5-16-24 - Resolution Approving Priorities for VDOT's Secondary 6-Year Improvement Program for FY25 through FY30 ����--38
RESOLUTION OF THE BOARD OF SUPERVISORS OF ISLE OF
WIGHT COUNTY TO APPROVE PRIORITIES FOR THE VIRGINIA
DEPARTMENT OF TRANSPORTATION'S SECONDARY SIX-YEAR
IMPROVEMENT PROGRAM FOR FY 2025 THROUGH FY 2030
WHEREAS, Sections 33.2-331 of the Code of Virginia (1950, as
amended) provide the opportunity for each county to work with the Virginia
Department of Transportation (VDOT) in developing a Secondary Six-Year
Improvement Program (SSYIP); and,
WHEREAS, this Board has held a public hearing on the proposed Plan
(FY 2025-FY 2030), in accordance with VDOT policies and procedures, on
May 16, 2024 and all citizens of the County had the opportunity to make
comments and recommendations concerning the proposed Program; and,
WHEREAS, VDOT Local Program and Residency staff have reviewed
and concurred with the proposed SSYIP (FY 2025-FY 2030).
NOW, THEREFORE, BE IT RESOLVED by the Board of
Supervisors of the County of Isle of Wight Virginia that the Secondary Six-
Year Improvement Program for FY 2025-2030 is hereby approved, as
presented at the public hearing.
BE IT FURTHER RESOLVED that the County Administrator of Isle
of Wight County, Virginia is authorized to execute all Program documents and
make such accounting adjustments and execute such agreements and contracts
for projects as necessary to proceed with the Program as approved.
Adopted this 16th day of May 2024. �
�((� � Joel C. Acre , Cha' _ n
Carey Mills-Storin, Clerk
Ap rove a to o .
Robert W. Jon s, r., County Attorney
SECONDARY SYSTEM CONSTRUCTION PROGRAM (in dollars)
Distnct Hampton Roads
County Isie of Wight County
Board Approval Date 2025-26 through 2029-30
Route Road Name Est�mated Cost Traffic Count
PPMS ID Pro�ed# Scope of Work
Accomplishment Desu�pt�on FHWA#
Type of Funds FROM Comments
Type of Pro�ect TO
Pnonty# Length Ad Date
0646 Rattlesnake Trail PE 52.509
104809 0646046649 RW 50 Resurfacmg
STATE FORCESlHIRED Rurai Rustic Paving Pro�ect(Rattlesnake Trail) CN 5395 368 47005
EQUIPMENT �ones Town Drive(Route 637� 7otal 5397,877
� S Dead End COMPLETE
State forces/Hired equip 4 4 2/22/2022
PE CN Only
9999 A 1
0673 Morgarts Beach Road PE S 10 000
-25170 0673046735 RW SO Reconstrudion wio Added Capacity
I STATE FORCESlHIRED Route 673 Reconstrud&Surface Treat Non-Hard CN 5576 500 47004
EQUIPMENT Surface Total 5586,500
Route 672 Blounts Corner Road
State forcesiHired eqwp Route 10 Bus-Old Stage Hwy 5�22�Zo29
PE CN Only � 3
9999 05
EN08 S Church Sireet PE $0
101793 EN08046115 RW 5268.710 Facd�Les for Pedestnans and Bicycles
NON VDOT Construction of a pedestnan/bicycle trad-Segment CN 51 143 381 25028
STP � Total 51,412,091 �71.000 transfer from#T4970 as per CTB
Migra6on South Church Street (6111)
9999 99 N�ke Park Road 3/3/2017
I 13
EN08 S Church Street PE 50
i 101794 EN08046115 RW 3230.838 Facildies for Pedestrians and Bicycles
� NON VDOT Constructron of a pedestrianlb�cycle tra�l CN S4.829.578 25028
; STP Battery Park Road Total 55,060,416 $71.000 transfer from#T4970 as per CTB
Migration Nike District Park �6����
9999 99 1 8 3/32017
0258 Main Street PE S150 181
102951 0258046626 RW 55 000 Fac�l�t+es tor Pedestr�ans and Bicycles
NON VDOT Main Street Pedestrian Improvements CN $1,478.437 23128
CM Route 10 Total 51,633,618
LAP Tier 1 PE,RW,CN Route 10(Intersection)
(PH.RFP) 4/15/2024
9999 99
0681 Strawberry Plains PE $5.000
-28050 0681046751 RW 50 Reconstruction w�o Added Capacity
STATE FORCES/HIRED ROUTE 681 RECONSTRUCT 8 SURFACE TREAT CN 5670,000 17004
EQUIPMENT NON-HARD SURFACED ROAD Total 5675,000
Route 620 Broadwater Rd
State forces/Hired equip Route 637 Racetrack Rd
PE CN Only 2 �
9999 99
Page 1 of 2 Date 4/29/2024
SECONDARY SYSTEM CONSTRUCTION PROGRAM (in dollars)
Distnd Hampton Roads
County Isle af Wiqht County
Board Approval Date 2025-26 through 2029-30
Route Road Name Est�mated Cost Traffic Count
PPMS ID Pro�ed� Scope o(Work
Accompl�shment Description FHWA M
Type of Funds FROM Comments
Type of Project TO
Pnor�ty# Length Ad Date
0699 Woody Acres Way PE 510 000
115872 0699046722 RW 50 Reconstrudion w/o Added Capauty
STATE FORCES/HIRED Route 699 ReconstruG&Surface Treat Non-Hard CN 5360.000 17004
EQUIPMENT Surfaced Road Totai 5370,000
MAINT Route 679 Bethel Church Lane
State forces/Hired equip Dead End PflOfi�/ �
PE CN Only 2/9/2026
OS
9999 99
0713 Bla�rs Creek Way PE 510 000
719506 0713046734 RW 50 Reconstruction w/o Added Capaaty
STATE FORCESlHIRED ROUTE 713 RECONSTRUCT 8 SURFACE TREAT CN 5275.000 47004
EQUIPMENT NON-HARD SURFACE ROAD Tota! 5285,000
Route 699 Woody Acres Way
State forces/Hired eqwp Dead End Priority 1
6/6/2028
PE CN Only 0 4
9999.99
Page 2 of 2 Date. 4/29/2024
Secondary System
Isle of Wight County
Construction Program
Estimated Allocations
Fund FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 Total
- - -- --- - - - -- - - - -- - - - -- - - - -- - - - -- - - - -- - - - -- - - - -
CTB Formula-Unpaved State So So So so 50 $o so
Formula Secondary State So So So bo So 3o So
Secondary Unpaved Roads Eo 5o so So 5o So Eo
TeleFee Stoa.526 E�oo.52s S�ao,526 S�oo 526 E�oo.526 Stoo,52s Sso3�ss
Formula STP so SD So So So so So
State Funds So SO So So 5o So 30
Federal STP So so 50 5o So 3o so
Distrid Grant-Unpaved $13D,473 5173 106 ins.�os s»s ios 5173 106 3�as.esa 5969,791
_ __ _ _ _ _ _ _ _ __ _ _ _ __ _ __ __ _ _ _ __ _ _ _ __ _ _ _ __ _ _ _ __ _ _ __
TOtel 5230,999 5273 632 5273,632 52'3 632 $273 632 $247.420 S1 572 94?
Board Approval Date
- - - - - - - - - - - - - - - - - - - - - - - -
Residency Administrator Date
��-- - - - - - - - - - - -�`'1.��
�
County Administrator Date