6-15-23 - (#23-007) Ordinance Approving (CUP-7-22) Conditional Use Permit for Solar Energy Facility on Longview Dr. Rte. 602 (Prairie Soloar, LLC)ORDINANCE NUMBER L V
AN ORDINANCE TO ISSUE A CONDITIONAL USE PERMIT, CUP-7-22, TO
ESTABLISH A MAJOR UTILITY SERVICE, SPECIFICALLY A 20 MWAC
UTILITY-SCALE SOLAR ENERGY FACILITY, ON 152 ACRES OF LAND
COMPRISED OF A PORTION OR ALL OF TAX MAP NUMBERS 41-01-018, 50-
01-009, 41-01-019, 1-01-017, 50-01-007, AND 50-01-006 LOCATED AT 19604
LONGVIEW DRIVE (ROUTE 602) AND TO WITHDRAWAL 34.91 ACRES OF
TAX MAP PARCEL 50-01-009 AND 67.91 ACRES OF TAX MAP PARCEL 50-01-
007 FROM THE LONGVIEW AGRICULTURAL AND FORESTAL DISTRICT
WHEREAS, Prairie Solar, LLC, a subsidiary of Energix, US, applicant, and Everets Properties,
Inc., property owner, have requested the issuance of a conditional use pennit for certain portions or all of
the property with tax parcel numbers 41-01-018, 50-01-009, 41-01-19, 41-01-O l 7, 50-01-007, and 50-01-
006, which land is depicted on Exhibit"B"; and,
WHEREAS, Everets Properties, Inc., property owner, has also requested the withdrawal of 34.91
acres of tax parcel number 50-0 l-009 and 67.91 acres of tax parcel number 50-01-007 from the Longview
Agricultural and Forestal District, which land is also depicted on Exhibit"B"; and,
WHEREAS, the procedural requirements of Appendix B, Zoning Ordinance, of the Code of Isle
of Wight County, Virginia, 2005 (as amended) and the Code of Virginia (as amended), have been
followed; and,
WHEREAS, in acting upon this request, the Planning Commission and Board of Supervisors
have considered the matters enunciated in Section 15.2-2284 of the Code of Virginia(1950), as amended,
and Section 1-1017 of the Isle of Wight County Zoning Ordinance with respect to the purposes stated in
Code of Virginia(1950), as amended, Section 15.2-2200 and 15.2 2283; and,
WHEREAS, the Planning Commission has made a recommendation as stated in Exhibit"A;"
NOW, THEREFORE, BE IT ORDA[NED by the Isle of Wight County Board of
Supervisors of Isle of Wight County, Virginia,that:
Section 1.Exhibits.
Exhibit "A", "Planning Commission Recommendation°', Exhibit "B", `Property Map", and
Exhibit `C" Conditions which are attached hereto, are hereby incorporated as part of this
ordinance.
Section 2.Findings.
The Board of Supervisors finds that the proposal for a conditional use permit (CUP-7-22) and the
withdrawal of enrolled land in the Longview Agricultural and Forestal District, as submitted or
modified with conditions herein, the expressed purpose of which is to permit a major utility
service, specifically a 20 MWac utility-scale solar energy facility, is in conformity with the
standards of the Isle of Wight County Zoning Ordinance, and that it will have no more adverse
effects on the health, safety or comfort of persons living or working in or driving through the
neighborhood, and will be no more injurious to property or improvements in the neighborhood
than would any other use generally permitted in the same district, taking into consideration the
location, type and height of buildings or structures, the type and extent of landscaping and
screening on site and whether the use is consistent with any theme. action, policy or map of the
Comprehensive Plan with the conditions set forth below.
These findings are based upon the consideration for the existing use and character of the property,
the Comprehensive Plan, the suitability of the property for various uses, the trends of growth ar
change, the current and future requirements of the community as to land for various purposes as
determined by population and economic studies and other studies, the transportation requirements
of the community, the requirements of airports, housing, schools, parks, playgrounds, recreation
areas and other public services, the conservation of natural resources, the preservation
floodplains, the preservation of agricultural and forestal land, the conservation of properties and
their values, and the encouragement of the most appropriate use of land throughout the County.
These findings are based upon a deter nination that the most reasonable and limited way of
avoiding the adverse impacts of a major utility service is by the imposition of the conditions
provided herein.
Section 3.Permit Granted.
The conditional use permit for the property be, and is hereby approved for the property, subject to
the attached conditions in Exhibit "C" and the general conditions set forth in Section 4 hereof.
