Loading...
2010-12-C (2) 7ln/ro AN ORDINANCE TO AMEND AND REENACT n THE ISLE OF WIGHT COUNTY CODE BY AMENDING AND REENACTING CHAPTER 4. BUILDINGS. ARTICLE III. INSPECTIONS. WHEREAS, the Isle of Wight County Board of Supervisors has determined that as part of its efforts to balance the local budget it must increase the fees imposed on building inspections; NOW THEREFORE, BE IT ORDAINED by the Isle of Wight County Board of Supervisors that Chapter 4. Buildings. Article III. Inspections. is hereby amended and reenacted as follows: CHAPTER 4. BUILDINGS. Article III. Inspections. Division 1. Fees Generally. Sec. 4-6. Existing buildings or structures. (a) Inspections will be provided by the building official of the county of existing buildings or structures to determine if same are in compliance with the requirements of the Uniform Statewide Building Code at the request of the owner thereof upon payment to the e•—•\ county of a fee of twenty-five dollars. (b) Issuance of certificates of compliance for existing elevators and associated equipment by the building official of the county at the request of the owner upon receipt of adequate proof of inspection in accordance with ASME Standards A17.2.1 and A17.2.2 and payment of a fee of twenty-five dollars. (9-5-74; 9-21-00.) Sec. 4-7. Uncertified mobile homes. There shall be a fee of one hundred dollars for the inspection of mobile homes manufactured after January 1, 1972, that do not bear the proper inspection seals as approved by the Virginia Industrialized Building Unit and Mobile Homes Safety Regulations, Article 5. The department of building inspections, upon request of the dealer, shall inspect and certify unlabeled mobile homes as reasonably safe to be used only in the county as directed by Article I, Section 103, of the Virginia Industrialized Building Unit and Mobile Homes Safety Regulations. (11-15-74.) Division 2. Fees When Building Permit Required. Sec. 4-7.1. Generally. On all buildings, structures, alterations or repairs requiring a building permit, including plumbing, electrical and mechanical installation, as defined in the Building Code, Plumbing Code, Electrical Code and Mechanical Code as adopted by the state and entitled the Uniform Statewide Building Code, fees shall be paid as required and in accordance with Sections 4-8 to 4-10.1. (5-3-79; 11-19-80; 6-16-88.) Sec. 4-7.2. Refunds. In the case of a revocation of a permit or abandonment or discontinuance of a building project, refunds of fees paid pursuant to Section 4-7.1 shall be paid for the portion of the work which was not completed, upon certification thereof by the building official and approval of the County Administrator. (2-16-89.) Sec. 4-8. Construction, repair or alteration of buildings or structures. (a) Minimum permit fee. The minimum building permit fee shall be fifty dollars. (b) Reinspection fee. The reinspection fee shall be one hundred twenty-five dollars. (c) Basic permit fee. (1) Usable area under roof, per building or structure (includes all new construction, finished or unfinished): For the construction of any building or addition thereto where floor area is increased, the fee shall be based on the floor area to be constructed, as computed from exterior building dimensions at each floor. a. All buildings of minimum construction types, for the first forty thousand square feet and under, sixteen cents per square foot; b. All buildings over forty thousand square feet, twelve cents per square foot. (2) All structures not under roof, ten cents per square foot of area or a minimum permit fee of thirty dollars,whichever is greater. (d) Demolition permit fee. The demolition permit fee shall be as follows: (1) Accessory buildings and structures, fifty dollars each; (2) All other buildings and structures, fifty dollars each. (e) Moving structures permit fee. The permit fee for moving structures shall be as follows: (1) Accessory buildings or structures, sixty-five dollars; (2) All other buildings and structures, seventy-five dollars. n (f) Industrialized building permit fee. The industrialized building permit fee shall be the same as the basic permit fee in subsection (c)(1) of this Section (excluding mobile homes). (g) Modular construction permit fee. The modular construction permit fee shall be same as the basic fee in subsection (c)(1)of this section. (h) Mobile home permit fees. The mobile home permit fee shall be as follows: (1) Mobile home and other mobile units permit fee, seventy-five dollars each. (i) Sign permit fees. Sign permit fees shall be sixty-five dollars per sign. (j) Tents and other temporary structures permit fee. The permit fee for tents and other temporary structures shall be sixty-five dollars each. (k) Chimneys, fireplaces, etc. The permit fee for chimneys, fireplaces, wood and coal stoves and other solid fuel burning heaters shall be fifty dollars. (NOTE: Fireplaces, heaters and chimneys shall be included in new construction permit fees only if so noted at the time of issuing the permit.) (I) Alterations to create finished space. The fee for alterations to shell buildings, unfinished tenant spaces, garages and attics to create finished space shall be twelve cents per n square foot. (m) Other structures. The fee for all other structures as defined in the Basic Building Code not included in the above fee schedule are as follows: (1) Piers -- $50.00; (2) Pools: a. Inground -- $125.00. b. Above ground -- $65.00. (3) Retaining wall as defined in the Building Code -- $75.00; (4) Towers -- $50.00. (n) Permit reissuance fee. Permits becoming invalid as specified by the Code may be reissued up to a period of five years and charged a fee of fifty dollars for each six months period thereof. A request for such reissuance shall be in writing and submitted prior to the permit becoming invalid. (o) Plans examination. (1) The fee for plans examination, other than residential and accessory