Loading...
May 21, 2015 - Resolution of the Board of Supervisors of Isle of Wight County to approve priorities for the Virginia Department of Transportation's Secondary 6-year Improvement Program... A RESOLUTION OF THE BOARD OF SUPERVISORS OF ISLE OF WIGHT COUNTY TO APPROVE PRIORITIES FOR THE VIRGINIA DEPARTMENT OF TRANSPORTATION'S SECONDARY SIX-YEAR IMPROVEMENT PROGRAM FOR FY 2016 THROUGH FY 2021 WHEREAS, Sections 33.1-23 and 33.1-23.4 of the Code of Virginia (1950, as amended) provide the opportunity for each county to work with the Virginia Department of Transportation (VDOT) in developing a Secondary Six-Year Improvement Program (SSYIP); and, WHEREAS, this Board has held a public hearing on the proposed Plan (FY 2016-FY 2021), in accordance with VDOT policies and procedures, on May 21, 2015 and all citizens of the County had the opportunity to make comments and recommendations concerning the proposed Program and Priority List; and, WHEREAS, VDOT Local Program and Residency staff have reviewed and concurred with the proposed SSYIP (FY 2016-FY 2021) and the Construction Priority List. NOW, THEREFORE, BE IT RESOLVED that the Secondary Six-Year Improvement Program and Construction Priority List for FY 2016-2021 are hereby approved, as presented at the public hearing. BE IT FURTHER RESOLVED that Isle of Wight County requests that Rattlesnake Trail (Route 646, UPC 104809) be designated as a Revenue Sharing project with the opportunity to receive surplus Revenue Sharing funds which may become available from completed Revenue Sharing projects for the purpose of advancing construction. BE IT FURTHER RESOLVED that the County Administrator of Isle of Wight County, Virginia is authorized to execute all Program documents and make such accounting adjustments and execute such agreements and contracts as necessary to proceed with the Program as approved. Adopted this 21t day of May 2015. R . Alphin, airman alit LA ).19 411 Carey lls-Sto , Clerk Appr a ve' as t• Form: ark C. Po vich, County Attorney May 21,2015/jloNDOY SSYIP FY 16-21 resolution Secondary System Isle of Wight County Construction Program Estimated Allocations Fund FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 Total CTB Formula-Unpaved State $49,660 $60,624 $69,298 $74,685 $71,779 $0 $326,046 Secondary Unpaved Roads $0 $0 $0 $0 $0 $0 $0 TeleFee $84,605 $84,605 $84,605 $84,605 $84,605 $84,605 $507,630 Residue Parcels $0 $0 $0 $0 $0 $0 $0 STP Converted from IM $0 $0 $0 $0 $0 $0 $0 Federal STP-Bond Match $0 $0 $0 $0 $0 $0 $0 Formula STP $0 $0 $0 $0 $0 $0 $0 MG Formula $0 $0 $0 $0 $0 $0 $0 BR Formula $0 $0 $0 $0 $0 $0 $0 Other State Match $0 $0 $0 $0 $0 $0 $0 State Funds $0 $0 $0 $0 $0 $0 $0 Federal STP $0 $0 $0 $0 $0 $0 $0 Total $134,265 $145,229 $153,903 $159,290 $156,384 $84,605 $833,676 Board Approval Date: Joseph E.Lomax Residency Administrator Date Anne Seward County Administrator Date Page 1 of 1 District:Hampton Roads SECONDARY SYSTEM CONSTRUCTION PROGRAM (in dollars) County Isle of Wight County Board Approval Date 2016-17 through 2020-21 'Route -Road Name Estimated Cost Previous Additional PROJECTED FISCAL YEAR ALLOCATIONS Balance to Traffic Count PPMS ID Project# Funding Funding complete Scope of Work Accomplishment Description Required FHWA# Type of Funds FROM SS YP Funding 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Comments Type of Project TO Other Funding