The conditional use permit specifically allows for a 20 MWac major utility service solar energy
generation facility in compliance with the County Zoning Ordinance.
Section 4.Severabilitv.
It is the intention of the Board of Supervisors that the provisions, sections, paragraphs, sentences,
clauses, and phrases of this ordinance are severable; and if any phrase, clause, sentence,
paragraph, section, and provision of this ordinance hereby adopted shall be declared
unconstitutional or otherwise invalid by the valid judgement or decree of a court of competent
jurisdiction, such unconstitutionality or invalidit shall not affect any of the remaining phrase,
clauses, sentences, paragraphs, sections, and provisions of this ordinance, to the extent that they
can be enforced notwithstanding such determination
Section 5.Effective Date
This ordinance shall be effective upon passage and shall not be published or codified. The
conditional use authorized by this permit shall be implemented within two (2) years from that
date of approval by the Board of Supervisors and shall terminate if not initiated within that time
period.
This ordinance shall be effective upon passage and shall not be published or codified.
DATE: — I ^ 2•d Z 3
READ AND PASSED:
Chairman, Board of ervisors
TESTE: c
Clerk, Boar f Su rvisors
Approved as to Form:
Robert W. Jones Jr, ty Attorney
EXHIBIT A
RESOLUTION NUMBER PC-23-4
ISLE OF WIGHT COUNTY PLANNING COMMISS[ON
A RESOLUTION TO PRESENT A REPORT AND RECOMMENDATION
TO TNE BOARD OF SUPERVISORS RELATING TO CONDITIONAL USE PERMIT
REQUEST CUP-07-22 TO ALLOW A MAJOR UTILITY SERVICE,SPECIFICALLY A 20
MWAC UTILITY SCALE SOLAR ENERGY GENERATION FACILITY AND SUBSTATON,
ON 152 ACRES OF PROPERTY VVITH TAX MAP PARCELS 41-01-018,50-01-009,41-01-019,
41-01-017,50-01-007,AND 50-01-006
AND
WITHDRAWAL OF APPROXIMATELY 103 ACRES OF PROPERTY WITH TAX MAP
PARCELS 50-01-007 AND 50-OI-009 FROM THE LONGVIEW AGRICULTURAL/FORESTAL
DISTRICT
WHEREAS, Prairie Solar, LLC, a subsidiary of Energix, US, applicant, and Everets Properties,
Inc.,property owner,has requested approval of a conditional use permit for a 20 MWac utility-scale solar
energy faciliry and substation on 152 acres located on tax parcel numbers 41-01-018, 50-01-009, 41-01-
019,41-01-017, 50-01-007, and 50-01-006 situated in Isle of Wight County; and,
WIIEREAS, the specific request is to permit a major utility service, specifically a utility-scale
solar energy generation facility and substation, in accordance with sections 1-1017 and 5-5003 of the
Zoning Ordinance and to withdraw approximately 103 acres of property with tax parcel numbers 50-007
and 50-01-009 from the Longview Agricultural/Forestal District; and,
WHEREAS the procedural requirements for the consideration of this request by the Planning
Commission have been met.
NOW,THEREFORE,BE IT RESOLVED by the Planning Commission of Isle of Wight County,
that:
Section 1. Findin¢s.
A. The Isle of Wight County Planning Commission finds that the proposed conditional use
permit is reasonable and has considered the following factors and finds that the proposed
use does not conflict with:
1. the existing use and character of property within the County;
2. the Comprehensive Plan;
3. the suitability of the property for various uses;
4. the trends of growth or change;
5. the current or future requirements of the community as to land for various purposes
as determined by population and economic studies and other studies;
6. the transportation requirements of the community;
7. the requirements for airports, housing, schools, parks, playgrounds, recreation
areas and other public services;
8. the conservation of natural resources;
9. the preservation of floodplains;
10. the preservation of agricultural and forestal land;
11. the conservation ofproperties and their values; and
12. the encouragement of the most appropriate use of land throughout the County.
B. The Isle of Wight County Planning Commission does not find that the proposed use is
reasonable based on the consideration of the factors listed herein.
Section 2. Recommendation to Board of Supervisors.
The Planning Commission recommends to the Board of Supervisors that the request, CUP-07-22,
and the withdrawal of the aforementioned parcels from the Longview Agricultural/Forestal District
be:
a. Granted as submitted, and that the Board of Supervisors adopt the proposed Ordinance
without modification.
b. Denied, and that Board of Supervisors not adopt the proposed Ordinance.
c. Granted with the specific recommended conditions in the attached exhibit, and that the
Board of Supervisors adopt the proposed Ordinance with such conditions.
