Loading...
Compensation and Classification Study Contract & Agreement with Evergreen Solutions - September 2014 e l R o =.c1cb l RErch ISLE OF WIGHT COUNTY VIRGINIA. DEPARTMENT OF HUMAN RESOURCES CON CT ROUTING SLIP From: Mary Beth Johnson, SPHR Subject: Compensation and Classification Study Contract Date: September 9, 2014 Please review attached Compensation and Classification Study Contract between the County and Evergreen Solutions, LLC. Upon your review and approval, please email me to let me know that you have forwarded the attached contract to the next person in the approval chain below. Please return this routing slip along with the attached contract to my attention once all persons listed below have reviewed and signed off. Name Approval lAr D e I'?Mary Beth Johnson, Dept. Head Approved as to Content I 1 Michael Terry, Director of Budget and Finance Funds Available I S'I©1 19 , Risk Coordinator Certification of Insurance \ Michael Coburn, Project Manager (Purchasing) Approved as to Procurement iki Mark Popovich, County Attorney Approved as to Form Anne Seward, County Administrator Contract Execution !II l Carey Mills-Storm, Clerk Attest Certification of Funds: I, (Dept. Head Signatur 6•C7 fV 4$81-- Tereby certify that funds are available in account number I I n-+ '531'7b0 ( 1?ressWjtczi Sel kQ (please include Fund Number, Department, and Object Code). ftS' ,aO e AA A-iA,lnbk. Direct• of Budge an' Financ- P.O.Box 80 17140 Monument Circle Isle of Wight,VA 23397 (757)365-6266 www.co.isle-of-wight.va.us CONTRACT THIS AGREEMENT, made and entered into this, the day of , 2014, by and between Isle of Wight County, (hereafter referred to as"County"), party of the first part, and Evergreen Solutions, LLC, with an office located at 2852 Remington Green Circle, Suite 101, Tallahassee, Florida, (hereinafter referred to as"CONTRACTOR",party of the second part. The CONTRACTOR did on the 3rd day of December, 2013, submit a sealed proposal to perform the services stipulated in accordance with specifications and conditions entitled PAY AND CLASSIFICATION STUDY FOR CLARKE COUNTY, RFP# 13-1203, hereinafter referred to as "PROJECT",which by reference is made a part hereof. It is mutually understood and agreed by the parties hereto that the Request for Proposals inviting Offerors to submit as published; the Conditions of Contract; the Anti-collusion/Nondiscrimination/Drug Free Workplace Clauses; all of the proceedings by the governing body of Clarke County Public Schools, including the cooperative clause which allows for County to join,as pertaining to the subject matter of this Contract; and all of which documents are hereinafter referred to as Contract Documents and are a part of this Contract by reference the same as if each had been fully set out and attached hereto. In consideration of the following mutual agreements and covenants to be kept by each party: a. The CONTRACTOR agrees to furnish and pay for all labor,tools,equipment,machinery, supplies, facilities, superintendence, insurance, taxes, utilities and services necessary to perform all items set forth in Exhibit A hereto attached and made a part hereof in strict compliance with the Contract Documents for a sum of Thirty-Five Thousand Dollars ($35,000.00)(the"Contract Sum"),subject to adjustment as provided in said documents. b. Monthly payments for work completed under this contract shall be made in strict accordance with the project specifications and any special conditions attached thereto. c. It is understood and agreed that all work shall be accomplished in strict compliance with the provisions of the Contract Documents. It is understood and agreed by both the County and the CONTRACTOR that any modifications or additions to this agreement shall be made only by the full execution of the County's standard contract change order form. Furthermore, it is understood and agreed by both parties that any work done by the CONTRACTOR on any such modification or addition to this AGREEMENT prior to the County's execution of its standard Contract Change Order form shall be at the total risk of the CONTRACTOR and said work shall not be compensated by the County. d. CONTRACTOR agrees to begin the work within ten(10) days of Notice to Proceed and that final completion shall be within 120 calendar days of notice to proceed. (a) The parties agree that damages due to delay in completion of the work are uncertainty and not readily capable of ascertainment. Accordingly, if the CONTRACTOR shall fail to complete the work or any part thereof within the time stipulated, or an applicable extension thereof,the CONTRACTOR shall pay to the OWNER as fixed and agreed,liquidated damages for each calendar day of delay until the delayed work is corrected or accepted,an amount equivalent to Contract Sum divided by the total number of days until final completion per day of delay. The parties agree that this sum is proportionate to the probable loss and is not a penalty. The CONTRACTOR expressly waives any