Loading...
2010-5-C Sh941a090 AN ORDINANCE TO AMEND AND REENACT THE ISLE OF WIGHT COUNTY CODE BY AMENDING AND REENACTING CHAPTER 14A. STORMWATER MANAGEMENT PROGRAM. ARTICLE II.DEFINITIONS. SECTION 14A-9.DEFINITIONS. WHEREAS, the Isle of Wight County Board of Supervisors has established a stormwater management program for Isle of Wight County, Virginia to protect properties, safeguard the general health, safety and welfare of the public residing in or near watersheds within this jurisdiction, and to protect aquatic resources; and, WHEREAS, the Isle of Wight County Board of Supervisors seeks to clarify its enforcement obligations with respect to the stormwater management program; NOW, THEREFORE, BE IT AND IT IS HEREBY ORDAINED by the Isle Of Wight County Board of Supervisors that Chapter 14A. Stormwater Management Program. Article II. Definitions. Section 14A-9. Definitions is hereby amended and reenacted as follows: Sec. 14A-9. Definitions. Unless specifically defined below, words or phrases used in this Chapter shall be interpreted so as to give them the meaning they have in common usage and to give this Chapter its most reasonable application. Accelerated Erosion means erosion caused by development activities that exceeds the natural processes by which the surface of the land is worn away by the action of water, wind, or chemical action. Act means Section 10.1-603.1 et seq. of the Code of Virginia(1950, as amended). Adequate Channel means a channel that will convey the designated frequency storm event without overtopping the channel bank nor causing erosive damage to the channel bed or banks. Applicant means any person submitting a stormwater management plan for approval. Aquatic Bench means a 10- to 15- foot wide bench around the perimeter of a permanent pool that ranges in depth from zero to 12 inches. Vegetated with emergent plants, the bench augments pollutant removal, provides habitats, conceals trash and water level fluctuations, and enhances safety. Average Land Cover Condition means a measure of the average amount of impervious surfaces within a watershed, assumed to be 16 %, or as may be otherwise determined pursuant to 4VAC 3-20-101. Best Management Practice (BMP) means a structural or nonstructural practice which is designed to minimize the impacts of development on surface and groundwater systems. Bioretention Basin means a water quality BMP engineered to filter the water quality volume through an engineered planting bed, consisting of a vegetated surface /`� layer (vegetation, mulch, ground cover), planting soil, and sand bed, and into the in-situ material. /-` Bioretention Filter means a bioretention basin with the addition of a sand filter collection pipe system beneath the planting bed. Board means the Virginia Board of Conservation and Recreation Building means any structure, either temporary or permanent, having walls and a roof, designed for the shelter of any person, animal, or property, and occupying more than 100 square feet of area. Channel means a natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water. Constructed Wetlands means areas intentionally designed and created to emulate the water quality improvement function of wetlands for the primary purpose of removing pollutants from stormwater. Dedication means the deliberate appropriation of property by its owner for general public use. Department means the Virginia Department of Conservation and Recreation. Detention means the temporary storage of storm runoff in a stormwater management practice with the goals of controlling peak discharge rates and providing gravity settling of pollutants. Detention Facility means a detention basin or alternative structure designed for the purpose of temporary storage of stream flow or surface runoff and gradual release of stored water at controlled rates. Developer means a person who undertakes land disturbance activities. Development means land development or land development project. Discharge means to dispose, deposit, spill, pour, inject, dump, leak or place by any means, or that which is disposed, deposited, spilled,poured, injected, dumped, leaked or placed by any means. Drainage Easement means a legal right granted by a landowner to a grantee allowing the use of private land for stormwater management purposes. Erosion and Sediment Control Plan means a plan that is designed to minimize the accelerated erosion and sediment runoff at a site during construction activities. Fee in Lieu means a payment of money in place of meeting all or part of the storm water performance standards required by this Chapter. Flooding means a volume of water that is too great to be confined within the banks or walls of the stream, water body or conveyance system and that overflows onto adjacent lands, causing or threatening damage. Grassed Swale means an earthen conveyance system which is broad and shallow with erosion resistant grasses and check dams, engineered to remove pollutants from stormwater runoff by filtration through grass and infiltration into the soil. Ground water refers to all subsurface water, including, but not limited to, that part within the zone of saturation. Hotspot means an area where land use or activities generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater. 2 Hydrologic Soil Group (HSG) means a Natural Resource Conservation Service classification system in which soils are categorized into four runoff potential groups. The groups range from A soils, with high permeability and little runoff production, to D soils, which have low permeability rates and produce much more runoff. Illicit Discharge means any discharge to the storm sewer system that is not composed entirely of stormwater, except discharges pursuant to a VPDES permit or discharges from firefighting activities. This definition shall not include discharges listed in Section 14A-30, unless such discharges are identified by the program administrator to cause sewage, industrial wastes or other wastes to be discharged into the storm sewer system. Impervious Cover means a surface composed of any material that significantly impedes or prevents natural infiltration of water into soil. Impervious surfaces include, but are not limited to, roofs, buildings, streets, parking areas, and any concrete, asphalt, or compacted gravel surface. Industrial Stormwater Permit means a National Pollutant Discharge Elimination System permit issued