10-22-24(#24-011) CUP-8-23 Ordinance Sycamore Cross SolarORDINANCE NUa1BEFZtG 1 �__
AN ORDINANCE TO ISSUE CONDITIONAL. USE PER,IMIT CUP-8-23 TO ESTABLISH
A SIAJOR UTILITY SERVICF„ SPECIFICALLY A 214 %IW UTILITY -SCALE SOLAR
ENERGY GENERATION FACILITY, ON APPROXI,MATEIA 1,795 ACRES LOCATED
ON Slush. SWAMP ROAD {RTF. 6211 WITH TAX PARCEL NUMBERS 09-01-001, 16-01-
002, 16-01-002A, 1"1-003, 16-01d105- 16-01-1108, 16-01-009, 17-01-W3, 17-01-003C, 17-01-
001, 17-01-002, 17-01-011, 27-014103, AND 27-01.004 IN THE RURAL AGRICULTURAL
CONSERVATION ZONING DISTRICT AND TO WITHDRAW APPROXIMATELY 860
ACRES THAT ARE PART OF TAX PARCEL NUMBERS 09-01-001, 16.01.003. 16.01.008.
16-01-009, 17-01-003C, 27-01-003 AND 17-01.011 FROM THE 1IOONLIGHT
AGRICULTURAL AND FORESTAL DISTRICT
WHEREAS. Sycamore Cross Sklar. M.C..rpplicant has requested the issuance of a conditional use: permit
for a certain portion ur all of the property with tar parcel number► 09-01-001, 16-01-002, 16-01 002A, 16-01 003.
16-01-005- t6-01-008. 16-01.009. 17•01-W1. 17-01.003C 17-01 001, 17.01-002, 17-01.011, 27-01-W3, and 27-
01-t111.1 fora 21-1 MW utility Scale solar energy generr(tun iaLility which land is depicted tin Exhibit "A": and,
WHEREAS. the applicant has aho requested the Ailhklrasaa1 of 960 airei on par( of tat snap parcels 09-01-
001 16-01-003. 16.01.008. 16-01.009 17-01 (K)iC 27-01.003 and 17-01-011 from the Moonliglu Agricultural and
Furesial District. which .and is also depicted on Exhibit 'A", and.
WHEREAS, the pnuedural requirements of Appendtr B Zoning Ordinance, of the Code of lsle of Wight
County Virginia 2001 as amendedl. hate been followed, and.
WHEREAS, in acliug upon this request, the Planning C-urnmresioa and Board of Supervisors have
considered the matters enunciated in Section 15-2-2294 of the Code of Virginia 119501, as amended. and Section I-
101 7 of the isle of Wight County Loring Ordinance with respect to the purposes stated in Code ul Virginia ( 1950).
a. amended. Section 15.2-22(K) and 15.2 2283: and.
WHEREAS. (lie Planning Commission has made a recommendation of denial of the application at their
May 28, 2024. regular meeting:
NOW, THEREFORE. BE IT ORDAINIED by (he Isle of Wight County Board of Supervisors of Isle of
Wight County, Virginia. that:
Section 1. Exhibits
Exhibit "A." "Property Nlap• . anti Exhibit •'B" Conditions which are attached hereto. are hereby
incorporated as part of this ordinance.
Section 2. Findings.
The Hoard of Supervisors finds that the proposal for a conditional use permit (CUP-8-23) and the
withdrawal of enrolled land in the Moonlight Agricultural and Forestal District. as submitted or modified
with conditions herein, the expressed purpose of which is to permit a major utility service, specifically a
21-1 MW utility -scale solar energy generation facility. is in conformity with the mandards of the Isle of
Wight County Zoning Ordinance, and that it will have no more advert effect. on the health, safety or
comfort of petsuns lining or working in tit driving through cite neighborhood, and will be no more iujurious
to propeny or improvements in the neighborhood than would any other use generally permitled in the saute
district• taking, into consideration the Location, type and height of building; or structures. the type and extent
Rif landscaping and screening (in site and whether the use is consistent with any theme, action, policy or
map of the Comprehensive Plan with the conditions set forth below.
These findings are based upon the consideration for llte existing use and character of the properly. the
Comprehensive Plan- the suilahili(y of the property for Various uses. the trends of growth or change. the
current and future requirements of the community as. to laud for various purposes a; determined by
population and economic studies and other studies, the Iramportanon reyuiremenls of the commuiity, the
requiren+ents nl airports, housing, schools, parks., playgrounds, recreation area, and other public services.
the con -;creation of natural resources, the preservation f1vodplams, the preservation of agricultural and
forestal land. the conservation of properties and their values, and the encouragen►eiu of the most
appropriate use of land tho-ughoui the County
These findings are haled urx+ll a delerminatlon chat the most reasonable and llniiled Way Of aViliding the
adverse unpacl, of .i major utility servit e is by the i-ripo,nton of the urnditions provided herein.
