________________________________________________________________ Phone Number_____________________________ Fax No.____________________________ (A Joint Venture) By (Signature) _________________________________________________________________ Type/Print Name________________________________________________________________ Title _______________________________________________________________________ Virginia Contractor No.___________________________________________________________ Business Address________________________________________________________________ Phone Number__________________________ Fax No._______________________________ By (Signature) _________________________________________________________________ Type/PrintName_________________________________________________________________ Title__________________________________________________________________________ Virginia Contractor No.___________________________________________________________ Business Address________________________________________________________________ Phone Number__________________________ Fax No._______________________________ (Each joint venturer must sign. The name of signing for each individual, partnership and corporation that is a party to the joint venture shall be in the manner indicated above.) CONDITIONS AND INSTRUCTIONS Rev: 07/29/2015 1. Use of Form: All bids shall be submitted on and in accordance with this form. If more space is required to furnish a description of the goods and/or services bid, or delivery terms, the bidder may attach a letter hereto that will be made a part of the bid. In case of a conflict with published requirements, the bid may be considered non-responsive. The County’s published specifications shall supersede any additional writings submitted with the bid. Such additional writings shall be clearly marked and noted as an exception. 2. Submittals: All bids shall be submitted sealed, plainly marked showing the bid number, date and time. The entire Section ‘A” of the document is to be returned when submitting a bid unless otherwise directed by the bid document. Failure to return all pages may result in a determination that the submittal is non-responsive. 3. Late Bids: Bids and amendments thereto, if received by Purchasing after the date and time specified for bid opening, will not be considered. It will be the responsibility of the bidder to see that their bid is received by Purchasing as specified. There will be no exceptions. Date of postmark will not be considered. Telephone, facsimile, electronic and verbal bids will not be accepted. Prices or changes shown on the outside of an envelope will not be considered in determination of low bid. 4. County Offices Closure: If County Offices are closed for business at the time scheduled for the bid opening, for whatever reasons, sealed bids will be accepted and opened on the next business day of the County, at the original scheduled hour. 5. Acceptance of Bid: Receipt of the bid by the County is not to be construed as an award or an order to ship. 6. Offer/Acceptance: Each bid is received with the understanding that the acceptance in writing by the County of the bidder to furnish any or all of the goods and/or services described therein, shall constitute a contract between the bidder and the County, which shall bind the bidder to furnish and deliver the goods and/or services quoted at the prices stated and in accordance with the conditions of the accepted bid; and the County on its part to order from such bidder, except for causes beyond reasonable control; and pay for, at the agreed prices, all goods and/or services specified and delivered. 7. Withdrawal of Bids: Bidder has the right to request withdrawal of their bids from consideration due to error by giving notice not later than two business days after the bids are publicly opened. Work papers showing evidence of error(s) may be required. Bids may be withdrawn any time prior to the bid opening. Withdrawal of bids may be accomplished by submitting such request in writing on the issuing company's letterhead in person, electronically (email) or by certified mail. 8. Addenda: If issued, addenda to this solicitation will be posted on the Purchasing website http://www.co.isle-of-wight.va.us/budget-and-finance/ It is the bidder’s responsibility to check the website or to contact the Purchasing division prior to the submittal deadline to ensure that the bidder has a complete, up-to-date package. Acknowledgement of all issued Addenda shall be indicated on the bid form in the appropriate spaces. 9. Governing Document: The solicitation document maintained by Purchasing, in the bid file, shall be considered the official copy. In the case of any inconsistency between bid documents submitted to the County, but not clearly listed as an exception, the language of the official copy shall prevail. Furthermore, any exception or change to the specifications made by the bidder may be cause to disqualify your bid. 10. Award: Award will be made to the lowest responsive and responsible bidder. The quality of the goods and/or services to be supplied, their conformity with the specifications, their suitability to the requirements, the delivery, qualifications and references will be taken into consideration in making the award. The County reserves the right to refuse all bids. Determination of low bid shall be determined by the audited figure shown on the pricing page titled ‘Total Sum’ In case of error in the extension of prices, the unit price shall govern. 11. Negotiation: Unless canceled or rejected, a responsive bid from the lowest responsible bidder shall be accepted as submitted; except that if the bid from the lowest responsible bidder exceeds available funds, the County may negotiate with the apparent low bidder to obtain a contract price within the available funds. 12. Announcements: Upon the award or the announcement of the decision to award a contract, the County will publicly post such notice on the bulletin board located outside of the Purchasing Division and on the County’s web site: http://www.co.isle-of-wight.va.us/budget-and-finance/ 13. County’s Rights: The County reserves the right to reject any and all bids, and to waive any informality if it is determined to be in the best interest of the County. 14. Cooperative Agreements: If authorized by the bidder(s), the resultant contract(s) may be extended to any jurisdiction within the Commonwealth of Virginia to purchase at the contract prices in accordance with the contract terms. Any jurisdiction using such contracts shall place its own order(s) directly with the successful contractor(s). The County of Isle of Wight acts only as the contracting agent and is not responsible for placement of orders, payment, or discrepancies of the participating jurisdictions. It is the contractor’s responsibility to notify the jurisdictions of the availability of contract(s). 15. Prices: Prices shall be stated in units of quantity specified. No additional charges shall be passed on to the County, including any applicable taxes, delivery, or surcharges. Prices quoted shall be the final cost to the County. In case of error in the extension of prices, the unit price shall govern. 16. Corrections: All prices and notations should be in ink or typewritten. Mistakes may be crossed out and corrections made in ink and must be initialed and dated by the person signing the bid. 17. Delivery: The time of delivery must be stated in definite terms. If time of delivery for different goods and/or services varies, the bidder shall so state. 18. Samples: Samples, when requested, must be furnished free of expense, and upon request, if not destroyed, will be returned at the bidder’s risk and expense. 19. Brand Names: The use of the name of a manufacturer, brand, make or catalog designation in specifying an item shall restrict bidders to the manufacturer, brand, make or catalog designation identified, unless qualified by the provision “or equal.” If qualified by the provision “or equal” the Brand Names are used simply to indicate the character, quality and/or performance equivalence of the goods and/or services desired. The goods and/or services on which bids are submitted must be of such character, quality and/or performance equivalence that it will serve as that specified. In submitting bids on goods and/or services other than as specified, bidder shall furnish complete data and identification with respect to the alternate goods and/or services that they propose to furnish. It shall be in the County’s sole judgment if a substitute product offered is an approved equal and acceptable. 20. Standard equipment: Any equipment delivered must be standard, new and unused equipment, latest model, except as otherwise specifically stated in the bid. Where any part or the normal accessories of equipment is not described, it shall be understood that all the equipment and accessories that are usually provided in the manufacturer’s stock model shall be furnished. 21. Silence of Specifications: The apparent silence of these specifications and any supplemental specifications as to any detail or the omission from the specifications of a detailed description concerning any point shall be regarded as meaning that only the best commercial practices are to prevail and correct type, size and design are to be used. All interpretations of these specifications shall be made on the basis of this statement. 22. Capacity of Bidder: All bids must be signed by a responsible officer or employee having the authority to bind the firm in contract. The bidder agrees that its contract performance shall be in strict conformance with the contract documents. 23. Rights to Damages: By signing this bid, the bidder assigns to the County any and all rights that it may have under the antitrust laws of the United States and the Commonwealth of Virginia in any way arising from or pertaining to this bid. This provision is remedial in nature and is to be liberally construed by any court in favor of the County. 24. Anti-collusion: The bidder certifies by signing this Invitation of Bid that this bid is made without prior understanding, agreement, or accord with any other person or firm submitting a bid for the same goods and/or services and that this bid is in all respects bona fide, fair, and not the result of any act of fraud or collusion with another person or firm engaged in the same line of business or commerce. Any false statement hereunder may constitute a felony and can result in a fine and imprisonment, as well as civil damages. 25. Indemnification: The Contractor shall defend, indemnify and hold the County, and the County’s employees, agents, and volunteers, harmless, from and against any and all damage claim, liability, cost, or expense (including, without limitation, attorney’s fees and court costs) of every kind and nature (including, without limitation, those arising from any injury or damage to any person, property or business) incurred by or claimed against the contractor, its employees, agents, and volunteers, or incurred by or claimed against the County, the County’s employees, agents, and volunteers, arising out of, or in connection with, the performance of all services hereunder by the contractor. This indemnification and hold harmless includes, but is not limited to, any financial or other loss including, but not limited to, any adverse regulatory, agency or administrative sanction or civil penalties, incurred by the County due to the negligent, fraudulent or criminal acts of the contractor or any of the Contractor’s officers, shareholders, employees, agents, contractors, subcontractors, or any other person or entity acting on behalf of the Contractor. Unless otherwise provided by law, the Contractor indemnification obligations hereunder shall not be limited in any way by the amount or type of damages, compensation, or benefits payable by or for the Contractor under worker’s compensation acts, disability benefit acts, other employee benefit acts, or benefits payable under any insurance policy. This paragraph shall survive the termination of the contract including any renewal or extension thereof. 26. Copyright Protection: The Contractor agrees to defend and save the County, its agents, officials, and employees, harmless from liability of any nature or kind, for use of any copyright, composition, secret process, patented or unpatented invention, articles or appliances furnished or used in the performance of the contract, or which the Contractor is not the patentee, assignee, or licensee, to the same extent as provided in the above paragraph. 27. Laws, Regulations: The Contractor shall keep fully informed of all federal, state, and local laws, ordinances and regulations that in any manner affect the conduct of the work. The Contractor shall at all times observe and comply with all such laws, ordinances and regulations. 28. Alien employment: The Contractor certifies that he does not and shall not during the performance of the contract for goods and services in the Commonwealth, knowingly employ unauthorized aliens as defined in the federal Immigration Reform and Control Act of 1986, as amended. 29. SCC Authorization: All bidders or offerors organized or authorized to transact business in the Commonwealth pursuant to Title 13.1 or Title 50, as amended, shall include the identification number issued to it by the State Corporation Commission. Any bidder or offeror that is not required to be authorized to transact business in the Commonwealth as a foreign business entity under Title 13.1 or Title 50, as amended, or as otherwise required by law shall include in its bid or proposal a statement describing why the bidder or offeror is not required to be so authorized. SCC Number or Statement: _______________________________________________ Any business entity that enters into a contract with a public body pursuant to this chapter shall not allow its existence to lapse or its certificate of authority or registration to transact business in the Commonwealth, if so required under Title 13.1, or Title 50, as amended, to be revoked or cancelled at any time during the term of the contract. The County may void any contract with a business entity if the business entity fails to remain in compliance with the provisions of this section. 30. Contractor’s License: If any of the services promulgated under this solicitation consist of construction work, it is required under Title 54.1, Chapter 11, Code of Virginia, for a contractor who performs or manages construction, removal, repair, or improvement when the total value referred to in a single contract or project is: One hundred twenty thousand dollars ($120,000) or more, or the total value of all such construction, removal, repair or improvements undertaken by such person within any twelve- month period is seven hundred fifty thousand dollars ($ 750,000) or more shall show evidence of being licensed as a Class A Contractor. Ten thousand dollars ($10,000) or more, but less than one hundred twenty thousand dollars ($120,000) or the total value of all such construction, removal, repair, or improvement undertaken by such person within any twelve-month period is one hundred and fifty thousand dollars ($150,000) or more, but less than seven hundred fifty thousand dollars ($750,000) shall show evidence of being licensed as a Class B Contractor. Over one thousand ($1,000) but less than ten thousand ($10,000), or the total value of all such construction, removal, repair, or improvements undertaken by such person within any twelve- month period is one hundred and fifty thousand dollars ($150,000) shall show evidence of being licensed as a Class C Contractor. The County shall require master certification as a condition of licensure or certification of electrical, plumbing and heating, ventilation and air conditions contractors. A valid business license from the County may be required. The bidder shall complete whichever of the following notations as appropriate: “Licensed Class A Virginia Contractor Number .” “Licensed Class B Virginia Contractor Number .” “Licensed Class C Virginia Contractor Number .” 31. Payment Terms: Payment terms shall be ‘Net 30’days, from the date of Contractor invoice approval by the County. Payment terms, if offered, shall not be considered in determining the low bidder. Discount period, if offered, shall be computed from the date of proper receipt of the contractor’s correct invoice, or from the date of acceptable receipt of the goods and/or services, whichever is latest. The payment terms stated herein must appear on the contractor’s invoice. Failure to comply with this requirement shall result in the invoice being returned to the contractor for correction. Late payment charges shall not exceed the allowable rate specified by the Commonwealth of Virginia Prompt Payment Act. (1% per month) Contractor shall submit invoices in duplicate, such statement to include detailed breakdown of all charges, and shall be based on completion of tasks or deliverables. Individual Contractors shall provide their social security numbers, and proprietorships, partnerships, and corporations shall provide their federal employer identification number on their submittal. The County prefers to make payment with the County’s Purchasing Card. Typically this enables faster payments to the Contractor. Are you willing and able to accept this type of payment? Yes____ No____ 32. Default: In event of default by the Contractor, the County reserves the right to procure the goods and/or services from other sources, and hold the Contractor liable for any excess cost occasioned thereby. Such actions taken by the County shall not release the contractor from additional remedies that may be allowed by law. 33. Availability of Funds: A contract shall be deemed in force only to the extent of appropriations available to each department for the purchase of such goods and/or services. The County’s extended obligations on those contracts that envision extended funding through successive fiscal periods shall be contingent upon actual appropriations for the following years. 34. Appeals Procedure: Upon your request, administrative appeals information will be provided that shall be used for hearing protests of a decision to award, or an award, appeals from refusal to allow withdrawal of bids, appeals from disqualification, appeals for debarment or suspension, or determination of non-responsibility and appeals from decision or disputes arising during the performance of a contract. To be timely all appeals shall be made within the time periods set forth by the Virginia Public Procurement Act, §2.2-4357, et seq. Contact the buyer at once for assistance. 35. Faith-based Organizations: The County of Isle of Wight does not discriminate against faith- based organizations. 36. Anti-Discrimination: By submitting their bids, bidders certify to the County that they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended, as well as the Virginia Fair Employment Contracting Act of 1975, as amended, where applicable, the Virginians with Disabilities Act, the Americans with Disabilities Act and 2.2-4311 of the Virginia Public Procurement Act (VPPA). If the award is made to a faith-based organization, the organization shall not discriminate against any recipient of goods, services, or disbursements made pursuant to the contract on the basis of the recipient's religion, religious belief, refusal to participate in a religious practice, or on the basis of race, age, color, gender or national origin and shall be subject to the same rules as other organizations that contract with public bodies to account for the use of the funds provided; however, if the faith-based organization segregates public funds into separate accounts, only the accounts and programs funded with public funds shall be subject to audit by the public body. (Code of Virginia 2.2.4343.1E). In every contract over $10,000 shall include the following provisions: 1. During the performance of this contract, the Contractor agrees as follows: a. The Contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, national origin, age, disability, service disabled veterans or any other basis prohibited by state law relating to discrimination in employment, except where there is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause. b. The Contractor, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, will state that such Contractor is an equal opportunity employer. c. Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting these requirements. 2. The Contractor will include the provisions of Section a, b, and c above in every subcontract or purchase order over $10,000, so that the provisions will be binding upon each subcontractor or vendor. 37. Drug-Free Workplace: During the performance of this contract, the Contractor agrees to (1) provide a drug-free workplace for the Contractor's employees; (2) post in conspicuous place, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor's workplace and specifying the actions that will be taken against employees for violations of such prohibition; (3) state in all solicitation or advertisement for employees placed by or on behalf of the Contractor that the Contractor maintains a drug-free workplace; and (4) include the provisions of the foregoing clauses in every subcontract or purchase order of over $10,000, so that the provisions will be binding upon each subcontractor or vendor. For the purposes of this section, "drug-free workplace" means a site for the performance of work done in connection with a specific contract awarded to a Contractor, the employees of whom are prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession or use of any controlled substance or marijuana during the performance of the contract. 38. Assignment of Contract: A contract shall not be assignable by the Contractor in whole or in part without the written consent of the County. 39. Independent Contractor: The Contractor and any employees, agents, or other persons or entities acting on behalf of the Contractor shall act in an independent capacity and not as officers, employees, or agents of the County. 40. Scheduling and Delays: The parties to any contract resultant of this solicitation acknowledge that all or part of the work to be performed hereunder may be delayed and extended at the option of the County. Such delays may be caused by delays, denials and modifications of the various state or federal permits, or for other reasons. The County shall not be required to pay any of the Contractor’s direct or indirect costs, or claims for compensation, extended overhead, or other damage or consequential damages arising out of or related to any delays or interruptions required or ordered by the County. If the County delays the project for any reason for a continuous period of ninety (90) days or more, the County and Contractor will negotiate a mutually agreeable adjustment to the Contractor’s award amount. Notwithstanding the above, in construction contracts, to the extent that an unreasonable delay is caused by the act or omissions of the County due to causes within the County’s control, the above waiver or release shall not apply. 41. Governing Law: This Agreement is made, entered into, and shall be performed in the County of Isle of Wight, Virginia, and shall be governed by the applicable laws of the Commonwealth of Virginia without regard to its conflict of law rules. In the event of litigation concerning this Agreement, the parties agree to the exclusive jurisdiction and venue of the Circuit Court of the County of Isle of Wight, Virginia; however, in the event that the federal court has jurisdiction over the matter, then the parties agree to the exclusive jurisdiction and venue of the U.S. District Court for the Eastern District of Virginia, Norfolk Division. The Contractor shall not cause a delay in services because of the pending or during litigation proceedings, except with the express, written consent of the County or written instruction/order from the Court. 42. Severability: If any provision of this contract or the application thereof to any person or circumstances shall to any extent be invalid or unenforceable, the remainder of this contract, or the application of such provision to persons or circumstances other than those which it is invalid or unenforceable, shall not be affected hereby, and each provision of this contract shall be valid and enforced to the full extent permitted by law. 43. Termination for Convenience: The County may at any time, and for any reason, terminate this Contract by written notice to Contractor specifying the termination date, which shall be not less than thirty (30) days from the date such notice is mailed. Notice shall be given to Contractor by certified mail/return receipt requested at the address set forth in Contractor’s Bid Proposal or as provided in this Contract. In the event of such termination, Contractor shall be paid such amount as shall compensate Contractor for the work satisfactorily completed, and accepted by the County, at the time of termination. If the County terminates this Contract, Contractor shall withdraw its personnel and equipment, cease performance of any further work under this Contract, and turn over to the County any work completed or in process for which payment has been made. 44. Termination for Cause: In the event that Contractor shall for any reason or through any cause be in default of the terms of this Contract, the County may give Contractor written notice of such default by certified mail/return receipt requested at the address set forth in Contractor’s Bid/Proposal or as provided in this Contract. Unless otherwise provided, Contractor shall have ten (10) days from the date such notice is mailed in which to cure the default. Upon failure of Contractor to cure the default, the County may immediately cancel and terminate this Contract as of the mailing date of the default notice. Upon termination, Contractor shall withdraw its personnel and equipment, cease performance of any further work under the Contract, and turn over to the County any work in process for which payment has been made. In the event of violations of law, safety or health standards and regulations, this Contract may be immediately cancelled and terminated by the County and provisions herein with respect to opportunity to cure default shall not be applicable. 45. Contact Prohibition: Direct contact with County departments other than Purchasing, on the subject of this bid is expressly forbidden except with the foreknowledge and permission of the Contract Officer. Violation may result in a determination that your firm is ineligible for an award. All questions shall be in writing to the Contract Officer shown on the title page of the bid. The respondents to this IFB shall not contact, either directly or indirectly, any other employee or agent of the County regarding this IFB. This prohibition shall also extend to the County Board of Supervisors and locally elected officials. Any such unauthorized contact may disqualify the bidder from this procurement. 46. Additional Conditions: The Conditions and Instructions in this solicitation are intended to apply to the resulting contract and shall supersede any conflicting terms offered. Any additional conditions a bidder intends be considered must be submitted with the bid and noted as an exception. Such exceptions may result in a finding that the submittal is ‘non-responsive’ to the bid, negating possibility of an award to that bidder. Contractual documents submitted by the successful firm after an award will not be accepted. 47. Contractor Failure to Perform: Failure of the Contractor to perform the contract by reason of the County’s non-acceptance of additional conditions submitted after the award shall result in termination of the contract by the County, and may result in debarment of the Contractor for a period of up to three (3) years. Termination and /or debarment of the Contractor shall not constitute a waiver by the County of any other rights or remedies available to the County by law or contract. 48. Conflict: In the event of a conflict between the contract documents, including these Conditions and Instructions, and the terms of a purchase order or related document issued by Purchasing, the contract documents shall control. 49. Records and Inspection: The Contractor shall maintain full and accurate records with respect to all matters covered under this contract, including, without limitation, accounting records, written policies, procedures, time records, telephone records, and any other supporting evidence used to memorialize, reflect, and substantiate charges or fees related to this contract. The Contractor’s records shall be open to inspection and subject to audit and/or reproduction, during normal working hours, by the County and its employees, agents or authorized representatives after giving at least three (3) days’ notice to the Contractor by the County. The County shall have access to such records from the effective date of this contract, for the duration of the contract, and for five (5) years after the date of final payment by the County to the Contractor pursuant to this contract or any renewal or extension of this contract. The County’s employees, agents or authorized representatives shall have access to the Contractor’s facilities, shall have access to all necessary records and shall be provided adequate and appropriate work space, in order to conduct audits. 50. Rights and Remedies Not Waived: In no event shall the making by the County of any payment to the Contractor, or the waiver by the County of any provision under this contract including any obligation of the Contractor, constitute or be construed as a waiver by the County of any other provision, obligation, breach of covenant, or any default which may exist under this contract on the part of the Contractor, and the making of any such payment by the County while any such breach or default exists shall not impair or prejudice any right or remedies available to the County. 