to a commercial industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies. Industrial Wastes are any liquid or other wastes resulting from any process of industry, manufacture, trade or business, or from the development of any natural resources. Infiltration means the process of percolating stormwater into the subsoil. Infiltration Facility means any structure or device designed to infiltrate retained water to the subsurface. These facilities may be above grade or below grade. Jurisdictional Wetland means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation. Land Development or Land Development Project means a manmade change to the land surface that potentially changes its runoff characteristics. Land Disturbance Activity means any activity which changes the volume or peak flow discharge rate of rainfall runoff from the land surface. This may include the grading, digging, cutting, scraping, or excavating of soil, placement of fill materials, paving, construction, substantial removal of vegetation, or any activity which bares soil or rock or involves the diversion or piping of any natural or man-made watercourse. Landowner means the legal or beneficial owner of land, including those holding the right to purchase or lease the land, or any other person holding proprietary rights in the land. Landscaping Chemicals are chemicals for maintaining lawns and landscapes including fertilizers, lime and pesticides which include herbicides, insecticides and fungicides. Linear Development Project means a land development project that is linear in nature such as, but not limited to, (i) the construction of electric and telephone utility /.\ lines, and natural gas pipelines; (ii) construction of tracks, rights-of-way, bridges, 3 communication facilities and other related structures of a railroad company; and (iii) highway construction projects. Local Stormwater Management Program or Local Program means a statement of the various methods adopted pursuant to the Act and implemented by a locality to manage the runoff from land development projects and shall include an ordinance with provisions to require the control of after-development stormwater runoff rate of flow, water quality, the proper maintenance of stormwater management facilities, and minimum administrative procedures consistent with this Chapter. Maintenance Agreement means a legally recorded document that acts as a property deed restriction, and which provides for long-term maintenance of storm water management practices. Nonpoint Source (NPS) Pollution means pollution from any source other than from any discernible, confined, and discrete conveyances, and shall include, but not be limited to, pollutants from agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources. Nonpoint Source Pollutant Runoff Load or Pollutant Discharge means the average amount of a particular pollutant measured in pounds per year, delivered in a diffuse manner by stormwater runoff Offset Fee means a monetary compensation paid to a local government for failure to meet pollutant load reduction targets. Off-Site Facility means a stormwater management measure located outside the subject property boundary described in the permit application for land development n activity. On-Site Facility means a stormwater management measure located within the subject property boundary described in the permit application for land development activity. Other Wastes are materials that can adversely affect waters of the United States should they be discharged into same, including, but not limited to, decayed wood, sawdust, chips, shavings, bark, leaves, lawn clippings, lawn chemicals (except those applied in accordance with manufacturer's recommendations), animal or vegetable matter, pet waste, construction debris, garbage, refuse, ashes, offal, tar, paint, solvents, petroleum products, gasoline, oil waste antifreeze, or other automotive, motor or equipment fluids. Owner means the owner or owners of the freehold of the premises or lesser estate therein, a mortgagee or vendee in possession, assignee of rents, receiver, executor, trustee, lessee or other person, firm or corporation in control of a property. Percent Impervious means the impervious area within the site divided by the area of the site multiplied by 100. Person means any individual, partnership, firm, association,joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, county, city, town or other political subdivision of the Commonwealth, any interstate body or any other legal entity. Planning Area means a designated portion of the parcel on which the land /•••■ development project is located. Planning areas shall be established by delineation on a 4 master plan. Once established, planning areas shall be applied consistently for all future projects. Post-development refers to conditions that reasonably may be expected or anticipated to exist after completion of the land development activity on a specific site or tract of land. Pre-development refers to the conditions that exist at the time that plans for the land development of a tract of land are approved by the plan approving authority. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time prior to the first item being approved or permitted shall establish pre-development conditions. Program Administrator refers to the County Administrator or his designee. Recharge means the replenishment of underground water reserves. Redevelopment means the process of developing land that is or has been previously developed. Regional (watershed-wide) Stormwater Management Facility or Regional Facility means a facility or series of facilities designed to control stormwater runoff from a specific watershed, although only portions of the watershed may experience development. Regional (watershed-wide) Stormwater Management Plan or Regional Plan means a document containing material describing how runoff from open space, existing development and future planned development areas within a watershed will be controlled by coordinated design and implementation of regional stormwater management facilities. Runoff or stormwater runoff means that portion of precipitation that is discharged across the land surface or through conveyances to one or more waterways. Sand Filter means a contained bed of sand which acts to filter the first flush of runoff. The runoff is then collected beneath the sand bed and conveyed to an