10-22-24 (#24-012) CUP-5-24 Ordinance Sycamore Cross SolarORDINANCE NUMBER
AN ORDINANCE TO ISSUE CONDITIONAL USE PERMIT CUP-5-2d TO ESTABLISH
A MAJOR UTILITY SERVICE, SPECIFICALLY A SIX %1W UTILITY -~CALF. SOLAR
ENERGY GENERATION FACILITY, ON APPROXIMATELY 240 ACRES WITH TAX
PARCEL NUMBERS 10-01-017, 1 E-01.015, 10-01-023, 10-01-025, 10-01-027, 10-01-028A,
10-01-030. AND Il-Ili-005 LOCATED ON JONES DRIVE (RTE. 6261, BURWELLS BAY
ROAD (RTE. 621). MILL SWAMP ROAD (RTE. 621 h ANII JANIES WILSON WAY iti
THE RURAL AGRICULTURAL CONSERVATION iN ZONING DISTRICT
WHERFAS. Sytaniore Cross Solar I.I.C. applicant, hat requested the issuance of a condmonal use perrim
for a Certain portion Or all of the property with tax parcel numbers 10-01.017. 11 d01-0t5. 10-01-023. 10-01.025. 10
1)1 027. 10-01.029A. 10.01.030. and 11-01-005 for a six MW utility stale solar energy generation facility which
land .s depicted ton Ethihit "A-: and
WHFRI•..\S the procedural requirement: of Appendix B Zoning Ordinance, tif the C ode of Isle of V1 ight
Couniy. Virginia. 2005 ta; amended). have been ftillowed; and.
WHERFAS. in acting upon thus request. the Planning C'ornmkmon anti Board of Supertisors have
con,I+�ered the ntalters enunciated in Scction 15 2.2 28.1 of the Code rib Virgnlia t 1951h. a. amended and Setuoon I
1017 ill' the Isle of Wight County -!_caning Ordinance wtlh respect to the purpose; ;fated in Code of Virginia t 1950)
a, an ended. Section 14 2 22W ant! 15.2 2293: and.
WHEREAS. the Plariiiing Commi.uoa ha, blade .i reunun.rntlallOn cal' dental of tilt apphtanun at Ihert
N1ay 18. 2024, regular n Bering
NOW. THEREFORE. BE IT ORDAINED by the isle of Wight Count,, Board of Supervisor% of Isle of
Wight County. Virgin that
Section I. Exhibit;
Exhibit "A" ' Properis Map', and F-Olibit " B" Conditions which are anaclactl hereto are herehy
Incorporated .is part cal this ordinance
Scction 2 Fmdirws
the Board of Supennors finds that the proposal for a t.unditi0tl31 use permit {CUP-5-241 and the
,Auhdra%tal of enrolled land nt the Momilight Agricultural and I-ore;tal Dwritt as submitted or modtfied
xtith conditoat; herein, the expressed purpose of which is to permit a major utility setvite. spctifically a SIX
MW uuht}-.tale solar energy generation fatility, is in tonfurntity with the standards of the Isle of Wight
County Zoning Ordinance and +hat it will have no more adverse elicits on the healih safety or comfort of
person, living or working in or driving through the neighborhood and w ill be mi more injurious to property
or iniprmetnents in the neighborhood than would any other use gerlerallN. petmtned in the same district
taking into con;tderatrtrn the location type and height of buildings or SHULture,, the type and extent of
land.tapiug anti <creenrng on site and whellier the use is cmiskiew with ans theme. act tun, polity nr map
of the Cumprehenso e Plan a ith the tonditum< set forth below
These finding: are based upon the uun,idcrstion for the existing use and character of the property, the
C'omprehensitc Plan. the sutiahility of the property lot- oarioui uses, the trends of growth or change. flit
current and future requirement-, of the taamnuoity as to land fur various purpo.cs as (ieternttned by
population and economic studies and Other .tuehes, the transportation requirements of the community. the
requiremems. of airportw, housing, schools, parks. pla)giountls, recreation areas and other public w'.1cei
the cow�ervaiion Of natural rt;tiuiccs, the preservation floodplains the preservation Of- agricultural and
lioresial land. the conser,tation of properties anti their values, and the encouragement of the most
,Ipprtupti.tte ki,se o: land Ihrotightatt the County
Thee findings are based upoit a detetnttsiatitns That Ilic most rcasonablc awl Ili med w,i), of avottling Itic
adver,c iizspacis of a maptr utility sen•ice is by the imposition of the conditions pros ided herein.