51. Entire Agreement: This contract and any additional or supplementary documents incorporated herein by reference contain all the terms and conditions agreed upon by the parties hereto, and no other agreements, oral or otherwise, regarding the subject matter of this contract or any part thereof shall have any validity or bind any of the parties hereto. This contract shall not be modified, altered, changed or amended unless in writing and signed by the parties hereto. 52. Conflicts of Interests: Contractor shall not accept or receive commissions or other payments from third parties for soliciting, negotiating, procuring, or effecting insurance on behalf of the County. 53. Responsibility of Contractor: The Contractor shall, without additional costs or fee to the County, correct or revise any errors or deficiencies in his performance. Neither the County’s review, approval or acceptance of, nor payment for any of the services required under this Agreement shall be deemed a waiver of rights by the County, and the Contractor shall remain liable to the County for all costs which are incurred by the County as a result of the Contractor’s negligent performance of any of the services furnished under this Agreement. 54. Changes and Additions: It shall be the responsibility of the Contractor to notify the County, in writing, of any necessary modifications or additions in the Scope of this Agreement. Compensation for changes or additions in the Scope of this Agreement will be negotiated and approved by the County, in writing. It is understood and agreed to by both the County and the Contractor that such modifications or additions to this Agreement shall be made only by the full execution of the County’s standard Agreement change order form. Furthermore, it is understood and agreed by both parties that any work done by the Contractor on such modification or addition to this Agreement prior to the County’s execution of its standard Agreement change order form shall be at the total risk of the Contractor and said work may not be compensated by the County. 55. Debarment Status: By submitting a bid, bidders certify that they are not currently debarred by the Commonwealth of Virginia from submitting bids or proposals on contracts for the type of goods and/or services covered by this solicitation, nor are they an agent of any person or entity that is currently so debarred. 56. Safety: All Contractors and subcontractors performing services for the County are required and shall comply with all Occupational Safety and Health Administration (OSHA), State and County Safety and Occupational Health Standards and any other applicable rules and regulations. Also all Contractors and subcontractors shall be held responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site area under this contract. 57. License Requirement: All firms doing business in the County of Suffolk are required to be licensed in accordance with the County of Isle of Wight business license ordinance. Wholesale and retail merchants without a business location in the County of Isle of Wight are exempt from this requirement. Any questions concerning business licenses should be directed to the Commissioner of the Revenue’s Office. 58. Contractor’s Form: In cases where the County may accept the Contractor’s form agreement, whereas certain standard clauses that may appear in the Contractor’s form agreement cannot be accepted by the County, and in consideration of the convenience of using that form, and this form, without the necessity of negotiating a separate contract document, the parties hereto specifically agree that, notwithstanding any provisions appearing in the attached Contractor’s form contract, the County’s contract addendum shall prevail over the terms of the Contractor’s agreement in the event of a conflict. 59. Bidder Qualifications: Only bids from established contractors for work similar in scope to work herein shall be considered; the County reserves the right to request specific reference information prior to award. Bidder shall demonstrate that he has adequate and appropriate manpower, tools and equipment to respond and perform in accordance with the provisions herein. The County may, at its option, disqualify a bidder and reject his bid for cause. Reasons deemed to be sufficient for this action shall include, but not be limited to, the following: o Evidence of collusion among bidders. o Receipt of more than one bid on any project from an individual, or from a corporation. This restriction does not apply to subcontractors o Default on any previous contract. o For unreasonable failure to complete a previous contract within the specified time or for being in arrears on an existing contract without reasonable cause for being in arrears. o Inability to perform as revealed by an investigation of the Bidder's financial statement, experience and/or plant and equipment. o Contractor does not meet project-specific requirements, as identified in the Contract Documents 60. Pricing to be F.O.B. Destination – Freight Allowed: Pricing shall be F.O.B. destination-freight included for all competitive bids. F.O.B. Destination-Freight Included shall include all shipping costs to the County location(s) at the unit cost. No additional shipping charges shall be allowed. 61. Contract Quantities: The quantities specified in the Invitation for Bid are estimates only unless otherwise clearly noted, and are given for the information of bidders and for the purpose of bid evaluation. They do not indicate the actual quantity that will be required, since such volume will depend upon requirements that may develop during the contract period. Quantities shown shall not be construed to represent any amount which the County shall be obligated to purchase under the contract, or relieve the Contractor of his obligation to fill all orders placed by the County, except as clearly noted. 62. Competition Intended: It is the County’s intent that the Invitation for Bid (IFB) permits competition. It shall be the bidder’s responsibility to advise the Buyer in writing if any language requirement, specification, etc., or any combination thereof, inadvertently restricts or limits the requirements stated in this IFB to a single source. Such notification must be received by the Contract Officer prior to the date set for bids to close. 63. Default on Taxes: No bid or proposal will be accepted from, or any Contract awarded to, any person, firm, or corporation that is in arrears, or in default to the County upon any debt or Contract, or that is a defaulter as surety, or otherwise upon any obligation to the County. Section B (To be filled out and returned by Successful Bidder) AGREEMENT THIS AGREEMENT, made and entered into this day of ______________, 2015, by and between the COUNTY OF ISLE OF WIGHT, VIRGINIA, whose principal office is 17090 Monument Circle, Suite 137, Isle of Wight, Virginia 23397, hereinafter called "OWNER", party of the first part, and ___________________________________________________________________________here inafter referred to as "CONTRACTOR", party of the second part. The CONTRACTOR did, on the ____ day of ____________ 2015, submit a sealed bid to perform the services stipulated in accordance with plans and specifications prepared by the OWNER entitled ______________________________________________________________________________ ______________________________________which by reference is made a part hereof. It is mutually understood and agreed by the parties hereto that the Invitation to Bid inviting Contractors to bid as published, Instructions to Bidder, Schedule of Unit Prices, Bid Form, Bid Bond, Contract Agreement, Hold Harmless Agreement, Certificate of Insurance, Scope of Services and Drawings, all proceedings by the governing body of the OWNER pertaining to the subject matter of this Contract, all of which documents are hereinafter referred to as Contract Documents and are a part of this Contract by reference the same as if each had been fully set out and attached hereto. In consideration of the following mutual agreements and covenants to be kept by each party: a. The CONTRACTOR agrees to furnish and pay for all labor, tools, equipment, machinery, supplies, facilities, superintendence, insurance, taxes, utilities and services necessary to perform all items set forth in the written Contract Documents hereto attached and made a part hereof in strict compliance with the Contract Documents and Total Base Bid for a sum of _______________ (the “Contract Sum”), subject to adjustment as provided in said documents. b. Invoice payments for work completed under this contract shall be made in strict accordance with the project specifications and any special conditions attached thereto. c. It is understood and agreed that all work shall be accomplished in strict compliance with the provisions of the Contract Documents. It is understood and agreed by both the County and the Contractor that any modifications or additions to this agreement shall be made only by the full execution of the County's standard contract change order form. Furthermore, it is understood and agreed by both parties that any work done by the CONTRACTOR on any such modification or addition to this AGREEMENT prior to the County's execution of its standard Contract Change Order form shall be at the total risk of the CONTRACTOR and said work shall not be compensated by the County. d. CONTRACTOR agrees to begin the work within ten (10) days of Notice to Proceed and that final completion shall be within ninety (70) calendar days of Notice to Proceed. e. The parties agree that damages due to delay in completion of the work are uncertain and not readily capable of ascertainment. Accordingly, if the CONTRACTOR shall fail to complete the work or any part thereof within the time stipulated, or an applicable extension thereof, the CONTRACTOR shall pay to the OWNER as fixed and agreed, liquidated damages for each calendar day of delay until the delayed work is corrected or accepted, an of $500 per day. The parties agree that this sum is proportionate to the probable loss and is not a penalty. (a) The CONTRACTOR expressly waives any defense as to the validity of any liquidated damages stated in this Agreement as they may appear on the grounds that such liquidated damages are void as penalties or are not reasonably related to actual damages. IN WITNESS WHEREOF, the parties hereto have executed and sealed this Agreement as of the day and year first above written. OWNER: County of Isle of Wight, Virginia By: _______________________________ H. Anne Seward, County Administrator CONTRACTOR: By: _______________________________ ATTEST: By: ____________________ Title: ___________________ Approved as to form: ______________________________ Mark C. Popovich, Isle of Wight County Attorney Section C (Drawings and Technical Specifications) GENERAL CONDITIONS ARTICLE 1 DEFINITION OF TERMS GC - 3 ARTICLE 2 EXECUTION, CORRELATION, INTENT GC - 6 ARTICLE 3 CONTRACTOR'S UNDERSTANDING GC - 6 ARTICLE 4 CONSTRUCTION STANDARDS GC - 7 ARTICLE 5 DETAILED DRAWINGS AND INSTRUCTIONS GC - 7 ARTICLE 6 SHOP DRAWINGS GC - 8 ARTICLE 7 DISCREPANCIES GC - 10 ARTICLE 8 COPIES OF DRAWINGS FURNISHED GC - 10 ARTICLE 9 OWNERSHIP OF DRAWINGS GC - 10 ARTICLE 10 DRAWINGS AND SPECIFICATIONS GC - 11 ARTICLE 11 PROGRESS OF THE WORK GC - 11 ARTICLE 12 ORDER OF COMPLETION GC - 11 ARTICLE 13 SUPERINTENDENCE, SUPERVISION GC - 11 ARTICLE 14 MATERIALS, APPLIANCES, EMPLOYEES GC - 12 ARTICLE 15 ROYALTIES AND PATENTS GC - 13 ARTICLE 16 SURVEYS, PERMITS, AND REGULATIONS GC - 13 ARTICLE 17 POINTS AND INSTRUCTIONS GC - 14 ARTICLE 18 EXISTING STRUCTURES GC - 14 ARTICLE 19 CARE OF EXISTING STRUCTURES GC - 15 ARTICLE 20 PROTECTION OF WORK AND PROPERTY GC - 15 ARTICLE 21 PROJECT COORDINATION GC - 16 ARTICLE 22 INSPECTION OF SITE AND WORK GC - 17 ARTICLE 23 ENGINEER'S/OWNER'S STATUS GC - 18 ARTICLE 24 CORRECTION OF WORK BEFORE FINAL PAY GC - 18 ARTICLE 25 SUSPENSION OF WORK GC - 19 ARTICLE 26 CHANGED CONDITIONS GC - 19 ARTICLE 27 CHANGE OF PLANS GC - 20 ARTICLE 28 ENGINEER'S/OWNER'S DECISIONS GC - 20 ARTICLE 29 CLEANING UP AND RESTORATION OF SITE GC - 20 ARTICLE 30 FINAL INSPECTION GC - 21 ARTICLE 31 GUARANTEE OF WORK GC - 21 ARTICLE 32 STATUTE OF LIMITATIONS GC - 22 ARTICLE 33 USE OF COMPLETED PORTIONS GC - 22 ARTICLE 34 SUBMISSION OF DAILY PERFORMANCE RECORD GC - 23 ARTICLE 35 RECORD DOCUMENTS GC - 23 ARTICLE 36 PARTIAL PAYMENTS GC - 25 ARTICLE 37 ESCROW ACCOUNT PROCEDURE GC - 25 ARTICLE 38 METHOD OF MEASUREMENT GC - 26 ARTICLE 39 BASIS OF PAYMENT GC - 26 ARTICLE 40 INCREASED OR DECREASED QUANTITIES GC - 26 ARTICLE 41 EXTRA WORK AND METHOD OF PAYMENT GC - 26 ARTICLE 42 WORK OUTSIDE REGULAR HOURS GC - 30 ARTICLE 43 DEDUCTIONS FOR UNCORRECTED WORK GC - 30 ARTICLE 44 LIQUIDATED DAMAGES FOR DELAY GC - 30 ARTICLE 45 DAMAGES GC - 32 ARTICLE 46 LIENS GC - 32 ARTICLE 47 PAYMENTS WITHHELD GC - 32 ARTICLE 48 THE OWNER'S RIGHT TO DO WORK GC - 34 ARTICLE 49 THE OWNER'S RIGHT TO TERMINATE GC - 34 ARTICLE 50 CONTRACTOR'S RIGHT TO STOP/TERMINATE GC - 35 ARTICLE 51 REMOVAL OF MATERIALS AND EQUIPMENT GC - 35 ARTICLE 52 ASSIGNMENT GC - 35 ARTICLE 53 RIGHTS OF VARIOUS INTEREST GC - 35 ARTICLE 54 SEPARATE CONTRACTS GC - 36 ARTICLE 55 SUBCONTRACTS GC - 36 ARTICLE 56 EMPLOYMENT DISCRIMINATION PROHIBITED GC - 37 ARTICLE 57 DRUG FREE WORKPLACE GC - 38 ARTICLE 58 INSURANCE GC - 39 ARTICLE 59 PERFORMANCE AND LABOR/MATERIAL BONDS GC - 42 ARTICLE 60 CONTRACTUAL CLAIMS GC - 42 ARTICLE 61 LITIGATION GC - 43 ARTICLE 62 NON-APPROPRIATION GC - 43 ARTICLE 63 SEVERABILITY GC - 44 ARTICLE 64 AGREEMENT CONSTRUED VIRGINIA LAWS GC - 44 GENERAL CONDITIONS ARTICLE 1. DEFINITION OF TERMS (A) THE "CONTRACT DOCUMENTS" SHALL CONSIST OF INVITATION TO BID, INSTRUCTIONS TO BIDDERS, BID CONTRACT AGREEMENT, PERFORMANCE BOND, PAYMENT BOND, CONTRACTOR'S CERTIFICATE OF INSURANCE AND ENDORSEMENTS, GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, SPECIFICATION SECTIONS, CONSTRUCTION DETAILS, ADDENDA, THE DRAWINGS, NOTICE OF AWARD, NOTICE TO PROCEED, INCLUDING ALL MODIFICATIONS THERETO INCORPORATED IN ANY OF THE DOCUMENTS BEFORE AND AFTER EXECUTION OF THE AGREEMENT. (B) THE WORD "OWNER" IS USED TO DESIGNATE THE DULY CONSTITUTED GOVERNMENT OF ISLE OF WIGHT COUNTY, VIRGINIA, ACTING THROUGH THE PROPERLY AUTHORIZED REPRESENTATIVES. (C) THE WORD "ENGINEER" SHALL MEAN THE ENGINEER DESIGNATED BY THE OWNER, WHETHER ACTING DIRECTLY OR THROUGH PROPERLY AUTHORIZED AGENTS, INSPECTORS OR REPRESENTATIVES OF THE ENGINEER, ACTING WITHIN THE SCOPE OF DUTIES ENTRUSTED TO THEM. IN THE EVENT THE OWNER SHOULD NOT REQUIRE THE SERVICES OF THE ENGINEER FOR CONTRACT ADMINISTRATION OR INSPECTIONS, THEN THE POWERS, DUTIES, AND RESPONSIBILITIES CONFERRED HEREIN TO THE ENGINEER SHALL BE CONSTRUED TO BE THOSE OF THE OWNER. (D) THE WORD "BIDDER" SHALL BE USED TO DESIGNATE ANY PARTY OR PARTIES SUBMITTING IN PROPER FORM A BID TO PERFORM THE WORK HEREINAFTER SPECIFIED. THE SUCCESSFUL BIDDER, SELECTED BY THE OWNER TO PERFORM THE WORK SPECIFIED, WILL THEREAFTER BE KNOWN AS THE CONTRACTOR. (E) THE WORD "CONTRACTOR" IS USED TO DESIGNATE THE PARTY OR PARTIES CONTRACTING TO PERFORM THE WORK OR HIS OR THEIR HEIRS, EXECUTORS, ADMINISTRATORS, SUCCESSORS, OR ASSIGNS. (F) THE WORD "SUPERINTENDENT" SHALL BE USED TO DESIGNATE THE PERSON APPOINTED BY THE CONTRACTOR, ACTING UNDER HIS INSTRUCTIONS AND IN DIRECT CHARGE OF THE WORK FOR THE CONTRACTOR. (G) THE TERM "SUBCONTRACTOR" SHALL MEAN ANY INDIVIDUAL, FIRM OR CORPORATION HAVING A DIRECT CONTRACT, WITH THE CONTRACTOR OR WITH ANY OTHER SUBCONTRACTOR FOR PERFORMANCE OF ANY PART OF THE WORK. (H) THE TERM "WORK" SHALL INCLUDE LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION, SUPERVISION, OR OTHER FACILITIES, DUTIES, OR INCIDENTALS NECESSARY TO COMPLETE THE PROJECT IN COMPLIANCE WITH THE TERMS OF THE CONTRACT DOCUMENTS. (I) THE WORD "PROJECT" SHALL MEAN THE ENTIRE CONSTRUCTION TO BE PERFORMED AS PROVIDED IN THE CONTRACT DOCUMENTS. (J) "PROJECT AREA" SHALL MEAN THE AREA WHERE WORK IS BEING PERFORMED FOR ISLE OF WIGHT COUNTY, VIRGINIA. (K) "WRITTEN NOTICE" SHALL BE DEEMED TO HAVE BEEN DULY SERVED IF DELIVERED IN PERSON TO THE INDIVIDUAL OR TO A MEMBER OF THE FIRM OR TO AN OFFICER OF THE CORPORATION FOR WHOM IT IS INTENDED, OR IF DELIVERED AT OR SENT BY REGISTERED MAIL TO THE LAST BUSINESS ADDRESS KNOWN TO HIM WHO GIVES THE NOTICE. (L) THE WORDS "AS DIRECTED," "AS REQUIRED," "AS PERMITTED," "AS ALLOWED," OR PHRASES OF LIKE EFFECT OR IMPORT AS USED HEREIN SHALL MEAN THAT THE DIRECTION, REQUIREMENT, PERMISSION OR ALLOWANCE OF THE ENGINEER OR OWNER IS INTENDED, AND SIMILARLY THE WORDS "ACCEPTED," "APPROVED," "REASONABLE," "SUITABLE," "PROPERLY," "SATISFACTORY," OR WORDS OF LIKE EFFECT OR IMPORT, UNLESS OTHERWISE PARTICULARLY SPECIFIED HERE, SHALL MEAN ACCEPTABLE, APPROVED, REASONABLE, SUITABLE, PROPERLY OR SATISFACTORY IN THE JUDGMENT OF THE ENGINEER OR OWNER. (M) THE WORD "ADDENDUM" SHALL MEAN A MODIFICATION OF THE CONTRACT DOCUMENTS ISSUED IN WRITING BY THE ENGINEER OR OWNER PRIOR TO THE OPENING OF THE BIDS. (N) THE TERM "FIELD ORDER" SHALL MEAN A WRITTEN ORDER ISSUED BY THE OWNER SUBSEQUENT TO THE FORMAL EXECUTION OF THE CONTRACT DOCUMENTS. WHICH ORDERS MINOR CHANGES IN THE WORK WHICH ARE COMPATIBLE WITH THE DESIGN CONCEPT OF THE COMPLETED PROJECT AS A FUNCTIONING WHOLE AS INDICATED BY THE CONTRACT DOCUMENTS BUT WHICH DOES NOT INVOLVE A CHANGE IN CONTRACT PRICE OR THE CONTRACT TIMES. (O) THE TERM "CHANGE ORDER" SHALL MEAN A MODIFICATION OF THE CONTRACT REQUIREMENTS ISSUED IN WRITING BY THE OWNER SUBSEQUENT TO THE FORMAL EXECUTION OF THE CONTRACT DOCUMENTS WHICH INVOLVES A CHANGE IN CONTRACT PRICE OR THE CONTRACT TIMES. (P) ALL TIME LIMITS STATED IN THE CONTRACT DOCUMENTS ARE OF THE ESSENCE OF THE CONTRACT. UNLESS SPECIFICALLY NOTED OTHERWISE, ALL "DAYS" SHALL BE CONSTRUED TO MEAN CALENDAR DAYS. (Q) THE WORDS "SUBSTANTIAL COMPLETION" SHALL MEAN THE WORK (OR A SPECIFIED PORTION THEREOF) HAS PROGRESSED TO THE POINT WHERE, IN THE OPINION OF THE ENGINEER, IT IS SUFFICIENTLY COMPLETED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, SO THAT THE WORK CAN BE UTILIZED FOR THE PURPOSES FOR WHICH IT WAS INTENDED. (R) THE TERM "OR APPROVED EQUAL" PERTAINS TO THE USE OF MATERIALS CURRENTLY ACCEPTED BY THE DEPARTMENT OF PUBLIC UTILITIES. ITEMS NOT CURRENTLY ACCEPTED MUST BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO INCORPORATION IN THE WORK. (S) THE TERM "FORCE ACCOUNT" SHALL MEAN WORK NOT SHOWN ON THE PLANS OR REQUIRED BY THE CONTRACT DOCUMENTS THAT IS NECESSARY FOR THE COMPLETION OF THE CONTRACT, WHICH SHALL BE CONSIDERED ADDITIONAL WORK AND WILL BE PAID FOR IN THE MANNER SET FORTH HEREINAFTER. ARTICLE 2. EXECUTION, CORRELATION, AND INTENT OF CONTRACT DOCUMENTS. THE CONTRACT DOCUMENTS SHALL BE EXECUTED BY THE OWNER AND THE CONTRACTOR IN SUCH NUMBERS AS REQUIRED BY THE OWNER. THE CONTRACT DOCUMENTS ARE COMPLEMENTARY AND WHAT IS CALLED FOR BY ANY ONE SHALL BE AS BINDING AS IF CALLED FOR BY ALL. THE INTENTION OF THE DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS, EQUIPMENT, AND SUPPLIES NECESSARY FOR THE PROPER EXECUTION OF THE WORK. IT IS NOT INTENDED, HOWEVER, THAT MATERIALS OR WORK NOT COVERED BY OR PROPERLY INFERABLE FROM ANY HEADING, BRANCH, CLASS, OR TRADE OF THE SPECIFICATIONS SHALL BE SUPPLIED UNLESS DISTINCTLY SO NOTED ON THE DRAWINGS. MATERIALS OR WORK DESCRIBED IN WORDS WHICH SO APPLIED HAVE A WELL-KNOWN TECHNICAL OR TRADE MEANING SHALL BE HELD TO REFER TO SUCH RECOGNIZED STANDARDS. THE DESIGNATION "ARCHITECTURAL," STRUCTURAL," ELECTRICAL," AND THE LIKE, IN THE DRAWING TITLES ARE PROVIDED FOR CONVENIENCE ONLY, AND ARE NOT INTENDED TO DEFINE THE WORK TO BE DONE BY ANY TRADES OR SUBCONTRACTORS. ARTICLE 3. CONTRACTOR'S UNDERSTANDING. IT IS UNDERSTOOD AND AGREED THAT THE CONTRACTOR HAS, BY CAREFUL EXAMINATION, SATISFIED HIMSELF AS TO THE NATURE AND LOCATION OF THE WORK, THE CONFORMATION OF THE GROUND, THE CHARACTER, EQUIPMENT AND FACILITIES NEEDED PRELIMINARY TO AND DURING THE PROSECUTION OF THE WORK, THE GENERAL AND LOCAL CONDITIONS, AND ALL OTHER MATTERS WHICH CAN IN ANY WAY AFFECT THE WORK UNDER THIS CONTRACT. NO VERBAL AGREEMENT OR CONVERSATION WITH ANY OFFICER, AGENT OR EMPLOYEE OF THE OWNER, EITHER BEFORE OR AFTER THE EXECUTION OF THIS CONTRACT, SHALL AFFECT OR MODIFY ANY OF THE TERMS OR OBLIGATIONS HEREIN CONTAINED. THE SUBMISSION OF A BID SHALL BE PRIMA FACIE EVIDENCE THAT THE BIDDER THOROUGHLY UNDERSTANDS THE DRAWINGS, TERMS OF THE SPECIFICATIONS, AND HAS MADE HIMSELF FAMILIAR WITH ALL FEDERAL AND STATE LAWS, LOCAL LAWS, ORDINANCES, AND REGULATIONS WHICH IN ANY MANNER AFFECT THE WORK OR ITS PROSECUTION. ARTICLE 4. CONSTRUCTION STANDARDS. THE CONTRACTOR WILL BE RESPONSIBLE FOR COMPLYING WITH ISLE OF WIGHT COUNTY, DEPARTMENT OF PUBLIC UTILITIES CONSTRUCTION SPECIFICATIONS AND STANDARDS FOR WATERWORKS AND SANITARY SEWERAGE FACILITIES DATED OCTOBER, 1996, AND ALL REVISIONS THERETO WHERE CONFLICTS OCCUR WITH THE STANDARDS AND THE REQUIREMENTS SET FORTH HEREIN, THE STANDARDS SHALL GOVERN. WAIVER OF ANY REQUIREMENTS SET FORTH BY THE STANDARDS IS AT THE DISCRETION OF THE OWNER. ARTICLE 5. DETAILED DRAWINGS AND INSTRUCTIONS. THE ENGINEER SHALL FURNISH WITH REASONABLE PROMPTNESS, ADDITIONAL INSTRUCTION, BY MEANS OF DRAWINGS OR OTHERWISE, NECESSARY FOR THE PROPER EXECUTION OF THE WORK. ALL SUCH DRAWINGS AND INSTRUCTIONS SHALL BE CONSISTENT WITH THE CONTRACT DOCUMENTS. WHERE SIZES ARE NOT MARKED PLAINLY ON THE DRAWINGS, THE SIZE OF CORRESPONDING PARTS MAY BE FOLLOWED, OR THE ENGINEER WILL DETERMINE THE SIZES WHEN DIMENSIONS ARE ENTIRELY OMITTED. THE CONTRACTOR SHALL VERIFY ALL FIGURES ON THE PLANS AND WILL BE RESPONSIBLE FOR THE PROPER COORDINATION OF ALL DIMENSIONS AS WELL AS THE DIFFERENT PARTS OF THE WORK. ARTICLE 6. SHOP DRAWINGS. (A) THE TERM "SHOP DRAWINGS," AS USED HEREIN SHALL INCLUDE FABRICATION, ERECTION AND SETTING DRAWINGS, MANUFACTURERS' STANDARD DRAWINGS, SCHEDULES, DESCRIPTIVE LITERATURE, CATALOGS, BROCHURES, PERFORMANCE AND TEST DATA, WIRING AND CONTROL DIAGRAMS AND ALL OTHER DESCRIPTIVE DATA PERTAINING TO THE MATERIALS AND EQUIPMENT AS REQUIRED TO DEMONSTRATE COMPLIANCE WITH THE CONTRACT REQUIREMENTS. (B) THE CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER ALL SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS OR REQUESTED BY THE OWNER. ALL SUCH SUBMISSIONS SHALL BE MADE WITH SUCH PROMPTNESS AS TO CAUSE NO DELAY IN THIS OR ANY OTHER CONTRACTOR ON THE PROJECT, AND TO ALLOW REASONABLE TIME FOR REVIEW. (C) SHOP DRAWINGS SHALL BE SUBMITTED IN SUCH NUMBER OF COPIES THAT THREE (3) COPIES MAY BE RETAINED BY THE OWNER. EACH SUBMISSION SHALL BE ACCOMPANIED BY A LETTER OF TRANSMITTAL IN DUPLICATE, LISTING THE CONTENTS OF THE SUBMISSION AND IDENTIFYING EACH ITEM BY REFERENCE TO SPECIFICATION SECTION OR DRAWING. ALL SHOP DRAWINGS SHALL BE CLEARLY LABELED WITH THE NAME OF THE PROJECT AND OTHER NECESSARY INFORMATION. CATALOG PLATES AND OTHER SIMILAR MATERIAL THAT CANNOT BE SO LABELED CONVENIENTLY, SHALL BE BOUND IN SUITABLE COVERS BEARING THE IDENTIFYING DATA. (D) SHOP DRAWINGS SHALL BE ACCOMPANIED BY ALL REQUIRED CERTIFICATIONS AND OTHER SUCH SUPPORTING MATERIAL, AND SHALL BE SUBMITTED IN SUCH SEQUENCE OR IN SUCH GROUPS THAT ALL RELATED ITEMS MAY BE REVIEWED TOGETHER. WHEN SHOP DRAWINGS CANNOT BE REVIEWED BECAUSE THE SUBMISSION IS NOT COMPLETE, OR BECAUSE SHOP DRAWINGS ON RELATED ITEMS HAVE NOT BEEN RECEIVED, THEN SUCH SHOP DRAWINGS WILL BE RETURNED WITHOUT ACTION OR WILL BE HELD, AND NOT REVIEWED, UNTIL THE LACKING MATERIAL IS RECEIVED. (E) SHOP DRAWINGS SHALL HAVE BEEN CHECKED BY THE CONTRACTOR AND COORDINATED WITH ALL OTHER RELATED OR AFFECTED WORK BEFORE THEY ARE SUBMITTED FOR APPROVAL, AND SHALL BEAR THE CONTRACTOR'S CERTIFICATION THAT HE HAS CHECKED AND APPROVED THEM AS COMPLYING WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. SHOP DRAWINGS SUBMITTED WITHOUT SUCH CERTIFICATION AND COORDINATION WILL BE RETURNED TO THE CONTRACTOR WITHOUT ACTION, AND WILL NOT BE CONSIDERED A FORMAL SUBMISSION. (F) IF THE SHOP DRAWINGS SHOW VARIATIONS FROM THE DRAWINGS AND SPECIFICATIONS BECAUSE OF STANDARD SHOP PRACTICE OR OTHER REASONS, THE CONTRACTOR SHALL MAKE SPECIFIC MENTION OF SUCH VARIATION IN HIS LETTER OF TRANSMITTAL IN ORDER THAT, IF ACCEPTABLE, SUITABLE ACTION MAY BE TAKEN FOR PROPER ADJUSTMENT; OTHERWISE, THE CONTRACTOR WILL NOT BE RELIEVED OF THE RESPONSIBILITY FOR EXECUTING THE WORK IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS EVEN THOUGH SUCH SHOP DRAWINGS HAVE BEEN APPROVED. (G) THE OWNER SHALL PASS UPON THE SHOP DRAWINGS WITH REASONABLE PROMPTNESS. REVIEWING AND/OR APPROVAL OF SHOP DRAWINGS WILL BE GENERAL, FOR CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS, AND WILL NOT INCLUDE QUANTITIES, DETAIL DIMENSIONS, NOR ADJUSTMENTS OF DIMENSIONS TO ACTUAL FIELD CONDITIONS. APPROVAL SHALL NOT BE CONSTRUED AS PERMITTING ANY DEPARTURE FROM CONTRACT REQUIREMENTS, AUTHORIZATION OF ANY INCREASE IN PRICE NOR AS RELIEVING THE CONTRACTOR OF THE RESPONSIBILITY FOR ANY ERROR IN DETAILS, DIMENSIONS OR OTHERWISE THAT MAY EXIST. ARTICLE 7. DISCREPANCIES. ANY DISCREPANCIES FOUND BETWEEN THE PLANS AND SPECIFICATIONS AND SITE CONDITIONS OR ANY INCONSISTENCIES OR AMBIGUITIES IN THE PLANS OR SPECIFICATIONS SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER, IN WRITING, WHO SHALL PROMPTLY CORRECT SUCH INCONSISTENCIES OR AMBIGUITIES IN WRITING. WORK DONE BY THE CONTRACTOR AFTER HIS DISCOVERY OF SUCH DISCREPANCIES, INCONSISTENCIES OR AMBIGUITIES SHALL BE DONE AT THE CONTRACTOR'S RISK. IF THE CONTRACTOR, IN THE COURSE OF THE WORK, FINDS ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE PHYSICAL CONDITIONS OF THE LOCALITY, OR ANY ERRORS, OR OMISSIONS IN DRAWINGS OR IN THE LAYOUT AS GIVEN BY POINTS AND INSTRUCTIONS, IT SHALL BE HIS DUTY TO IMMEDIATELY INFORM THE ENGINEER AND THE OWNER IN WRITING, AND THE ENGINEER AND OWNER SHALL PROMPTLY VERIFY THE SAME. ANY WORK DONE AFTER SUCH DISCOVERY, UNTIL AUTHORIZED, WILL BE DONE AT THE CONTRACTOR'S RISK AND EXPENSE. ARTICLE 9. OWNERSHIP OF DRAWINGS. ALL DRAWINGS AND SPECIFICATIONS FURNISHED BY THE ENGINEER ARE PROPERTY OF THE OWNER. THEY ARE NOT TO BE USED ON OTHER WORK AND, WITH THE EXCEPTION OF THE SIGNED CONTRACT SET, ARE TO BE RETURNED TO THE OWNER ON REQUEST, AT THE COMPLETION OF THE WORK. ALL MODELS ARE THE PROPERTY OF THE OWNER. ARTICLE 10. DRAWINGS AND SPECIFICATIONS ON THE WORK. THE CONTRACTOR SHALL KEEP ONE (1) COPY OF ALL DRAWINGS AND THE SPECIFICATIONS AT THE JOB SITE, IN GOOD ORDER, AVAILABLE TO THE OWNER. ARTICLE 11. PROGRESS OF THE WORK. IT IS UNDERSTOOD AND AGREED THAT THE CONTRACTOR WILL EXECUTE THE AGREEMENT WITHIN TEN (10) DAYS AFTER WRITTEN NOTICE OF AWARD. THE CONTRACTOR SHALL PROVIDE AN ADEQUATE FORCE OF LABOR AND EQUIPMENT TO PROSECUTE THE WORK AT AS MANY DIFFERENT POINTS AS MAY BE NECESSARY TO INSURE THE COMPLETION OF SAME WITHIN THE TIME LIMIT FOR THE COMPLETION AS SET FORTH IN THIS AGREEMENT. THE CONTRACTOR SHALL FURNISH A PROGRESS SCHEDULE FOR APPROVAL BY THE OWNER AND THE ENGINEER. IT SHALL BE INCUMBENT UPON THE CONTRACTOR TO PROVIDE THE MANPOWER AND EQUIPMENT TO MAINTAIN THIS SCHEDULE. IN THE EVENT PERIODIC ESTIMATES INDICATE THE SCHEDULE IS NOT BEING MET, THE CONTRACTOR MAY BE REQUIRED TO FURNISH IN WRITING TO THE ENGINEER THE METHOD HE PROPOSES TO EMPLOY TO RETURN THE PROJECT TO THE ORIGINAL SCHEDULE. THE OWNER MAY WITHHOLD PAYMENTS IF THE WORK IS NOT PROCEEDING IN ACCORDANCE WITH TERMS OF THIS AGREEMENT. ALL WORK SHALL BE FAITHFULLY UNDERTAKEN, PERFORMED AND COMPLETED WITHIN THE TIME DESIGNATED IN THE CONTRACT, AS TIME IS UNDERSTOOD TO BE THE ESSENCE OF THE CONTRACT. ARTICLE 12. ORDER OF COMPLETION. THE CONTRACTOR SHALL SUBMIT AT SUCH TIME AS MAY BE REQUESTED BY THE OWNER, SCHEDULES WHICH SHALL SHOW THE ORDER IN WHICH THE CONTRACTOR WILL START THE SEVERAL PARTS OF THE WORK AND ESTIMATED DATES OF COMPLETION OF THE SEVERAL PARTS. WHEN APPROVED, SUCH SCHEDULE SHALL GOVERN THE WORK. THE OWNER RESERVES THE RIGHT TO ESTABLISH AN ORDER OF PRECEDENCE FOR THE COMPLETION OF THE WORK. ARTICLE 13. SUPERINTENDENCE, SUPERVISION. THE CONTRACTOR SHALL KEEP ON HIS WORK DURING ITS PROGRESS A COMPETENT SUPERINTENDENT AND ANY NECESSARY ASSISTANTS, ALL SATISFACTORY TO THE OWNER. THE SUPERINTENDENT SHALL NOT BE CHANGED EXCEPT WITH THE CONSENT OF THE OWNER, UNLESS THE SUPERINTENDENT PROVES TO BE UNSATISFACTORY TO THE CONTRACTOR AND CEASES TO BE IN HIS EMPLOY. THE SUPERINTENDENT SHALL REPRESENT THE CONTRACTOR IN HIS ABSENCE AND ALL DIRECTIONS GIVEN TO HIM SHALL BE AS BINDING AS IF GIVEN TO THE CONTRACTOR. IMPORTANT DIRECTIONS SHALL BE CONFIRMED UPON WRITTEN REQUEST IN EACH CASE. THE CONTRACTOR SHALL GIVE EFFICIENT SUPERVISION TO THE WORK, USING HIS BEST SKILL AND ATTENTION. ARTICLE 14. MATERIALS, APPLIANCES, EMPLOYEES. UNLESS OTHERWISE STIPULATED, THE CONTRACTOR SHALL PROVIDE AND PAY FOR ALL MATERIALS, LABOR, WATER, TOOLS, EQUIPMENT, LIGHT, POWER, TRANSPORTATION, SANITARY FACILITIES, AND OTHER FACILITIES NECESSARY FOR THE EXECUTION AND COMPLETION OF THE WORK. UNLESS OTHERWISE SPECIFIED, ALL MATERIALS SHALL BE NEW AND BOTH WORKMANSHIP AND MATERIALS SHALL BE OF GOOD QUALITY. THE CONTRACTOR SHALL, IF REQUIRED, FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY OF MATERIALS. THE CHARACTER, CONDITIONS, ADAPTABILITY, AND QUANTITY OF EQUIPMENT USED BY THE CONTRACTOR SHALL BE SUCH AS MAY BE NECESSARY FOR THE PROPER EXECUTION OF THE WORK WITHIN THE SPECIFIED WORKING TIME. THE EQUIPMENT USED SHALL BE MAINTAINED IN GOOD CONDITION AND SHALL BE SUBJECT TO APPROVAL OF THE OWNER PRIOR TO AND DURING ITS USE IN CONNECTION WITH THE WORK TO BE PERFORMED UNDER THIS CONTRACT. THE CONTRACTOR SHALL AT ALL TIMES ENFORCE STRICT DISCIPLINE AND GOOD ORDER AMONG HIS EMPLOYEES. NO PERSON UNDER THE AGE OF SIXTEEN (16) YEARS, NO PERSON WHO, AT THE TIME, IS SERVING A SENTENCE IN A PENAL OR CORRECTIONAL INSTITUTION, AND NO PERSON WHO HAS BEEN CONVICTED OF COMMISSION OF FRAUD OR A CRIMINAL OFFENSE IN CONNECTION WITH OBTAINING, ATTEMPTING