Priority S Length Ad Date Total Rt,0620 BROADWATER ROAD P' $405,145 1300 14994 0620046249 RW $237,618 $1,773,429 $0 $0 $0 $0 $0 $0 Reconstruction wlo Added Capacity RAAP CONTRACT RTE 620-RECONSTRUCTION CON $2,292,920 $1,573,891 $0 $0 $0 $0 $0 $0 14004 SW 0.031 Mt.W.INT.ROUTE 681 Total $2,935,683 $3,347,320 ($411,637) $0 $0 $0 $0 $0� $0 ($411,637) IProject complete,currently going MIN PLAN,FED- 0.061 MI.E.INT.ROUTE 637 through closeout proceediings.Eligible AID,SECONDARY surplus funds will be transferred to UPC 105469(Broadwater btw Strawberry Ln 0001.00 1.4 and S.Hampton Cty line). 12/13/2011 Rt.0620 Broadwater Road PE $481,500 105469 0620046650 RW $500,000 $171,778 $14,605 $80,890 $80,890 580.890 $80,890 $64,000 Reconstruction wyo Added Capacity RAAP CONTRACT Rte 620 Reconstruction- CON $2,228,500 $0 $0 $0 SO SO $0 $0 Broadwater Road 14004 Strawberry Plains(Route 681) Total $3,210,000 $171,778 $3,038,222 $14,605 $80,890 $80.890 $80.090 580,890 $64,000 $2,636,057 Anticipated to received eligible surplus Minimum Plan South Hampton County 5ne funds from UPCs 14994(Broadwater Road btw Rte 681 and Rte 637)and 0003.00 1.8 UPC 14991(W.Blackwater Road btw Rte 642-Pear Tree Rd and Rte 643- 2/11/2022 Wood Duck Dr) Rt.9999 PE $0 31665 999904661 RW $0 $174,925 50 50 SO 50 50 SO Environmental Only STATE RTE9999-BUDGETITEM CON $204,925 $30,000 50 50 $0 50 SO $0 FORCES/HIRED EQUIPMENT 16020 S DRAINAGE d SIDEWALK AT Total $204,925 $204,925 $0 50 50 50 $0 SO 50 SO WINDSOR BUDGET ITEMS YEARLY PROJECT FOR ISLE OF WIGHT 9999.01 Page odf 6 4/16/2010 R1.4002 PE $0 Route Road Name Estimated Cost Previous Additional PROJECTED FISCAL YEAR ALLOCATIONS Balance to Traffic Count PPMS ID Project# Funding Funding complete Scope of Work Accomplishment Description Required FHWA# Type of Funds FROM SSYP Funding 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Comments Type of Project TO Other Funding Priority 9 Length Ad Date Total - 0 -2892 1204002 RW $0 $45,099 $0 $0 $0 $0 $0 $0 COUNTYWIDE PIPE& CON 545.099 $0 $0 $0 $0 SO $0 $0 ENTRANCE VARIOUS LOCATIONS IN Total $0 $45,099 $0 $0 $0 SO SO Sol ad 50 COUNTY I INSTALLATION CHARGE FOR PIPES AT PRIVATE ENTRANCES AND OTHER MINOR DRAINAGE 9999.02 IMPROVEMENTS. Rt.4003 PE $0 0 99975 1204003 RW $0 $40,000 $20,000 50 50 so 50 $0 Reconstruction vro Added Capacity COUNTYWIDE RURAL CON $60 000 $0 Sii 50 SO si. 50 $0 ADDITIONS 16004 S VARIOUS LOCATIONS IN Total $60,000 $40,000 $20,000 $20.000 50 $0 00 50 $0 $0 COUNTY RURAL ADDITIONS-SECTION 33.1- VARIOUS LOCATIONS IN 72.1. ROLLOVER OF FUNDS CAN BE FOR FIVE YEARS. COUNTY 9999.03 3/1/2011 Rt.4005 PE $0 0 99976 1204005 RW $0 556,575 50 50 50 50 50 50 Preliminary Engineering COUNTYWIDE ENGINEERING& '<,N $56.575 50 00 S0 50 S0 50 50 SURVEY 16015 S VARIOUS LOCATIONS IN 550.575 556.575 50 50 50 50 50 50 $0 $0 COUNTY MINOR SURVEY&PRELIMINARY VARIOUS LOCATIONS IN ENGINEERING FOR BUDGET ITEMS AND INCIDENTAL TYPE WORK. COUNTY 9999.05 3/1/2011 Rt4006 PE $0 0 100245 1204006 RW $0 $30,058 50 50 50 50 $0 $0 Preliminary Engineering COUNTYWIDE FERTILIZATION& CON 530.058 $0 50 50 50 50 50 $0 SEEDING 16015 S VARIOUS LOCATIONS IN Total 530,058 530.058 50 So 50 $0 $0 $0 $0 $0 COUNTY FERTILIZATION AND SEEDING TO i� IMPROVE SLOPE STABILIZATION ON Page i aS7DUS LOCATIONS IN SECONDARY SYSTEM COUNTY Route Road Name Estimated Cost Previous Additional PROJECTED FISCAL YEAR ALLOCATIONS Balance to Traffic