Section ? Permit Granted
The conditional use pci-tim kir die property he. and i, hereby approved for the prnperty, ;uhject to the
attached vondttions in l'thibit "B" and the "neral condition; set lorth in Section a hereof. The conditional
use permit rpreifically allow, for a ,it MW major utility ;emits solar energy gencration fJUlit\ in
compliance a ith the Cuunt•v 7ontne fhdinance
Section 4. Severahility
It is the intents+m of the Board of Super,isors that the proi.i swns. section,, paragraphs sentence:. clauses
and phra,cs of thi, ordmam c are sever.ible; and it any phrase. Oduse. xiiience. paragraph, %cc(ion, and
pnwnuot of this ordinance herehy adopted shall be declared unconstitutional or ullrenvise illvand by the
valid Judgt lem or decrs:e of a cow( of conspetent Jsrrs,thctuur_ such uncunslitutionalrty or invalidtIN shall
nol atiecl an, of the remaining phrase. Claud',. ?taitCnce,. paragraphs. SectionS and pro+iSiort, of shts
Ordinance. a+ the extent that they can he cnforced not,t,ithstandrrig such determination
SCLIk+rt 5. EffectiNe Date
The, ordinance Shall he eOwive upon passage aisd shall out he published or codificti The condrtlon,rl use
authoriml by this permit shall be implememed within iwo (2) years from that dme ill' apprm at bi, the
Hoare! ,+I Supervisors and shall terrimixe if nut initiated m,11hin that timc period.
Thts ordinance ,hall he of fecisve upon passage and :hall not tie published or eodified
1)1Tl:. Z
i
RFAD AND P,\SSED:
/jC'hairm:us. B nr_l o Su �tsor.
TI:STL:
Clerk. Board of Supersssors
Approved as to Form.,
1
dRobert W. lone., Jr. Cuu r mmic '
F
X
W
sea
Exhibit B
CUP-S-24
SYCAMORE CROSS B CONDITIONS OF APPROVAL
1. Topsoil shall be stockpiled on the site and shall be stored out of view from adjacent
properties and public roads.
2. The Applicant shall submit an invasive species management plan as
recommended by DCR with the submission of the final site plan.
3. No impacts shall be permitted to the Pouches Swamp stream conservation unit
area.- The Applicant shall comply with Virginia Department of Conservation and
Recreation ("DCR") recommendations regarding the C1-C3 ecological core areas
and shall coordinate with Virginia Department of Forestry on efforts to mitigate
impact to the priority forestland areas.
4. The Applicant shall submit a seed mix for site groundcover that includes native
pollinators blooming in spring/summer as recommended by DCR.
5. The Applicant will work directly with the Isle of Wight County Chamber of
Commerce, Paul D. Camp Community College, and the Economic Development
Department to ensure inclusion of local contractors in the bidding process.
6. A laminated Emergency Response Poster will be mounted near the front gate. The
poster will include a general site plan, evacuation routes and muster points,
emergency response chain of command, directions to the closest hospital,
coordinates to the closest life flight landing area, and other pertinent information
associated with the facility during an emergency response.
7. The facility perimeter fencing will be equipped with gates to permit emergency exits
from the facility_subject to compliance with applicable requirements, including
those of the National Electric Code and the North American Electric Reliability
Corporation.
8. Adherence to the approved transportation plan shall be required for all facility traffic
during construction of the facility. Oversized vehicle traffic shall be limited only to
the approved route as described in in the transportation plan. The Applicant shall
coordinate with the Isle of Wight County school administration on school bus
pickup and drop-off times and locations for incorporation into the transportation
plan.
9. Excluding the bufferyards, the ground between the panels and in areas not
otherwise covered by gravel or infrastructure shall be planted and maintained
with a vegetative cover. This vegetative cover will be managed with mowing
and/or grazing.
10. Hours of operation for construction (including construction associated with repairs
during operation of the facility) shall be limited to Monday through Friday, 7:00 a.m.
to 6:00 p.m. and Saturdays from 7:00 a.m. to 5:00 p.m., except in cases of
emergency._Except in cases of emergency, no construction is to occur on Sundays
by any party involved with the Project. In the event of any emergency event
necessitating divergence from the foregoing hours and days of operation, the
Applicant shall notify the zoning administrator as soon as reasonably possible.
11. As part of the site plan review, the Applicant shall provide documentation that the
selected panels on -site are "Tier 1" modules, as established by the most recent
"PV Module Tier 1 List" issued by Bloomberg NE1= or a similar third -party analysis
widely accepted in the solar industry. Additionally, the make and model of the
selected panels and all power -generating equipment initially installed and replaced
on the site must qualify, for disposal purposes only, as non -hazardous waste under
applicable U.S. Environmental Protection Agency tests (e.g. TCLP).
12. The Applicant shall implement a program for the collection of baseline data
establishing pre -construction soil conditions for the production of row crops for the
agricultural areas within the Project area. The program shall establish the relevant
characteristics of the topsoil. The baseline data shall be derived from field and
laboratory testing of soil conditions, including depth, density, and quality from
representative locations. Laboratory testing shall be conducted by an accredited
laboratory. Parameters for assessing soil quality may include the following:
infiltration rate, bulk density, water holding capacity, pH, percent organic matter,
cation exchange capacity, Phosphorous/ Phosphate (P), Nitrogen (N), and
Potassium/Potash (K). After 30 years of operation and again after 35 years of
operation, soil conditions shall be determined for the same sampling locations
using the same parameters and the results used to plan soil restoration activities.