TO OBTAIN, OR PERFORMING A PUBLIC CONTRACT OR SUBCONTRACT, SHALL BE EMPLOYED ON THE WORK COVERED BY THIS CONTRACT. NEITHER PARTY SHALL EMPLOY OR HIRE ANY EMPLOYEES OF THE OTHER PARTY WITHOUT HIS CONSENT. THE CONTRACTOR SHALL AT ALL TIMES ENFORCE STRICT DISCIPLINE AND GOOD ORDER AMONG HIS EMPLOYEES. IF THE CONTRACTOR OR ANY OF HIS EMPLOYEES AT ANY TIME IN ANY WAY ABUSES PHYSICALLY OR VERBALLY ANY COUNTY EMPLOYEE ENGAGED IN PERFORMANCE OF HIS DUTIES WITH REFERENCE TO SUPERVISION OR INSPECTION OF THE PROJECT OR PERFORMANCE OF ANY OTHER DUTIES RELATED TO THE COUNTY, THE CONTRACTOR MAY BE ORDERED BY THE COUNTY TO REMOVE HIS PERSON AND/OR ANY OF HIS EMPLOYEES ENGAGING IN SUCH CONDUCT FROM THE JOB SITE FOR THE DURATION OF THE CONTRACT. SHOULD THE CONTRACTOR REFUSE TO DO SO, THE CONTRACT MAY IMMEDIATELY AND WITHOUT ADVANCE NOTICE TO SURETIES BE TERMINATED BY THE COUNTY. ARTICLE 15. ROYALTIES AND PATENTS. THE CONTRACTOR SHALL PAY ROYALTIES AND LICENSE FEES. HE SHALL DEFEND ALL SUITS OR CLAIMS FOR THE INFRINGEMENT OF ANY PATENT RIGHTS AND SHALL SAVE THE OWNER HARMLESS FROM LOSS ON ACCOUNT THEREOF, EXCEPT THAT THE OWNER SHALL BE RESPONSIBLE FOR ALL SUCH LOSS WHEN A PARTICULAR PROCESS OR THE PRODUCT OF A PARTICULAR MANUFACTURER OR MANUFACTURERS IS SPECIFIED, BUT IF THE CONTRACTOR HAS INFORMATION THAT THE PROCESS OR ARTICLE SPECIFIED IS INFRINGEMENT OF A PATENT, HE SHALL BE RESPONSIBLE FOR SUCH LOSS UNLESS HE PROMPTLY GIVES SUCH INFORMATION IN WRITING TO THE ENGINEER AND OWNER. ARTICLE 16. SURVEYS, PERMITS, AND REGULATIONS. PERMITS AND LICENSES NECESSARY FOR THE PROSECUTION OF THE WORK SHALL BE SECURED AND PAID FOR BY THE CONTRACTOR. EASEMENTS AND RIGHT-OF-WAY FOR PERMANENT STRUCTURES OR PERMANENT CHANGES IN EXISTING FACILITIES SHALL BE SECURED AND PAID FOR BY THE OWNER, UNLESS OTHERWISE SPECIFIED. THE CONTRACTOR WILL HAVE IN HAND, ON SITE, AN APPROVED TRAFFIC CONTROL PLAN AND AN APPROVED HIGHWAY PERMIT PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO CONSTRUCTION WILL BE PERFORMED UNTIL THESE REQUIREMENTS ARE MET. THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, AND REGULATIONS BEARING ON THE CONDUCT OF THE WORK AS DRAWN AND SPECIFIED. IF THE CONTRACTOR OBSERVES THAT THE DRAWINGS AND SPECIFICATIONS ARE AT VARIANCE THEREWITH, HE SHALL PROMPTLY NOTIFY THE ENGINEER AND OWNER IN WRITING, AND ANY NECESSARY CHANGES SHALL BE ADJUSTED AS PROVIDED IN THE CONTRACT FOR CHANGES IN THE WORK. IF THE CONTRACTOR PERFORMS ANY WORK KNOWING IT TO BE CONTRARY TO SUCH LAWS, ORDINANCES, RULES AND REGULATIONS AND WITHOUT SUCH NOTICE TO THE ENGINEER AND OWNER, HE AGREES TO BEAR ALL COSTS AND PENALTIES ARISING THEREFROM. UNLESS OTHERWISE SPECIFIED, THE OWNER SHALL FURNISH ALL LAND SURVEYS AND ESTABLISH ALL BASE LINES FOR LOCATING THE PRINCIPAL COMPONENT PARTS OF THE WORK TOGETHER WITH A SUITABLE NUMBER OF BENCH MARKS ADJACENT TO THE WORK. FROM THE INFORMATION PROVIDED BY THE OWNER, THE CONTRACTOR SHALL DEVELOP AND MAKE ALL DETAIL SURVEYS NEEDED FOR CONSTRUCTION. ARTICLE 17. POINTS AND INSTRUCTIONS. THE CONTRACTOR SHALL PROVIDE REASONABLE AND NECESSARY OPPORTUNITIES AND FACILITIES FOR SETTING POINTS AND MAKING MEASUREMENTS. HE SHALL NOT PROCEED UNTIL HE HAS MADE TIMELY DEMAND UPON THE OWNER FOR, AND HAS RECEIVED FROM HIM, SUCH POINTS AND INSTRUCTIONS AS MAY BE NECESSARY AS THE WORK PROGRESSES. THE WORK SHALL BE DONE IN STRICT CONFORMITY WITH SUCH POINTS AND INSTRUCTIONS. ARTICLE 18. EXISTING STRUCTURES. THE LOCATION OF EXISTING SEWERS, WATER AND GAS PIPES, CONDUITS AND OTHER STRUCTURES ACROSS OR ALONG THE LINE OF THE PROPOSED WORK ARE NOT NECESSARILY SHOWN ON THE PLANS, AND IF SHOWN, THE LOCATION, DEPTH AND DIMENSION OF SUCH STRUCTURE ARE ONLY APPROXIMATELY CORRECT. THE CONTRACTOR SHALL HAVE A WORKING PIPE LOCATOR ON THE JOB AT ALL TIMES. THE CONTRACTOR SHALL DIG THE NECESSARY TEST HOLES FOR THE PURPOSE OF LOCATING EXISTING UNDERGROUND STRUCTURES. SUCH EXCAVATION SHALL NOT BE UNDERTAKEN WITHOUT FORTY-EIGHT (48) HOURS PRIOR NOTICE TO THE OWNER. NO CLAIMS FOR DAMAGES OR EXTRA COMPENSATION SHALL ACCRUE TO THE CONTRACTOR FROM THE PRESENCE OF SUCH PIPE OR OTHER OBSTRUCTION OR FROM ANY DELAY DUE TO REMOVAL OR REARRANGEMENT OF SAME. ARTICLE 19. CARE OF EXISTING STRUCTURES. THE CONTRACTOR SHALL BE LIABLE FOR ALL DAMAGE DONE TO ANY STRUCTURES OR PROPERTY ARISING THROUGH HIS NEGLIGENCE OR CARELESSNESS. HE SHALL TAKE CARE OF AND MAINTAIN ALL UNDERGROUND, OVERHEAD OR SURFACE UTILITIES ENCOUNTERED IN THE PERFORMANCE OF THE WORK. PRIOR TO COMMENCING WORK, CONTRACTOR SHALL CONTACT THE UTILITY INFORMATION CENTER ("MISS UTILITY"), TELEPHONE 1-800-552-7001 FOR ASSISTANCE IN LOCATING EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR SHALL OBSERVE ALL PRECAUTIONS WITH RESPECT TO FIRE AND AVOID THE INDISCRIMINATE MUTILATION, OR CUTTING DOWN OF TREES, WITHIN AND OUTSIDE OF PROJECT WORK AREAS OR EASEMENTS. ANY DAMAGE TO PROPERTY OR EASEMENTS NOT IN THE WORK AREA ARISING FROM THE CONTRACTOR'S NEGLIGENCE OR CARELESSNESS IN PERFORMANCE OF THE WORK WILL BE THE CONTRACTOR'S RESPONSIBILITY. THE CONTRACTOR SHALL NOT USE PRIVATE PROPERTY IN CONNECTION WITH THE WORK UNLESS PRIOR WRITTEN PERMISSION IS OBTAINED FROM THE PROPERTY OWNER. A COPY OF THE WRITTEN PERMISSION SHALL BE FURNISHED TO THE COUNTY ENGINEERING DIVISION. THE WRITTEN STATEMENT OF PERMISSION SHALL ALSO INDICATE THE NAME, ADDRESS, AND PHONE NUMBER OF THE PROPERTY OWNER. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO TAKE PHOTOGRAPHS OF THE PROPERTY PRIOR TO ITS USE IN CASE OF DISPUTES ARISING FROM THE USE OF THE PROPERTY. VERIFICATION OF OWNERSHIP SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ARTICLE 20. PROTECTION OF WORK AND PROPERTY. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL NECESSARY WATCHMEN, BARRICADES, LIGHTS AND WARNING SIGNS, AND TAKE ALL NECESSARY PRECAUTIONS FOR THE PROTECTION AND SAFETY OF THE PUBLIC. HE SHALL CONTINUOUSLY MAINTAIN ADEQUATE PROTECTION OF ALL WORK FROM DAMAGE AND SHALL TAKE ALL REASONABLE PRECAUTIONS TO PROTECT THE OWNER'S PROPERTY FROM INJURY OR LOSS ARISING IN CONNECTION WITH THIS CONTRACT. HE SHALL MAKE GOOD ANY DAMAGE, INJURY OR LOSS TO HIS WORK AND TO THE PROPERTY OF THE OWNER RESULTING FROM LACK OF REASONABLE PROTECTIVE PRECAUTIONS, EXCEPT SUCH AS MAY BE DUE TO ERRORS IN THE CONTRACT DOCUMENTS, OR CAUSED BY AGENT OR EMPLOYEES OF THE OWNER. HE SHALL ADEQUATELY PROTECT ADJACENT PRIVATE AND PUBLIC PROPERTY, AS PROVIDED BY LAW AND THE CONTRACT DOCUMENTS. IN AN EMERGENCY AFFECTING THE SAFETY OF LIFE OR LOSS OR DAMAGE TO THE WORK OR TO THE ADJOINING PROPERTY, THE CONTRACTOR WITHOUT SPECIAL INSTRUCTION OR AUTHORIZATION FROM THE ENGINEER OR OWNER, IS HEREBY PERMITTED TO ACT, AT HIS DISCRETION, TO PREVENT SUCH THREATENED LOSS OR INJURY, AND HE SHALL SO ACT, WITHOUT APPEAL AS IF INSTRUCTED OR AUTHORIZED. THE CONTRACTOR SHALL PROVIDE WRITTEN DOCUMENTATION CONCERNING THE CIRCUMSTANCES OF THE EMERGENCY TO THE OWNER AS SOON AS PRACTICAL. ANY COMPENSATION, CLAIMED BY THE CONTRACTOR ON ACCOUNT OF EMERGENCY WORK, SHALL BE DETERMINED BY AGREEMENT OR LITIGATION AS PROVIDED FOR IN ARTICLE 59 HEREIN. THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCH MARKS, REFERENCE POINTS AND STAKES, AND IN CASE OF WILLFUL OR CARELESS DESTRUCTION, HE SHALL BE CHARGED WITH THE RESULTING EXPENSE AND SHALL BE RESPONSIBLE FOR ANY MISTAKES THAT MAY BE CAUSED BY THEIR UNNECESSARY LOSS OR DISTURBANCE. ARTICLE 21. PROJECT COORDINATION. WHERE REQUIRED BY STATE, FEDERAL, OR LOCAL REGULATIONS, THE CONTRACTOR SHALL COORDINATE HIS CONSTRUCTION PLAN WITH THE VIRGINIA DEPARTMENT OF TRANSPORTATION AND WILL OBTAIN THEIR APPROVALS TO DATE OF WORK, PERMITS, TYPE OF TEMPORARY PATCHING, TRAFFIC CONTROL, TYPE AND PLACEMENT OF TRAFFIC CONTROLS, SAFETY DEVICES, AND FLAGMEN. EXISTING COUNTY WATER AND SEWER VALVES MAY ONLY BE OPENED AND CLOSED BY OR UNDER THE DIRECT SUPERVISION OF DEPARTMENT OF PUBLIC UTILITIES PERSONNEL. THE ONLY EXCEPTION IS AN EMERGENCY SITUATION AFFECTING PUBLIC HEALTH OR SAFETY IN WHICH CASE THE CONTRACTOR WOULD ACT IN ACCORDANCE WITH ARTICLE 20. ANY CONTRACTOR FOUND VIOLATING THIS PROVISION MAY BE SUBJECT TO PROSECUTION FOR TAMPERING WITH COUNTY PROPERTY. WHEN THE CONTRACTOR REQUIRES VALVE OPERATING SERVICES, HE SHALL VERBALLY INFORM THE DEPARTMENT OF PUBLIC UTILITIES AND GIVE WRITTEN NOTICE OF THE REQUIREMENT TO THE PROJECT ENGINEER. THE WRITTEN AND DATED REQUEST SHALL BE DELIVERED TO THE OFFICE OF THE PROJECT ENGINEER AT LEAST FORTY-EIGHT (48) HOURS IN ADVANCE OF THE SERVICE. ARTICLE 22. INSPECTION OF SITE AND WORK. THE OWNER AND HIS REPRESENTATIVES SHALL AT ALL TIMES HAVE ACCESS TO THE WORK WHEREVER AND WHENEVER IT IS, IN PREPARATION OR PROGRESS, AND THE CONTRACTOR SHALL PROVIDE FOR SUCH ACCESS AND FOR INSPECTION. THE OWNER WILL APPOINT SUCH PERSON OR PERSONS AS HE MAY DEEM NECESSARY TO PROPERLY INSPECT THE MATERIALS FURNISHED AND WORK DONE UNDER THE CONTRACT, AND TO SEE THAT THE SAME STRICTLY CORRESPONDS WITH THE DRAWINGS AND SPECIFICATIONS. WORK AND MATERIALS WILL BE INSPECTED PROMPTLY, BUT IF, FOR ANY REASON DELAY SHOULD OCCUR, THE CONTRACTOR SHALL HAVE NO CLAIM FOR DAMAGES OR EXTRA COMPENSATION. THE FAILURE OF THE INSPECTOR TO REJECT OR CONDEMN IMPROPER MATERIALS AND WORKMANSHIP SHALL NOT PREVENT THE OWNER FROM REJECTING MATERIALS AND WORKMANSHIP FOUND DEFECTIVE AT ANY TIME PRIOR TO THE FINAL ACCEPTANCE OF THE COMPLETED WORK, NOR SHALL IT BE CONSIDERED AS A WAIVER OF ANY DEFECTS WHICH MAY BE DISCOVERED LATER, OR AS PREVENTING THE COUNTY AT ANY TIME PRIOR TO THE EXPIRATION OF THE GUARANTEE PERIOD FROM RECOVERING DAMAGES FOR WORK ACTUALLY DEFECTIVE. IF THE SPECIFICATIONS, OWNER'S INSTRUCTIONS, LAWS, ORDINANCES, OR ANY PUBLIC AUTHORITY REQUIRE ANY WORK TO BE SPECIFICALLY TESTED OR APPROVED, THE CONTRACTOR SHALL GIVE THE OWNER TIMELY NOTICE OF ITS READINESS FOR INSPECTION AND, IF THE INSPECTION IS BY ANOTHER AUTHORITY THAN THE OWNER, OF THE DATE FIXED FOR SUCH INSPECTION. INSPECTIONS BY THE OWNER SHALL BE PROMPTLY MADE, AND WHERE PRACTICABLE AT THE SOURCE OF SUPPLY. IF ANY WORK SHOULD BE COVERED UP WITHOUT APPROVAL OR CONSENT OF THE OWNER, IT MUST, IF REQUIRED BY THE OWNER, BE UNCOVERED FOR EXAMINATION. REEXAMINATION OF QUESTIONED WORK MAY BE ORDERED BY THE OWNER AND IF SO ORDERED, THE WORK MUST BE UNCOVERED BY THE CONTRACTOR. IF SUCH WORK BE FOUND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, THE OWNER SHALL PAY THE COST OF REEXAMINATION AND REPLACEMENT. IF SUCH WORK BE FOUND NOT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL PAY SUCH COST, UNLESS HE SHALL SHOW THAT THE DEFECT IN THE WORK WAS CAUSED BY ANOTHER CONTRACTOR, AND IN THAT EVENT THE OWNER SHALL SEEK CORRECTIVE ACTION FROM THE OTHER CONTRACTOR. ARTICLE 23. ENGINEER'S/OWNER'S STATUS. THE ENGINEER AND/OR OWNER SHALL MAKE PERIODIC VISITS TO THE JOB TO FAMILIARIZE HIMSELF GENERALLY WITH THE PROGRESS AND QUALITY OF THE WORK BEING CONSTRUCTED. HE WILL CARRY OUT REASONABLE INSPECTIONS OF THE WORK TO DETERMINE IF, IN GENERAL, THE CONTRACTOR IS PROCEEDING IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE OWNER MAY STOP THE PROCEEDING IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE OWNER MAY STOP THE WORK WHENEVER SUCH STOPPAGE MAY BE NECESSARY TO INSURE THE PROPER EXECUTION OF THE CONTRACT. HE SHALL ALSO HAVE AUTHORITY TO REJECT ALL WORK AND MATERIALS WHICH DO NOT CONFORM TO THE CONTRACT, TO REQUIRE THE APPLICATION OF FORCES TO ANY PORTION OF THE WORK AS IN HIS JUDGEMENT IS NECESSARY, AND TO DECIDE QUESTIONS WHICH ARISE IN THE EXECUTION OF THE WORK. ARTICLE 24. CORRECTION OF WORK BEFORE FINAL PAYMENT. THE CONTRACTOR SHALL PROMPTLY REMOVE FROM THE PREMISES ALL MATERIALS CONDEMNED BY THE OWNER AS FAILING TO CONFORM TO THE CONTRACT, WHETHER INCORPORATED IN THE WORK OR NOT, AND THE CONTRACTOR SHALL PROMPTLY REPLACE AND RE-EXECUTE HIS OWN WORK IN ACCORDANCE WITH THE CONTRACT AND WITHOUT EXPENSE TO THE OWNER AND SHALL BEAR THE EXPENSE OF MAKING GOOD ALL WORK OF OTHERS DESTROYED OR DAMAGED BY SUCH REMOVAL OR REPLACEMENT. IF THE CONTRACTOR DOES NOT REMOVE SUCH CONDEMNED WORK AND MATERIALS WITHIN A REASONABLE TIME, FIXED BY WRITTEN NOTICE, THE OWNER MAY REMOVE AND THEN MAY STORE THE MATERIALS AT THE EXPENSE OF THE CONTRACTOR. IF THE CONTRACTOR DOES NOT PAY THE EXPENSE OF SUCH REMOVAL AND STORAGE WITHIN TEN (10) DAYS TIME THEREAFTER, THE OWNER MAY UPON TEN (10) DAYS WRITTEN NOTICE, SELL SUCH MATERIALS AT AUCTION OR AT PRIVATE SALE AND SHALL ACCOUNT FOR THE NET PROCEEDS THEREOF AFTER DEDUCTING ALL THE COSTS AND EXPENSES THAT SHOULD HAVE BEEN BORNE BY THE CONTRACTOR. ARTICLE 25. SUSPENSION OF WORK. THE OWNER MAY AT ANY TIME SUSPEND THE WORK, OR ANY PART THEREOF BY GIVING TEN (10) DAYS NOTICE TO THE CONTRACTOR IN WRITING. THE WORK SHALL BE RESUMED BY THE CONTRACTOR WITHIN TEN (10) DAYS AFTER THE DATE FIXED IN THE WRITTEN NOTICE FROM THE OWNER TO THE CONTRACTOR TO DO SO. THE OWNER SHALL REIMBURSE THE CONTRACTOR FOR EXPENSES INCURRED BY THE CONTRACTOR IN CONNECTION WITH THE WORK UNDER HIS CONTRACT AS A RESULT OF SUCH SUSPENSION. BUT IF THE WORK OR ANY PART THEREOF SHALL BE STOPPED BY THE NOTICE IN WRITING AFORESAID, AND IF THE OWNER DOES NOT GIVE NOTICE IN WRITING TO THE CONTRACTOR TO RESUME WORK AT A DATE WITHIN NINETY (90) DAYS OF THE DATE FIXED IN THE WRITTEN NOTICE TO SUSPEND, THE CONTRACTOR MAY ABANDON THAT PORTION OF THE WORK SO SUSPENDED AND HE WILL BE ENTITLED TO PAYMENT FOR ALL WORK COMPLETED UP TO THE DATE OF NOTICE TO SUSPEND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. ARTICLE 26. CHANGED CONDITIONS. NOTWITHSTANDING ANY OTHER PROVISION OR CONDITION SET FORTH IN THE CONTRACT DOCUMENTS AS HEREIN DEFINED, IT IS UNDERSTOOD AND AGREED THAT SHOULD THE CONTRACTOR ENCOUNTER OR THE OWNER DISCOVER, DURING THE PROGRESS OF THE WORK, SUBSURFACE AND/OR LATENT CONDITIONS AT THE SITE MATERIALLY DIFFERING FROM THOSE SHOWN ON THE DRAWINGS OR INDICAT- ED IN THE SPECIFICATIONS, OR UNKNOWN CONDITIONS OF AN UNUSUAL NATURE DIFFERING MATERIALLY FROM THOSE ORDINARILY ENCOUNTERED AND GENERALLY RECOGNIZED AS INHERENT IN WORK OF THE CHARACTER PROVIDED FOR IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE PROJECT ENGINEER VERBALLY AND SHALL THEN FOLLOW UP IN WRITING WITHIN TEN (10) DAYS OF THE FIRST OBSERVATION OF ANY SUCH CONDITION. IF THE CONTRACTOR SHOULD FAIL TO NOTIFY THE PROJECT ENGINEER AS REQUIRED ABOVE, THEN ANY WORK PERFORMED SHALL BE DONE AT THE CONTRACTOR'S RISK AND EXPENSE. IF IT IS FOUND CONDITIONS DO MATERIALLY DIFFER, THE CONTRACT SHALL BE MODIFIED VIA WRITTEN CHANGE ORDER TO PROVIDE ANY INCREASE OR DECREASE OF COST AND/OR DIFFERENCE IN TIME RESULTING FROM SUCH CONDITION; THE OWNER MAY TERMINATE THE CONTRACT DUE TO CHANGED CONDITIONS BY DELIVERY OF WRITTEN NOTICE TO THE CONTRACTOR AND THE CONTRACTOR WILL BE ENTITLED ONLY TO PAYMENT FOR WORK COMPLETED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS OF THE RECEIPT OF SUCH NOTICE. ARTICLE 27. CHANGE OF PLANS. IT IS AGREED THAT THE ENGINEER, WITH THE APPROVAL OF THE OWNER, MAY MAKE ALTERATIONS FOR LINE, GRADE, PLAN POSITIONS, DIMENSIONS OR MATERIALS OF WORK HEREIN CONTEMPLATED OR ANY PART THEREOF, EITHER BEFORE OR AFTER COMMENCEMENT OF THE CONSTRUCTION UNDER THIS AGREEMENT SO LONG AS SUCH CHANGES DO NOT RENDER THE TERMS OF THE AGREEMENT INAPPLICABLE. ARTICLE 28. ENGINEER'S/OWNER DECISIONS. THE OWNER SHALL WITHIN FIFTEEN (15) DAYS TIME AFTER PRESENTATION TO HIM IN WRITING, RENDER DECISIONS, IN WRITING, ON ALL CLAIMS OF THE CONTRACTOR, OR OTHER MATTERS RELATING TO THE EXECUTION AND PROGRESS OF THE WORK. QUESTIONS WHICH ARISE AND PERTAIN TO THE INTERPRETATION OF THE CONTRACT DOCUMENTS SHALL BE SUBMITTED IN WRITING TO THE ENGINEER. THE ENGINEER SHALL WITHIN FIFTEEN (15) DAYS TIME RENDER A DECISION AS TO THE INTERPRETATION OF THE CONTRACT DOCUMENTS. ARTICLE 29. CLEANING UP AND RESTORATION OF SITE. THE CONTRACTOR SHALL, DURING THE PROGRESS OF THE WORK AND AS DIRECTED BY THE OWNER, REMOVE FROM THE OWNER'S PROPERTY AND FROM ALL PUBLIC AND PRIVATE PROPERTY AND RIGHTS-OF-WAY, AT HIS OWN EXPENSE, ALL TEMPORARY STRUCTURES, RUBBISH, DEBRIS, PILES OF EARTH, FOREIGN MATTER, AND WASTE MATERIALS RESULTING FROM HIS OPERATIONS. THE SITE OF THE WORK SHALL BE RESTORED TO THE CONDITIONS EXISTING BEFORE THE WORK WAS STARTED, TO THE SATISFACTION OF THE OWNER. LAWNS, PAVEMENTS, SIDEWALKS, AND OTHER SURFACES SHALL BE PRESERVED WHERE PRACTICABLE BUT IF DAMAGED SHALL BE FULLY RESTORED. IF THE CONTRACTOR FAILS TO PERFORM CLEANUP AND RESTORATION IN AN ORDERLY, CONTINUOUS, AND EXPEDITIOUS MANNER, THE OWNER MAY TAKE CORRECTIVE ACTION THREE (3) DAYS AFTER DELIVERY OF NOTICE TO DO SO TO THE CONTRACTOR; ANY EXPENSE RESULTING FROM CORRECTIVE ACTION TAKEN BY THE OWNER FOR CLEANUP OR RESTORATION SHALL BE DEDUCTED FROM PAYMENTS DUE TO THE CONTRACTOR. ARTICLE 30. FINAL INSPECTION. THE OWNER SHALL SCHEDULE A FINAL INSPECTION OF THE WORK INCLUDED IN THE CONTRACT WITHIN TEN (10) DAYS AFTER RECEIPT OF WRITTEN NOTIFICATION FROM THE CONTRACTOR THAT THE WORK IS COMPLETED. IF THE WORK IS NOT ACCEPTABLE TO THE ENGINEER OR OWNER, THE CONTRACTOR SHALL BE ADVISED AS TO THE PARTICULAR DEFECTS TO BE REMEDIED BEFORE FINAL ACCEPTANCE CAN BE MADE. FAILURE OF THE OWNER TO MAKE THIS INSPECTION WITHIN THE TIME SPECIFIED IN NO WAY RELIEVES THE CONTRACTOR OF ANY OF HIS OBLIGATIONS UNDER THE CONTRACT. ONLY WRITTEN NOTIFICATION FROM THE OWNER WILL CONSTITUTE FINAL ACCEPTANCE OF ANY PART OF THE WORK UNDER THIS CONTRACT. ARTICLE 31. GUARANTEE OF WORK. CONTRACTOR WARRANTS AND GUARANTEES TO THE OWNER AND TO THE ENGINEER THAT ALL WORK WILL BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND WILL BE WITHOUT DEFECT. THE GUARANTEE PERIOD SHALL BE NOT LESS THAN ONE YEAR AFTER THE DATE OF SUBSTANTIAL COMPLETION. SHOULD ANY MANUFACTURER'S WARRANTY BE GREATER THAN ONE YEAR OR SHOULD ANY PERMIT, SPECIFICATION, OR REGULATORY WARRANTY REQUIREMENT BE GREATER THAN ONE YEAR, THE CONTRACTOR SHALL GUARANTEE THE WORK FOR THE LONGER PERIOD. IF DURING THE GUARANTEE PERIOD ANY WORK IS FOUND TO BE DEFECTIVE, CONTRACTOR SHALL PROMPTLY, WITHOUT COST TO OWNER, AND IN ACCORDANCE WITH OWNER'S WRITTEN INSTRUCTION, EITHER CORRECT SUCH DEFECTIVE WORK OR REMOVE IT FROM THE SITE AND REPLACE IT WITH NON- DEFECTIVE WORK. IF CONTRACTOR DOES NOT PROMPTLY COMPLY WITH THE TERM OF SUCH INSTRUCTION, OR IN AN EMERGENCY WHERE DELAY WOULD CAUSE SERIOUS RISK OF LOSS OR DAMAGE, OWNER MAY HAVE THE DEFECTIVE WORK CORRECTED OR THE REJECTED WORK REMOVED AND REPLACED, AND ALL DIRECT AND INDIRECT COSTS OF SUCH REMOVAL AND REPLACEMENT, INCLUDING COMPENSATION FOR ADDITIONAL PROFESSIONAL SERVICES, SHALL BE PAID BY CONTRACTOR. ARTICLE 32. STATUTE OF LIMITATIONS; WARRANTIES; AS BETWEEN THE OWNER AND THE CONTRACTOR: (A) ANY APPLICABLE STATUE OF LIMITATIONS SHALL COMMENCE TO RUN AND ANY ALLEGED CAUSE OF ACTION SHALL BE DEEMED TO HAVE ACCRUED IN ANY AND ALL EVENTS NO EARLIER THAN THE DATE OF FINAL PAYMENT. (B) AS TO ACTS OR FAILURES TO ACT OCCURRING AFTER THE DATE OF FINAL PAYMENT, ANY APPLICABLE STATUE OF LIMITATIONS SHALL COMMENCE TO RUN AND ANY ALLEGED CAUSE OF ACTION SHALL BE DEEMED TO HAVE ACCRUED IN ANY AND ALL EVENTS NO EARLIER THAN THE DATE OF ANY ACT OR FAILURE TO ACT BY THE CONTRACTOR PURSUANT TO ANY REQUIRED OR OTHERWISE PROVIDED WARRANTY, THE DATE OF ANY CORRECTION OF THE WORK OR FAILURE TO CORRECT THE WORK BY THE CONTRACTOR, OR THE DATE OF ACTUAL COMMISSION OF ANY OTHER ACT OR FAILURE TO PERFORM ANY DUTY OR OBLIGATION BY THE CONTRACTOR OR OWNER, WHICHEVER OCCURS LAST. ARTICLE 33. USE OF COMPLETED PORTIONS. THE OWNER SHALL HAVE THE RIGHT TO TAKE POSSESSION OF AND USE ANY COMPLETED OR PARTIALLY COMPLETED PORTIONS OF THE WORK, NOTWITHSTANDING THAT THE TIME FOR COMPLETING THE ENTIRE WORK OR SUCH PORTIONS MAY NOT HAVE EXPIRED, BUT SUCH TAKING POSSESSION AND USE SHALL NOT BE DEEMED AN ACCEPTANCE OF ANY WORK NOT COMPLETED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. IF SUCH PRIOR USE INCREASES THE COST OF OR DELAYS THE WORK, THE CONTRACTOR SHALL BE ENTITLED TO SUCH EXTRA COMPENSATION OR EXTENSION OF TIME OR BOTH AS THE OWNER MAY DETERMINE. ARTICLE 34. SUBMISSION OF DAILY PERFORMANCE RECORDS. THE CONTRACTOR SHALL AT THE START OF EACH WORK DAY PROVIDE THE PROJECT INSPECTOR A COPY OF HIS DAILY PERFORMANCE RECORD FOR WORK PERFORMED ON THE PRECEDING WORK DAY. THE PERFORMANCE RECORD SHALL BE SUBMITTED IN FORMAT AS PRESCRIBED BY THE COUNTY ENGINEERING DIVISION. A COPY OF THE PRESCRIBED FORMAT WILL BE PROVIDED TO THE CONTRACTOR BY THE OWNER. THE SUBMISSION OF THE DAILY RECORD DOES NOT PRECLUDE THE SUBMISSION OF ADDITIONAL DOCUMENTATION, REPORTS, INFORMATION WHEN REQUESTED BY THE OWNER; OR AS SPECIFICALLY PROVIDED FOR OR REQUIRED BY THE CONTRACT DOCUMENTS. ARTICLE 35. RECORD DOCUMENTS. THE CONTRACTOR SHALL AT THE END OF CONSTRUCTION PROVIDE THE OWNER WITH ONE COMPLETE SET OF DRAWINGS RECORDING THE INSTALLATION OF THE PROJECT. DURING THE COURSE OF THE CONSTRUCTION THE AS-BUILTS SHALL BE UPDATED DAILY BY THE END OF EACH WORKING DAY. UNDER ARTICLE 47, PARTIAL PAYMENTS MAY BE WITHHELD FOR FAILURE TO KEEP NEAT, ACCURATE AND COMPLETE AS-BUILTS. UNDER ARTICLE 43, THE OWNER MAY ELECT TO PREPARE THE AS-BUILTS AT THE EXPENSE OF THE CONTRACTOR SHOULD THE CONTRACTOR FAIL TO PERFORM UNDER THIS PROVISION OF THE CONTRACT. AS-BUILT INFORMATION SHALL INCLUDE THE FOLLOWING AS A MINIMUM, WHERE APPLICABLE: (A) Pond and outlet structure as-built survey documenting the pond volume is as required per the construction plans, to include as-constructed gabion basket elevation and outlet structure rim and inverts. THESE RECORDS ARE A SPECIFIC CONTRACT REQUIREMENT OF THE CONTRACTOR. FINAL PAYMENT WILL NOT BE ISSUED UNTIL SAID DOCUMENTS HAVE BEEN SUBMITTED IN AN ACCEPTABLE FORM. ARTICLE 36. PARTIAL PAYMENTS. PARTIAL PAYMENTS WILL BE MADE EACH MONTH FOR THE QUANTITY OF WORK PERFORMED IN THE PRECEDING MONTH LESS FIVE PERCENT (5%) TO BE RETAINED UNTIL FINAL COMPLETION OF THE WORK. REQUESTS FOR PAYMENTS SHALL BE SUBMITTED TO THE OWNER BY THE 1ST OF THE MONTH FOR PAYMENT BY MID-MONTH. REQUESTS FOR PAYMENTS SHALL BE SUBMITTED USING THE APPLICATION FOR PAYMENT AND SUBMITTED TO THE COUNTY PROJECT LEADER FOR REVIEW AND SIGNATURE APPROVALS; ADDITIONAL INFORMATION MAY BE REQUESTED DEPENDING ON PROJECT: ARTICLE 37. ESCROW ACCOUNT PROCEDURE. IN ACCORDANCE WITH SECTION 2.2-4334 OF THE CODE OF VIRGINIA (1950) AS AMENDED, ON PUBLIC CONTRACTS OF $200,000 OR MORE, THE CONTRACTOR WILL HAVE THE OPTION TO USE AN ESCROW ACCOUNT PROCEDURE FOR UTILIZATION OF RETAINAGE FUNDS. IN THE EVENT THE CONTRACTOR ELECTS TO USE THE ESCROW ACCOUNT PROCEDURE, THE "ESCROW AGREEMENT" FORM SHALL BE EXECUTED AND SUBMITTED TO THE OWNER WITHIN FIFTEEN CALENDAR DAYS AFTER NOTIFICATION OF INTENT TO AWARD. IF THE "ESCROW AGREEMENT' FORM IS NOT SUBMITTED WITHIN THE FIFTEEN-DAY PERIOD, THE CONTRACTOR SHALL FORFEIT HIS RIGHTS TO USE OF THE ESCROW ACCOUNT PROCEDURE. THE "ESCROW AGREEMENT" AND ALL REGULATIONS PERTAINING THERETO SHALL BE IN SUBSTANTIAL ACCORDANCE WITH THE AGREEMENT USED BY COMMONWEALTH OF VIRGINIA, DEPARTMENT OF TRANSPORTATION. THE CONTRACTOR'S ESCROW AGENT SHALL BE A TRUST COMPANY, BANK OR A SAVINGS INSTITUTION WITH ITS PRINCIPAL OFFICE LOCATED IN THE COMMONWEALTH. ARTICLE 38. METHOD OF MEASUREMENT. EXCEPT WHEN STIPULATED OTHERWISE, ALL QUANTITIES OF WORK PERFORMED AND TO BE PAID FOR UNDER THIS CONTRACT SHALL BE CONSTRUED AS THOSE MEASURED IN PLACE BY THE OWNER. ARTICLE 39. BASIS OF PAYMENT. THE PRICES TO BE PAID FOR THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE THE PRICES STIPULATED IN THE CONTRACTOR'S BID. ARTICLE 40. INCREASED OR DECREASED QUANTITIES AND METHOD OF PAYMENT - UNIT PRICES. THE OWNER RESERVES THE RIGHT TO INCREASE OR DECREASE THE ESTIMATED VALUE OF THE CONTRACT IN AN AMOUNT NOT TO EXCEED TWENTY-FIVE PERCENT (25%). SUCH INCREASE OR DECREASE MAY BE BROUGHT ABOUT EITHER BY VARYING QUANTITIES WITHIN THE ORIGINAL UNITS OF THE CONTRACT OR BY AN EXTENSION OR REDUCTION IN THE ORIGINAL LIMITS OF THE PROJECT. NO CLAIM FOR EXTRA COMPENSATION WILL BE ALLOWED FOR SUCH INCREASE OR DECREASE IN THE VALUE OF THE CONTRACT NOT EXCEEDING TWENTY-FIVE PERCENT (25%). CHANGES IN THE ESTIMATED VALUE OF ANY MAJOR OR MINOR ITEM OF MORE THAN TWENTY-FIVE PERCENT (25%) NOT CONSISTENT WITH THE ABOVE, OR CHANGES IN EITHER TOTAL COST OR THE AMOUNT OF ANY ITEM MAJOR OR MINOR WHICH ARE THE RESULTS OF MORE ACCURATE MEASUREMENTS AND ARE NOT DUE TO ANY CHANGE IN PLAN OR IN CHARACTER OF THE WORK SHALL NOT BE CONSIDERED A BASIS OF DEMAND FOR REVISION IN CONTRACT PRICE BY EITHER PARTY TO THE CONTRACT. FOR ANY INCREASED OR DECREASED QUANTITIES, SETTLEMENT SHALL BE MADE FOR THE ACTUAL AMOUNT OF WORK PERFORMED AT THE UNIT PRICES SHOWN IN THE PROPOSAL FOR THE WORK UNDER CONSIDERATION. ARTICLE 41. EXTRA WORK AND METHOD OF PAYMENT. THE OWNER MAY AT ANY TIME BY A WRITTEN ORDER, AND WITHOUT NOTICE TO SURETIES, MAKE CHANGES IN DRAWINGS OR SPECIFICATIONS, WITHIN THE GENERAL SCOPE THEREOF. ANY EXTRA WORK DONE PRIOR TO THE EXECUTION OF THE COUNTY'S STANDARD CHANGE ORDER FORM BY THE CHAIRMAN OF THE BOARD OF SUPERVISORS IS DONE AT THE CONTRACTOR'S TOTAL RISK AND WITH NO OBLIGATION ON THE PART OF THE COUNTY TO PAY FOR THE WORK. THE CONTRACTOR SHALL PERFORM UNFORESEEN WORK OR WORK WHICH MAY EXCEED THE TWENTY-FIVE PERCENT (25%) STATED IN ARTICLE 40 OR WORK FOR WHICH THERE IS NO PRICE INCLUDED IN THE CONTRACT, WHENEVER IT IS DEEMED NECESSARY OR DESIRABLE IN ORDER TO COMPLETE FULLY THE WORK AS CONTEMPLATED. SUCH WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND AS DIRECTED BY THE OWNER, AND WILL BE PAID FOR AS STIPULATED HEREINAFTER. EXTRA WORK SHALL BE PAID FOR AT THE UNIT PRICES OR LUMP SUM AS AGREED TO BY THE CONTRACTOR AND THE OWNER, OR IN LIEU OF SUCH AGREEMENT, THE OWNER MAY REQUIRE THE CONTRACTOR TO DO SUCH WORK ON A FORCE ACCOUNT BASIS TO BE COMPENSATED FOR IN THE FOLLOWING MANNER. (A) LABOR. FOR ALL LABOR AND FOREMEN IN DIRECT CHARGE OF THE SPECIFIC OPERATIONS, THE CONTRACTOR SHALL RECEIVE THE RATE OF WAGE (OR SCALE) AS SET FORTH IN HIS MOST RECENT PAYROLL ON WHICH THE APPLICABLE CLASS OF LABOR AND FOREMEN WERE USED FOR EACH HOUR OF REGULAR TIMES AND 1- 1/2 TIMES SUCH RATES FOR OVERTIME WHEN SUCH OVERTIME WORK IS AUTHORIZED, THAT SAID LABOR AND FOREMEN ARE ACTUALLY ENGAGED IN SUCH WORK. IN THE EVENT THE CLASS OF LABOR NEEDED HAS NOT BEEN EMPLOYED ON THE PROJECT, MUTUALLY AGREED UPON RATES WILL BE ESTABLISHED, PROVIDED, HOWEVER, THAT THE RATES SHALL CONFORM TO PREDETERMINED RATES AUTHORIZED FOR THE PROJECT. AN AMOUNT EQUAL TO TEN PERCENT (10%) OF THE SUM THEREFORE SHALL BE ADDED TO THESE RATES. (B) BOND, INSURANCE, AND TAX, FOR PROPERTY DAMAGE, LIABILITY, AND WORKMEN'S COMPENSATION INSURANCE PREMIUMS, UNEMPLOYMENT INSURANCE CONTRIBUTIONS AND SOCIAL SECURITY TAXES ON FORCE ACCOUNT WORK, THE CONTRACTOR SHALL RECEIVE AN AMOUNT EQUAL TO TWENTY PERCENT (20%) THE BASE COST FOR LABOR. (C) MATERIALS. FOR MATERIALS ACCEPTED BY THE OWNER AND USED, THE CONTRACTOR SHALL RECEIVE THE ACTUAL COST OF SUCH MATERIALS DELIVERED ON THE WORK, INCLUDING TRANSPORTATION, AND HANDLING CHARGES PAID BY HIM (EXCLUSIVE OF EQUIPMENT RENTALS AS HEREINAFTER SET FORTH), TO WHICH COST TEN PERCENT (10%) WILL BE ADDED. (D) EQUIPMENT. FOR ANY MACHINERY OR SPECIAL EQUIPMENT (OTHER THAN SMALL TOOLS AND OPERATOR) INCLUDING FUEL, LUBRICANTS AND REPAIRS, THE CONTRACTOR SHALL RECEIVE HOURLY RENTAL RATES WHICH SHALL NOT EXCEED THE RENTAL RATES BASED ON 1/40TH OF THE WEEKLY RATE OF THE CURRENT SCHEDULE PUBLISHED BY THE ASSOCIATED EQUIPMENT DISTRIBUTORS (AED) PLUS TRANSPORTATION COST FOR EQUIPMENT NOT ALREADY ON THE PROJECT. SUCH RATE WILL BE PAID FOR THE ACTUAL TIME THE EQUIPMENT IS IN OPERATION ON THE FORCE ACCOUNT WORK. THE RATES FOR LICENSED TRUCKS AND SPECIAL EQUIPMENT NOT LISTED IN THE AED SCHEDULE USED ON THE FORCE ACCOUNT WORK SHALL NOT EXCEED THE HOURLY RATE BEING PAID FOR SUCH TRUCKS AND EQUIPMENT BY THE CONTRACTOR AT THE TIME OF THE FORCE ACCOUNT AUTHORIZATION. IN THE ABSENCE OF SUCH RATES, THE PREVAILING RATES BEING PAID IN THE AREA WHERE THE WORK IS CONTEMPLATED SHALL BE USED. (E) MISCELLANEOUS. NO ADDITIONAL ALLOWANCE WILL BE MADE FOR GENERAL SUPERINTENDENCE, THE USE OF SMALL TOOLS, OR OTHER COSTS FOR WHICH NO SPECIFIC ALLOWANCE IS HEREIN PROVIDED. (F) COMPENSATION. THE COMPENSATION AS SET FORTH IN THIS SECTION SHALL BE ACCEPTED BY THE CONTRACTOR AS PAYMENT IN FULL INCLUDING PROFIT FOR EXTRA WORK DONE ON A FORCE ACCOUNT BASIS. AT THE END OF EACH DAY THE CONTRACTOR'S REPRESENTATIVE AND THE INSPECTOR SHALL COMPARE RECORDS OF THE COST OF WORK DONE AS ORDERED ON A FORCE ACCOUNT BASIS. (G) STATEMENTS. NO PAYMENT WILL BE MADE FOR WORK PERFORMED ON A FORCE ACCOUNT BASIS UNTIL THE CONTRACTOR HAS FURNISHED THE ENGINEER OR OWNER WITH DUPLICATE ITEMIZED STATEMENTS OF THE COST OF SUCH FORCE ACCOUNT WORK DETAILED AS FOLLOWS: 1. NAME, CLASSIFICATION, DATE, DAILY HOURS, TOTAL HOURS, RATE AND EXTENSION FOR EACH LABORER, AND FOREMAN 2. DESIGNATION, DATES, DAILY HOURS, TOTAL HOURS, RENTAL RATE, AND EXTENSION FOR EACH UNIT OF EQUIPMENT 3. QUANTITIES OF MATERIALS, PRICES AND EXTENSIONS 4 TRANSPORTATION OF MATERIAL 5. COST OF PROPERTY DAMAGE, LIABILITY AND WORKERS' COMPENSATION INSURANCE PREMIUMS, UNEMPLOYMENT INSURANCE CONTRIBUTIONS, AND SOCIAL SECURITY TAX STATEMENTS SHALL BE ACCOMPANIED AND SUPPORTED BY RECEIPTED INVOICES FOR ALL MATERIALS USED AND TRANSPORTATION CHARGES. HOWEVER, IF MATERIALS USED ON THE FORCE ACCOUNT WORK ARE NOT SPECIFICALLY PURCHASED FOR SUCH WORK BUT ARE TAKEN FROM THE CONTRACTOR'S STOCK THEN, IN LIEU OF THE INVOICES, THE CONTRACTOR SHALL FURNISH AN AFFIDAVIT CERTIFYING THAT SUCH MATERIALS WERE TAKEN FROM HIS STOCK, THAT THE QUANTITY CLAIMED WAS ACTUALLY USED AND THAT THE PRICE AND TRANSPORTATION AND HANDLING CLAIMED REPRESENT THE ACTUAL COST TO THE CONTRACTOR. ARTICLE 42. WORK OUTSIDE REGULAR HOURS. IF THE CONTRACTOR DESIRES TO PERFORM WORK OUTSIDE THE REGULAR HOURS OR ON SATURDAY, HE SHALL REQUEST PERMISSION TO WORK FORTY-EIGHT (48) HOURS IN ADVANCE TO ALLOW ARRANGEMENTS TO BE MADE FOR PROPER INSPECTION. THE OWNER MAY REFUSE THE CONTRACTOR PERMISSION TO WORK IF THE 48-HOUR NOTICE IS NOT GIVEN OR FOR OTHER JUST CAUSE. REASONABLE EFFORTS SHALL BE MADE BY THE CONTRACTOR TO AVOID UNDUE NOISE DURING THE