G r
DATE: a U J ,
READ AND PASSED
airman, sle of Wight County Plannmg Co ssion
TESTE:
Secretary, Isle of Wight County Planning Commission
Approv as t o
Robert W. Jones,Jr. C y Attorney
EXHIBIT B: CUP-07-22 Conditional Use Permit - Location Closeup
w
µ
J Op
NO :;
i
k x p_
Sr J'Rt F s _
x ,V n.'
y tjiiS„ ".-, 'T,_ r T _^ a. ln
d
r -
Z ' .lO
i \ l ; r " a,NGVIv
f,,-, ; ,
w Rr
OLNER DRNE ; r C E k
Y ,atj'—4 `z ; n
1:+`!"' Z y 'c.= •
x,, . w:.
J r '' ,,!( ..Z 1.
t/ rt I",
1 J .Q d,,;`
r., . i
I NUII>
Y -`'
r ;
Q Nu
2
L o
R r p i r' OikaC 9 ? I" O 2 iS QT NUII> I,
I
7 !?r:
y zr
O''1t `",.:
i Null> L'-,.`" '¢i 1
s'''"
L`
r:. rIL:. 8',.
r '1yno ..,,
g I t':. X'.
Y l I' F
r.
Sp,.
y
w, a
r 9NF, "
l f J .'``%,
Legend ----
t,,
Road Center Lines S yqO
Hi hwa Corridor Overla District YiO N 9 Y Y
Towns y • '` F-` h F<
qq;c
1 _..!
lF
2""yr t+1 .i .. Sl i
J\ m n rvice Districts tDeveloetSePI r
s_ ', p
G''
0 Parcels k,- , W. 2
County Boundary t NUIvl___
o soo ,000 y `, eNu
Feet
y
EXHIBIT C – CONDITIONS APPROVED BY BOARD OF SUPERVISORS
JUNE 15, 2023
CUP-7-22
PRAIRIE SOLAR
1. The subject property shall be developed in general conformance with the Concept Plan
included in the Prairie Solar application as determined by the Zoning Administrator.
2. The portion of the subject property supporting solar panels shall be enclosed by security
fencing of a type which is harmonious with the rural, agricultural, and historical character of
the County while meeting federal and state regulations for solar electric generating facility
fencing as determined by the Zoning Administrator while upon approval of the site plan for
the project.
3. The applicant shall preserve and maintain both existing forest and vegetation as well as planted
landscape buffering within required setback areas and buffer yards and shall not clear or cut
live trees within required setbacks or buffer yards without written authorization from the
Zoning Administrator.
4. The applicant shall submit an Emergency Response Plan with the first submission of the site
plan, which shall detail fire suppression methods that will be immediately deployed during
both construction and operation of the facility. The plan shall include a training program to be
provided, at the discretion of the County, to County emergency response staff with regards to
safety for on-site emergency response. The applicant shall install a Knox Box or other remote
access technology at the facility to ensure emergency responders have access to the facility
should the need arise and include plans for the same on the project site plan.
5. The applicant shall conserve topsoil on the site. Topsoil stockpiled on the site shall be stored
out of view from adjacent properties and public roads.
6. The applicant shall reimburse the County for reasonable costs related to retaining such third-
party inspectors as deemed necessary for project inspections.
7. The applicant shall submit an invasive species management plan as recommended by DCR
with the submission of the final site plan.
8. The applicant will work directly with Isle of Wight County’s Chamber of Commerce, the Paul
D. Camp Community College, and the Economic Development Department to ensure inclusion
of local contractors in the bidding process.
9. The applicant shall submit a seed mix for site groundcover that includes native pollinators
blooming in spring/summer as recommended by DCR.
10. A sign shall be installed at the entrance of the site with contact information for the facility.
11. Adherence to the proposed Transportation Plan shall be required. Pre-construction photo
documentation of roadway conditions taken within 1000 feet in both directions of the proposed
site entrance on Longview Drive shall be undertaken to establish baseline road conditions.
Truck traffic shall be limited to only two routes: Route 10 in Suffolk via Audubon Road to
Sandy Ridge Road to Longview Drive north to the site entrance until such time as the bridge
repair project is completed; then, the truck haul route shall be limited to Route 10 in Isle of
Wight or Suffolk via Oliver Drive to Longview Drive south to the site entrance. No other local
routes in Isle of Wight County may be used and no access to such from Route 460 will be
allowed. Impacts to any County roads and rights-of-way from construction and post-
construction vehicles shall be subject to damage claims by VDOT, and repairs shall be
undertaken at the applicant’s cost based on confirmation by VDOT of such directly-attributable
damage.