After equipment is removed as part of decommissioning, soil conditions shall be
determined for the same sampling locations using the same parameters. Soil
restoration activities shall be performed as necessary during operations or
decommissioning to return soil conditions to substantially similar or better condition
as in the baseline conditions. The County will be provided with data of soil
conditions within 30 days after the receipt of results.
13. Any recommendations provided by VDHR during site plan review will be adhered
to, in addition to requirements in the zoning ordinance.
14. The Property shall be developed in general conformance with the submitted
conceptual plan prepared by AES and dated December 12, 2023.
15. During the Project life, the Applicant shall preserve and maintain existing and
newly installed buffer landscaping and shall not clear cut live trees within
required setbacks or buffer zones except as necessary for access roads, utility
crossings, and to avoid shading of solar panels per the approval of the Zoning
Administrator.
16. The Applicant shall submit a combined Stormwater Management Plan and a
combined Erosion and Sediment Control Plan for Sycamore Cross A and
Sycamore Cross B with the submission of the site plan for review by the Virginia
Stormwater Management Program authority having jurisdiction at the time of
submission.
17. The Applicant shall submit a combined Unanticipated Discovery Plan for
Sycamore Cross A and Sycamore Cross B prior to final site plan approval. The
plan shall include emergency protection protocols, curation processing of cultural
materials, disposition of cultural materials, and a contact list including an on -call
archaeologist, Project contacts, and state/regional contacts.
18. Applicant will coordinate with landowners and the Zoning Administrator to install
enhanced landscape buffers in proximity to occupied residential properties as
needed to mitigate potential viewshed impacts.
19. TheApplicant shall submit an initial combined Transportation Plan, as referenced
in Condition 8 of Staff Recommended Conditions, for Sycamore Cross A and
Sycamore Cross B with the first submission of the site plan. The final
Transportation Plan shall address traffic control measures, an evaluation of the
condition of the public roads along delivery routes prior to construction, and a
plan to address repairs to public roads that may be needed due to damages
attributable to Project construction. The Applicant shall obtain Isle of Wight
County approval of the final Transportation Plan prior to approval of the site plan.
Additionally, the Transportation Plan shall include each of the following:
i. Third party enforcement of the approved transportation plan.
ii. Prior to the start of construction, reinforcement of shoulders,
clearing of roadside drainage ways, and road improvement where
permissible through coordination with the applicable Virgina
Department of Transportation (VDOT) office.
iii. Limit construction traffic on White Hill Trail (State Route623).
iv. Upon commencement of construction, Applicant will engage a
Project Liaison to facilitate communication between citizens,
construction crews, maintenance teams, and the Applicant. The
contact information for the Project Liaison will be posted at each
permanent site gate, published on the Project's website, and
provided to Isle of Wight County Staff. A Project Liaison will remain
in place until completion of construction.
v. A detailed description of what types of vehicles and activities are
subject to the Transportation Plan and a definition of "material non-
compliance" with the Transportation Plan.
vi. Penalties for material non-compliance with the Transportation Plan
in accordance with the following:
a) First Violation: A written warning may be issued to the Applicant.
b) Second Violation: A monetary penalty of $10,000 maybe
imposed.
c) Third Violation: Amonetary penalty of $20,000 may be imposed.
d) Subsequent Violations: For each subsequent violation, a
monetary penalty of $50,000 may be imposed.
e) In no event shall monetary penalties assessed under the
Transportation Plan exceed a total of $500,000, however, nothing
contained herein shall preclude the Zoning Administrator from
enforcement of the conditions of the permit in accordance with the
Zoning Ordinance.
20. The Applicant will commit to agricultural uses on site, including, but not limited to,
sheep grazing and forage crops. The Applicant will develop and submit as part of
the site plan review process a Farming Plan for such agricultural uses on site,
which will require a performance bond to secure Applicant's obligations under the
Farming Plan.
21. The Applicant will commit at least eight (8) acres of land to agricultural community
support. The Applicant will develop a program to manage the land identified for
agricultural community support.
22. Pursuant to Va. Code 15.2-2209.1:2, the Applicant must commence construction
of the Project within three years from the date of approval of this Conditional Use
Permit, unless otherwise extended by the Board of Supervisors or applicable law.
23. This Conditional Use Permit, including these conditions, shall run with the land and
shall not be affected by a change in ownership of the Applicant or the Project.
EXHIBIT A-1
TAX PARCELS
CUP-8-23: Isle of Wight County Tax Parcels 09-01-001, 16-01-002, 16-01-002A, 16-01-003,
16-01-005. 16-01-008, 16-01-009, l 7-01-003, 17-01-003C, 17-01-001, 17-01-002, 17-01-01 1,
27-01-003, and 27-01-004
CUP-5-24: Isle of Wight County Tax Parcels 10-01-017, l 1-01-015, 10-01-023, 10-01-025, 10-
01-027, 10-01-028A, 10-01-030, and i l -01-005
Solar Facility Siting Agreement
262200004 12)68297v2
26220/4004 12176169v1