NIGHT AND ON SUNDAYS, IF IT IS NECESSARY TO WORK AT SUCH TIMES. UNDER NORMAL CIRCUMSTANCES THE CONTRACTOR WILL NOT BE PERMITTED TO WORK ON SUNDAYS OR COUNTY HOLIDAYS. UNLESS SPECIFICALLY SCHEDULED TO WORK OUTSIDE NORMAL HOURS BY THE OWNER IN THE INTEREST OF PUBLIC SAFETY OR CONVENIENCE, THE CONTRACTOR WILL BE LIABLE FOR THE EXPENSE OF OVERTIME WORK REQUIRED BY COUNTY EMPLOYEES. THIS EXPENSE INCLUDES BUT IS NOT LIMITED TO COUNTY EMPLOYEES' PERFORMING INSPECTIONS OUTSIDE NORMAL WORKING HOURS AS WELL AS EMPLOYEES BEING CALLED TO THE JOB SITE OUTSIDE NORMAL WORKING HOURS TO RESOLVE PROBLEMS DIRECTLY RELATED TO THIS CONTRACT. NORMAL WORKING HOURS ARE DEFINED AS 8:30 A.M. TO 5:00 P.M. MONDAY THROUGH FRIDAY, EXCLUDING COUNTY HOLIDAYS. THE OWNER RESERVES THE RIGHT TO SCHEDULE THE CONTRACTOR TO WORK OUTSIDE NORMAL WORKING HOURS IN THE INTEREST OF PUBLIC SAFETY OR CONVENIENCE. NO CLAIM FOR ADDITIONAL COMPENSATION SHALL BE MADE BY THE CONTRACTOR WHEN SUCH OCCASIONS OCCUR. ARTICLE 43. DEDUCTIONS FOR UNCORRECTED WORK. IF THE OWNER DEEMS IT INEXPEDIENT TO CORRECT WORK DAMAGED OR NOT DONE IN ACCORDANCE WITH THE CONTRACT, AN EQUITABLE DEDUCTION FROM THE CONTRACT PRICE SHALL BE MADE THEREFOR. ARTICLE 44. LIQUIDATED DAMAGES FOR DELAY AND EXTENSION OF THE TIME. IF THE CONTRACTOR SHALL FAIL TO COMPLETE THE WORK OR ANY PART THEREOF WITHIN THE TIME STIPULATED IN THESE SPECIFICATIONS AND IN THE CONTRACT AGREEMENT, OR AN APPLICABLE EXTENSION THEREOF, IT WILL BE DIFFICULT OR IMPOSSIBLE TO ASCERTAIN THE ACTUAL DAMAGES FOR THE DELAY, AND IN LIEU THEREOF, THE CONTRACTOR SHALL PAY TO THE OWNER AS FIXED AND AGREED, LIQUIDATED DAMAGES FOR EACH CALENDAR DAY OF DELAY UNTIL THE DELAYED WORK IS CORRECTED OR ACCEPTED, AN AMOUNT EQUAL TO THE CONTRACT PRICE DIVIDED BY THE TOTAL NUMBER OF DAYS UNTIL FINAL COMPLETION PER DAY OF DELAY. THE CONTRACTOR AND OWNER AGREE THAT THIS SUM IS PROPORTIONATE TO THE PROBABLE LOSS AND IS NOT A PENALTY. THE CONTRACTOR EXPRESSLY WAIVES ANY DEFENSE AS TO THE VALIDITY OF ANY LIQUIDATED DAMAGES STATED IN THESE CONTRACT DOCUMENTS AS THEY MAY APPEAR ON THE GROUNDS THAT SUCH LIQUIDATED DAMAGES ARE VOID AS PENALTIES OR ARE NOT REASONABLY RELATED TO ACTUAL DAMAGES. IF, AFTER THE EXPIRATION OF THE TIME STIPULATED IN THESE CONTRACT DOCUMENTS AND IN THE CONTRACT AGREEMENT, OR APPLICABLE EXTENSION THEREOF, THE OWNER TERMINATES THE RIGHT OF THE CONTRACTOR TO PROCEED AND DOES NOT ELECT TO COMPLETE THE WORK, LIQUIDATED DAMAGES SHALL BE PAID AS ABOVE PROVIDED FOR EACH CALENDAR DAY AFTER THE TIME SO STIPULATED, UNTIL THE EFFECTIVE DATE OF THE TERMINATION OF THE CONTRACTOR'S RIGHT TO PROCEED. IF THE OWNER TERMINATES THE CONTRACTOR'S RIGHT TO PROCEED AND ELECTS TO COMPLETE THE WORK AS PROVIDED ELSEWHERE IN THE SPECIFICATIONS, LIQUIDATED DAMAGES SHALL BE PAID AS PROVIDED FOR EACH CALENDAR DAY AFTER THE TIME SO STIPULATED, OR APPLICABLE EXTENSION THEREOF, UNTIL THE DELAYED WORK IS COMPLETED, PROVIDED THE OWNER EXERCISES DUE DILIGENCE IN COMPLETING THE WORK. THE CONTRACTOR AND HIS SURETIES SHALL BE LIABLE FOR ALL SUCH LIQUIDATED DAMAGES OCCURRING HERETOFORE DESCRIBED. IT IS AGREED, HOWEVER, THE CONTRACTOR SHALL NOT BE CHARGED WITH LIQUIDATED DAMAGES OR ACTUAL DAMAGES FOR DELAYS DUE TO CAUSES BEYOND HIS CONTROL AND WITHOUT HIS FAULT OR NEGLIGENCE, INCLUDING BUT NOT RESTRICTED TO: ACTS OF THE OWNER OR OF HIS EMPLOYEES, OR OF ANY OTHER CONTRACTOR EMPLOYED BY THE OWNER; CHANGES ORDERED IN THE WORK; STRIKES; LOCKOUTS; FIRE; UNUSUAL DELAY IN TRANSPORTATION; UNAVOIDABLE CASUALTIES; DELAY AUTHORIZED BY OWNER PENDING LITIGATION AS PROVIDED BY ARTICLE 59. NO SUCH EXTENSION SHALL BE MADE FOR DELAY OCCURRING MORE THAN SEVEN (7) DAYS BEFORE CLAIM IS MADE IN WRITING TO THE OWNER. IN THE CASE OF A CONTINUING CAUSE OF DELAY ONLY ONE CLAIM IS NECESSARY. IF NO SCHEDULE OR AGREEMENT STATING THE DATES UPON WHICH DRAWINGS SHALL BE FURNISHED IS MADE, THEN NO CLAIM FOR DELAY SHALL BE ALLOWED ON ACCOUNT OF FAILURE TO FURNISH DRAWINGS UNTIL TEN (10) DAYS AFTER RECEIPT BY THE ENGINEER OF A WRITTEN DEMAND FOR SUCH DRAWINGS. ARTICLE 45. DAMAGES. ANY CLAIM FOR DAMAGE ARISING UNDER THIS CONTRACT SHALL BE MADE IN WRITING TO THE PARTY LIABLE WITHIN FIFTEEN (15) DAYS TIME OF THE FIRST OBSERVANCE OF SUCH DAMAGE AND NOT LATER THAN THE TIME OF FINAL PAYMENT EXCEPT AS EXPRESSLY STIPULATED OTHERWISE IN GUARANTEE OF WORK AS IN THE CASE OF THE DEFECTIVE WORK OR MATERIALS, AND SHALL BE ADJUSTED BY AGREEMENT OR LITIGATION AS PROVIDED BY ARTICLE 59. ARTICLE 46. LIENS. NEITHER THE FINAL PAYMENT NOR ANY PART OF THE RETAINED PERCENTAGE SHALL BECOME DUE UNTIL THE CONTRACTOR, IF REQUIRED, SHALL DELIVER TO THE OWNER A COMPLETE RELEASE OF ALL LIENS ARISING OUT OF THIS CONTRACT, OR RECEIPTS IN FULL IN LIEU THEREOF, AND IF REQUIRED IN EITHER CASE AN AFFIDAVIT THAT SO FAR AS HE HAS KNOWLEDGE OR INFORMATION THE RELEASES AND RECEIPTS INCLUDE ALL THE LABOR AND MATERIAL FOR WHICH A LIEN COULD BE FILED; BUT THE CONTRACTOR MAY IF ANY SUBCONTRACTOR REFUSES TO FURNISH A RELEASE OR RECEIPT IN FULL, FURNISH A BOND SATISFACTORY TO THE OWNER TO INDEMNIFY THE OWNER AGAINST ANY LIEN. IF ANY LIEN REMAINS UNSATISFIED AFTER ALL PAYMENTS ARE MADE, THE CONTRACTOR SHALL REFUND TO THE OWNER ALL MONIES THAT THE LATTER MAY BE COMPELLED TO PAY IN DISCHARGING SUCH A LIEN, INCLUDING ALL COST AND A REASONABLE ATTORNEY'S FEE. ARTICLE 47. PAYMENTS WITHHELD. THE OWNER MAY WITHHOLD OR, ON ACCOUNT OF SUBSEQUENTLY DISCOVERED EVIDENCE, NULLIFY THE WHOLE OR PART OF ANY PAYMENT TO SUCH EXTENT AS MAY BE NECESSARY TO PROTECT HIMSELF FROM LOSS ON ACCOUNT OF: (A) DEFECTIVE WORK NOT REMEDIED (B) CLAIMS OR LIENS THAT HAVE BEEN FILED OR EVIDENCE INDICATING THAT THERE IS REASONABLE CAUSE TO BELIEVE SUCH MAY BE FILED (C) FAILURE OF THE CONTRACTOR TO PAY FOR LABOR OR MATERIALS, OR TO MAKE PAYMENTS PROPERLY TO SUBCONTRACTORS (D) A REASONABLE DOUBT THAT THE CONTRACT CAN BE COMPLETED FOR THE BALANCE THEN UNPAID (E) DAMAGE TO ANOTHER CONTRACTOR (F) THE OWNER HAVING BEEN REQUIRED TO CORRECT DEFECTIVE WORK, COMPLETE ANY WORK, PERFORM EMERGENCY WORK, OR PERFORM OTHER WORK (G) UNSATISFACTORY PROSECUTION OF THE WORK, INCLUDING FAILURE TO FURNISH ACCEPTABLE SUBMITTALS, FAILURE TO MAKE ADEQUATE PROGRESS TOWARDS COMPLETING THE WORK WITHIN THE CONTRACT TIME OR FAILURE TO MAINTAIN THE WORK SITE AT ALL TIMES IN A NEAT, ORDERLY, AND WORKMAN-LIKE APPEARANCE. (H) FAILURE TO KEEP NEAT, ACCURATE, AND COMPLETE SET OF "AS- BUILTS" UPDATED ON A DAILY BASIS. (I) FAILURE TO SUBMIT A DAILY PERFORMANCE RECORD IN SUITABLE FORMAT. WHEN THE ABOVE GROUNDS ARE REMOVED, PAYMENT SHALL BE MADE FOR AMOUNTS WITHHELD BECAUSE OF THEM. ARTICLE 48. THE OWNER'S RIGHT TO DO WORK. IF THE CONTRACTOR SHOULD FAIL TO PROSECUTE THE WORK OR FAITHFULLY PERFORM ANY PROVISIONS OF THIS CONTRACT, IT SHALL BE CONSTRUED AS GROUNDS FOR THE OWNER'S RIGHT TO PERFORM WORK. THE OWNER, HAVING DULY SERVED WRITTEN NOTICE TO THE CONTRACTOR OF HIS INTENT TO PERFORM WORK, MAY REMEDY SUCH DEFICIENCIES AFTER THREE (3) DAYS FROM DELIVERY OF SAID NOTICE TO THE CONTRACTOR. THE COSTS INCURRED BY THE OWNER IN CORRECTING THE DEFICIENCY SHALL BE PAID FOR BY THE CONTRACTOR. ARTICLE 49. THE OWNER'S RIGHT TO TERMINATE CONTRACT. IF THE CONTRACTOR SHOULD BE ADJUDGED BANKRUPT, OR IF HE SHOULD MAKE A GENERAL ASSIGNMENT FOR THE BENEFIT OF HIS CREDITORS, OR A RECEIVER SHOULD BE APPOINTED ON ACCOUNT OF HIS INSOLVENCY, OR IF HE SHOULD PERSISTENTLY OR REPEATEDLY REFUSE OR SHOULD FAIL, EXCEPT IN CASES FOR WHICH EXTENSION OF TIME IS PROVIDED, TO SUPPLY ENOUGH PROPERLY SKILLED WORKMEN OR PROPER MATERIALS, OR IF HE SHOULD FAIL TO MAKE PROMPT PAYMENT TO SUBCONTRACTORS OR FOR MATERIALS OR LABOR OR PERSISTENTLY DISREGARD LAWS, ORDINANCES, OR THE INSTRUCTIONS OF THE OWNER, OR OTHERWISE BE GUILTY OF A VIOLATION OF ANY PROVISION OF THE CONTRACT, THEN THE OWNER, UPON THE CERTIFICATE OF THE ENGINEER THAT CAUSE EXISTS TO JUSTIFY SUCH ACTIONS, MAY, WITHOUT PREJUDICE TO ANY OTHER RIGHT OF REMEDY AND AFTER GIVING THE CONTRACTOR SEVEN (7) DAYS WRITTEN NOTICE, TERMINATE THE EMPLOYMENT OF THE CONTRACTOR AND TAKE POSSESSION OF THE PREMISES AND ALL OF THE MATERIALS, TOOLS, AND EQUIPMENT THEREON AND FINISH THE WORK BY WHATEVER METHOD HE MAY DEEM EXPEDIENT. IN SUCH CASE THE CONTRACTOR SHALL NOT BE ENTITLED TO RECEIVE ANY FURTHER PAYMENT UNTIL THE WORK IS FINISHED. IF THE UNPAID BALANCE OF THE CONTRACT PRICE SHALL EXCEED THE EXPENSE OF FINISHING THE WORK INCLUDING COMPENSATION FOR ADDITIONAL MANAGERIAL AND ADMINISTRATIVE SERVICES, SUCH EXCESS SHALL BE PAID TO THE CONTRACTOR. IF SUCH EXPENSE SHALL EXCEED SUCH UNPAID BALANCE THE CONTRACTOR SHALL PAY THE DIFFERENCE TO THE OWNER. THE EXPENSE INCURRED BY THE OWNER AS HEREIN PROVIDED, AND THE DAMAGE INCURRED THROUGH THE CONTRACTOR'S DEFAULT, SHALL BE CERTIFIED BY THE ENGINEER. ARTICLE 50. CONTRACTOR'S RIGHT TO STOP WORK OR TERMINATE CONTRACT. IF THE WORK SHOULD BE STOPPED UNDER AN ORDER OF ANY COURT, OR OTHER PUBLIC AUTHORITY, FOR A PERIOD OF NINETY (90) DAYS, THROUGH NO ACT OR FAULT OF THE CONTRACTOR OR OF ANYONE EMPLOYED BY HIM, OR IF THE ENGINEER SHOULD FAIL TO ISSUE ANY ESTIMATE FOR PAYMENT WITHIN THIRTY (30) DAYS AFTER IT IS DUE, OR IF THE OWNER SHOULD FAIL TO PAY THE CONTRACTOR WITHIN THIRTY (30) DAYS OF ITS MATURITY AND PRESENTATION, ANY SUM CERTIFIED BY THE ENGINEER OR AWARDED BY ARBITRATORS; THEN THE CONTRACTOR MAY, UPON SEVEN (7) DAYS WRITTEN NOTICE TO THE OWNER AND THE ENGINEER, STOP WORK OR TERMINATE THIS CONTRACT AND RECOVER FROM THE OWNER PAYMENT OF ALL WORK EXECUTED AND ANY LOSS SUSTAINED UPON ANY PLANT OR MATERIAL AND REASONABLE PROFIT AND DAMAGES. ARTICLE 51. REMOVAL OF MATERIALS AND EQUIPMENT. IN THE CASE OF ANNULMENT OF THIS CONTRACT BEFORE COMPLETION FROM ANY CAUSE WHATEVER OR IN THE CASE OF ACCEPTANCE OF THE WORK AFTER COMPLETION, THE CONTRACTOR WHEN NOTIFIED BY THE OWNER IN WRITING, SHALL WITHIN FIVE (5) DAYS AFTER RECEIPT OF NOTIFICATION REMOVE ALL OR ANY PORTION AS DIRECTED OF HIS EQUIPMENT AND MATERIALS FROM THE PROPERTY OF THE OWNER. SHOULD THE CONTRACTOR BE UNABLE OR UNWILLING TO COMPLY WITH THE OWNER'S REQUEST, THEN THE OWNER RESERVES THE RIGHT TO REMOVE AND/OR STORE SUCH EQUIPMENT AND MATERIALS AT THE CONTRACTOR'S EXPENSE. ARTICLE 52. ASSIGNMENT. NEITHER PARTY TO THE CONTRACT SHALL ASSIGN THE CONTRACT OR SUBLET IT AS A WHOLE WITHOUT THE WRITTEN CONSENT OF THE OTHER, NOR SHALL THE CONTRACTOR ASSIGN ANY MONIES DUE OR TO BECOME DUE TO HIM HEREUNDER, WITHOUT THE PREVIOUS WRITTEN CONSENT OF THE OWNER. SUCH CONSENT SHALL NOT BE UNREASONABLY WITHHELD. ARTICLE 53. RIGHTS OF VARIOUS INTEREST. WHEREVER WORK BEING DONE BY THE OWNER'S FORCES OR OTHER CONTRACTORS IS CONTIGUOUS TO WORK COVERED BY THIS CONTRACT, THE RESPECTIVE RIGHTS OF THE VARIOUS INTERESTS INVOLVED SHALL BE ESTABLISHED BY THE OWNER, TO SECURE THE COMPLETION OF THE VARIOUS PORTIONS OF THE WORK IN GENERAL HARMONY. ARTICLE 54. SEPARATE CONTRACT. THE OWNER RESERVES THE RIGHT TO LET OTHER CONTRACTS IN CONNECTION WITH THIS WORK. THE CONTRACTOR SHALL AFFORD OTHER CONTRACTORS REASONABLE OPPORTUNITY FOR THE INTRODUCTION AND STORAGE OF THEIR MATERIALS AND THE EXECUTION OF THEIR WORK, AND SHALL PROPERLY CONNECT AND COORDINATE HIS WORK WITH THEIRS. IF ANY PART OF THE CONTRACTOR'S WORK DEPENDS FOR PROPER EXECUTION OR RESULTS UPON THE WORK OF ANY OTHER CONTRACTOR, THE CONTRACTOR SHALL INSPECT AND PROMPTLY REPORT TO THE OWNER ANY DEFECTS IN SUCH WORK THAT RENDER IT UNSUITABLE FOR SUCH PROPER EXECUTION AND RESULTS. HIS FAILURE SO TO INSPECT AND REPORT SHALL CONSTITUTE AN ACCEPTANCE OF THE OTHER CONTRACTOR'S WORK, AS FIT AND PROPER FOR THE RECEPTION OF HIS WORK, EXCEPT AS TO DEFECTS WHICH MAY DEVELOP IN THE OTHER CONTRACTOR'S WORK AFTER THE EXECUTION OF HIS WORK. TO INSURE THE PROPER EXECUTION OF HIS SUBSEQUENT WORK, THE CONTRACTOR SHALL MEASURE WORK ALREADY IN PLACE AND SHALL AT ONCE REPORT IN WRITING TO THE OWNER ANY DISCREPANCY BETWEEN THE EXECUTED WORK AND THE DRAWINGS. ARTICLE 55. SUBCONTRACTS. THE CONTRACTOR SHALL, WITHIN TEN (10) DAYS AFTER THE SIGNATURE OF THE CONTRACT, NOTIFY THE OWNER IN WRITING OF THE NAMES OF SUBCONTRACTORS PROPOSED FOR THE WORK AND SHALL NOT EMPLOY ANY THAT THE OWNER MAY WITHIN TEN (10) DAYS AFTER RECEIPT OF NOTIFICATION OBJECT TO AS INCOMPETENT OR UNFIT OR ANY THAT APPEAR ON THE HUD AREA OFFICE CONSOLIDATED LIST OF DEBARRED, SUSPENDED, AND INELIGIBLE CONTRACTORS. THE CONTRACTOR AGREES THAT HE IS AS FULLY RESPONSIBLE TO THE OWNER FOR THE ACTS AND OMISSIONS OF HIS SUBCONTRACTORS AND PERSONS EITHER DIRECTLY OR INDIRECTLY EMPLOYED BY THEM AS HE IS FOR THE ACTS OR OMISSIONS OF PERSONS DIRECTLY EMPLOYED BY HIM. WITH THE EXCEPTION OF SUBCONTRACTS FOR LESS THAN $10,000 EACH, AND SUBCONTRACTS WITH A MANUFACTURER OR A FABRICATOR, ANY AGREEMENT BETWEEN THE CONTRACTOR AND ANY SUBCONTRACTOR SHALL REQUIRE OF THE SUBCONTRACTOR A PAYMENT BOND WITH SURETY THEREON IN THE AMOUNT OF ONE HUNDRED PERCENT (100%) OF THE WORK SUBLET TO THE SUBCONTRACTOR, WHICH SHALL BE CONDITIONED UPON THE PAYMENT TO ALL PERSONS WHO HAVE AND FULFILL, CONTRACTS WHICH ARE DIRECTLY WITH THE SUBCONTRACTOR FOR PERFORMING LABOR AND/OR FURNISHING MATERIALS IN THE PROSECUTION OF THE WORK PROVIDED FOR IN THE SUBCONTRACT, AND TO PAY THOSE PERSONS WHO FURNISH LABOR AND/OR MATERIALS AS AFORESAID. IN THE EVENT THE CONTRACTOR FAILS TO REQUIRE SAID BOND, ANY PERSON WHO HAS AND FULFILLS A CONTRACT DIRECTLY WITH SUCH SUBCONTRACTOR IN PERFORMING LABOR AND/OR FURNISHING MATERIALS IN THE PROSECUTION OF THE WORK PROVIDED FOR IN THE SUBCONTRACT SHALL HAVE A DIRECT RIGHT OF ACTION AGAINST THE OBLIGORS AND SURETIES ON THE PAYMENT BOND REQUIRED OF THE CONTRACTOR. PAYMENTS TO SUBCONTRACTORS SHALL BE MADE IN ACCORDANCE WITH THE TERMS OF VIRGINIA CODE SECTION 2.2-4354, WHICH ARE INCORPORATED HEREIN BY REFERENCE. NOTHING CONTAINED IN THE CONTRACT DOCUMENTS SHALL CREATE ANY CONTRACTUAL RELATION BETWEEN ANY SUBCONTRACTOR AND THE OWNER. ARTICLE 56. EMPLOYMENT DISCRIMINATION PROHIBITED. IN ACCORDANCE WITH SECTION 2.2-4311 OF THE CODE OF VIRGINIA, EVERY CONTRACT FOR GOODS OR SERVICES OVER $10,000 SHALL INCLUDE THE FOLLOWING PROVISIONS DURING THE PERFORMANCE OF THIS CONTRACT. (A) THE CONTRACTOR WILL NOT DISCRIMINATE AGAINST ANY EMPLOYEE OR APPLICANT FOR EMPLOYMENT BECAUSE OF RACE, RELIGION, COLOR, SEX OR NATIONAL ORIGIN EXCEPT WHERE RELIGION, SEX OR NATIONAL ORIGIN IS A BONA FIDE OCCUPATIONAL QUALIFICATION REASONABLY NECESSARY TO THE NORMAL OPERATION OF THE CONTRACTOR. THE CONTRACTOR AGREES TO POST IN CONSPICUOUS PLACES, AVAILABLE TO EMPLOYEES AND APPLICANTS FOR EMPLOYMENT, NOTICES SETTING FORTH THE PROVISIONS OF THIS NON-DISCRIMINATION CLAUSE. B) THE CONTRACTOR, IN ALL SOLICITATION OR ADVERTISEMENTS FOR EMPLOYEES PLACED BY OR ON BEHALF OF THE CONTRACTOR, WILL STATE THAT SUCH CONTRACTOR IS AN EQUAL OPPORTUNITY EMPLOYER. (C) NOTICES, ADVERTISEMENTS AND SOLICITATIONS PLACED IN ACCORDANCE WITH FEDERAL LAW, RULE OR REGULATION SHALL BE DEEMED SUFFICIENT FOR THE PURPOSE OF MEETING THE REQUIREMENTS OF THIS SECTION. THE CONTRACTOR WILL INCLUDE THE PROVISIONS OF THE FOREGOING PARAGRAPHS A, B, AND C IN EVERY SUBCONTRACT OR PURCHASE ORDER OF OVER $10,000 SO THAT THE PROVISIONS WILL BE BINDING UPON EACH SUBCONTRACTOR OR VENDOR. FURTHER, ALL INDIVIDUALS OR FIRMS CONTRACTING WITH ISLE OF WIGHT COUNTY ARE ENCOURAGED TO USE MINORITY BUSINESS ENTERPRISES AS SUBCONTRACTORS AND SUPPLIERS TO THE FULLEST EXTENT POSSIBLE IN PROVIDING SERVICES OR PRODUCTS TO ISLE OF WIGHT COUNTY. ARTICLE 57. DRUG FREE WORKPLACE. DURING THE PERFORMANCE OF THIS CONTRACT, THE CONTRACTOR AGREES TO (I) PROVIDE A DRUG-FREE WORKPLACE FOR THE CONTRACTOR’S EMPLOYEES; (II) POST IN CONSPICUOUS PLACES, AVAILABLE TO EMPLOYEES AND APPLICANTS FOR EMPLOYMENT, A STATEMENT NOTIFYING EMPLOYEES THAT THE UNLAWFUL MANUFACTURE, SALE DISTRIBUTION, DISPENSATION, POSSESSION, OR USE OF CONTROLLED SUBSTANCE OR MARIJUANA IS PROHIBITED IN THE CONTRACTOR’S WORKPLACE AND SPECIFYING THE ACTIONS THAT WILL BE TAKEN AGAINST EMPLOYEES FOR VIOLATIONS OF SUCH PROHIBITION; (III) STATE IN ALL SOLICITATIONS OR ADVERTISEMENTS FOR EMPLOYEES PLACED BY OR ON BEHALF OF THE CONTRACTOR THAT THE CONTRACTOR MAINTAINS A DRUG-FREE WORKPLACE; AND (IV) INCLUDE THE PROVISIONS OF THE FOREGOING CLAUSES IN EVERY SUBCONTRACT OR PURCHASE ORDER OF OVER TEN THOUSAND DOLLARS ($10,000), SO THAT THE PROVISIONS WILL BE BINDING UPON EACH SUBCONTRACTOR OR VENDOR. FOR THE PURPOSES OF THIS SECTION, “DRUG-FREE WORKPLACE” MEANS A SITE FOR THE PERFORMANCE OF WORK DONE IN CONNECTION WITH A SPECIFIC CONTRACT AWARDED TO A CONTRACTOR IN ACCORDANCE WITH THIS CHAPTER, THE EMPLOYEES OF WHOM ARE PROHIBITED FROM ENGAGING IN THE UNLAWFUL MANUFACTURE, SALE, DISTRIBUTION, DISPENSATION, POSSESSION OR USE OF ANY CONTROLLED SUBSTANCE OR MARIJUANA DURING THE PERFORMANCE OF THE CONTRACT. ARTICLE 58. INSURANCE. CONTRACTOR SHALL PURCHASE AND MAINTAIN INSURANCE WITH THE LIMITS OF LIABILITY NOT LESS THAN THE FOLLOWING AMOUNTS OR GREATER WHERE REQUIRED BY LAW: (A) WORKMAN'S COMPENSATION INCLUDING EMPLOYER'S LIABILITY INSURANCE COMPLYING WITH STATE REQUIREMENTS. EMPLOYER'S LIABILITY INSURANCE SHALL BE PROVIDED WITH A LIMIT OF NOT LESS THAN $500,000 PER OCCURRENCE. (B) COMMERCIAL GENERAL LIABILITY INSURANCE INCLUDING: PREMISES AND OPERATIONS; INDEPENDENT CONTRACTORS' PROTECTION; PRODUCTS AND COMPLETED OPERATIONS; BROAD FORM PROPERTY DAMAGE; AND ENDORSEMENTS TO THE AGGREGATE LIMIT OF INSURANCE SPECIFYING AGGREGATE APPLIES SEPARATELY TO EACH PROJECT AND EACH LOCATION. THE GENERAL LIABILITY COVERAGE SHALL NAME THE OWNER AND ENGINEER AS ADDITIONAL INSURED. (1) LIMITS OF LIABILITY AGGREGATE LIMITS: $2,000,000 PRODUCTS/COMPLETED OPERATIONS $2,000,000 GENERAL AGGREGATE COVERAGE A: BODILY INJURY AND PROPERTY DAMAGE $1,000,0000 ANY ONE OCCURRENCE FIRE DAMAGE LIMIT $50,000 ANY ONE FIRE COVERAGE B: PERSONAL & ADVERTISING INJURY $1,000,000 ANY ONE PERSON OR ORGANIZATION COVERAGE C: MEDICAL EXPENSE LIMIT $5,000 ANY ONE PERSON (C) COMPREHENSIVE AUTOMOBILE LIABILITY INSURANCE: (1) COMBINED SINGLE LIMIT (BODILY INJURY & PROPERTY DAMAGE) $1,000,000 EACH OCCURRENCE (D) CONTRACTUAL LIABILITY: (1) BODILY INJURY $1,000,000 EACH OCCURRENCE (2) PROPERTY DAMAGE $1,000,000 EACH OCCURRENCE $ 2,000,000 ANNUAL AGGREGATE (E) CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS ISLE OF WIGHT COUNTY, THE ENGINEER, CONSULTANTS OF THE ENGINEER, AND EMPLOYEES OR AGENTS OF ANY OF THEM FROM ANY AND ALL LOSSES, DAMAGES, CLAIMS, FINES, PENALTIES, SUITS AND COSTS, INCLUDING INJURY OR DEATH OF ANY PERSONS, OR DAMAGE TO OR LOSS OF PROPERTY, AS WELL AS FINES, ASSESSMENTS AND PENALTIES IMPOSED BY ANY AUTHORITY WHICH ARISE OUT OF ANY VIOLATION OF LAW BY, AND ALL ACTS AND OMISSION OF THE CONTRACTOR, THE CONTRACTOR'S AGENTS, EMPLOYEES, OR CUSTOMERS, OCCURRING IN CONNECTION WITH THE PRODUCTS AND SERVICES COVERED HEREIN. (F) COMMERCIAL UMBRELLA (EXCESS) LIABILITY (1) LIMIT OF LIABILITY AGGREGATE LIMIT: $3,000,000 PRODUCTS AND COMPLETED OPERATIONS COVERAGE A: BODILY INJURY AND PROPERTY DAMAGE $3,000,000 ANY ONE OCCURRENCE COVERAGE B: PERSONAL & ADVERTISING INJURY $3,000,000 ANY ONE PERSON OR ORGANIZATION RETAINED LIMIT: $10,000 ANY ONE OCCURRENCE OR OFFENSE A CERTIFICATE EVIDENCING INSURANCE COVERAGE AS ABOVE SHALL BE PROVIDED BY THE CONTRACTOR TO ISLE OF WIGHT COUNTY. THE COUNTY AND ITS CONSULTING ENGINEERS SHALL BE NAMED AS ADDITIONAL INSURES UNDER GENERAL LIABILITY COVERAGE; ENDORSEMENT OF SAME SHALL BE SUBMITTED WITH THE CERTIFICATE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO KEEP SAID INSURANCE COVERAGE IN FULL FORCE AND EFFECT UNTIL FINAL PAYMENT AND AT ALL TIMES THEREAFTER WHEN CONTRACTOR MAY BE CORRECTING, REMOVING OR REPLACING DEFECTIVE WORK IN ACCORDANCE WITH TERMS OF THIS AGREEMENT. SUCH CERTIFICATE SHALL PROVIDE THAT THIRTY (30) DAYS ADVANCE WRITTEN NOTICE SHALL BE GIVEN TO THE COUNTY IN THE EVENT OF ANY CHANGE IN, OR CANCELLATION OF SUCH INSURANCE. ALL INSURANCE SHALL BE WRITTEN BY INSURANCE COMPANIES LICENSED TO DO BUSINESS IN THE COMMONWEALTH OF VIRGINIA. ARTICLE 59. PERFORMANCE BOND AND LABOR AND MATERIALS BOND. THE SUCCESSFUL BIDDER WILL BE REQUIRED TO FURNISH A PERFORMANCE BOND AND LABOR AND MATERIALS BOND PAYABLE TO THE TREASURER OF ISLE OF WIGHT COUNTY, EACH IN THE AMOUNT OF ONE HUNDRED PERCENT (100%) OF THE TOTAL AMOUNT OF THE CONTRACT, AS A GUARANTEE FOR THE FAITHFUL PERFORMANCE THEREOF. SUCH BONDS MUST BE FURNISHED TO THE COUNTY WITHIN TWENTY (20) DAYS AFTER REQUESTED BY THE COUNTY. THE SUCCESSFUL BIDDER UPON FAILURE OR REFUSAL TO FURNISH THE REQUIRED BONDS OR DEPOSIT WITHIN THE TIME SPECIFIED SHALL PAY TO ISLE OF WIGHT COUNTY AS LIQUIDATED DAMAGES FOR SUCH FAILURE OR REFUSAL AN AMOUNT EQUAL TO THE BID SECURITY DEPOSITED WITH BID. ALL BONDS MUST BE FURNISHED BY SUCH SURETY COMPANY OR COMPANIES AS ARE AUTHORIZED AND LICENSED TO TRANSACT BUSINESS IN THE COMMONWEALTH OF VIRGINIA. ARTICLE 60. CONTRACTUAL CLAIMS. CONTRACTUAL CLAIMS, WHETHER FOR MONEY OR OTHER RELIEF, SHALL BE SUBMITTED IN WRITING NO LATER THAN SIXTY (60) DAYS AFTER FINAL PAYMENT; HOWEVER, WRITTEN NOTICE OF THE CONTRACTOR’S INTENTION TO FILE SUCH CLAIM SHALL HAVE BEEN GIVEN AT THE TIME OF THE OCCURRENCE OR BEGINNING OF THE WORK UPON WHICH THE CLAIM IS BASED. ANY NOTICE OR CLAIM SHALL BE DELIVERED TO EDDIE WRIGHTSON, DIRECTOR OF GENERAL SERVICES, COUNTY OF ISLE OF WIGHT, P.O. BOX 80, ISLE OF WIGHT, VIRGINIA 23397 AND SHALL INCLUDE A DESCRIPTION OF THE FACTUAL BASIS FOR THE CLAIM AND A STATEMENT OF THE ACCOUNTS CLAIMED OR OTHER RELIEF REQUESTED. THE DIRECTOR OF GENERAL SERVICES SHALL RENDER A DECISION ON THE CLAIM AND SHALL NOTIFY THE CONTRACTOR WITHIN THIRTY (30) DAYS OF RECEIPT OF THE CLAIM. THE CONTRACTOR MAY APPEAL THE DECISION OF THE DIRECTOR OF PUBLIC UTILITIES TO THE COUNTY ADMINISTRATOR BY PROVIDING WRITTEN NOTICE TO THE DIRECTOR OF PUBLIC UTILITIES WITHIN FIFTEEN (15) DAYS OF THE DATE OF THE DECISION. THE COUNTY ADMINISTRATOR SHALL RENDER A DECISION ON THE CLAIM WITHIN SIXTY (60) DAYS OF THE DATE OF RECEIPT OF THE APPEAL NOTICE AND SUCH DECISION SHALL BE FINAL UNLESS THE CONTRACTOR APPEALS THE DECISION IN ACCORDANCE WITH THE VIRGINIA PUBLIC PROCUREMENT ACT (VPPA). INVOICES FOR ALL SERVICES OR GOOD PROVIDED BY THE CONTRACTOR SHALL BE DELIVERED TO THE COUNTY NO LATER THAN TIRTY (30) DAYS FOLLOWING THE CONCLUSION OF THE WORK OR DELIVERY OF THE GOODS. ARTICLE 61. LITIGATION. IN ANY CLAIM OR DISPUTE BETWEEN THE PARTIES TO THIS AGREEMENT, ARISING OUT OF OR RELATING TO THIS AGREEMENT OR THE BREACH THEREOF, THE PARTIES CONSENT TO THE JURISDICTION AND SOLE VENUE OF THE CIRCUIT COURT OF ISLE OF WIGHT COUNTY, VIRGINIA. ACCEPTANCE OF FINAL PAYMENT SHALL BE DEEMED A WAIVER OF CONTRACTOR'S RIGHT TO FILE CLAIM FOR DISPUTE OR BREACH RELATING TO THIS AGREEMENT. THE CONTRACTOR SHALL NOT CAUSE A DELAY OF WORK BECAUSE OF THE PENDING LITIGATION PROCEEDINGS, EXCEPT WITH THE EXPRESS, WRITTEN CONSENT OF THE OWNER OR WRITTEN INSTRUCTION FROM THE COURT. ARTICLE 62. NON-APPROPRIATION. NOTWITHSTANDING ANYTHING CONTAINED HEREIN TO THE CONTRARY, THIS CONTRACT SHALL BE TERMINATED IF ALL OF THE FOLLOWING EVENT SHALL HAVE OCCURRED: (A) FUNDS ARE NOT APPROPRIATED FOR A SUBSEQUENT FISCAL PERIOD DURING THE TERM OF THIS CONTRACT FOR THE ACQUISITION OF SUBSTANTIALLY THE SAME FUNCTIONS AS PROVIDE FOR HEREIN, AND WRITTEN NOTICE THEREOF IS GIVEN TO THE CONTRACTOR AT LEAST THIRTY (30) DAYS PRIOR TO THE FIRST DAY OF SUCH SUBSEQUENT FISCAL PERIOD OR WITHIN FIVE (5) DAYS OF THE APPROVAL OF THE FINAL BUDGET FOR SUCH FISCAL YEAR, WHICHEVER OCCURS LATER. (B) COUNTY HAS EXHAUSTED ALL FUNDS LEGALLY AVAILABLE FOR PAYMENT UNDER THIS CONTRACT. UPON SUCH TERMINATION, CONTRACTOR'S ONLY REMEDY SHALL BE TO TERMINATE THE CONTRACT AT THE END OF THE FISCAL PERIOD DURING WHICH NOTICE IS GIVEN; AND PAYMENT IN COMPLIANCE WITH THE CONTRACT FOR MATERIALS, GOODS, AND SERVICES RENDERED THEREUNDER DURING THE FISCAL YEAR AT THE END OF WHICH TERMINATION OCCURS, WITHOUT PENALTY, TERMINATION, PROFIT OR OVERHEAD EXPENSES OF ANY KIND, SHALL CONSTITUTE FULL PERFORMANCE ON THE PART OF THE OWNER. ARTICLE 63. SEVERABILITY. IN THE EVENT THAT ANY PROVISION OR PORTION THEREOF OF ANY CONTRACT DOCUMENT SHALL BE FOUND TO BE LEGALLY INVALID OR UNENFORCEABLE, THEN SUCH PROVISION OR PORTION THEREOF, SHALL BE REFORMED IN ACCORDANCE WITH APPLICABLE LAW. THE INVALIDITY OR UNENFORCEABILITY OF ANY PROVISION OR PORTION OF ANY CONTRACT DOCUMENT SHALL NOT AFFECT THE VALIDITY OR ENFORCEABILITY OF ANY OTHER PROVISION OR PORTION OF THE CONTRACT DOCUMENTS. ARTICLE 64. AGREEMENT CONSTRUED UNDER VIRGINIA LAWS. THE AGREEMENT AND BOND GIVEN TO SECURE IT ARE TO BE EXECUTED AND PERFORMED IN THE COMMONWEALTH OF VIRGINIA AND SHALL BE CONSTRUED IN ACCORDANCE WITH THE LAWS OF THE COMMONWEALTH OF VIRGINIA. END OF SECTION CHANGE ORDER FORM CHANGE NO: DATE: PROJECT: ___________________________________________________________________ CONTRACTOR: ______________________________________________________________ The following changes are hereby made to the CONTRACT DOCUMENTS (Use Additional Sheets if Necessary): Original Contract Date: ......................................................................................................... Original Contract Price: ....................................................................................................... $ Amount of Prior Change Orders: ........................................................................................ $ This Change Order: ............................................................................................................. $ Cumulative Change Orders: ................................................................................................ $ (% of original contract amount) Revised Contract Amount: .................................................................................................. $ Reason For Change Order: Original Contract completion date was: The new completion date for all work is: REQUIRED APPROVALS: Submitted by: Contractor Recommended by: Construction Administrator Accepted by: Engineering Division Funds Available: Finance Director Procurement Requires _____________________ Purchasing Agent Approved: _____________________ County Administrator Any work done on this project prior to the execution of this change order by the County is done at the contractor’s total risk and with no obligation on the part of the Isle of Wight County to pay for the work. Technical Specifications TABLE OF CONTENTS Tab Content 1 SWPPP TITLE SHEET 2 TABLE OF CONTENTS 3 REQUIRED SWPPP COMPONENTS 4 NARRATIVE 5 DELEGATION OF AUTHORITY 6 IDENTIFICATION OF QUALIFIED PERSONNEL 7 ENVIRONMENTAL COMPLIANCE PLAN AND OTHER INCORPORATED PLANS 8 POLLUTION PREVENTION PLAN INFORMATION 9 TMDL INFORMATION 10 SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES 11 PUBLIC NOTICE, AVAILABILITY AND IMPLEMENTATION OF THE SWPPP 12 SWPPP INSPECTIONS 13 CORRECTIVE ACTIONS 14 SWPPP TERMINATION 15 REGISTRATION STATEMENT FOR THE PROJECT 16 NOTICE OF COVERAGE FOR THE PROJECT 17 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES 18 NOTICE OF TERMINATION FOR GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES FORM 19 GCP TRANSFER AGREEMENT FORM STORMWATER POLLUTION PREVENTION PLAN (SWPPP) for ISLE OF WIGHT COUNTY INDUSTRIAL DEVELOPMENT AUTHORITY SHIRLEY T. HOLLAND INTERMODAL PARK – PHASE II DITCH RESTORATION Located in Isle of Wight County, Virginia Developed in compliance with: General VPDES Permit for Discharges of Stormwater from Construction Activities (9VAC25-880) DELEGATED AUTHORITY Name: _________________________________ Title: _________________________________ Company: _________________________________ Phone #: _________________________________ Fax #: _________________________________ E-mail: _________________________________ I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend or modify this SWPPP. “I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” OPERATOR Signature: Date: ________________ Name: Title: SECTION 3 REQUIRED SWPPP COMPONENTS In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the SWPPP must include the following information: 1. General Information a. A signed copy of the registration statement for coverage under the GCP; b. Upon receipt, a copy of the notice of coverage under the GCP (i.e., notice of coverage letter); c. Upon receipt, a copy of the GCP; d. A narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: 1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; 2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; 3) Locations of major structural and nonstructural control measures including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment that will be installed between disturbed areas and the undisturbed vegetated areas, in order to increase sediment removal and maximize stormwater infiltration; 4) Locations of surface waters; 5) Locations where concentrated stormwater is discharged; 6) Locations of support activities, when applicable and when required by the VSMP authority, including but not limited to: (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels, fertilizers and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and 7) When applicable, the location of the on-site rain gauge, or the methodology established in consultation with the VSMP authority, used to identify measurable storm events for inspection purposes. 2. An Erosion and Sediment Control (ESC) Plan developed and approved in accordance with Chapter 8 of this manual. 3. A Stormwater Management (SWM) Plan developed and approved in accordance with Chapter 9 of this manual. 4. A Pollution Prevention Plan (PPP). 5. Information demonstrating compliance with the Total Maximum Daily Load (TMDL) Requirements. 6. Qualified personnel responsible for conducting on-site and off-site inspections required by the GCP shall be identified by the Operator in the SWPPP. The Operator is responsible for insuring that the qualified personnel conduct inspections. 7. The SWPPP must identify individuals or positions with delegated authority to sign inspection reports and/or amend or modify the SWPPP. 8. The SWPPP shall be signed and dated in accordance with the signatory requirements. 9. The SWPPP must contain documentation of all amendments, modifications, and updates. 