12. If construction has not begun by August 1 of each ensuing year post-lease or purchase, then
the project area shall continue to be managed under prior site cultivation management
practices, such as by mowing or cover vegetation. This is to avoid introduction of invasive
weed or other species of surrounding cropland owned or leased by others.
13. An enhanced landscape buffer plan proposed on the concept plan exhibit is conceptual only at
this time. A detailed landscape plan shall be included with the Preliminary Site Development
Plan application for review and will require approval by the Zoning Administrator as part of
final site plan approval. At a minimum, a double- or triple-staggered row of evergreen and
deciduous trees and shrubs that are designed to form an effective landscape screen at full
maturity will be a required design. Trees shall be planted no more than ten (10) feet on center.
14. Excluding the bufferyards described above, the ground between the panels and in areas not
otherwise covered by gravel or infrastructure shall be planted and maintained with a vegetative
cover. This vegetative cover will be managed with moving and/or grazing.
15. Due to the potential for this site to support populations of rare amphibians, an inventory for
the resources in the study area is recommended by the Virginia Department of Conservation’s
Division of Natural Heritage (DCR). With the survey results, DCR states that they can more
accurately evaluate potential impacts to natural heritage resources and offer specific protection
recommendations for minimizing impacts to the documented resources. DCR also
recommends the development of an invasive species management plan for the project and the
planting of Virginia native pollinator plant species that bloom throughout the spring and
summer, to maximize benefits to native pollinators. DCR recommends planting these species
in at least the buffer areas of the planned facility, and optimally including other areas within
the project site. For screening zones outside the perimeter fencing, DCR recommends native
species appropriate for the region being used.
16. The applicant shall meet any additional delineation and buffer requirements specified by the
Virginia Department of Historic Resources prior to receiving final site plan approval.
17. Fencing shall be placed around the solar arrays, inverters, and substation only and not the
whole site in order to provide wildlife corridors.
18. In order to minimize the visual impacts to historic, civic, and residential properties, staff
recommends that all solar arrays, substations, and others associated structures be subject to a
minimum 200-foot setback from these structures if part of the project, and 200 feet from the
property line of these properties if outside of the project. Inverters shall be setback a minimum
of 250 feet from these properties.
19. No construction or delivery activities are to occur within the project site on Sundays by any
party involved with the project, including the solar developer, its contractors and Dominion
Energy contractors. During construction, there will be no deliveries made on Thursdays
between 10:45 am and 1:15 pm. Construction hours are limited to Monday through Friday,
7:00 am to 5:00 pm. In the event site and weather conditions require construction activities
related to erosion and stormwater control to be conducted on Sunday, authorization for these
activities may be granted by the Zoning Administrator, in their sole discretion.
20. As part of the site plan review, the Applicant shall provide documentation that the selected
panels and all power-generating equipment onsite are “Tier 1” modules, as established by the
most recent “PV Module Tier 1 List” issued by Bloomberg NEF or a similar third party analysis
widely accepted in the solar industry. Additionally, the make and model of the selected panels
and all power-generating equipment initially installed and replaced on the site mut qualify, for
disposal purposes only, as non-hazardous waste under applicable U.S. Environmental
Protection Agency tests (e.g., TCLP).
21. No salvage value shall be added to the decommissioning surety bond.
22. The applicant shall implement a program for the collection of baseline data establishing pre-
construction soil conditions for the production of row crops for the agricultural areas within
the project area. The program shall establish the relevant characteristics of the topsoil. The
baseline data shall be derived from field and laboratory testing of soil conditions, including
depth, density and quality from representative locations. Laboratory testing shall be conducted
by an accredited laboratory. Parameters for assessing soil quality may include the following:
infiltration rate, bulk density, water holding capacity, pH, percent organic matter, cation
exchange capacity, Phosphorous/Phosphate (P), Nitrogen (N), and Potassium/Potash (K).
After 30 years of operation and again after 35 years of operation, soil conditions shall be
determined for the same sampling locations using the same parameters and the results used to
plan soil restoration activities. After equipment is removed as part of decommissioning, soil
conditions shall be determined for the same sampling locations using the same parameters.
Soil restoration activities shall be performed as necessary during operations or
decommissioning to return soil conditions to at least baseline conditions. The County will be
provided with data of soil conditions within 30 days after the receipt of results.