Scciion 3 Permit Granted.
']'he conditional use permit for the prupeny be. Mill is. hereby appro►ed for lite property subJcu u) the
allached conditions in Exhibit " B" and the general conditions .set forth In Section 4 hereof The conditional
use permit spet-dwally allows for a 214 MW nl,tjur utility Servuc solar energy generation facility Itt
con►pliance m ith the Couniv Ionia,-, Otdnlance
Section -1 Severabiltt
11 is the Intemitin of the Board of Supersisors chat the provision,, seltiWlK, paragraphC, ;eweiwes. clauses,
and phrase, of this ordinance are seserahle_ and if any phrase. clause ,enteiue. paragraph, section, and
provision it( this ordinance hereby adopted shall be declared uncousututiunal or ntherwisc invalid by the
valid Judgement or decree of a court of u+mpctenl Jurisdiction, such unconstitutionality or invalidity shall
not affect any of the remaining phrase clauses, senlences, paragraphs. sections. and provisiuns of this
ordinance. it, the extent That they can be enforced notwlthslandinr such determination.
Section 5 Fflc.ctne Date
This ordinance shall be eflectrce upon passage mid shall not he published or cochtieti The coudlu011,11 use
aulhorized by this permit shalt be implemented within Ikko f21 years from that date of approval by the
Huard of Supervisors and shall terminate if not initiated within that time penod
This ordinance shall he effective upon passage tuid shall not he published or eudified
I
READ AND PASSED,
Ahaiirnman, Bo rd of Supe %hors
W LIC
T6• STE:
Clerk. Board o1 Supervisors
\pp as t rt
. d
Robert W June+ Jr, CoAtf Attorney
+f r^WS,
ri
�S
ti. t M1s %
J y/tS i
h d
' �{y '+'k � �r •o-
; tv Y . i
Exhibit B
CUP-S-23
SYCAMORE CROSS A CONDITIONS OF APPROVAL
1. Topsoil shall be stockpiled on the site and shall be stored out of view from adjacent
properties and public roads.
2. The Applicant shall submit an invasive species management plan as
recommended by DCR with the submission of the final site plan.
3. No impacts shall be permitted to the Pouches Swamp stream conservation unit
area: The Applicant shall comply with Virginia Department of Conservation and
Recreation ("DCR") recommendations regarding the C1-C3 ecological core areas
and shall coordinate with Virginia Department of Forestry on efforts to mitigate
impact to the priority forestland areas.
4. The Applicant shall submit a seed mix for site groundcover that includes native
pollinators blooming in spring/summer as recommended by DCR.
5. The Applicant will work directly with the Isle of Wight County Chamber of
Commerce, Paul D. Camp Community College, and the Economic Development
Department to ensure inclusion of local contractors in the bidding process.
6. A laminated Emergency Response Poster will be mounted near the front gate. The
poster will include a general site plan, evacuation routes and muster points,
emergency response chain of command, directions to the closest hospital,
coordinates to the closest life flight landing area, and other pertinent information
associated with the facility during an emergency response.
7. The facility perimeter fencing will be equipped with gates to permit emergency exits
from the facility_subject to compliance with applicable requirements, including
those of the National Electric Code and the North American Electric Reliability
Corporation.
8. Adherence to the approved transportation plan shall be required for all facility traffic
during construction of the facility. Oversized vehicle traffic shall be limited only to
the approved route as described in in the transportation plan. The Applicant shall
coordinate with the Isle of Wight County school administration on school bus
pickup and drop-off times and locations for incorporation into the transportation
plan.
9. Excluding the bufferyards, the ground between the panels and in areas not
otherwise covered by gravel or infrastructure shall be planted and maintained
with a vegetative cover. This vegetative cover will be managed with mowing
and/or grazing.
10. Hours of operation for construction (including construction associated with repairs
during operation of the facility) shall be limited to Monday through Friday, 7:00 a.m.
to 6:00 p.m. and Saturdays from 7:00 a.m. to 5:00 p.m., except in cases of
emergency._Except in cases of emergency, no construction is to occur on Sundays
by any party involved with the Project. In the event of any emergency event
necessitating divergence from the foregoing hours and days of operation, the
Applicant shall notify the zoning administrator as soon as reasonably possible.
11. As part of the site plan review, the Applicant shall provide documentation that the
selected panels on -site are "Tier 1" modules, as established by the most recent
"PV Module Tier 1 List" issued by Bloomberg NEF or a similar third -party analysis
widely accepted in the solar industry. Additionally, the make and model of the
selected panels and all power -generating equipment initially installed and replaced
on the site must qualify, for disposal purposes only, as non -hazardous waste under
applicable U.S. Environmental Protection Agency tests (e.g. TCLP).