10. The SWPPP must include documentation of inspections conducted in accordance with the inspection requirements. 11. The SWPPP must contain documentation of corrective actions taken in accordance with the requirements. SECTION 4 NARRATIVE In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the SWPPP must include a narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.). Shirley t. Holland Intermodal Park – Phase II is located in Isle of Wight County, Virginia, northwest of the intersection of Old Mill Road (State Route 607) and William A. Gwaltney Way. The Isle of Wight County Industrial Development Authority is continuing the development of the Shirley T. Holland Intermodal Park - Phase II. As part of ongoing maintenance of the property, the County must maintain the existing drainage ditches to ensure proper drainage of the site. Maintenance shall include dredging of sediment deposits within the ditches and removal of vegetation (trees and shrubs) which would impede the flow. Periodic maintenance shall be provided in accordance with this plan. Land disturbance will be approximately 12 acres. SECTION 5 REVISIONS TO DELEGATION OF AUTHORITY In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the individuals or positions with delegated authority to sign inspection reports and/or amend this SWPPP must be identified. If the individual or position identified on the Title Sheet of the SWPPP changes or additional individuals or positions are given this responsibility after the preconstruction meeting occurs, the changes/additions must be noted below. Print Name: _____________________________________________ Title: _____________________________________________ Company: _____________________________________________ Phone #: _____________________________________________ I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend or modify this SWPPP. Operator Signature: ___________________________ Date: ____________ Print Name: _____________________________________________ Title: _____________________________________________ Company: _____________________________________________ Phone #: _____________________________________________ I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend or modify this SWPPP. Operator Signature: ___________________________ Date: ____________ Print Name: _____________________________________________ Title: _____________________________________________ Company: _____________________________________________ Phone #: _____________________________________________ I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend or modify this SWPPP. Operator Signature: ___________________________ Date: ____________ Print Name: _____________________________________________ Title: _____________________________________________ Company: _____________________________________________ Phone #: _____________________________________________ I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend or modify this SWPPP. Operator Signature: ___________________________ Date: ____________ SECTION 6 IDENTIFICATION OF QUALIFIED PERSONNEL In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the individuals responsible for conducting on-site and off-site inspections must be identified. If the identified individual changes or additional individuals are given this responsibility after the preconstruction meeting occurs, the changes/additions must be noted below. Print Name: _____________________________________________ Company: _____________________________________________ Address: _____________________________________________ Phone #: _____________________________________________ Qualifications:  Responsible Land Disturber # ________________  Certified ESC Inspector # ___________________  Certified SWM Inspector # ___________________  Licensed Professional (P.E., L.S., etc.)  Other: _________________________ Print Name: _____________________________________________ Company: _____________________________________________ Address: _____________________________________________ Phone #: _____________________________________________ Qualifications:  Responsible Land Disturber # ________________  Certified ESC Inspector # ___________________  Certified SWM Inspector # ___________________  Licensed Professional (P.E., L.S., etc.)  Other: _________________________ Print Name: _____________________________________________ Company: _____________________________________________ Address: _____________________________________________ Phone #: _____________________________________________ Qualifications:  Responsible Land Disturber # ________________  Certified ESC Inspector # ___________________  Certified SWM Inspector # ___________________  Licensed Professional (P.E., L.S., etc.)  Other: _________________________ Print Name: _____________________________________________ Company: _____________________________________________ Address: _____________________________________________ Phone #: _____________________________________________ Qualifications:  Responsible Land Disturber # ________________  Certified ESC Inspector # ___________________  Certified SWM Inspector # ___________________  Licensed Professional (P.E., L.S., etc.)  Other: _________________________ SECTION 7 EROSION AND SEDIMENT CONTROL PLAN, STORMWATER MANAGEMENT PLAN, POLLUTION PREVENTION PLAN, AND TMDLS Erosion and Sediment Control Plan The preconstruction meeting was held on: __________________ An Erosion and Sediment Control (ESC) Plan was developed and approved as authorized by the Virginia Erosion and Sediment Control Regulations (9VAC25-840). When properly implemented, the approved ESC plan has been determined to adequately address the following effluent limit guidelines: 1. Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion; 2. Controls stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; 3. Minimizes the amount of soil exposed during the construction activity; 4. Minimizes the disturbance of steep slopes; 5. Minimizes sediment discharges from the site in a manner that addresses (i) the amount, frequency, intensity, and duration of precipitation, (ii)the nature of resulting stormwater runoff, and (iii) soil characteristics, including the range of soil particle sizes present on the site; 6. Provides and maintains natural buffers around surface waters, directs stormwater to vegetated areas to increase sediment removal, and maximized infiltration, unless infeasible; 7. Minimizes soil compaction and, unless infeasible, preserves topsoil; 8. Ensures that stabilization of disturbed areas will be initiated immediately whenever any clearing, grading, or excavating, or other land-disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days; 9. Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible, when discharging from sediment basins or sediment traps. The following individual(s) will implement and maintain the control measures identified in the ESC plan (if other than the Operator or Delegated Authority): Name(s): ____________________________________ Company: ____________________________________ Stormwater Management Plan A Stormwater Management Plan (SWM) plan was developed as a required component of the ECP and was approved as authorized by the Virginia Stormwater Management Program Regulations (9VAC25-870). The following individual(s) will implement and maintain the control measures identified in the SWM plan (if other than the Operator or Delegated Authority): Name(s): ____________________________________ Company: ____________________________________ Pollution Prevention Plan The individuals responsible for implementing and maintaining the control measures identified in the Pollution Prevention Plan are listed in the Appendix. Total Maximum Daily Load (TMDL) Requirements All projects requiring coverage under the GCP are subject to the following requirements associated with discharges to impaired waters, surface waters with an applicable TMDL wasteload allocation established and approved prior to the term of this GCP, or exceptional waters: 1. Identify the impaired water(s), approved TMDL(s), pollutants of concern, and exceptional waters identified in 9VAC25-260-30.A.3.c, when applicable; 2. Provide clear direction that: a. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; b. Nutrients shall be applied in accordance with manufacturer’s recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and c. A modified inspection schedule shall be implemented in accordance with Part I B.4 or Part I B.5. These requirements are addressed on the Pollution Prevention Plan sheet of the ECP and in Tab 9 of the SWPPP Binder. The following individual(s) will implement and maintain these control measures (if other than the Operator or Delegated Authority): Name(s): ____________________________________ Company: ____________________________________ Other Incorporated Plans Plans from other projects have not been used or incorporated into this design. Off-site areas of land disturbance activities associated with this project must have such locations noted below and approved prior to use. Additional off-site areas to be used during construction: Location Plan Title Approval Date Purpose SECTION 8 POLLUTION PREVENTION PLAN INFORMATION In accordance with Part II A.4 of the General VPDES Permit for Discharges of Stormwater from Construction Activities: 1. Identify potential pollutant-generating activities and pollutants expected to be exposed to stormwater; 2. Describe the location where the potential pollutant generating activity will occur; 3. Identify all authorized non-stormwater discharges that are or will be comingled with stormwater discharges from the construction activity, including any applicable support activity; 4. Identify the person responsible for implementing the pollution prevention practice(s) for each pollutant generating activity, if other than the person listed as the qualified personnel; 5. Describe pollution prevention procedures and practices that will be implemented to: a. Prevent and respond to leaks, spills and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks and other releases; and (ii) procedures for reporting leaks, spills, and other releases; b. Prevent the discharge of spilled or leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available); c. Prevent the discharge of soaps, detergents, solvents, and wash water from construction materials, including the cleanup of stucco, paint, form release oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these pollutants; d. Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins/traps, using filtration devices such as filter bags or sand filters or using similarly effective controls); e. Direct concrete wash water into a leak-proof container or leak-proof settling basin. The container or basin must be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes must be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes must be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; f. Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes, including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, styrofoam, concrete, and other trash or building materials; g. Prevent discharges of fuels, oils, and other petroleum products, hazardous or toxic waste, and sanitary wastes; and h. Address any other discharges from potential pollutant generating activity not addressed above. 6. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water, disposal practices, and applicable disposal locations of such wastes, to personnel in order to comply with the conditions of the GCP. The information required in Items 1, 2, and 4 can be found in Table 8.1 of this section of the SWPPP. The information required in Item 3 can be found in Table 8.2 of this section of the SWPPP. Table 8.1 – Pollutant-Generating Activities, Potential Pollutants and Responsible Parties Pollutant Generating Activity Check if Present Potential Pollutants Responsible Party (if other than the person(s) identified as the qualified personnel) Se d i m e n t Nu t r i e n t s , F e r t i l i z e r He a v y M e t a l s pH ( a c i d s a n d b a s e s ) Pe s t i c i d e s o r H e r b i c i d e s Oi l o r G r e a s e Ba c t e r i a o r V i r u s e s Tr a s h , D e b r i s o r S o l i d s To x i c C h e m i c a l s Pa i n t s o r P l a s t e r Ad h e s i v e s , s o l v e n t s o r c u r i n g c o m p o u n d s As p h a l t o r C o n c r e t e Ve h i c l e o r he a v y e q u i p m e n t w a s h w a t e r Ga s o l i n e , d i e s e l o r k e r o s e n e Wo o d p r e s e r v a t i v e s An t i f r e e z e o r c o o l a n t Clearing, grading or excavating        Paving operations         Concrete washout and concrete waste disposal       Structure construction, stucco, painting or cleaning         Dewatering operations     Material delivery and storage                Material use during building process           Pollutant Generating Activity Check if Present Potential Pollutants Responsible Party (if other than the person(s) identified as the qualified personnel) Se d i m e n t Nu t r i e n t s , F e r t i l i z e r He a v y M e t a l s pH ( a c i d s a n d b a s e s ) Pe s t i c i d e s o r H e r b i c i d e s Oi l o r G r e a s e Ba c t e r i a o r V i r u s e s Tr a s h , D e b r i s o r S o l i d s To x i c C h e m i c a l s Pa i n t s o r P l a s t e r Ad h e s i v e s , s o l v e n t s o r c u r i n g c o m p o u n d s As p h a l t o r C o n c r e t e Ve h i c l e o r he a v y e q u i p m e n t w a s h w a t e r Ga s o l i n e , d i e s e l o r k e r o s e n e Wo o d p r e s e r v a t i v e s An t i f r e e z e o r c o o l a n t Solid waste disposal                Sanitary waste disposal        Landscaping operations          Vehicle Fueling or Maintenance       Other (describe)  Other (describe)  Other (describe)  Table 8.2 – Authorized Non-stormwater Discharges Anticipated from the Construction Activity or Support Activities Authorized Non-stormwater Discharges Anticipated from the Construction Activity or support Activities (check if applicable) Discharges from firefighting activities  Fire hydrant flushings  Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge  Water used to control dust that has been filtered, settled, or similarly treated prior to discharge  Potable water sources, including uncontaminated waterline flushings  Routine external building wash down where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge  Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurrs (or where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similarly treated prior to discharge  Uncontaminated air conditioning or compressor condensate  Uncontaminated ground water or spring water  Foundation or footing drains where flows are not contaminated with process materials such as solvents  Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge  Landscape irrigation  SECTION 9 TOTAL MAXIMUM DAILY LOAD INFORMATION In accordance with Part II A.5 of the General VPDES Permit for Discharges of Stormwater from Construction Activities, the SWPPP must note the following: 1. The impaired water(s), approved TMDL(s) and pollutants of concern are identified in Tables 9.1 and 9.2 below. 2. The Responsible Land Disturber shall understand that: a. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; b. Nutrients shall be applied in accordance with manufacturer’s recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and c. Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day. Table 9.1 – Identification of the Impaired Waters the Project Discharges Into Waterbody Location / Length Pollutant of Concern Cohoon Creek Begins at the confluence with Cohoon Creek and continues downstream until the confluence with Lake Mead. Lake Prince Begins at the confluence with Lake Prince and continues downstream until the confluence with Western Branch Reservoir. Table 9.2 – Identification of the Surface Waters with Applicable TMDL Wasteload Allocations the Project Discharges Into Waterbody Pollutants of Concern Does the project discharge to the waterbody? Chesapeake Bay Phosphorus Nitrogen Sediment YES SECTION 10 SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES In accordance with Part II B of the General VPDES Permit for Discharges of Stormwater from Construction Activities: 1. The operator or their designee shall amend the SWPPP whenever there is a change in the design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days following approval. Implementation of these additional of modified control measures must be accomplished as described in Section 13. 3. The SWPPP must clearly identify the contractor(s) that will implement and maintain each control measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator or their designee shall update the SWPPP no later than seven days following any modification to its implementation. All modifications or updates to the SWPPP shall be noted and shall include the following items; a. A record of dates when: (1) Major grading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization measures are initiated. b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and where modified as soon as possible; c. Areas that have reached final stabilization and where no further SWPPP inspection requirements apply; d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and g. Measures taken to address any evidence identified as a result of an inspection. 5. All amendments, modifications, or updates to the SWPPP shall be signed by the Operator or their designee. The following Amendment, Modification, and Update Log form must be used to document all amendments, modification, and updates. SWPPP AMENDMENT, MODIFICATION AND UPDATE LOG Date Description of Amendment, Modification or Update _________ ________________________________ Responsible Party _______________________________________ "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." ______________________________________________________ Operator or Delegated Authority Signature SECTION 11 PUBLIC NOTICE, AVAILABLITY AND IMPLEMENTATION OF THE SWPPP In accordance with Part II C of the General VPDES Permit for Discharges of Stormwater from Construction Activities: Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publically accessible location near an active part of the construction project. The operator shall maintain the posted information until termination of general permit coverage. In accordance with Part II D of the General VPDES Permit for Discharges of Stormwater from Construction Activities: Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on-site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. The operator shall make the SWPPP and all amendments, modifications, and updates available upon request to the department, the VSMP authority, the EPA, the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on-site location is unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's location must be posted near the main entrance of the construction site. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II C. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. In accordance with Part II E of the General VPDES Permit for Discharges of Stormwater from Construction Activities: The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage. All control measures must be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection identifies a control measure that is not operating effectively, corrective action(s) shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. If site inspections identify an existing control measure that needs to be modified or if an additional control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority. SECTION 12 SWPPP INSPECTIONS In accordance with Part I B.4.d and Part II F of the General VPDES Permit for Discharges of Stormwater from Construction Activities: 1. Personnel responsible for on-site and off-site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for insuring that the qualified personnel conduct the inspection. 2. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: a. Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day, and b. Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and when applicable the date and rainfall amount of the last measurable storm event; (2) Record the information and a description of any discharges occurring at the time of the inspection; (3) Record any land-disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization; (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channel, flume, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for initiation of stabilization activities; (6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for completion of stabilization activities within seven days of reaching grade or stopping work; (7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department- approved annual standards and specifications has not been properly implemented. This includes but is not limited to: (a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge , or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance outside of the approved area to be disturbed; (8)Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance and effectiveness of the procedures and practices; (9)Identify any pollutant generating activities not identified in the pollution prevention plan; and (10)Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The location(s) of prohibited discharges; d. The location(s) of control measures that require maintenance; e. The location(s) of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The location(s) where any evidence identified under Part II F 3 a (7) exists; g. The location(s) where any additional control measure is needed that did not exist at the time of inspection; h. A list of corrective actions required (including any changes to the SWPPP that are necessary ) as a result of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented; and j. The date and signature of the qualified personnel and the operator or its duly authorized representative. The inspection report and any actions taken in accordance with Part II must be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. VSMP INSPECTION REPORT Project: GCP Number: Notice of Coverage posted?  YES  NO SWPPP available for review?  YES  NO Inspection Date/Time Inspection Conducted By (must be the Qualified Personnel identified in the SWPPP) Date of Last Measureable Storm Event Rainfall Amount  Not applicable since inspection frequency is at least once every four business days Record the information and a description of any discharges occurring at the time of the inspection Record any land-disturbing activities that have occurred outside the approved erosion and sediment control plan Inspection requirements: Have controls been installed in accordance with the approved ECP? Are controls effectively minimizing sediment discharges? Have controls been inappropriately or incorrectly used? Describe any maintenance needs or other deficiencies that were identified and the location of the deficiencies All perimeter erosion and sediment controls (silt fence, etc.)  YES  NO  YES  NO  YES  NO Soil stockpiles and borrow areas (for stabilization or sediment trapping measures)  YES  NO  YES  NO  YES  NO Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization  YES  NO  YES  NO  YES  NO Cut and fill slopes  YES  NO  YES  NO  YES  NO Sediment basins and traps, sediment barriers, and other measures (installed to control sediment discharges from stormwater)  YES  NO  YES  NO  YES  NO Temporary or permanent channels, flumes, or other slope drain structures (installed to convey concentrated runoff down cut and fill slopes)  YES  NO  YES  NO  YES  NO Storm inlets (to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated)  YES  NO  YES  NO  YES  NO Construction entrances and access routes (for minimizing mud/sediment tracking)  YES  NO  YES  NO  YES  NO Have stabilization activities begun on areas that have reached final grade or that will remain dormant for more than 14 days?  YES  NO Were stabilization activities completed within seven days of reaching final grade or stopping work on areas that have reached final grade or that will remain dormant for more than 14 days?  YES  NO Inspect for the presence of the following: Present? Location Concentrated flows of stormwater in conveyances (such as rills, rivulets or channels) that have not been filtered, settled, or similarly treated prior to discharge, (or evidence thereof)  YES  NO Sediment laden runoff that has not been filtered or settled to remove sediments prior to discharge  YES  NO Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters.  YES  NO Inlets and catch basins with failing sediment controls due to improper installation, lack of maintenance, or inadequate design  YES  NO Sediment deposition on any property (including public and private streets) outside of the construction activity covered by the general permit  YES  NO Required stabilization (initiated or completed on portions of the site?)  YES  NO Sediment basins/traps without adequate wet or dry storage volume  YES  NO Sediment basins where the riser appears to be leaking, water appears to be leaving the basin around the barrel pipe (rather than through it), or the dewatering device appears to be dewatering basin from below the water surface  YES  NO Sediment traps that allow stormwater to discharge from below the surface of the wet storage portion of the trap  YES  NO Land disturbance outside of the approved limits of disturbance  YES  NO Inspect the pollution prevention controls associated with the pollutant generating activities identified in the Pollution Prevention Plan Inspect the pollution prevention controls associated with the pollution generating activities identified in Table 8.1 of the SWPPP Have the controls been properly implemented as outlined on the PPP sheet? Are controls effectively minimizing pollutant discharges? Describe any maintenance needs or other deficiencies that were identified and the location of the deficiencies Clearing, grading or excavating  N/A  YES  NO  YES  NO Paving operations  N/A  YES  NO  YES  NO Concrete washout and concrete waste disposal  N/A  YES  NO  YES  NO Structure construction, stucco, painting or cleaning  N/A  YES  NO  YES  NO Dewatering operations  N/A  YES  NO  YES  NO Material delivery and storage  N/A  YES  NO  YES  NO Material use during building process  N/A  YES  NO  YES  NO Solid waste disposal  N/A  YES  NO  YES  NO Sanitary waste disposal (porta-johns)  N/A  YES  NO  YES  NO Landscaping operations  N/A  YES  NO  YES  NO Vehicle Fueling or Maintenance  N/A  YES  NO  YES  NO Other (describe)  YES  NO  YES  NO Other (describe)  YES  NO  YES  NO Other (describe)  YES  NO  YES  NO Other (describe)  YES  NO  YES  NO Other (describe)  YES  NO  YES  NO Identify the material(s) and document the location or presence of any evidence of pollutant discharges that are not authorized by the general permit Identify the location(s) where any additional control measures are needed that did not exist at the time of the inspection List the corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance Document any corrective action(s) required from a previous inspection that have not been implemented “I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” Signature: _____________________________ Date: ________________ Name: _____________________________ Title: ________________ (must be either the Operator or Delegated Authority, not necessarily the person who conducted the inspection) I-103 SECTION 13 CORRECTIVE ACTIONS In accordance with Part II F.4 of the General VPDES Permit for Discharges of Stormwater from Construction, documentation of any corrective actions taken shall be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. In accordance with Part II G of the General VPDES Permit for Discharges of Stormwater from Construction Activities The operator shall implement the corrective action(s) identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts. The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. I-104 CORRECTIVE ACTION LOG Correction Action Date Description of Corrective Action _________ ________________________________ Responsible Party _______________________________________ "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." ______________________________________________________ Operator or Delegated Authority Signature I-105 SECTION 14 SWPPP TERMINATION In accordance with Part I F of the General VPDES Permit for Discharges of Stormwater from Construction Activities: The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met: a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long term responsibility and maintenance requirements shall be recorded in the local land records prior to the submission of a notice of termination; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained; or d. For residential construction only, temporary soil stabilization has been completed and the residence has been transferred to the homeowner. The notice of termination should be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection are met. