Loading...
Scope & Fee Proposal Contract & Agreement for Turner Drive Turning Lane Improvment - May 27, 2015 evk r ROUTING SLIP From: Jamie Oliver, Transportation Projects Manager Subject: Turner Drive Turn Lane(UPC# 103021) -Request to Increase Purchase Order Date: 7/1/2015 Request to increase Purchase Order (20150145-000) for A. Morton Thomas and Engineering Services (AMT) by $14,990. AMT is designing the Turner Drive Turn Lane. The sidewalk was intended to be included with the original project scope; however, due to time constraints was removed until preliminary drainage calculations were completed to ensure inclusion of the sidewalk would not require stormwater management features that would cause the project to exceed the budget. Turner Drive Turn Lane is a capital project and the overall design cost(including the additional$14,990 increase for the sidewalk)is within the $70,000 design budget (see below and the attached Munis report). PO # 20150145-000 DESIGN BUDGET Original Amount: $ 49,547 Total Budget: $ 70,000 Requested Increase Amount: $ 14,990 Minus PO Amount: $ 64,537 Total Amount(if Approved): $ 64,537 Remaining Budget: $ 5,463 Name Approval Initial Date Frank Haltom, Department Head Approved as to Content 70-/— 7//f Michael Terry, Director of Budget& Finance Verification of Funds '� l -)�5 Michael Coburn, Purchasing Coordinator Approved as to Procurement 7/Z//c N/A, Risk Coordinator Certification of Insurance Mark Popovich, County Attorney Approved as to Form �o�r Anne Seward, County Administrator Final Approval � 'j N/A, Clerk Attest • Certification of Funds: I (Dept. Head Signature / ) hereby certify that funds are available in the project expenditure account(31432010-531700). hy,\ iw AL y() '453 4t, rilt)�S Dir ctor of B dg and in 14c1 /-eith / CtP, f?ar"a • A.Morton Thomas and Associates,Inc. Consulting Engineers May 27, 2015 Jamie Oliver Project Manager Engineering Division County of Isle of Wight P.O. Box 80 County of Isle of Wight, VA 23397 Re: Scope and Fee Proposal Turner Drive Turning Lane Improvements—Addendum 1 (Sidewalk improvements) VDOT UPC 103021 Dear Ms. Oliver: A.MORTON THOMAS and Associates, Inc. (AMT) is pleased to provide the County of Isle of Wight this proposed addendum to provide engineering services for the design of sidewalk improvements as part of the design improvements to the intersection of Turner Drive and Benns Church Boulevard (Route 10). We are very excited to continue working on this important intersection improvements project. Please call me at 757-484-3930 or e-mail me at sstewart @amtengineering.com if you have any questions or require additional information. Sincerely, A. MORTON THOMAS and Associates, Inc. Stephen E. Stewart, PE, Associate Project Manager PHONE 757-484-3940 E-MAIL sstewart @amtengineering.com 1520 Breezeport Way, Suite 500, Suffolk, Virginia 23435 Scope and Fee Proposal—Addendum 1 (Sidewalk Improvements) May 27, 2015 Turner Drive Turning Lane Improvements SCOPE OF SERVICES Turner Drive Turning Lane Improvements Addendum 1 —Sidewalk Improvements County of Isle of Wight, Virginia VDOT UPC 103021 1.0 Scope of Services for Addendum 1 (Sidewalk Improvements) The project scope consists of the following: i. Topographic Survey of the sidewalk limits beginning at the proposed intersection improvements and terminating at Smithfield High School as shown in Exhibit 1. A subsurface investigation will not be provided but Miss Utility will mark underground utilities that will be surveyed as part of this project. ii. Upon completion of the survey, AMT will provide construction documents for the geometric design of a 5' sidewalk with a 2% cross slope. The approximate length of the sidewalk is 1390LF and alignment will be based upon the proposed roadway alignment and will not have an additional profile. The design will be consistent with Safe Routes to School (SRTS) guidelines and provide a grass buffer between the roadway pavement. As shown in Exhibit 1. If the topographic survey or other gathered information indicates that the improvements cannot be accomplished as specified, the scope of work and fee for this work will be revised. iii. Stormwater calculations and required measures will be modified to account for sidewalk improvements and will be consistent with original scope of open ditch without curb and gutter. iv. Cost estimate will be updated to account for sidewalk improvements. v. Design will accompany the deliverables for the intersection improvements and will be submitted at 60%, 90% and Final. 