Count PPMS ID Project# Funding Funding complete Scope of Work Accomplishment Description Required FHWA# Type of Funds FROM SSYP Funding 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Comments Type of Project TO Other Funding Pnoriy# Length Ad Dale Total 9999.06 3/1/2011 RL4007 PE $35,465 0 99765 1204007 RW SO 547.933 $0 $3,715 $3,715 $3,715 $3,715 $20,605 Safety COUNTYWIDE TRAFFIC CON 547.933 <-o $0 $0 50 $0 $0 $0 SERVICES 16021 S VARIOUS LOCATIONS IN Total $83,398 547.933 $35.415 50 53.715 53.715 $3,715 53,715 $20,608 $0 COUNTY TRAFFIC SERVICES INCLUDE VARIOUS LOCATIONS IN SECONDARY SPEED ZONES,SPEED STUDIES,OTHER NEW SECONDARY COUNTY SIGNS 9999.07 3/1/2011 Rt.4008 1'E $0 0 100282 1204008 RW 71' $8,078 $0 $0 $0 50 $0 $0 Right of Way COUNTYWIDE RIGHT OF WAY CON $8,078 SO SO S0 $0 $0 SO $0 ENGR. 16016 S VARIOUS LOCATIONS IN Total $8.078 58.078 50 50 $0 $0 $0 SO $0 SO COUNTY USE WHEN IMPARTICAL TO OPEN A VARIOUS LOCATIONS IN PROJECT.ATTORNEY FEES and ACQUISITION COST. COUNTY 9999.08 1/30/2011 Rt.0683 Halltown Road PE $15,681 1976 0683046205 RW ... 04,592 SO $0 $0 $0 $0 SO Resurfacing NON VDOT RTE683-RECONSTRUCTION CON 5241.589 5279,364 50 50 S0 $0 $0 $0 16005 SS/REVSH ROUTE 681 Total $257 270 5283 956 1526/81,) 50 50 So $0 $0 Sd ($26,686) Project complete and currently going NO ROUTE 682 through doseout proceedings.The PLAN,SECONDARY project is funded by Revenue Share 9999.09 1.2 Funds and$4.592 of Telefees. Eligible surplus funds will be transferred to UPC 104809(Rattlesnake Trail). 10/16/2012 Rt.0647 POPE SWAMP TRAIL PE $23,841 8321 0647046P29 RW $0 515,036 50 50 50 50 $0 $0 Resurfacing NON VDOT Page'fA C o47-RURAL RUSTIC CON $240,930 $350,922 SO SO $0 SO SO $0 ■ Route Road Name Estimated Cost Previous Additional PROJECTED FISCAL YEAR ALLOCATIONS Balance to Traffic Count PPMS ID Project 8 Funding Funding complete Scope of Work Accomplishment Description Required FHWA ft Type of Funds FROM SSYP Funding 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Comments Type of Project TO Other Funding Priority 6 Length Ad Date Total ■ 16005 SS/REVSH ROUTE645 Total $264,771 $365,958 ($101,187) $0 $0 $0 $0 $0 $0 ($101,187) Project complete and currently going NO ROUTE 644 through closeout proceedings.The PLAN,SECONDARY project is funded by Unpaved road 9999.09 2.2 funds in the amount of$15,036 and Revenue Share Funds.Eligible surplus funds will be transferred to UPC 104809 (Rattle Snake Road). 10/16/2012 Rt.0637 Orbil Road PE $340,789 91168 0637046573 RW $373,718 $128,875 50 SO SO $0 SO $0 Bridge Replacement w/o Added RAAP CONTRACT Rte 637 Over Nuby Run VA str. CON $1,126.783 $1,648,182 SO SO SO $0 50 $0 Capacity 6045 16011 BROS 0.016 Ml.SOUTH OF NUBY RUN Total $1.841.200 $1,777,057 $64,233 SO 50 S0 SO SO $d $64,233 Accruing funds for CN Single Hearing 0.017 Ml.NORTH OF NUBY RUN 999909 10/8/2013 Rt.0671 Country Way PE $15,000 103052 0671046629 !