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice of termination, whichever occurs first. The notice of termination shall be signed in accordance with Part III K of the general permit. I-106 PERMANENT STORMWATER MANAGEMENT FACILITIES INSTALLED (information will need to reflect data requirements of online permitting system) Stormwater Management Facility (Designation/Type) N/A Location Isle of Wight County 6th Order Hydrolo gic Unit Code JL45 and JL46 Waterbody the SWM Facility discharges to: N/A Drainage Area Served _________________ acres Impervious Area Served _________________ acres Managed Turf Area Served _________________ acres I-107 SECTION 15 CONSTRUCTION GENERAL PERMIT REGISTRATION STATEMENT I-108 SECTION 16 CONSTRUCTION GENERAL PERMIT NOTICE OF COVERAGE I-109 SECTION 17 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES I-110 SECTION 18 CONSTRUCTION GENERAL PERMIT TERMINATION I-111 SECTION 19 CONSTRUCTION GENERAL PERMIT TRANSFER I-112 POLLUTION PREVENTION PLAN INTRODUCTION This Stormwater Pollution Prevention Plan (SWPPP) has been developed as a requirement of the General VPDES Permit for Discharges of Stormwater from Construction Activities (GCP), as defined in 9VAC25-880. The purpose of this SWPPP is to: 1) Identify potential sources of pollution that may reasonably be expected to affect the quality of storm water discharges from the construction site, and 2) To describe and ensure the implementation of practices that will be used to reduce pollutants in stormwater discharges from the construction site and to assure compliance with the conditions of the Permit. Implementation of the components of this SWPPP is required as a condition of the GCP. The GCP has a fixed term of 5 years from the effective date of July 1, 2014 and permit coverage is required for all VSMP land-disturbing activities. The GCP authorizes the discharge of stormwater from construction activities until the expiration date. The GCP also authorizes the discharge of stormwater from offsite support activities, provided that certain conditions are met as outlined in Part I A. 2 of the GCP. Certain non-stormwater discharges are also authorized and are described in Part I E of the GCP. The SWPPP must be prepared, updated and amended, implemented as written, made available to the public according to the requirements of the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). I-113 PURPOSE  4VAC50-60-54 of the Virginia Stormwater Management Program (VSMP) Permit Regulations requires that Stormwater Pollution Prevention Plan (SWPPP) be developed for all regulated land disturbing activities. The SWPPP must include, but not be limited to, an approved erosion and sediment control plan, an approved stormwater management plan, and this Pollution Prevention Plan (PPP) for regulated land disturbing activities, and a description of any additional control measures necessary to address a TMDL as applicable. The plan for implementing pollution prevention measures during construction activities developed on this sheet must be implemented and updated as necessary. Any PPP requirements not included on this sheet must be incorporated into the SWPPP required by 4VAC50-60-54 that must be developed before land disturbance commences. This PPP identifies potential sources of pollutants that may reasonable be expected to affect the quality stormwater discharges from the construction site (both on- and off-site activities) and describes control measures that will be used to minimize pollutants in stormwater discharges from the construction site. OTHER REFERENCED PLANS  SWPPP requirements may be fulfilled by incorporating, by reference, other plans. All plans incorporated by reference become enforceable under the VSMP Permit Regulations and General Permit VAR10 for Discharges of Stormwater from Construction Activities. If a plan incorporated by reference does not contain all of the required elements of the PPP, the operator must develop the missing elements and include them in the SWPPP. Independent Plans Incorporated by Reference Date Approved Stormwater Management Plans (Regional or Master) N/A Spill Prevention, Control, and Countermeasure Plans N/A Off-Site Stockpile N/A Off-Site Borrow Area N/A POTENTIAL POLLUTANT SOURCES The following sources of potential pollutants must be addressed in the Pollution Prevention Plan. Various controls and/or measures designed to prevent and/or minimize pollutants in stormwater discharges from the project site must be applied to the sources found on the site. Additional information concerning the following controls and/or measures may be found in the SWPPP. Deviations from the location criteria may be approved by the County Environmental Inspector. LEAKS, SPILLS, AND OTHER RELEASES I-114  The operator(s) shall ensure procedures are in place to prevent and respond to all leaks, spills and other releases of pollutants.  The operator(s) shall ensure all leaks, spills and other releases of pollutant are contained and cleaned immediately upon discovery. Any contaminated materials are to be disposed in accordance with federal, state, and/or local requirements.  The operator(s) shall ensure spill containment kits containing appropriate materials (e.g., absorbent material and pads, brooms, gloves, sand, etc.) are available at appropriate locations, including, but not limited to: designated areas for vehicle and equipment maintenance; vehicle and equipment fueling; storage and disposal of construction materials, products, and waste; and storage and disposal of hazardous and toxic materials; and sanitary waste facilities.  The locations of the spill containment kits are identified as described below: Date Shown on Plan Sheet #(s) Location Approved Plan N/A MOBILE REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location Operator(s) Initials  The operator(s) shall notify the Department of Environmental Quality of leaks, spills, and other releases that discharge to or have the potential to discharge to surface waters immediately upon discovery of the discharge but in no case later than 24 after the discovery.  The operator(s) shall notify the Department of Environmental Quality (DEQ) of leaks, spills, and other releases that discharge to or have the potential to discharge to surface waters immediately upon discovery of the discharge but in no case later than 24 after the discovery. Written notice of the discharge must be sent to DEQ and Hanover County Department of Public Works within five (5) days of the discovery. VA Department of Environmental Quality 5636 Southern Boulevard Virginia Beach, VA 22362 (757) 518-2000 (phone) (757) 518-2009 (fax) (800) 468-8892 (outside normal working hours) Isle of Wight County General Services Department P. O. Box 80 Isle of Wight County, VA 23397 (757) 365-6388 (phone) EQUIPMENT / VEHICLE WASHING  I-115  Washing must be conducted in a dedicated area that is located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.  All wash water used in vehicle wheel washing must be directed to a sediment basin/trap.  All vehicle washing activities other than wheel washing must have secondary containment.  Each facility must have appropriate signage to inform users where the dedicated area(s) are located. Activity Location of Dedicated Area(s) Shown on Plan Sheet #(s) Water Source Location Wheel Wash Construction Entrance C-3 Portable Tank Other Wash Areas N/A REVISIONS TO LOCATIONS Activity Location of Dedicated Area(s) Shown on Plan Sheet #(s) Water Source Location Operator’s Initials VEHICLE FUELING AND MAINTENANCE   Conduct regular maintenance in a dedicated area that is located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.  If fueling is conducted at a dedicated area, the location must be located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.  The dedicated areas must be designed to eliminate the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities by providing secondary containment (spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available).  Each facility must have appropriate signage to inform users where the dedicated area(s) are located. Date Shown on Plan Sheet #(s) Location of Dedicated Area(s) Approved Plan N/A I-116 REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location of Dedicated Area(s) Operator’s Initials  If mobile fueling will be used, the fueling must be done in an area that located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.  Spill kits must be readily available at all mobile fueling locations.  On-site storage tanks must have a means of secondary containment (spill berms, decks, spill containment pallets, etc.) and must be covered where appropriate.  All vehicles on site must be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. DISCHARGE FROM STORAGE, HANDLING, AND DISPOSAL OF CONSTRUCTION PRODUCTS, MATERIALS, AND WASTE  Storage of construction products, materials, and waste is to be conducted in dedicated areas.  The dedicated area must be located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features. Separations of less than 50 feet may be approved by the Environmental Inspector.  The dedicated areas must be designed to minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete and other trash or building products..  Each facility must have appropriate signage to inform users where the dedicated area(s) are located. Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for storage of construction products and materials Approved Plan N/A I-117 REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for storage of construction products and materials Operator(s) Initials  Follow all federal, state, and local requirements that apply to the use, handling and disposal of pesticides, herbicides, and fertilizers.  Keep chemicals on-site in small quantities and in closed, well marked containers.  Ensure that containers have lids or are otherwise protected from exposure to precipitation. Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for waste from construction products and materials Approved Plan N/A REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for waste from construction products and materials Operator(s) Initials  Follow all federal, state, and local requirements that apply to the use, handling and disposal of pesticides, herbicides, and fertilizers.  Clean up solid waste, including building materials, garbage, and debris on a daily basis and deposit into covered dumpsters that are periodically emptied.  Schedule waste collection to prevent exceeding the capacity of onsite containers. Additional containers may be necessary depending on the phase of construction (e.g., demolition, etc.)  Dispose of all solid waste at an authorized disposal site. I-118 DISCHARGES FROM OTHER POTENTIAL POLLUTANT SOURCES  Discharges from other pollutant sources (e.g., water line flushing, storm sewer flushing, above ground storage tanks, etc.) not mentioned elsewhere must be addressed. Other Potential Pollutant Sources Location(s) of Potential Pollutant Sources  Above ground oil storage tanks with a storage capacity exceeding 1,320 gallons and have a reasonable expectation of a discharge into or upon Waters of the United States are required to have a Spill Prevention Control and Countermeasure (SPCC) Plan.  The discharge of contaminated flush water and material removed during flushing operations must be collected and disposed of in accordance with appropriate federal, state, and local requirements. I-119 DISCHARGES FROM CONCRETE RELATED WASH ACTIVITIES  Concrete trucks are not allowed to wash out or discharge surplus concrete or drum wash water on site except in a dedicated area(s) that is located to prevent discharge to storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.  Each facility must have a stabilized access to prevent mud tracking into the street.  Each facility must have appropriate signage to inform users where the dedicated area(s) are located. Date Shown on Plan Sheet #(s) Location of Dedicated Area(s) Approved Plan N/A REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location of Dedicated Area(s) Operator’s Initials  Facilities must be cleaned, or new facilities constructed, once the washout area is two- thirds (2/3) full. I-120 I-121 I-122 CONCRETE WASHOUT AREA NOTES  The facility must be lined with 10 mil plastic lining that is free from holes, tears, or other defects that might compromise the material’s impermeability.  The lining must be anchored with staples (2’ spacing) or sandbags.  Side slopes must be 1:1 (horizontal:vertical) or flatter.  Stone access must be provided between the street and the concrete washout area.  A “Concrete Washout” sign must be installed within 30 feet of the washout facility. The sign must be no smaller than 2’ tall by 4’ wide. DISCHARGES OF SOAPS, DETERGENTS, SOLVENTS, AND WASH WATER FROM CONSTRUCTION ACTIVITIES SUCH AS CLEANUP OF STUCCO, PAINT, FORM RELEASE OILS, AND CURING COMPOUNDS  Washing activities associated with construction activities other than vehicle and equipment washing, such as clean up of stucco, paint, form release oils, and curing compounds are to be conducted in a dedicated area.  The dedicated area must be located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features. Separations of less than 50 feet may be approved by the Environmental Inspector.  The dedicated areas must be designed to prevent the discharge of soaps, detergents, solvents, and wash water. Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) Approved Plan N/A REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) Operator(s) Initials  The dedicated area must be covered (e.g., plastic sheeting, temporary roof, etc.) to prevent contact with stormwater. I-123  The contaminated wastewater from the dedicated area must be collected for disposal by a waste hauler or discharged to the sanitary sewer.  In situations where these pollutants are or could be generated at locations other than at the designated area (e.g., concrete pours, building washing, etc.), cover (e.g., plastic sheeting, temporary roof, etc.) must be provided to prevent contact with stormwater and the contaminated wastewater from the activity must be collected for disposal by a waste hauler or discharged to the sanitary sewer. DISCHARGES OF HAZARDOUS, TOXIC, AND SANITARY WASTE  Storage and disposal of hazardous, toxic and sanitary wastes are to be conducted in dedicated areas.  The dedicated areas must be located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features. Separations of less than 50 feet may be approved by the Environmental Inspector.  The dedicated areas must be designed to prevent the discharge of hazardous, toxic and sanitary waste by avoiding contact with precipitation  Each facility must have appropriate signage to inform users where the dedicated area(s) are located. Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for storage and disposal of hazardous and toxic wastes Approved Plan N/A REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for storage and disposal of hazardous and toxic wastes Operator(s) Initials  Consult with local waste management authorities or private firms about the requirements for disposing of hazardous materials and/or soils that may be contaminated with hazardous materials.  Never remove the original product label from the container. Follow the manufacturer’s recommended method of disposal. Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for portable toilets Approved Plan C-3 Near Construction Entrance I-124 REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for portable toilets Operator(s) Initials  Schedule periodic pumping of portable toilets and dispose of waste  Dispose of all solid waste at an authorized disposal site. SWPPP MODIFICATIONS AND REVISIONS The operator(s) shall ensure the SWPPP is modified and/or revised to reflect:  Changes in qualified personnel; delegated authorities or other personnel required as a condition of the General Construction Permit;  Changes in site conditions;  Changes in the design, construction, operation, or maintenance of the construction site that affect the potential for discharges of pollutants that are not addressed in the normal implementation of the plan; and  Ineffective control measures identified during inspections or investigations conducted by the operator’s qualified personnel or local, state or federal officials. Modifications/revisions to the SWPPP shall include additional or modified control measures to address the identified deficiencies. If the necessary modifications/revisions require approval by the Administrator or DEQ, the modifications/revisions must be implemented no later than seven (7) calendar days following approval. If the necessary modifications/revisions do not require approval by the Administrator, the modifications/revisions must be implemented prior to the next anticipated storm event or as soon as practicable. I-125 SWPPP UPDATES The operator(s) shall update the SWPPP to include:  A record of dates when 1) major grading activities occur, 2) construction activities temporarily or permanently cease on a portion of the site, and 3) stabilization measures are initiated;  Documentation of modifications and revisions to the SWPPP;  Areas that have reached final stabilization where no further SWPPP or inspection requirements apply;  All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; and  The date, volume, and corrective/preventative actions implemented for any prohibited discharge. The operator(s) shall update the SWPPP no later than seven (7) days following any of the situations identified above. OPERATOR INSPECTIONS The operator(s) identified below shall provide for inspections of the permitted land-disturbing activities by the qualified personnel identified below. The inspections will be conducted (select one the following options):  at least once every four (4) business days; or  at least once every five (5) business days and no later than 48 hours following any measurable storm event. Where areas are in a stabilized condition or runoff is unlikely due to winter conditions, the inspection frequency may be reduced to once every 30 days while these conditions exist. Otherwise, the operator(s) shall resume the regular inspection frequency identified above. The operator(s) shall provide for inspections of the permitted land-disturbing activity to ensure implementation and continued maintenance of all requirements of the Stormwater Pollution Prevention Plan (Erosion and Sediment Control Plan, Stormwater Management Plan, Pollution Prevention Plan, TMDL requirements, etc.). Records of the required inspections must be maintained and included in the SWPPP binder. The qualified personnel are encouraged to use the Operator Inspection form provided in the SWPPP binder to document the required inspections. If inspections are conducted once every five (5) business days and no later than 48 hours following any measureable storm event, the location of the rain gauge used to determine the amount of rain must be included in the SWPPP and documented in the inspection report. I-126 ACKNOWLEDGMENTS QUALIFIED PERSONNEL ACKNOWLEDGEMENTS I certify under penalty of law that I: a. have been designated by the Operator to conduct inspections of the permitted site; b. am knowledgeable in the principles and practices of erosion and sediment control and stormwater management; c. possess the skills to assess conditions at the permitted site for the Operator(s) that could impact stormwater quality and quantity; d. will assess the effectiveness of any erosion and sediment control measures or stormwater management facilities selected to control the stormwater discharges from the permitted site; and e. will conduct inspections in accordance with the frequency noted above in the OPERATOR INSPECTIONS. QUALIFIED PERSONNEL Name (print) Signature Company or Organization Address Phone Certificates / #s As the Operator(s), I/we understand that prior to initiating land disturbance, the potential pollutant sources, appropriate control measures, and all responsible parties (operator, qualified inspection personnel, contractors, etc.) required as a condition of the General Construction Permit (GCP) and the Stormwater Pollution Prevention Plan (SWPPP) must be identified. I also understand this information must be updated as necessary throughout all phases of construction until the GCP is terminated. Furthermore, I/we certify under penalty of law that I/we have read and understand all requirements of the SWPPP (erosion and sediment control plan, stormwater management plan, pollution prevention plan, TMDL provisions, administrative requirements, etc.) and GCP and that the information herein is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment for knowing violations. I/we understand that I/we are ultimately responsible for compliance with all conditions and requirements of the SWPPP and GCP and for ensuring all contractors and subcontractors on the permitted site are aware of the conditions and requirements of the SWPPP and GCP. I/we shall comply with all conditions and requirements of the SWPPP and shall at all times properly operate and maintain all measures and control (and related appurtenances) which are installed or used to achieve compliance I-127 with the conditions of the GCP. Proper operation and maintenance also includes adequate funding and adequate staffing. I/we shall take all reasonable steps to minimize or prevent any discharge in violation of the SWPPP and/or GCP. I/we understand that if it determined by the Department of Environmental Quality (DEQ) in consultation with the State Water Control Board at any time that stormwater discharges are causing, have reasonable potential to cause, or contribute to and excursion above any applicable water quality standard, the DEQ may, in consultation with the Administrator, take appropriate enforcement action and require: a. Modification of control measures to adequately address water quality concerns; b. Submission of valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards; or c. Cessation of discharges of pollutants from construction activity and submit an individual permit application according to 4VAC25-870-410. OPERATOR(S) Name (print) Signature Company or Organization Date I-128 SECTION 02020 EROSION AND SEDIMENT CONTROL PART 1 - GENERAL 1.1 INTENT A. The Department of Conservation and Recreation (DCR) of the Commonwealth of Virginia requires the preparation and implementation of a plan for the prevention of accelerated soil erosion and sediment of the streams of the Commonwealth. Such plans are required for all earth-moving activities and it is intended that this document, when used in conjunction with the Erosion and Sediment Control plan, the Stormwater Pollution Prevention Plan (SWPPP) and the Pollution Prevention Plan (PPP), will fulfill this requirement and prevent sediment. B. It shall be the responsibility of the Contractor to implement this plan in the field and meet all state and local regulations. The Contractor shall assign this responsibility to a “Responsible Land Disturber” certified by the Commonwealth of Virginia. Modifications or deviations from this plan will be allowed only if the Contractor first obtains written permission from the County Erosion Control Administrator. C. The Virginia Department of Environmental Quality (DEQ) requires a VSMP, of which includes the SWPPP and the PPP. D. The County has the right to require additional measures deemed necessary. 1.2 APPLICABLE STANDARDS A. Virginia Erosion and Sediment Control Regulations, VR 625-02-00. B. Virginia Erosion and Sediment Control Handbook, Third Edition, 1992 Virginia Department of Conservation and Recreation, Division of Soil and Water Conservation. 1. Std. & Spec. 3.02, Temporary Construction Entrance 2. Std. & Spec. 3.03, Construction Road Stabilization 3. Std. & Spec. 3.08, Culvert Inlet Protection 4. Std. & Spec. 3.18, Outlet Protection 5. Std. & Spec. 3.05, Silt Fence (Standard and Wire-backed) 6. Std. & Spec. 3.31, Temporary Seeding 7. Std. & Spec. 3.32, Permanent Seeding 8. Std. & Spec. 3.35, Blankets and Matting 1.3 RELATED WORK A. SECTION 02200 - EARTHWORK PART 2 - PRODUCTS I-129 2.1 GENERAL A. All products and materials shall meet the requirements of the Virginia Erosion and Sediment Control Handbook. PART 3 - EXECUTION 3.1 PLANNING AND DESIGN FOR CONSTRUCTION A. Construction of projects that involve land disturbance such as this project shall be planned and designed with soil erosion and sediment control in mind. While erosion and sediment controls are important on all sites, particular attention should be given to areas adjacent to wetlands and highly erodible soils. Denuded areas shall be kept to a minimum and for the shortest time practical. B. Where practical, a schedule of earth-moving activities shall be included in the above. C. Restoration work shall be accomplished as the project progresses and not be left until the end of the project. No excavated ditch shall be left unprotected for more than a day without temporary seeding and EC-2 matting. Other disturbed areas, such as stockpiles, shall be stabilized in accordance with the seeding standards. 3.2 STOCKPILES A. Stockpile areas shall also be maintained by on-site personnel. Stockpile design shall incorporate erosion and sediment control facilities to prevent production and delivery of sediment to waterways and damage to vegetation. Temporary or interim stabilization of soil stockpiles shall be promptly instituted. Stockpiling in, or within 50 feet of, ditches or wetlands will not be allowed. Silt fences, as shown on the plan, shall be installed around the stockpiles. B. Temporary vegetative measures planned for implementation on stockpile areas shall be established immediately after the stockpile operation is. Proper mulching and soil stabilization in conjunction with seeding operations shall also be carried out. 3.3 EXCAVATION AND BACKFILL A. Ditch excavation shall be closely controlled. The material removed from the ditch shall be hauled immediately to the existing stockpiles. The adjacent ditch must be protected at all times and the piling of soil in any ditch will not be allowed. 3.4 FINAL GRADING AND SEEDING A. Final grading and seeding shall be performed as specified on the Drawings. Types and quantities of seed mixtures shall be as specified in accordance with the specifications. Blankets and matting shall be installed on all excavated ditch slopes. B. After the maintenance work is complete, carefully remove all mats and reestablish permanent vegetation on the areas that have been disturbed as rapidly as possible. If the completion of the construction activities does not coincide with a season in which permanent vegetation can be started an interim or temporary program is required. This shall include soil stabilization, mulching, or the establishment of filter strips. In any case sediment and erosion controls shall be installed promptly and their maintenance assured. 3.5 MAINTENANCE I-130 A. Sediment and erosion control measures and facilities shall be maintained so that they will individually and collectively perform the functions for which they were designed. Inspection shall be made at intervals to detect any impairment in the ability of the erosion control facilities to continue to function effectively, but no longer than 4 days apart. Responsibility for maintenance shall be assigned to an individual who has access to equipment, material, and funds required to sustain the maintenance schedule. B. Maintenance shall be performed on control structures after each storm or rainfall event to allow them to continue to perform the function for which they were designed. C. Information shall be distributed to all persons on the construction site describing and stressing the importance of the proper installation and maintenance of the erosion and sediment control procedures included in this plan. D. The approved erosion and sediment control plan and any other documents and plans relating to VPDES/VSMP permits shall be available at the site of maintenance activity at all times. E. The maintenance of the soil and erosion control measures shall continue throughout the life of the project. * * * * * END OF SECTION * * * * * I-131 SECTION 02200 EARTHWORK PART 1 GENERAL 1.1 The Contract Documents apply to this Section. 1.2 Related work specified elsewhere includes the following: A. Section 02020 – Erosion and Sediment Control 1.3 Locate existing utilities, culverts and structures, above or below ground, before any excavation starts. Protect, maintain in service, and prevent damage to utilities, culverts and structures. When such are encountered and are not shown on drawings, or when locations differ from those shown on drawings, notify Engineer for instructions before proceeding. 1.4 Grading excavation is unclassified and includes excavation to elevations indicated, regardless of character of materials and obstructions encountered. 1.5 Unauthorized excavation consists of removal of materials beyond indicated subgrade elevations or side dimensions. Without specific approval of Engineer, unauthorized excavation shall be replaced at Contractor's expense. PART 2 PRODUCTS Not Used. PART 3 EXECUTION 3.1 Preparation. A. Cut trees where timber matting is shown. Do not grub stumps in the wetland area. Deposit trees onsite as directed by Owner or Engineer. B. Confirm culvert inverts, as shown on the plans. Notify engineer is the inverts are significantly different from the plans. 3.2 Excavation. A. Remove trees and roots from ditch banks. B. Excavate to elevations shown. C. Stockpile clean soil material. D. Place unclean soil in a separate stockpile from the clean soil. E. Trees, stumps and debris shall be removed from the site. Burning will not be allowed. F. Excavate ditch to original cross-section. Ensure positive drainage. 3.3 Where unauthorized excavations have been carried below or beyond points required, restore these areas to the elevations and dimensions shown on the drawings with granular fill or material approved by Engineer and compact as specified. No payment will be made where unauthorized excavations have been made below the required elevations. I-132 3.4 Grading. A. Uniformly grade all ditches within the limits of disturbance designated on the drawings. Finished grades shall be of uniform slope between points where proposed elevations are shown. B. Protect newly graded ditches from erosion. Repair and reestablish grade in settled, eroded, or rilled areas to the specified elevations. 