structures, shall be two hundred fifty dollars. (2) A fee of one hundred fifty dollars shall be charged for the reviewing of residential plans prior to making application for a permit. This fee will be credited to the permit fee if the permit is applied for within six months. (p) Appeals. For each appeal to the Building Code board of appeals, the fee shall be four hundred fifty dollars. (1-10-74, §A; 5-3-79; 6-16-88; 12-16-04; 4-21-05.) For state law as to authority of county to levy permit Fees, see Code of Va., §36-105. Sec. 4-9. Installation of plumbing fixtures, etc. (a) Minimum permit fee. The minimum permit plumbing fee shall be fifty dollars. (b) Reinspection fee. The reinspection fee shall be one hundred twenty-five dollars (see Section 4-8(b)). Corrections shall be made and the reinspection fee paid before the reinspection is conducted. (c) Basic permit fee. The basic plumbing permit fee shall be as follows: ■-■ (1) Residential, fifty dollars per bathroom to include one-half baths; (2) Commercial, fifty dollars plus ten dollars per fixture. (d) Sewers, manholes, etc. The permit fee for sewers, storm and sanitary manholes, area drains or devices shall be twenty-five dollars each. (1-10-74, § B; 5-3-79; 6- 16-88; 12-16-04.) Sec. 4-10. Electrical services. (a) Minimum permit fee. The minimum electrical service permit fee shall be fifty dollars. (b) Reinspection fee. The reinspection fee shall be one hundred twenty-five dollars. (See Section 4-8(b)). (c) New service equipment permit fee. New service equipment permit fees shall be as follows (new construction fees based on total ampacity of service equipment and subpanels feeder overcurrent protection): 0—200 amps $75.00 201 —400 amps $75.00 n 401 —600 amps $100.00 601+ amps $100.00 +$20 per 50 amps above 600 (d) Relocation and service increases permit fee. The permit fee for relocations and service increases shall be as follows (additional work charged according to Subsection (i) of this Section): (1) Existing service panels only, fifty dollars each; (2) Meter only, fifty dollars each; (3) Service increases, fifty dollars. (e) Temporary service. The fee for temporary service (includes thirty-day power release prior to the issuance of a certificate of occupancy) shall be fifty dollars. (f) Reconnection fee. The reconnection fee shall be fifty dollars each (this does not include any electrical work within any structure). (g) Mobile home hookup. The fee for a mobile home hookup (excluding electrical service) shall be seventy-five dollars. For a mobile home hookup plus electrical service, the fee shall be based on the size of service. (h) Connections and outlets. The for fixed appliances and equipment connections and outlets to existing service (ranges, water heaters, dishwashers, disposals, furnaces dryers, baseboard units,exhaust fans, motors, air conditioning units, etc.) shall be fifty dollars. (i) Permit reissuance fee. The permit reissuance fee shall be the same as stated in Section 4-8(n). (1-10-74, § C; 5-3-79; 6-16-88; 12-16-04.) Sec. 4-10.1. Mechanical and gas fees. (a) Minimum permit fee. The minimum mechanical and gas permit fee shall be fifty dollars. (b) Reinspection fee. The reinspection fee shall be one hundred twenty-five dollars. (See Section 4-8(b)). (c) Basic permit fee. The basic mechanical and gas permit fee shall be as follows: (1) New construction: a. Up to one thousand dollars contract value, fifty dollars; b. Over one thousand dollars contract value, fifty dollars plus eight dollars per one thousand dollars or fraction thereof. (2) Equipment replacement, repair, etc. The permit fee for the replacement, repair or alteration of mechanical systems, or equipment in existing buildings, structures or additions thereof shall be as follows: a. Up to one thousand dollars contract value, fifty dollars; b. Over one thousand dollars contract value, fifty dollars plus eight dollars per one thousand dollars or fraction thereof. Exemptions: Domestic cooking equipment and space heaters in dwelling units are exempt from mechanical permit fees. Inspections of this equipment are required. (d) Fuel piping. The fuel piping permit fee shall be as follows: (I) Minimum permit fee, fifty dollars; (2) Each outlet,ten dollars. Note: This fee applies when a permit is issued for fuel piping work only. (e) L.P.G. tanks and piping. The permit fee for L.P.G. (i.e., butane, propane, etc.)tanks and associated piping shall be fifty dollars per tank. • '• (f) Tanks and piping for flammable liquids. Tanks and associated piping for flammable liquids shall be fifty dollars per tank. (g) Removal of fuel storage tanks. Removal of fuel storage tanks shall be the minimum fee; i.e., fifty dollars for each tank. (h) Fire suppression systems. The fire suppression system permit fee shall be as follows: (1) New construction, same as basic fee (subsection (c)(1) of this Section); (2) All others, same as basic fee (subsection(c)(2) of this Section). (i) Elevators, dumbwaiter, etc. The permit fee for elevators, dumbwaiters, moving stairways, moving walks, construction personnel hoists and conveying equipment shall be fifty dollars per unit. (j) Permit reissuance fee. The permit reissuance fee shall be the same as stated in Section 4-8(n). Amusement rides and devices. The permit fee for amusement rides and devices shall be as set forth in the then current edition of the Virginia Amusement Device Regulations adopted by the Virginia Board of Housing and Community Development. (6-16-88; 12-16-04.) NOW THEREFORE, BE IT FURTHER ORDAINED by the Isle of Wight County Board of Supervisors that the amendment and reeneactment of Chapter 4, Buildings, Article III, Inspections shall be effective as of July 1, 2010. Adopted this 15th day of July, 2010. ' - lip A. Bradshaw, Chairman Board of Supervisors Attest: _lam 'I Carey Mi s Storm, lerk Approved as to Form: aPa.,' A. Paul Burton Interim County Attorney