adequate discharge point or infiltrated into the in-situ soils. Sanitary Sewer means a system of underground conduits that collect and deliver sanitary wastewater to a wastewater treatment or pumping facility. Sewage is the water-carried human wastes from residences, buildings industrial establishments or other places, together with such industrial wastes, stormwater or other wastes as may be present. Shallow Marsh means a zone within a stormwater extended detention facility that exists from the surface of the normal pool to a depth of six to 18 inches, and has a large surface area and, therefore requires a reliable source of baseflow, groundwater supply, or a sizeable drainage area to maintain the desired water surface elevations to support emergent vegetation Site means the parcel of land being developed, or a designated planning area in which he land development project is located State Waters means all waters on the surface and under the ground wholly or partially within or bordering the Commonwealth or within its jurisdiction. Stop Work Order means an order issued which requires that all construction activity on a site be stopped. 5 Storm Sewer System is the system of roads, streets, catch basins, curbs, gutters, ditches, pipes, lakes, ponds, channels, infiltration facilities, storm drains, and other facilities owned and/or operated by Isle of Wight County and located within Isle of Wight County which are designed or used for collecting, storing, or conveying stormwater, or through which stormwater is collected, stored, or conveyed. Stormwater means runoff from rain, snow or other forms of precipitation, and surface runoff and drainage. Stormwater Detention Basin or Detention Basin means a stormwater management facility which temporarily impounds runoff and discharges it through a hydraulic outlet structure to a downstream conveyance system. While a certain amount of outflow may also occur via infiltration through the surrounding soil, such amounts are negligible when compared to the outlet structure discharge rates and are, therefore, not considered in the facility's design. Since a detention facility impounds runoff only temporarily, it is normally dry during nonrainfall periods. Stormwater Extended Detention Basin or Extended Detention Basin means a stormwater management facility which temporarily impounds runoff and discharges it through a hydraulic structure over a period of time to a downstream conveyance system for the purpose of water quality enhancement or stream channel erosion control. While a certain amount of outflow may also occur via infiltration through the surrounding soil, such amounts are negligible when compared to the outlet structure discharge rates and, therefore, are not considered in the facility's design. Since an extended detention basin impounds runoff only, temporarily, it is normally dry during nonrainfall periods. Stormwater Extended Detention Basin-Enhanced or Extended Detention Basin- Enhanced means an extended detention basin modified to increase pollutant removal by providing a shallow marsh in the lower stage of the basin. Stormwater Management Facility means a device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow. Stormwater Management means the use of structural or non-structural practices that are designed to reduce storm water runoff pollutant loads, discharge volumes, and/or peak flow discharge rates. Stormwater Management Plan or Plan means a document containing material for describing how existing runoff characteristics will be affected by a land development project and methods for complying with the requirements of the local program or this Chapter. Stormwater Retention Basin I or Retention Basin I means a retention basin with the volume of the permanent pool equal to three times the water quality volume. Stormwater Retention Basin II or Retention Basin II means a retention basin with the volume of the permanent pool equal to four times the water quality volume. Stormwater Retention Basin III or Retention Basin III means a retention basin with the volume of the permanent pool equal to four times the water quality volume with the addition of an aquatic bench. Stormwater Retrofit means a stormwater management practice designed for an existing development site that previously had either no stormwater management practice 6 in place or a practice inadequate to meet the stormwater management requirements of the site. Stormwater Runoff means flow on the surface of the ground, resulting from precipitation. Stormwater Treatment Practices (STPs) means measures, either structural or nonstructural, that are determined to be the most effective, practical means of preventing or reducing point source or nonpoint source pollution inputs to stormwater runoff and water bodies. Subdivision, unless otherwise defined in a local ordinance adopted pursuant to Section 15.2-2240 of the Code of Virginia (1950, as amended), means the division of a parcel of land into three or more lots or parcels of less than five acres each for the purpose of transfer of ownership or building development, or, if a new street is involved in such division, any division of a parcel of land. The term includes resubdivision and, when appropriate to the context, shall relate to the process of subdividing or to the land subdivided. Town means an incorporated town. Vegetated Filter Strip means a densely vegetated section of land engineered to accept runoff as overland sheet flow from upstream development. It shall adopt any vegetated form, from grassy meadow to small forest. The vegetative cover facilitates pollutant removal through filtration, sediment deposition, infiltration and absorption, and is dedicated for that purpose. Water Quality Volume (WQV) means the volume equal to the first 1/2 inch of runoff multiplied by the impervious surface of the land development project. Watercourse means a permanent or intermittent stream or other body of water, either natural or man-made, which gathers or carries surface water. Watershed means a defined land area drained by a river, stream, drainage ways or system of connecting rivers, streams, or drainage ways such that all surface water within the area flows through a single outlet. Adopted this 24th day of March , 2010. • . Bradshaw, Chairman Board of Supervisors Attest: tint/12PD 01-6-Yrn Carey ills Storm, Clerk Approved as to Form: 4 A. Paul Burton County Attorney 7