3.5 Finished Construction A. Seed and install EC-2 matting on newly excavated ditches. B. Remove all trash and debris from the site. C. Remove remaining erosion control measures when authorized by the County to do so. ***END OF SECTION*** IFB # 16-1815-01 ADDENDUM 1 DEPARTMENT OF BUDGET AND FINANCE Shirley T. Holland Intermodal Park – Phase II Ditch Maintenance Sealed bids subject to the conditions and instructions contained herein, will be received at the office of the Purchasing Agent listed below, until the time and date shown below (local prevailing time), for furnishing the items or services described herein. The Schedule of Unit Prices is added to Section A. It is required bidders include these prices with their submittal. Bid Due: 3:00 PM., August 12, 2015 Contract Officer: Michael Coburn, Sr., Purchasing Agent, Michael.coburn@isleofwightus.net ** SECTION "A" AND ONE ELECTRONIC CD COPY IS REQUESTED AT SUBMITTAL** In compliance with this invitation for bids, and subject to all the conditions thereof, the undersigned offers, if this bid is accepted within ninety (90) calendar days from the date of the opening, to furnish any or all of the items and/or services upon which prices are quoted, at the price set opposite each item, to be delivered at the time and place specified herein. The undersigned certifies he has read, understands, and agrees to all terms, conditions, and requirements of this bid, and is authorized to contract on behalf of firm named below. Company Name: Address: City / State / Zip: Telephone: FAX No.: E-mail: Print Name: Title: Signature: Date: SCHEDULE OF UNIT PRICES Project: Shirley T. Holland Intermodal Park, Phase II Ditch Maintenance IFB# 16-1815-01 Bid Submitted By: Lump Sum Prices shall include the furnishing of labor, material, where specified, excavation, installation, laying jointing, connecting, backfilling, testing and all incidental work called for in the Contract Documents. In case of discrepancy, Unit Price will govern; if stated in words and figures, the price in words shall govern. Item No. Description Est. Quantity Unit Prices Total Price Item 1 Mobilization LS $___________ $ ___________ Item 2 General Conditions LS $____________ $ ___________ Item 3 Excavation 11,000 CY $ ____________ $ ___________ Item 4 Construction Entrance LS $ ___________ $ ___________ Item 5 Construction Road Stabilization 375 Tons $ _____________ $ ___________ Item 6 Silt Fence (Std) 6,000LF $ _____________ $ ___________ Item 7 Silt Fence (Wire Back) 800LF $ _____________ $ ___________ Item 8 EC-2 Matting 7400 SY $ _____________ $ ___________ Item 9 Permanent Seeding 800 LBS $ _____________ $ ___________ Item 10 Outlet Protection 32 Tons $ _____________ $ ___________ Item 11 Culvert Inlet Protection 9 EA $ ______________ $ ___________ Item 12 Timber Logging Mats LS $ ______________ $ ___________ Item 13 18” HDPE 60 LF $ _______________ $ ___________ Item 14 30” HDPE 40 LF $ ________________ $ ___________ DEPARTMENT OF BUDGET AND FINANCE August 10, 2015 ADDENDUM 2 Shirley T. Holland Intermodal Park – Phase II Ditch Maintenance, IFB # 16-1815-01 Sealed bids subject to the conditions and instructions contained herein, will be received at the office of the Purchasing Agent listed below, until the time and date shown below (local prevailing time), for furnishing the items or services described herein. Questions & Answers on next sheet. Bid Due Date Changed to: 3:00 PM., August 19, 2015 Contract Officer: Michael Coburn, Sr., Purchasing Agent, Michael.coburn@isleofwightus.net ** SECTION "A" AND ONE ELECTRONIC CD COPY IS REQUESTED AT SUBMITTAL** In compliance with this invitation for bids, and subject to all the conditions thereof, the undersigned offers, if this bid is accepted within ninety (90) calendar days from the date of the opening, to furnish any or all of the items and/or services upon which prices are quoted, at the price set opposite each item, to be delivered at the time and place specified herein. The undersigned certifies he has read, understands, and agrees to all terms, conditions, and requirements of this bid, and is authorized to contract on behalf of firm named below. Company Name: Address: City / State / Zip: Telephone: FAX No.: E-mail: Print Name: Title: Signature: Date: 1. What is the size and type of timber Matts required and will they be left in place? Answer: The size and types of timber matting is up to the contractor, based on the size of the equipment to be used. The mats shall not remain in place after construction is complete. The intent of the matting is to prevent disturbance of the wetlands adjacent to the excavation. 2. Will all Excavation and Clearing debris be stockpiled onsite? I read the specs and want to confirm. Answer: All bush may remain on site with the exception of the stumps which must be hauled off-site. The bush shall be burned per the County ordinance. Ditch Maintenance IFB # 16-1815-01 August 19 2015, 3:000 PM Bidders Carolina Marine Structures, Inc. Bryant’s Excavation, Inc. Northwest Contractors Lump Sum (A) $369,125.00 321,749.90 $262,030.00 Bidders Lump Sum (A) BY: Date: 6/23/2015 TIME: __3:01________________ TABLE OF CONTENTS Tab Content 1 SWPPP TITLE SHEET 2 TABLE OF CONTENTS 3 REQUIRED SWPPP COMPONENTS 4 NARRATIVE 5 DELEGATION OF AUTHORITY 6 IDENTIFICATION OF QUALIFIED PERSONNEL 7 ENVIRONMENTAL COMPLIANCE PLAN AND OTHER INCORPORATED PLANS 8 POLLUTION PREVENTION PLAN INFORMATION 9 TMDL INFORMATION 10 SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES 11 PUBLIC NOTICE, AVAILABILITY AND IMPLEMENTATION OF THE SWPPP 12 SWPPP INSPECTIONS 13 CORRECTIVE ACTIONS 14 SWPPP TERMINATION 15 REGISTRATION STATEMENT FOR THE PROJECT 16 NOTICE OF COVERAGE FOR THE PROJECT 17 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES 18 NOTICE OF TERMINATION FOR GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES FORM 19 GCP TRANSFER AGREEMENT FORM STORMWATER POLLUTION PREVENTION PLAN (SWPPP) for ISLE OF WIGHT COUNTY INDUSTRIAL DEVELOPMENT AUTHORITY SHIRLEY T. HOLLAND INTERMODAL PARK – PHASE II DITCH RESTORATION Located in Isle of Wight County, Virginia Developed in compliance with: General VPDES Permit for Discharges of Stormwater from Construction Activities (9VAC25-880) DELEGATED AUTHORITY Name: _________________________________ Title: _________________________________ Company: _________________________________ Phone #: _________________________________ Fax #: _________________________________ E-mail: _________________________________ I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend or modify this SWPPP. “I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” OPERATOR Signature: Date: ________________ Name: Title: SECTION 3 REQUIRED SWPPP COMPONENTS In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the SWPPP must include the following information: 1. General Information a. A signed copy of the registration statement for coverage under the GCP; b. Upon receipt, a copy of the notice of coverage under the GCP (i.e., notice of coverage letter); c. Upon receipt, a copy of the GCP; d. A narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: 1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; 2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; 3) Locations of major structural and nonstructural control measures including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment that will be installed between disturbed areas and the undisturbed vegetated areas, in order to increase sediment removal and maximize stormwater infiltration; 4) Locations of surface waters; 5) Locations where concentrated stormwater is discharged; 6) Locations of support activities, when applicable and when required by the VSMP authority, including but not limited to: (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels, fertilizers and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and 7) When applicable, the location of the on-site rain gauge, or the methodology established in consultation with the VSMP authority, used to identify measurable storm events for inspection purposes. 2. An Erosion and Sediment Control (ESC) Plan developed and approved in accordance with Chapter 8 of this manual. 3. A Stormwater Management (SWM) Plan developed and approved in accordance with Chapter 9 of this manual. 4. A Pollution Prevention Plan (PPP). 5. Information demonstrating compliance with the Total Maximum Daily Load (TMDL) Requirements. 6. Qualified personnel responsible for conducting on-site and off-site inspections required by the GCP shall be identified by the Operator in the SWPPP. The Operator is responsible for insuring that the qualified personnel conduct inspections. 7. The SWPPP must identify individuals or positions with delegated authority to sign inspection reports and/or amend or modify the SWPPP. 8. The SWPPP shall be signed and dated in accordance with the signatory requirements. 9. The SWPPP must contain documentation of all amendments, modifications, and updates. 10. The SWPPP must include documentation of inspections conducted in accordance with the inspection requirements. 11. The SWPPP must contain documentation of corrective actions taken in accordance with the requirements. SECTION 4 NARRATIVE In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the SWPPP must include a narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.). Shirley t. Holland Intermodal Park – Phase II is located in Isle of Wight County, Virginia, northwest of the intersection of Old Mill Road (State Route 607) and William A. Gwaltney Way. The Isle of Wight County Industrial Development Authority is continuing the development of the Shirley T. Holland Intermodal Park - Phase II. As part of ongoing maintenance of the property, the County must maintain the existing drainage ditches to ensure proper drainage of the site. Maintenance shall include dredging of sediment deposits within the ditches and removal of vegetation (trees and shrubs) which would impede the flow. Periodic maintenance shall be provided in accordance with this plan. Land disturbance will be approximately 12 acres. SECTION 5 REVISIONS TO DELEGATION OF AUTHORITY In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the individuals or positions with delegated authority to sign inspection reports and/or amend this SWPPP must be identified. If the individual or position identified on the Title Sheet of the SWPPP changes or additional individuals or positions are given this responsibility after the preconstruction meeting occurs, the changes/additions must be noted below. Print Name: _____________________________________________ Title: _____________________________________________ Company: _____________________________________________ Phone #: _____________________________________________ I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend or modify this SWPPP. Operator Signature: ___________________________ Date: ____________ Print Name: _____________________________________________ Title: _____________________________________________ Company: _____________________________________________ Phone #: _____________________________________________ I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend or modify this SWPPP. Operator Signature: ___________________________ Date: ____________ Print Name: _____________________________________________ Title: _____________________________________________ Company: _____________________________________________ Phone #: _____________________________________________ I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend or modify this SWPPP. Operator Signature: ___________________________ Date: ____________ Print Name: _____________________________________________ Title: _____________________________________________ Company: _____________________________________________ Phone #: _____________________________________________ I certify the individual or position named above has the delegated authority to sign inspection reports and/or amend or modify this SWPPP. Operator Signature: ___________________________ Date: ____________ SECTION 6 IDENTIFICATION OF QUALIFIED PERSONNEL In accordance with the General VPDES Permit for Discharges of Stormwater from Construction Activities, the individuals responsible for conducting on-site and off-site inspections must be identified. If the identified individual changes or additional individuals are given this responsibility after the preconstruction meeting occurs, the changes/additions must be noted below. Print Name: _____________________________________________ Company: _____________________________________________ Address: _____________________________________________ Phone #: _____________________________________________ Qualifications:  Responsible Land Disturber # ________________  Certified ESC Inspector # ___________________  Certified SWM Inspector # ___________________  Licensed Professional (P.E., L.S., etc.)  Other: _________________________ Print Name: _____________________________________________ Company: _____________________________________________ Address: _____________________________________________ Phone #: _____________________________________________ Qualifications:  Responsible Land Disturber # ________________  Certified ESC Inspector # ___________________  Certified SWM Inspector # ___________________  Licensed Professional (P.E., L.S., etc.)  Other: _________________________ Print Name: _____________________________________________ Company: _____________________________________________ Address: _____________________________________________ Phone #: _____________________________________________ Qualifications:  Responsible Land Disturber # ________________  Certified ESC Inspector # ___________________  Certified SWM Inspector # ___________________  Licensed Professional (P.E., L.S., etc.)  Other: _________________________ Print Name: _____________________________________________ Company: _____________________________________________ Address: _____________________________________________ Phone #: _____________________________________________ Qualifications:  Responsible Land Disturber # ________________  Certified ESC Inspector # ___________________  Certified SWM Inspector # ___________________  Licensed Professional (P.E., L.S., etc.)  Other: _________________________ SECTION 7 EROSION AND SEDIMENT CONTROL PLAN, STORMWATER MANAGEMENT PLAN, POLLUTION PREVENTION PLAN, AND TMDLS Erosion and Sediment Control Plan The preconstruction meeting was held on: __________________ An Erosion and Sediment Control (ESC) Plan was developed and approved as authorized by the Virginia Erosion and Sediment Control Regulations (9VAC25-840). When properly implemented, the approved ESC plan has been determined to adequately address the following effluent limit guidelines: 1. Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion; 2. Controls stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; 3. Minimizes the amount of soil exposed during the construction activity; 4. Minimizes the disturbance of steep slopes; 5. Minimizes sediment discharges from the site in a manner that addresses (i) the amount, frequency, intensity, and duration of precipitation, (ii)the nature of resulting stormwater runoff, and (iii) soil characteristics, including the range of soil particle sizes present on the site; 6. Provides and maintains natural buffers around surface waters, directs stormwater to vegetated areas to increase sediment removal, and maximized infiltration, unless infeasible; 7. Minimizes soil compaction and, unless infeasible, preserves topsoil; 8. Ensures that stabilization of disturbed areas will be initiated immediately whenever any clearing, grading, or excavating, or other land-disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days; 9. Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible, when discharging from sediment basins or sediment traps. The following individual(s) will implement and maintain the control measures identified in the ESC plan (if other than the Operator or Delegated Authority): Name(s): ____________________________________ Company: ____________________________________ Stormwater Management Plan A Stormwater Management Plan (SWM) plan was developed as a required component of the ECP and was approved as authorized by the Virginia Stormwater Management Program Regulations (9VAC25-870). The following individual(s) will implement and maintain the control measures identified in the SWM plan (if other than the Operator or Delegated Authority): Name(s): ____________________________________ Company: ____________________________________ Pollution Prevention Plan The individuals responsible for implementing and maintaining the control measures identified in the Pollution Prevention Plan are listed in the Appendix. Total Maximum Daily Load (TMDL) Requirements All projects requiring coverage under the GCP are subject to the following requirements associated with discharges to impaired waters, surface waters with an applicable TMDL wasteload allocation established and approved prior to the term of this GCP, or exceptional waters: 1. Identify the impaired water(s), approved TMDL(s), pollutants of concern, and exceptional waters identified in 9VAC25-260-30.A.3.c, when applicable; 2. Provide clear direction that: a. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; b. Nutrients shall be applied in accordance with manufacturer’s recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and c. A modified inspection schedule shall be implemented in accordance with Part I B.4 or Part I B.5. These requirements are addressed on the Pollution Prevention Plan sheet of the ECP and in Tab 9 of the SWPPP Binder. The following individual(s) will implement and maintain these control measures (if other than the Operator or Delegated Authority): Name(s): ____________________________________ Company: ____________________________________ Other Incorporated Plans Plans from other projects have not been used or incorporated into this design. Off-site areas of land disturbance activities associated with this project must have such locations noted below and approved prior to use. Additional off-site areas to be used during construction: Location Plan Title Approval Date Purpose SECTION 8 POLLUTION PREVENTION PLAN INFORMATION In accordance with Part II A.4 of the General VPDES Permit for Discharges of Stormwater from Construction Activities: 1. Identify potential pollutant-generating activities and pollutants expected to be exposed to stormwater; 2. Describe the location where the potential pollutant generating activity will occur; 3. Identify all authorized non-stormwater discharges that are or will be comingled with stormwater discharges from the construction activity, including any applicable support activity; 4. Identify the person responsible for implementing the pollution prevention practice(s) for each pollutant generating activity, if other than the person listed as the qualified personnel; 5. Describe pollution prevention procedures and practices that will be implemented to: a. Prevent and respond to leaks, spills and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks and other releases; and (ii) procedures for reporting leaks, spills, and other releases; b. Prevent the discharge of spilled or leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available); c. Prevent the discharge of soaps, detergents, solvents, and wash water from construction materials, including the cleanup of stucco, paint, form release oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these pollutants; d. Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins/traps, using filtration devices such as filter bags or sand filters or using similarly effective controls); e. Direct concrete wash water into a leak-proof container or leak-proof settling basin. The container or basin must be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes must be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes must be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; f. Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes, including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, styrofoam, concrete, and other trash or building materials; g. Prevent discharges of fuels, oils, and other petroleum products, hazardous or toxic waste, and sanitary wastes; and h. Address any other discharges from potential pollutant generating activity not addressed above. 6. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water, disposal practices, and applicable disposal locations of such wastes, to personnel in order to comply with the conditions of the GCP. The information required in Items 1, 2, and 4 can be found in Table 8.1 of this section of the SWPPP. The information required in Item 3 can be found in Table 8.2 of this section of the SWPPP. Table 8.1 – Pollutant-Generating Activities, Potential Pollutants and Responsible Parties Pollutant Generating Activity Check if Present Potential Pollutants Responsible Party (if other than the person(s) identified as the qualified personnel) Se d i m e n t Nu t r i e n t s , F e r t i l i z e r He a v y M e t a l s pH ( a c i d s a n d b a s e s ) Pe s t i c i d e s o r H e r b i c i d e s Oi l o r G r e a s e Ba c t e r i a o r V i r u s e s Tr a s h , D e b r i s o r S o l i d s To x i c C h e m i c a l s Pa i n t s o r P l a s t e r Ad h e s i v e s , s o l v e n t s o r c u r i n g c o m p o u n d s As p h a l t o r C o n c r e t e Ve h i c l e o r h e a v y e q u i p m e n t w a s h w a t e r Ga s o l i n e , d i e s e l o r k e r o s e n e Wo o d p r e s e r v a t i v e s An t i f r e e z e o r c o o l a n t Clearing, grading or excavating        Paving operations         Concrete washout and concrete waste disposal       Structure construction, stucco, painting or cleaning         Dewatering operations     Material delivery and storage                Pollutant Generating Activity Check if Present Potential Pollutants Responsible Party (if other than the person(s) identified as the qualified personnel) Se d i m e n t Nu t r i e n t s , F e r t i l i z e r He a v y M e t a l s pH ( a c i d s a n d b a s e s ) Pe s t i c i d e s o r H e r b i c i d e s Oi l o r G r e a s e Ba c t e r i a o r V i r u s e s Tr a s h , D e b r i s o r S o l i d s To x i c C h e m i c a l s Pa i n t s o r P l a s t e r Ad h e s i v e s , s o l v e n t s o r c u r i n g c o m p o u n d s As p h a l t o r C o n c r e t e Ve h i c l e o r h e a v y e q u i p m e n t w a s h w a t e r Ga s o l i n e , d i e s e l o r k e r o s e n e Wo o d p r e s e r v a t i v e s An t i f r e e z e o r c o o l a n t Material use during building process           Solid waste disposal                Sanitary waste disposal        Landscaping operations          Vehicle Fueling or Maintenance       Other (describe)  Other (describe)  Other (describe)  Table 8.2 – Authorized Non-stormwater Discharges Anticipated from the Construction Activity or Support Activities Authorized Non-stormwater Discharges Anticipated from the Construction Activity or support Activities (check if applicable) Discharges from firefighting activities  Fire hydrant flushings  Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge  Water used to control dust that has been filtered, settled, or similarly treated prior to discharge  Potable water sources, including uncontaminated waterline flushings  Routine external building wash down where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge  Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurrs (or where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similarly treated prior to discharge  Uncontaminated air conditioning or compressor condensate  Uncontaminated ground water or spring water  Foundation or footing drains where flows are not contaminated with process materials such as solvents  Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge  Landscape irrigation  SECTION 9 TOTAL MAXIMUM DAILY LOAD INFORMATION In accordance with Part II A.5 of the General VPDES Permit for Discharges of Stormwater from Construction Activities, the SWPPP must note the following: 1. The impaired water(s), approved TMDL(s) and pollutants of concern are identified in Tables 9.1 and 9.2 below. 2. The Responsible Land Disturber shall understand that: a. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; b. Nutrients shall be applied in accordance with manufacturer’s recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and c. Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day. Table 9.1 – Identification of the Impaired Waters the Project Discharges Into Waterbody Location / Length Pollutant of Concern Cohoon Creek Begins at the confluence with Cohoon Creek and continues downstream until the confluence with Lake Mead. Lake Prince Begins at the confluence with Lake Prince and continues downstream until the confluence with Western Branch Reservoir. Table 9.2 – Identification of the Surface Waters with Applicable TMDL Wasteload Allocations the Project Discharges Into Waterbody Pollutants of Concern Does the project discharge to the waterbody? Chesapeake Bay Phosphorus Nitrogen Sediment YES SECTION 10 SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES In accordance with Part II B of the General VPDES Permit for Discharges of Stormwater from Construction Activities: 1. The operator or their designee shall amend the SWPPP whenever there is a change in the design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days following approval. Implementation of these additional of modified control measures must be accomplished as described in Section 13. 3. The SWPPP must clearly identify the contractor(s) that will implement and maintain each control measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator or their designee shall update the SWPPP no later than seven days following any modification to its implementation. All modifications or updates to the SWPPP shall be noted and shall include the following items; a. A record of dates when: (1) Major grading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization measures are initiated. b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and where modified as soon as possible; c. Areas that have reached final stabilization and where no further SWPPP inspection requirements apply; d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and g. Measures taken to address any evidence identified as a result of an inspection. 5. All amendments, modifications, or updates to the SWPPP shall be signed by the Operator or their designee. The following Amendment, Modification, and Update Log form must be used to document all amendments, modification, and updates. SWPPP AMENDMENT, MODIFICATION AND UPDATE LOG Date Description of Amendment, Modification or Update _________ ________________________________ Responsible Party _______________________________________ "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." ______________________________________________________ Operator or Delegated Authority Signature SECTION 11 PUBLIC NOTICE, AVAILABLITY AND IMPLEMENTATION OF THE SWPPP In accordance with Part II C of the General VPDES Permit for Discharges of Stormwater from Construction Activities: Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publically accessible location near an active part of the construction project. The operator shall maintain the posted information until termination of general permit coverage. In accordance with Part II D of the General VPDES Permit for Discharges of Stormwater from Construction Activities: Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on-site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. The operator shall make the SWPPP and all amendments, modifications, and updates available upon request to the department, the VSMP authority, the EPA, the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on-site location is unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's location must be posted near the main entrance of the construction site. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II C. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. In accordance with Part II E of the General VPDES Permit for Discharges of Stormwater from Construction Activities: The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage. All control measures must be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection identifies a control measure that is not operating effectively, corrective action(s) shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. If site inspections identify an existing control measure that needs to be modified or if an additional control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority. SECTION 12 SWPPP INSPECTIONS In accordance with Part I B.4.d and Part II F of the General VPDES Permit for Discharges of Stormwater from Construction Activities: 1. Personnel responsible for on-site and off-site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for insuring that the qualified personnel conduct the inspection. 2. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: a. Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day, and b. Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and when applicable the date and rainfall amount of the last measurable storm event; (2) Record the information and a description of any discharges occurring at the time of the inspection; (3) Record any land-disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization; (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channel, flume, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for initiation of stabilization activities; (6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for completion of stabilization activities within seven days of reaching grade or stopping work; (7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department-approved annual standards and specifications has not been properly implemented. This includes but is not limited to: (a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge , or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance outside of the approved area to be disturbed; (8)Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance and effectiveness of the procedures and practices; (9)Identify any pollutant generating activities not identified in the pollution prevention plan; and (10)Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The location(s) of prohibited discharges; d. The location(s) of control measures that require maintenance; e. The location(s) of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The location(s) where any evidence identified under Part II F 3 a (7) exists; g. The location(s) where any additional control measure is needed that did not exist at the time of inspection; h. A list of corrective actions required (including any changes to the SWPPP that are necessary ) as a result of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented; and j. The date and signature of the qualified personnel and the operator or its duly authorized representative. The inspection report and any actions taken in accordance with Part II must be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. VSMP INSPECTION REPORT Project: GCP Number: Notice of Coverage posted?  