defense as to the validity of any liquidated damages stated in this Agreement as they may appear on the grounds that such liquidated damages arc void as penalties or are not reasonably related to actual damages. TN WITNESS WHEREOF, the parties hereto have executed and sealed this AGREEMENT as of the day and year first above written. ISLE OF WRIGHT COUNTY CONTRACTOR BY: _ BY: 1 II. Anne Seward County Administrator ATTEST: BY: .L L►_ • ! �7 SPZ,nrD County Ci APPROVED AS T BY: ► FORM / unty Atto y EXHIBIT A Task 1.0 TASK GOALS Project Initiation • Finalize the project plan with Isle of Wight County(County) • Gather all pertinent data. • Finalize any remaining contractual negotiations. • Establish an agreeable final time line for all project milestones and deliverables. TASK ACTIVITIES 1.1 Discuss with the County's Project Manager(CPM)the following objectives: • understand the County's mission and current compensation philosophy(if any); • review our proposed methodology,approach,and project work plan to identify any necessary revisions; • reach agreement on a schedule for the project including all assignments and project milestones/deliverables;and • establish an agreeable communication schedule. 1.2 Identify potential challenges and opportunities for the study. Discuss the strategic direction of the County and some of the short-and long-term priorities. This activity serves as the basis for assessing where the organization is going and what type of pay plan will reinforce current and future goals. 1.3 Obtain relevant materials,including: • any previous projects,research,evaluations,or other studies that may be relevant to this project; • organizational charts for departments and divisions,along with related responsibility descriptions; • current position and classification descriptions,salary schedule(s), and classification system; • strategic business plans and budgets;and • personnel policies and procedures. 1.4 Review and edit the project work plan and submit a schedule for the completion of each project task. Evergreen will provide updates to the CPM throughout the duration of the project. KEY PROJECT MILESTONES • Comprehensive project management plan • Comprehensive database of County employees • Status updates Task 2.0 TASK GOALS Collect and Review Current Environment • Conduct statistical and anecdotal research into the current environment Data within the County. • Guide subsequent analytical tasks. TASK ACTIVITIES 2.1 Schedule and conduct employee orientation sessions. 2.2 Meet with department heads/supervisors to obtain relevant information and statistical/anecdotal data on specific compensation issues and policies. Obtain insight into perceived current compensation system strengths and weaknesses. 2.3 Hold focus groups with a sample of employees to obtain additional relevant information and statistical/anecdotal data on specific compensation issues and policies. 2.4 Work with the CPM to administer the JATs and MITs. Our staff utilizes a web-based tool for data collection,but we can provide paper copies as well as those for classifications without computers or Internet access. We will seek approval from the CPM before distribution of the JAT/MIT questionnaire. 2.5 Review any data provided by the County that may provide additional relevant insight. 2.6 Review internal career ladders and make recommendations for new career ladders to keep positions competitive. KEY PROJECT MILESTONES • JAT and MIT distribution • Department head/supervisor interviews • Employee focus groups and orientation sessions Task 3.0 TASK GOAL Evaluate the Current System • Conduct a comprehensive preliminary evaluation of the County's existing compensation plan. TASK ACTIVITIES 3.1 Obtain the existing pay structure and compensation philosophy. Review the existing pay structure and look for potential problems to be resolved. 3.2 Determine the strengths and weaknesses of the current pay plan(s). 3.3 Complete an assessment of current conditions that details the pros and cons of the current system as well as highlights areas for potential improvement in the final adopted solution. KEY PROJECT MILESTONES • Review of existing compensation plan(s) • Assessment of current conditions Task 4.0 TASK GOAL Develop Compensation • Facilitate the development of the County's initial compensation Philosophy philosophy. TASK ACTIVITIES 4.1 Conduct a thorough review of all background materials related to the County's compensation system. 4.2 Review information from department head/supervisor interviews. 4.3 Document accepted initial compensation philosophy. KEY PROJECT MILESTONE • Compensation philosophy Task 5.0 TASK GOALS Evaluate and Build Projected • Identify the classification of existing positions utilizing Evergreen aassification Plan Solutions'job evaluation system. • Review JAT responses. • Characterize internal equity relationships within the County. TASK ACTIVITIES 5.1 Review all draft class specifications with the CPM. 5.2 Review the work performed by each classification and score.Review includes evaluation of supervisory comments. 