2.0 Excluded Services i. Preparation of plats, easements or additional right-of-way acquisition ii. Design of earth retaining structures iii. Design of pedestrian signal or modifications to the existing signal iv. Design or modification of downstream receiving waterways or channels v. Hydrologic studies outside of the limits of the sidewalk or intersection improvements vi. Geotechnical services. Sidewalk Section will be based upon HRPDC standard. vii. All services outlined in Section 5.0 (Exclusions) of previous constract. viii.Services resulting from significant changes in the general scope of the project or its design including, but not limited to, changes in size, complexity, or character of construction; and, revising previously accepted studies, reports, design documents, or contract documents when such revisions are due to causes beyond AMT's control. 6.0 Engineering Fee The above-listed services shall be performed for the lump sum fee $14,990.00 (Fourteen thousand, nine hundred and ninety dollars and zero cents.) See Attachment A Fee Proposal Estimate dated May 27, 2015 for detailed engineering fee schedule. 2 u .,EW01 .,1-„m 811,403 •LE ,v00, Exhibit 1 -Turner Drive (Addendum 1 -Sidewalk Improvements) ®® ® 5/27/2015 III ,o TURNER UPC 6 DRIVE 4 VDOT UPC 103021 STATE PROD.0644-046828 Pa•e 1 of 2 A,aa�•a; yr" ktts. r � r '.. &v..'�lemw -- — ^ D• Or$5' r 135.x'` SCALE 40 9V ._, 0 ss so' N 26'2'Y 25 t • • i i Q % I W i - - ' , (7 I] 0 jr W�a N N ® : $ i Y ', ., k, s f{ +(,)+ 4 a.) E � ' i ..,:2--.:,,,-:„,, g, a . } co N ~ aw LO '\. `\\\ o L n Q t ` N 0 c d tq - , „ '.. ,w, �, 11 e 1 t g t 1 '`, 1 ,. \t tit.� c N R' c '1y ''�.S; y , -;12.1 ,-t. , ,,I,..,,, ., ._, } :,,,,,..,;40.,,k,,,.. „1, , , , ...4,.,, '� r 2,hcam, 1 ' Attachment A-Fee Proposal Estimate Addendum-Turner Drive Sidewalk Improvements(VDOT UPC 103021) May 27,2015 1.Engineering and Survey Fee • Classification Principal Project Senior CADD Land 2 Man Manager Engineer Engineer Tech. Clerical Surveyor Survey Crew Total (Hours) (Hours) (Hours) (Hours) (Hours) (Hours) - (Hours) (Hours) (HRS) Rate $ 180.00 $ 150.00 $ 140.00 $ 120.00 $ 80.00 $ 65.00 $ 125.00 $ 140.00 60%Plan Development Kick-off Meeting with VDOT 2 2 Topographic Survey 2 12 12 26 E&S Plan Development 2 4 6 Layout Plan Development 2 4 6 Grading.Utility and Stormwater Plan Development 2 4 6 Specifications and Details Development 2 4 6 Project Management 2 2 Quality Control Review 2 2 4 Subtotal 2 16 0 0 16 0 12 12 34 Subtotal Task Fee $ 7,220.00 90%Plan Development E&S Plan Development 2 4 6 Layout Plan Development 2 4 6 Grading.Utility and Stormwater Plan Development 2 3 5 • Specifications and Details Development 2 2 2 6 Project Management 2 2 • Cost Estimate 2 4 6 Quality Control Review 2 2 4 Subtotal 2 14 4 0 13 2 0 0 35 Subtotal Task Fee $ 4,190.00 Final Plan Development E&S Plan Development 2 4 6 I Layout Plan Development 2 4 6 Grading,Utility and Stormwater Plan Development 2 4 6 • Specifications and Details Development 2 2 4 Project Management 2 2 Cost Estimate 2 2 Quality Control Review 2 2 4 Subtotal 2 14 0 0 14 0 0 0 30 Subtotal Task Fee $ 3,580.00 Total AMT Engineering Fee $ 14,990.00 I 2.Reimbursable Expenses Personal Auto Travel 0 Miles @ $ 0.56 /Mile S - Plan Printing and Reproduction $ - Total $ - Fee Summary 1.Engineering and Survey Fee $ 14,990.00 2.Reimbursable Expenses $ - I4Ial ; 14.990.0Q