12. The Applicant shall implement a program for the collection of baseline data
establishing pre -construction soil conditions for the production of row crops for the
agricultural areas within the Project area. The program shall establish the relevant
characteristics of the topsoil. The baseline data shall be derived from field and
laboratory testing of soil conditions, including depth, density, and quality from
representative locations. Laboratory testing shall be conducted by an accredited
laboratory. Parameters for assessing soil quality may include the following:
infiltration rate, bulk density, water holding capacity, pH, percent organic matter,
cation exchange capacity, Phosphorous/ Phosphate (P), Nitrogen (N), and
Potassium/Potash (K). After 30 years of operation and again after 35 years of
operation, soil conditions shall be determined for the same sampling locations
using the same parameters and the results used to plan soil restoration activities.
After equipment is removed as part of decommissioning, soil conditions shall be
determined for the same sampling locations using the same parameters. Soil
restoration activities shall be performed as necessary during operations or
decommissioning to return soil conditions to substantially similar or better condition
as in the baseline conditions. The County will be provided with data of soil
conditions within 30 days after the receipt of results.
13. Any recommendations provided by VDHR during site plan review will be adhered
to, in addition to requirements in the zoning ordinance.
14. The Property shall be developed in general conformance with the submitted
conceptual plan prepared by AES and dated December 12, 2023.
15. During the Project life, the Applicant shall preserve and maintain existing and
newly installed buffer landscaping and shall not clear cut live trees within
required setbacks or buffer zones except as necessary for access roads, utility
crossings, and to avoid shading of solar panels per the approval of the Zoning
Administrator.
16. The Applicant shall submit a combined Stormwater Management Plan and a
combined Erosion and Sediment Control Plan for Sycamore Cross A and
Sycamore Cross B with the submission of the site plan for review by the Virginia
Stormwater Management Program authority having jurisdiction at the time of
submission.
17. The Applicant shall submit a combined Unanticipated Discovery Plan for
Sycamore Cross A and Sycamore Cross B prior to final site plan approval. The
plan shall include emergency protection protocols, curation processing of cultural
materials, disposition of cultural materials, and a contact list including an on -call
archaeologist, Project contacts, and state/regional contacts.
18. Applicant will coordinate with landowners and the Zoning Administrator to install
enhanced landscape buffers in proximity to occupied residential properties as
needed to mitigate potential viewshed impacts.
19. TheApplicant shall submit an initial combined Transportation Plan, as referenced
in Condition 8 of Staff Recommended Conditions, for Sycamore Cross A and
Sycamore Cross B with the first submission of the site plan. The final
Transportation Plan shall address traffic control measures, an evaluation of the
condition of the public roads along delivery routes prior to construction, and a
plan to address repairs to public roads that may be needed due to damages
attributable to Project construction. The Applicant shall obtain Isle of Wight
County approval of the final Transportation Plan prior to approval of the site plan.
Additionally, the Transportation Plan shall include each of the following:
i. Third party enforcement of the approved transportation plan.
ii. Prior to the start of construction, reinforcement of shoulders,
clearing of roadside drainage ways, and road improvement where
permissible through coordination with the applicable Virgina
Department of Transportation (VDOT) office.
iii. Limit construction traffic on White Hill Trail (State Route623).
iv. Upon commencement of construction, Applicant will engage a
Project Liaison to facilitate communication between citizens,
construction crews, maintenance teams, and the Applicant. The
contact information for the Project Liaison will be posted at each
permanent site gate, published on the Project's website, and
provided to Isle of Wight County Staff. A Project Liaison will remain
in place until completion of construction.
v. A detailed description of what types of vehicles and activities are
subject to the Transportation Plan and a definition of "material non-
compliance" with the Transportation Plan.
vi. Penalties for material non-compliance with the Transportation Plan
in accordance with the following:
a) First Violation: A written warning may be issued to the Applicant.
b) Second Violation: A monetary penalty of $10,000 maybe
imposed.
c) Third Violation: Amonetary penalty of $20,000 may be imposed.
d) Subsequent Violations: For each subsequent violation, a
monetary penalty of $50,000 may be imposed.
e) In no event shall monetary penalties assessed under the
Transportation Plan exceed a total of $500,000, however, nothing
contained herein shall preclude the Zoning Administrator from
enforcement of the conditions of the permit in accordance with the
Zoning Ordinance.
20. The Applicant will commit to agricultural uses on site, including, but not limited to,
sheep grazing and forage crops. The Applicant will develop and submit as part of
the site plan review process a Farming Plan for such agricultural uses on site,
which will require a performance bond to secure Applicant's obligations under the
Farming Plan.
21. The Applicant will commit at least eight (8) acres of land to agricultural community
support. The Applicant will develop a program to manage the land identified for
agricultural community support.
22. Pursuant to Va. Code 15.2-2209.1:2, the Applicant must commence construction
of the Project within three years from the date of approval of this Conditional Use
Permit, unless otherwise extended by the Board of Supervisors or applicable law.
23. This Conditional Use Permit, including these conditions, shall run with the land and
shall not be affected by a change in ownership of the Applicant or the Project.