5.3 Review JAT scores and identify the classification of positions. 5.4 Schedule and conduct additional follow up with employees for jobs where uncertainty exists over data obtained from the JATs. 5.5 Develop preliminary recommendations for the classification structure. The classification system designed at this point would be based solely on internal equity relationships and would be guided by the JAT scores for each classification. Essentially,a structure of classifications would be established,and classifications with similar scoring would be grouped into pay grades.Spacing between jobs would be determined,and each classification would be assigned to a pay grade. Final decision on the minimums and maximums of the pay grades would be determined after the market data has been collected. 5.6 Review recommendations with the CPM. KEY PROJECT MILESTONES • JAT scores by class • Recommended classification changes • Preliminary job structure based on internal equity Task 6.0 TASK GOAL Identify List of Market Survey Benchmarks • Reach an appropriate number and identify the proper benchmark positions for the external labor market assessment. TASK ACTIVITIES 6.1 Conduct a thorough review of all materials to date, including employee database, classification listing, interviews, compensation review,and meetings with the CPM. 6.2 Identify,from the initial review, a list of classifications(benchmarks)to include in the labor market survey. 6.3 Submit the proposed list of positions to the CPM for review. 6.4 Based on the CPM's review,make revisions to the benchmark list and • finalize consistent with Evergreen Solutions'analysis. KEY PROJECT MILESTONES • Preliminary list of benchmark classifications • Final list of benchmark positions for the external labor market assessment Task 7.0 TASK GOAL Identify Approved List of Survey Targets • Identify and develop a comprehensive list of targets for conducting a successful external labor market assessment. TASK ACTIVITIES 7.1 For each employee group, review with the CPM peer organizations that must be included in the survey. 7.2 Develop a preliminary list of organizations for the external labor market survey, placing a comparative emphasis on characteristics such as: • size of the organization; • geographic proximity to the Isle of Wight area; • economic and budget characteristics;and • other demographic data. 7.3 Develop a list of survey targets by employee. Develop a system for use of secondary data including potential sources and weighting of secondary data, if necessary. 7.4 Review survey methodology with the CPM and refine survey methodology prior to distribution of survey. 7.5 After approval of survey methodology,develop contact list of peer organizations and notify peers of impending survey. KEY PROJECT MILESTONES • Initial list of survey peers • Survey methodology • Final list of survey organizations and contacts Task 8.0 TASK GOALS Conduct Market Survey and Provide • Conduct the external labor market salary survey. External Assessment Summary • Provide a summary of the survey results to the CPM for review. TASK ACTIVITIES 8.1 Prepare a customized external labor market salary survey for the CPM's approval. Discuss questions and categories for the market survey. 8.2 Contact the targets for electronic completion of the survey. Provide paper copies by fax, if requested. 8.3 Conduct necessary follow-up through e-mails,faxes,and phone calls. 8.4 Collect and enter survey results into Evergreen Solutions' electronic data analysis tools. 8.5 Validate all data submitted. 8.6 Develop summary report of external labor market assessment results. 8/ Submit summary report of external labor market assessment results to the CPM. KEY PROJECT MILESTONES • Market survey instrument • Summary report of external labor market assessment results Task 9.0 TASK GOALS Develop Strategic Positioning • Assess the appropriateness of the County's current compensation Recommendations philosophy. • Plan for all employees,providing issue areas and preliminary recommendations for strategic improvement. TASK ACTIVITIES 9.1 Identify the final compensation philosophy and accompanying thresholds. 9.2 Using the market salary data collected in Task 8.0 and the classification data reviewed in Task 5.0,determine the proper pay plan including number of grades,steps,and ranges. 9.3 Identify highly competitive positions within the County and customize recommendations for compensation where required. 9.4 Produce a pay plan(s)that best meets the needs of the County from an internal equity and external equity standpoint. 9.5 Develop career paths when possible for each job family. 