YES  NO SWPPP available for review?  YES  NO Inspection Date/Time Inspection Conducted By (must be the Qualified Personnel identified in the SWPPP) Date of Last Measureable Storm Event Rainfall Amount  Not applicable since inspection frequency is at least once every four business days Record the information and a description of any discharges occurring at the time of the inspection Record any land-disturbing activities that have occurred outside the approved erosion and sediment control plan Inspection requirements: Have controls been installed in accordance with the approved ECP? Are controls effectively minimizing sediment discharges? Have controls been inappropriately or incorrectly used? Describe any maintenance needs or other deficiencies that were identified and the location of the deficiencies All perimeter erosion and sediment controls (silt fence, etc.)  YES  NO  YES  NO  YES  NO Soil stockpiles and borrow areas (for stabilization or sediment trapping measures)  YES  NO  YES  NO  YES  NO Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization  YES  NO  YES  NO  YES  NO Cut and fill slopes  YES  NO  YES  NO  YES  NO Sediment basins and traps, sediment barriers, and other measures (installed to control sediment discharges from stormwater)  YES  NO  YES  NO  YES  NO Temporary or permanent channels, flumes, or other slope drain structures (installed to convey concentrated runoff down cut and fill slopes)  YES  NO  YES  NO  YES  NO Storm inlets (to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated)  YES  NO  YES  NO  YES  NO Construction entrances and access routes (for minimizing mud/sediment tracking)  YES  NO  YES  NO  YES  NO Have stabilization activities begun on areas that have reached final grade or that will remain dormant for more than 14 days?  YES  NO Were stabilization activities completed within seven days of reaching final grade or stopping work on areas that have reached final grade or that will remain dormant for more than 14 days?  YES  NO Inspect for the presence of the following: Present? Location Concentrated flows of stormwater in conveyances (such as rills, rivulets or channels) that have not been filtered, settled, or similarly treated prior to discharge, (or evidence thereof)  YES  NO Sediment laden runoff that has not been filtered or settled to remove sediments prior to discharge  YES  NO Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters.  YES  NO Inlets and catch basins with failing sediment controls due to improper installation, lack of maintenance, or inadequate design  YES  NO Sediment deposition on any property (including public and private streets) outside of the construction activity covered by the general permit  YES  NO Required stabilization (initiated or completed on portions of the site?)  YES  NO Sediment basins/traps without adequate wet or dry storage volume  YES  NO Sediment basins where the riser appears to be leaking, water appears to be leaving the basin around the barrel pipe (rather than through it), or  YES  NO the dewatering device appears to be dewatering basin from below the water surface Sediment traps that allow stormwater to discharge from below the surface of the wet storage portion of the trap  YES  NO Land disturbance outside of the approved limits of disturbance  YES  NO Inspect the pollution prevention controls associated with the pollutant generating activities identified in the Pollution Prevention Plan Inspect the pollution prevention controls associated with the pollution generating activities identified in Table 8.1 of the SWPPP Have the controls been properly implemented as outlined on the PPP sheet? Are controls effectively minimizing pollutant discharges? Describe any maintenance needs or other deficiencies that were identified and the location of the deficiencies Clearing, grading or excavating  N/A  YES  NO  YES  NO Paving operations  N/A  YES  NO  YES  NO Concrete washout and concrete waste disposal  N/A  YES  NO  YES  NO Structure construction, stucco, painting or cleaning  N/A  YES  NO  YES  NO Dewatering operations  N/A  YES  NO  YES  NO Material delivery and storage  N/A  YES  NO  YES  NO Material use during building process  N/A  YES  NO  YES  NO Solid waste disposal  N/A  YES  NO  YES  NO Sanitary waste disposal (porta-johns)  N/A  YES  NO  YES  NO Landscaping operations  N/A  YES  NO  YES  NO Vehicle Fueling or Maintenance  N/A  YES  NO  YES  NO Other (describe)  YES  NO  YES  NO Other (describe)  YES  NO  YES  NO Other (describe)  YES  NO  YES  NO Other (describe)  YES  NO  YES  NO Other (describe)  YES  NO  YES  NO Identify the material(s) and document the location or presence of any evidence of pollutant discharges that are not authorized by the general permit Identify the location(s) where any additional control measures are needed that did not exist at the time of the inspection List the corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance Document any corrective action(s) required from a previous inspection that have not been implemented “I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” Signature: _____________________________ Date: ________________ Name: _____________________________ Title: ________________ (must be either the Operator or Delegated Authority, not necessarily the person who conducted the inspection) SECTION 13 CORRECTIVE ACTIONS In accordance with Part II F.4 of the General VPDES Permit for Discharges of Stormwater from Construction, documentation of any corrective actions taken shall be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. In accordance with Part II G of the General VPDES Permit for Discharges of Stormwater from Construction Activities The operator shall implement the corrective action(s) identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts. The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. CORRECTIVE ACTION LOG Correction Action Date Description of Corrective Action _________ ________________________________ Responsible Party _______________________________________ "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." ______________________________________________________ Operator or Delegated Authority Signature SECTION 14 SWPPP TERMINATION In accordance with Part I F of the General VPDES Permit for Discharges of Stormwater from Construction Activities: The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met: a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long term responsibility and maintenance requirements shall be recorded in the local land records prior to the submission of a notice of termination; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained; or d. For residential construction only, temporary soil stabilization has been completed and the residence has been transferred to the homeowner. The notice of termination should be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection are met. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice of termination, whichever occurs first. The notice of termination shall be signed in accordance with Part III K of the general permit. PERMANENT STORMWATER MANAGEMENT FACILITIES INSTALLED (information will need to reflect data requirements of online permitting system) Stormwater Management Facility (Designation/Type) N/A Location Isle of Wight County 6th Order Hydrolo gic Unit Code JL45 and JL46 Waterbody the SWM Facility discharges to: N/A Drainage Area Served _________________ acres Impervious Area Served _________________ acres Managed Turf Area Served _________________ acres SECTION 15 CONSTRUCTION GENERAL PERMIT REGISTRATION STATEMENT SECTION 16 CONSTRUCTION GENERAL PERMIT NOTICE OF COVERAGE SECTION 17 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES SECTION 18 CONSTRUCTION GENERAL PERMIT TERMINATION SECTION 19 CONSTRUCTION GENERAL PERMIT TRANSFER POLLUTION PREVENTION PLAN INTRODUCTION This Stormwater Pollution Prevention Plan (SWPPP) has been developed as a requirement of the General VPDES Permit for Discharges of Stormwater from Construction Activities (GCP), as defined in 9VAC25-880. The purpose of this SWPPP is to: 1) Identify potential sources of pollution that may reasonably be expected to affect the quality of storm water discharges from the construction site, and 2) To describe and ensure the implementation of practices that will be used to reduce pollutants in stormwater discharges from the construction site and to assure compliance with the conditions of the Permit. Implementation of the components of this SWPPP is required as a condition of the GCP. The GCP has a fixed term of 5 years from the effective date of July 1, 2014 and permit coverage is required for all VSMP land-disturbing activities. The GCP authorizes the discharge of stormwater from construction activities until the expiration date. The GCP also authorizes the discharge of stormwater from offsite support activities, provided that certain conditions are met as outlined in Part I A. 2 of the GCP. Certain non-stormwater discharges are also authorized and are described in Part I E of the GCP. The SWPPP must be prepared, updated and amended, implemented as written, made available to the public according to the requirements of the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). PURPOSE  4VAC50-60-54 of the Virginia Stormwater Management Program (VSMP) Permit Regulations requires that Stormwater Pollution Prevention Plan (SWPPP) be developed for all regulated land disturbing activities. The SWPPP must include, but not be limited to, an approved erosion and sediment control plan, an approved stormwater management plan, and this Pollution Prevention Plan (PPP) for regulated land disturbing activities, and a description of any additional control measures necessary to address a TMDL as applicable. The plan for implementing pollution prevention measures during construction activities developed on this sheet must be implemented and updated as necessary. Any PPP requirements not included on this sheet must be incorporated into the SWPPP required by 4VAC50-60-54 that must be developed before land disturbance commences. This PPP identifies potential sources of pollutants that may reasonable be expected to affect the quality stormwater discharges from the construction site (both on- and off-site activities) and describes control measures that will be used to minimize pollutants in stormwater discharges from the construction site. OTHER REFERENCED PLANS  SWPPP requirements may be fulfilled by incorporating, by reference, other plans. All plans incorporated by reference become enforceable under the VSMP Permit Regulations and General Permit VAR10 for Discharges of Stormwater from Construction Activities. If a plan incorporated by reference does not contain all of the required elements of the PPP, the operator must develop the missing elements and include them in the SWPPP. Independent Plans Incorporated by Reference Date Approved Stormwater Management Plans (Regional or Master) N/A Spill Prevention, Control, and Countermeasure Plans N/A Off-Site Stockpile N/A Off-Site Borrow Area N/A POTENTIAL POLLUTANT SOURCES The following sources of potential pollutants must be addressed in the Pollution Prevention Plan. Various controls and/or measures designed to prevent and/or minimize pollutants in stormwater discharges from the project site must be applied to the sources found on the site. Additional information concerning the following controls and/or measures may be found in the SWPPP. Deviations from the location criteria may be approved by the County Environmental Inspector. LEAKS, SPILLS, AND OTHER RELEASES  The operator(s) shall ensure procedures are in place to prevent and respond to all leaks, spills and other releases of pollutants.  The operator(s) shall ensure all leaks, spills and other releases of pollutant are contained and cleaned immediately upon discovery. Any contaminated materials are to be disposed in accordance with federal, state, and/or local requirements.  The operator(s) shall ensure spill containment kits containing appropriate materials (e.g., absorbent material and pads, brooms, gloves, sand, etc.) are available at appropriate locations, including, but not limited to: designated areas for vehicle and equipment maintenance; vehicle and equipment fueling; storage and disposal of construction materials, products, and waste; and storage and disposal of hazardous and toxic materials; and sanitary waste facilities.  The locations of the spill containment kits are identified as described below: Date Shown on Plan Sheet #(s) Location Approved Plan N/A MOBILE REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location Operator(s) Initials  The operator(s) shall notify the Department of Environmental Quality of leaks, spills, and other releases that discharge to or have the potential to discharge to surface waters immediately upon discovery of the discharge but in no case later than 24 after the discovery.  The operator(s) shall notify the Department of Environmental Quality (DEQ) of leaks, spills, and other releases that discharge to or have the potential to discharge to surface waters immediately upon discovery of the discharge but in no case later than 24 after the discovery. Written notice of the discharge must be sent to DEQ and Hanover County Department of Public Works within five (5) days of the discovery. VA Department of Environmental Quality 5636 Southern Boulevard Virginia Beach, VA 22362 (757) 518-2000 (phone) (757) 518-2009 (fax) (800) 468-8892 (outside normal working hours) Isle of Wight County General Services Department P. O. Box 80 Isle of Wight County, VA 23397 (757) 365-6388 (phone) EQUIPMENT / VEHICLE WASHING   Washing must be conducted in a dedicated area that is located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.  All wash water used in vehicle wheel washing must be directed to a sediment basin/trap.  All vehicle washing activities other than wheel washing must have secondary containment.  Each facility must have appropriate signage to inform users where the dedicated area(s) are located. Activity Location of Dedicated Area(s) Shown on Plan Sheet #(s) Water Source Location Wheel Wash Construction Entrance C-3 Portable Tank Other Wash Areas N/A REVISIONS TO LOCATIONS Activity Location of Dedicated Area(s) Shown on Plan Sheet #(s) Water Source Location Operator’s Initials VEHICLE FUELING AND MAINTENANCE   Conduct regular maintenance in a dedicated area that is located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.  If fueling is conducted at a dedicated area, the location must be located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.  The dedicated areas must be designed to eliminate the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities by providing secondary containment (spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available).  Each facility must have appropriate signage to inform users where the dedicated area(s) are located. Date Shown on Plan Sheet #(s) Location of Dedicated Area(s) Approved Plan N/A REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location of Dedicated Area(s) Operator’s Initials  If mobile fueling will be used, the fueling must be done in an area that located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.  Spill kits must be readily available at all mobile fueling locations.  On-site storage tanks must have a means of secondary containment (spill berms, decks, spill containment pallets, etc.) and must be covered where appropriate.  All vehicles on site must be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. DISCHARGE FROM STORAGE, HANDLING, AND DISPOSAL OF CONSTRUCTION PRODUCTS, MATERIALS, AND WASTE  Storage of construction products, materials, and waste is to be conducted in dedicated areas.  The dedicated area must be located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features. Separations of less than 50 feet may be approved by the Environmental Inspector.  The dedicated areas must be designed to minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete and other trash or building products..  Each facility must have appropriate signage to inform users where the dedicated area(s) are located. Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for storage of construction products and materials Approved Plan N/A REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for storage of construction products and materials Operator(s) Initials  Follow all federal, state, and local requirements that apply to the use, handling and disposal of pesticides, herbicides, and fertilizers.  Keep chemicals on-site in small quantities and in closed, well marked containers.  Ensure that containers have lids or are otherwise protected from exposure to precipitation. Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for waste from construction products and materials Approved Plan N/A REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for waste from construction products and materials Operator(s) Initials  Follow all federal, state, and local requirements that apply to the use, handling and disposal of pesticides, herbicides, and fertilizers.  Clean up solid waste, including building materials, garbage, and debris on a daily basis and deposit into covered dumpsters that are periodically emptied.  Schedule waste collection to prevent exceeding the capacity of onsite containers. Additional containers may be necessary depending on the phase of construction (e.g., demolition, etc.)  Dispose of all solid waste at an authorized disposal site. DISCHARGES FROM OTHER POTENTIAL POLLUTANT SOURCES  Discharges from other pollutant sources (e.g., water line flushing, storm sewer flushing, above ground storage tanks, etc.) not mentioned elsewhere must be addressed. Other Potential Pollutant Sources Location(s) of Potential Pollutant Sources  Above ground oil storage tanks with a storage capacity exceeding 1,320 gallons and have a reasonable expectation of a discharge into or upon Waters of the United States are required to have a Spill Prevention Control and Countermeasure (SPCC) Plan.  The discharge of contaminated flush water and material removed during flushing operations must be collected and disposed of in accordance with appropriate federal, state, and local requirements. DISCHARGES FROM CONCRETE RELATED WASH ACTIVITIES  Concrete trucks are not allowed to wash out or discharge surplus concrete or drum wash water on site except in a dedicated area(s) that is located to prevent discharge to storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.  Each facility must have a stabilized access to prevent mud tracking into the street.  Each facility must have appropriate signage to inform users where the dedicated area(s) are located. Date Shown on Plan Sheet #(s) Location of Dedicated Area(s) Approved Plan N/A REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location of Dedicated Area(s) Operator’s Initials  Facilities must be cleaned, or new facilities constructed, once the washout area is two-thirds (2/3) full. CONCRETE WASHOUT AREA NOTES  The facility must be lined with 10 mil plastic lining that is free from holes, tears, or other defects that might compromise the material’s impermeability.  The lining must be anchored with staples (2’ spacing) or sandbags.  Side slopes must be 1:1 (horizontal:vertical) or flatter.  Stone access must be provided between the street and the concrete washout area.  A “Concrete Washout” sign must be installed within 30 feet of the washout facility. The sign must be no smaller than 2’ tall by 4’ wide. DISCHARGES OF SOAPS, DETERGENTS, SOLVENTS, AND WASH WATER FROM CONSTRUCTION ACTIVITIES SUCH AS CLEANUP OF STUCCO, PAINT, FORM RELEASE OILS, AND CURING COMPOUNDS  Washing activities associated with construction activities other than vehicle and equipment washing, such as clean up of stucco, paint, form release oils, and curing compounds are to be conducted in a dedicated area.  The dedicated area must be located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features. Separations of less than 50 feet may be approved by the Environmental Inspector.  The dedicated areas must be designed to prevent the discharge of soaps, detergents, solvents, and wash water. Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) Approved Plan N/A REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) Operator(s) Initials  The dedicated area must be covered (e.g., plastic sheeting, temporary roof, etc.) to prevent contact with stormwater.  The contaminated wastewater from the dedicated area must be collected for disposal by a waste hauler or discharged to the sanitary sewer.  In situations where these pollutants are or could be generated at locations other than at the designated area (e.g., concrete pours, building washing, etc.), cover (e.g., plastic sheeting, temporary roof, etc.) must be provided to prevent contact with stormwater and the contaminated wastewater from the activity must be collected for disposal by a waste hauler or discharged to the sanitary sewer. DISCHARGES OF HAZARDOUS, TOXIC, AND SANITARY WASTE  Storage and disposal of hazardous, toxic and sanitary wastes are to be conducted in dedicated areas.  The dedicated areas must be located to maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features. Separations of less than 50 feet may be approved by the Environmental Inspector.  The dedicated areas must be designed to prevent the discharge of hazardous, toxic and sanitary waste by avoiding contact with precipitation  Each facility must have appropriate signage to inform users where the dedicated area(s) are located. Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for storage and disposal of hazardous and toxic wastes Approved Plan N/A REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for storage and disposal of hazardous and toxic wastes Operator(s) Initials  Consult with local waste management authorities or private firms about the requirements for disposing of hazardous materials and/or soils that may be contaminated with hazardous materials.  Never remove the original product label from the container. Follow the manufacturer’s recommended method of disposal. Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for portable toilets Approved Plan C-3 Near Construction Entrance REVISIONS TO LOCATIONS Date Shown on Plan Sheet #(s) Location(s) of Dedicated Area(s) for portable toilets Operator(s) Initials  Schedule periodic pumping of portable toilets and dispose of waste  Dispose of all solid waste at an authorized disposal site. SWPPP MODIFICATIONS AND REVISIONS The operator(s) shall ensure the SWPPP is modified and/or revised to reflect:  Changes in qualified personnel; delegated authorities or other personnel required as a condition of the General Construction Permit;  Changes in site conditions;  Changes in the design, construction, operation, or maintenance of the construction site that affect the potential for discharges of pollutants that are not addressed in the normal implementation of the plan; and  Ineffective control measures identified during inspections or investigations conducted by the operator’s qualified personnel or local, state or federal officials. Modifications/revisions to the SWPPP shall include additional or modified control measures to address the identified deficiencies. If the necessary modifications/revisions require approval by the Administrator or DEQ, the modifications/revisions must be implemented no later than seven (7) calendar days following approval. If the necessary modifications/revisions do not require approval by the Administrator, the modifications/revisions must be implemented prior to the next anticipated storm event or as soon as practicable. SWPPP UPDATES The operator(s) shall update the SWPPP to include:  A record of dates when 1) major grading activities occur, 2) construction activities temporarily or permanently cease on a portion of the site, and 3) stabilization measures are initiated;  Documentation of modifications and revisions to the SWPPP;  Areas that have reached final stabilization where no further SWPPP or inspection requirements apply;  All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; and  The date, volume, and corrective/preventative actions implemented for any prohibited discharge. The operator(s) shall update the SWPPP no later than seven (7) days following any of the situations identified above. OPERATOR INSPECTIONS The operator(s) identified below shall provide for inspections of the permitted land- disturbing activities by the qualified personnel identified below. The inspections will be conducted (select one the following options):  at least once every four (4) business days; or  at least once every five (5) business days and no later than 48 hours following any measurable storm event. Where areas are in a stabilized condition or runoff is unlikely due to winter conditions, the inspection frequency may be reduced to once every 30 days while these conditions exist. Otherwise, the operator(s) shall resume the regular inspection frequency identified above. The operator(s) shall provide for inspections of the permitted land-disturbing activity to ensure implementation and continued maintenance of all requirements of the Stormwater Pollution Prevention Plan (Erosion and Sediment Control Plan, Stormwater Management Plan, Pollution Prevention Plan, TMDL requirements, etc.). Records of the required inspections must be maintained and included in the SWPPP binder. The qualified personnel are encouraged to use the Operator Inspection form provided in the SWPPP binder to document the required inspections. If inspections are conducted once every five (5) business days and no later than 48 hours following any measureable storm event, the location of the rain gauge used to determine the amount of rain must be included in the SWPPP and documented in the inspection report. ACKNOWLEDGMENTS QUALIFIED PERSONNEL ACKNOWLEDGEMENTS I certify under penalty of law that I: a. have been designated by the Operator to conduct inspections of the permitted site; b. am knowledgeable in the principles and practices of erosion and sediment control and stormwater management; c. possess the skills to assess conditions at the permitted site for the Operator(s) that could impact stormwater quality and quantity; d. will assess the effectiveness of any erosion and sediment control measures or stormwater management facilities selected to control the stormwater discharges from the permitted site; and e. will conduct inspections in accordance with the frequency noted above in the OPERATOR INSPECTIONS. QUALIFIED PERSONNEL Name (print) Signature Company or Organization Address Phone Certificates / #s As the Operator(s), I/we understand that prior to initiating land disturbance, the potential pollutant sources, appropriate control measures, and all responsible parties (operator, qualified inspection personnel, contractors, etc.) required as a condition of the General Construction Permit (GCP) and the Stormwater Pollution Prevention Plan (SWPPP) must be identified. I also understand this information must be updated as necessary throughout all phases of construction until the GCP is terminated. Furthermore, I/we certify under penalty of law that I/we have read and understand all requirements of the SWPPP (erosion and sediment control plan, stormwater management plan, pollution prevention plan, TMDL provisions, administrative requirements, etc.) and GCP and that the information herein is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment for knowing violations. I/we understand that I/we are ultimately responsible for compliance with all conditions and requirements of the SWPPP and GCP and for ensuring all contractors and subcontractors on the permitted site are aware of the conditions and requirements of the SWPPP and GCP. I/we shall comply with all conditions and requirements of the SWPPP and shall at all times properly operate and maintain all measures and control (and related appurtenances) which are installed or used to achieve compliance with the conditions of the GCP. Proper operation and maintenance also includes adequate funding and adequate staffing. I/we shall take all reasonable steps to minimize or prevent any discharge in violation of the SWPPP and/or GCP. I/we understand that if it determined by the Department of Environmental Quality (DEQ) in consultation with the State Water Control Board at any time that stormwater discharges are causing, have reasonable potential to cause, or contribute to and excursion above any applicable water quality standard, the DEQ may, in consultation with the Administrator, take appropriate enforcement action and require: a. Modification of control measures to adequately address water quality concerns; b. Submission of valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards; or c. Cessation of discharges of pollutants from construction activity and submit an individual permit application according to 4VAC25-870-410. OPERATOR(S) Name (print) Signature Company or Organization Date