-:cl $0 $161,478 10 SO So 50 50 $0 Resurfacing NON VDOT ROUTE 671-RURAL RUSTIC r'1N $146,478 $0 SO 50 50 50 $0 $0 SURFACE TREAT NON- HARDSURFACE ROAD 16005 S Rte.704 ., $161,478 $161,478 Ea $0 SO SO So SO 50 $0 No Plan Dead End 9999.10 0.5 9/5/2014 Rt.0667 Twin Hill Lane PE $15,000 103054 0667046630 RW $0 $138,522 50 So 50 50 50 SO Resurfacing NON VDOT ROUTE 667-RURAL RUSTIC CON $94,714 SO SO 5O 50 S0 50 50 SURFACE TREAT NON- HARDSURFACE ROAD 16005 S Rte.665 Total $109,714 $138,522 ($28,808) SO SO 50 50 SO 50 (528,808) No Plan Dead End 9999.10 0.3 9/5/2014 R10675 Page■Fplltteoint Way PE $34,000 Route Road Name Estimated Cost Previous Additional PROJECTED FISCAL YEAR ALLOCATIONS Balance to Traffic Count PPMS ID Project# Funding Funding complete Scope of Work Accomphshment Description Required FHWA# Type of Funds FROM SS VP Funding 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Comments Type of Project TO Other Funding Priority# Length Ad Date Total 103055 0675046631 RW $0 $340,000 SO $0 $0 SO $0 $0 Resurfacing NON VDOT ROUTE 675-RURAL RUSTIC CON $189.356 $0 $0 50 80 SO SO 50 SURFACE TREAT NON- HARDSURFACE ROAD 16005 S Rte.10 Total $223,356 $340,000 ($116,644) S0 $0 $0 $0 $0 $0 ($116,644) No Plan Dead End 9999.10 0.7 9/5/2014 Rt.2003 Poplar Dove PE $20,000 103056 2003046632 RW $0 $211,273 $0 $0 $0 $0 $0 $0 Resurfacing NON VDOT ROUTE 2003-Rural Addition CON $130,353 $0 $0 $0 $0 $0 $0 $0 Surface Treat Non-Hardsurface RD 16005 S Rte.2001 Woodmere Lane Total $150,353 $211,273 ($60,920) $0 $0 $0 SO SO 50 (560.920) No Plan Rte.2002 South Shore Drive 9999.10 0.4 9/5/2014 Rt.0716 YeNow Rock Lane PE 321.000 103057 0716046633 RW $0 $211,274 $0 SO $0 $0 SO SO NON VDOT ROUTE 0716-Rural Addition CON $177,752 $0 $0 SO $0 $0 SO 00 Surface Treat Non-Hardsurface RD xl5 S Rte.665 Smithneck Road Total $198,752 $211,274 ($12,522) S0 SO $0 SO SO $0 ($12,522) No Plan Hideaway Lane 9999.10 0.7 9/5/2014 •Rf.0646 Rattlesnake Trail PE $62,000 104809 0646046649 RW $0 $144,207 SO9.000 560.504 $69,298 $74,685 $71,779 So NON VDOT Rural Rustic Paving Project CON $844,818 $0 SO 00 50 SO S0 So 16005 S Town Dove(Route 637) Total $906,818 $144,207 $762,611 $99,600 $00.624 $60.298 $74.605 071.770 S0 $386,565 Minimum Plan Ramsey Road(Route 622) 9999.11 2.1 3/1/2019 Rt.0673 Page A9On Beach Road PE $68,000 Route Road Name Estimated Cost Previous Additional PROJECTED FISCAL YEAR ALLOCATIONS Balance to Traffic Count PPMS ID Project it Funding Funding complete Scope of Work Accomplishment Description Required FHWA 8 Type of Funds FROM SSYP Funding 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Comments Type of Projed TO Other Funding Priority Length Ad Date Total 104806 0673046653 RW SO $5,000 $0 $0 $0 SO $0 $0 Resurfacing NON VDOT Rural Rustic Project-Resurface CON $385.409 $453,409 SO 50 00 SO 50 $0 (Mogan Beach Road) 16005 Blounts Corner Road(Route 674) Total 5453.4n9 0458,409 ($5.000) $0 $0 50 SO $O 50 ($5,000) No Plan Fort Boykin Trail(Route 705) 9999.12 1.1 Page 6 of 6 Isle of Wight County Secondary Six-Year Improvement Program Construction Priority List FY 2016-2021 Secondary Paved Roads Priority Route UPC Road Name From/To Ad Date Cost Estimate 1 620 14994 Broadwater Rd Strawberry $3,365,375 Plains to Racetrack Rd 2 637 91168 Orbit Rd Bridge over $975,611 Great Swamp Branch 3 620 Broadwater Rd County Line to 08/11/2021 $3,210,000 Strawberry Plains 4 603 14991 W. Blackwater Rd Pear Tree Rd to $3,597,545 Wood Duck Dr Unpaved Roads Tr Priority Route UPC Road Name Length Ad Date Cost (miles) Estimate 1 671 103052 Country Way 0.3 07/01/2014 $150,000 2 667 103054 Twin Hill Ln 0.3 07/01/2014 $150,000 3 675 103055 Holly Point Way 0.7 07/01/2014 $340,000 4 2003 103056 Poplar Dr 0.4 07/01/2014 $200,000 5 716 103057 Yellow Rock Ln 0.6 07/01/2014 $210,000 6 673 13964 Morgart Beach Road 1.1 05/01/2016 $453,409 7 646 13878 Rattlesnake Trail 2.1 05/01/2020 $906,818