9.6 Recommend strategies for enhancing executive recruitment. KEY PROJECT MILESTONES • Proposed compensation strategic direction,taking into account internal and external equity • Plan for addressing unique, highly competitive positions • Executive recruitment strategies Task 10.0 TASK GOALS Conduct Solution Analysis • Conduct analysis comparing JAT values. • Survey results for the benchmark positions. • Produce several possible solutions for implementation. TASK ACTIVITIES 10.1 Conduct regression analysis or other appropriate techniques to properly slot each classification into the proposed pay plan. 10.2 Place all classifications into pay grades based on Task Activity 10.1.Sort alphabetically by job class title, in descending order by range,and by old class title and new class specifications. 10.3 Create implementation solutions for consideration that take into account the current position of the organization as well as the findings from the classification and compensation analysis. Identify and prepare a range of compensation policy alternatives. 10.4 Meet with the CPM to discuss the potential solutions. 10.5 Determine the best solution to meet the County's needs in the short-term and long-term. 10.6 Document the accepted solution. KEY PROJECT MILESTONES • Initial regression analysis • • Potential solutions • Documented final solution Task 11.0 TASK GOALS Develop and Submit Draft and Final • Develop and submit a draft and final report of the Pay and Classification Reports and Deliver a Study to Isle of Wight County. Presentation • Deliver a presentation of the final report TASK ACTIVITIES 11.1 Produce a comprehensive draft report that captures the results of each previous step. 11.2 Submit the comprehensive draft report to the CPM for review and approval. 11.3 Make edits and submit necessary copies of the final report which will describe the classification and pay plan and will recommend implementation procedures as well as procedures for the continuing maintenance and administration of the plan. 11.4 Deliver a presentation of the final report to the County. 11.5 Provide recommendations for communicating study results to employees. 11.6 Develop implementation plan to communicate the process and progress of this project to the CPM. 11.7 Develop a plan for maintaining recommendations over time. KEY PROJECT MILESTONES • Draft and final reports • Final presentation • Communication plan • Implementation and maintenance manual Task 12.0 TASK GOAL Develop Recommendations for • Develop recommendations for the continued administration by County Compensation staff to sustain the recommended compensation and classification Administration structure. TASK ACI1VITIES 12.1 Develop recommendations and guidelines for the continued administration and maintenance of the classification and compensation structure, including recommendations and guidelines related to: • how employees will move through the pay structure/system as a result of transfers,promotions,or demotions; • how to pay employees whose base pay has reached the maximum of their pay range or value of their position; • the proper mix of pay; • how often to adjust pay scales and survey the market; • the timing of implementation;and • how to keep the system fair and competitive over time. 12.2 Recommend recruitment/retention strategies,where appropriate. 12.3 Present recommendations to the CPM for review. KEY PROJECT MILESTONES • Recommendations for compensation administration • Recommendations for recruitment/retention policies Task 13.0 TASK GOALS Provide Revised Class Descriptions • Assist the County in reviewing and updating existing class descriptions. and FLSA Determinations • Create new class descriptions as needed,ensuring FLSA and ADA compliance. • Provide final version of all class descriptions/specifications in electronic format(i.e.,MS Word). TASK ACT VMES 13.1 Assess current class descriptions for form,content,validity,and FLSA and ADA compliance. 13.2 Discuss new class description format with the CPM. 13.3 Revise classification descriptions based on data gathered from the JAT process. 13.4 Create new class descriptions for new classifications, as needed. Provide complete listing of the allocation of job classes to salary range assignments. 13.5 Verify that job descriptions meet federal requirements pursuant to FLSA and ADA. 13.6 Recommend a systematic,regular process for reviewing job descriptions. KEY PROJECT MILESTONES • Updated class descriptions • New class descriptions,as needed Prowsed Cost Our total, not-to-exceed,fixed cost to complete all tasks identified above in our detailed work plan is$35,000. This cost is all inclusive,and includes travel costs(meals and lodging),transportation,fringe benefits,indirect cost(overhead),clerical support, and all other out-of-pocket expenses.This cost also includes two separate trips to the County to complete the requested work. Any additional onsite meetings would be billed at$2,000 each in order to cover our expenses.The following is our preferred invoicing schedule: 25%-upon completion of Task 1 of the detailed work plan 25%-upon completion of Tasks 2- 5 of the detailed work plan 25%-upon completion of Tasks 6 - 8 of the detailed work plan 25%-upon completion of Tasks 9 - 13 of the detailed work plan