Loading...
6-15-23 - Resolution Approving Priorities for VDOT's Secondary 6Yr. Improvement Program for FY24 - FY29 2bZ3�� RESOLUTION OF TH� BOARD OF SUPERVISORS OF ISLE OF WIGHT COUNTY TO APPROVE PRIORITIES FOR THE VIRGINIA DEPARTMENT OF TRANSPORTATION'S SECONDARY SIX-YEAR IMPROVEMENT PROGRAM FOR FY2024 THROUGH FY2029 WHEREAS, Sections 33.2-331 of the Code of Virginia (1950, as amended) provide the opportunity for each county to work with the Virginia Department of Transportation (VDOT) in developing a Secondary Six-Year Improvement Program (SSYIP); and, WHEREAS, the Board of Supervisors has held a public hearing on the proposed Plan (FY2024-FY2029), in accordance with VDOT policies and procedures, on June 15, 2023, an all citizens of the County had the opportunity to make comments and recommendations concerning the proposed Program; and, WHEREAS, VDOT Local Program and Residency staff have reviewed and concurred with the proposed SSYIP (FY2024-FY2029). NOW THEREFORE, BE IT RESOLVED, by the Board of Supervisors of the County of Isle of Wight, Virginia that the Secondary Six- Year Improvement Program for FY2024-2029 is hereby approved, as presented at the public hearing. BE IT FURTHER RESOLVED that the County Administrator of Isle of Wight County, Virginia is authorized to execute all Program documents and make such accounting adjustments and execute such agreements and contracts for projects as necessary to proceed with the Program as approved. Adopted this 15`'' day of June 2023. --•� � William M. arty, Chairman � C,C�S Carey lls torm, Clerk Approved as to Form: Robert W. J s, Jr., County Attorney -- -- - - - - i Secondary System Isle of Wight County Construction Program Estimated Ailocations Func7 FY2024 FY2025 FY2026 FY2027 FV2028 FY2029 Tota1 •���������������_��_�_�����_�_������_�____�__��� TCIeFE!C 575.497 S?5.497 575.4g7 575.497 E75.497 5�5,497 5452.982 OiStrict Cxenl-Unpaved 592,300 5�30.473 5�73.tOF, 5173.tOf, f�73.tp6 3�73.1� 5915.i?? '�������������....�.����������.�������������...�����.��� Total 5167.7y� 5205,970 S2a8.607 S2a8.603 S2a8.603 5248,6p3 i�.168.�79 Board Approval Date: .�����.���_�����_�����_�_—. Paul Mathcks Res�dency Admmistrator Oatc � �_ �_�_��...����_.����".L—� �� . Randy R.Kea n County Adm rnstrator �atc Page 1 01 1 SECONDARY SYSTEM CONSTRUCTION PROGRAM(in dollars) DiStnct:Hampton Roads County Isle ot Wight County $oard Approval Datc: 2024-25 Ihrough 2028-29 a+te oad Name tstimate�Cost Traffic Count PPMS 10 Pro�ect tt Scope of Work Accomplishment Description FHWA it � Type of Funds FROM Comments � i Type of Pro�er,l TO � I 'i Pnonty ri Length Ad Date � 064G Rattlesnake Trail pE gz Spg � 104809 0646046649 RW 30 Resurtacing � STATE FORCES/HIRED Rural Rustic Paving Project(Ratttesnake Trdil) CN 5477,210 47005 � EQUIPMENT � S Jones Town Drive(Roulc 637) Tolal s473,T19 I� State forceslHired equ�p PE �ead End CN p�ly 9999.01 4.4 2l21�2U22 0673 Morgarts Eleach Road PE St0.000 -25170 06T3046735 RW $0 Reconstruction w/o Added Capac�ty STATE FORCES/HIRED Route 673 Reconstruct 8 Surtace T�eat Non-Hard CN $,76,500 47004 EQUIPMENT SuAace Route 6)2 Bloums Corner Road lofal 5586,5a0 State forces/H1red equip PE Roufe 70 Bus-Old Stage Hwy CN Only 9999.05 1.3 5/22/2029 EN08 S.Church Street PE SO 101793 EN080461�5 RW E268,710 Facilities for Pedestrians and Bicydes NON VDOT Construction of a pedeStnaNbiCycle trai�-Segment 1 CN 51,143,381 25028 STP South Cfxuch Sheet Total 51.412,091 $71,000 trarnter from#T4970 as per CTB(6/11). MigraUon Nike Park Road 9999 99 1.3 3!3/2017 ENpA S.Churdi SUeet PE $0 101794 EN08046115 RW $234.838 Faciiities for Pedestrians and Bicycles NON VDOT ConsWctan o1 a pedestriaMbiqGe trad CN b4,829.578 25028 STP Battery Park Roatl 7ora1 S5,D6U,416 371.000 trans(er irom#T4970 as per CTB(6/11). Mgration Nike Distrlct Park �� page 1 of 2 1 6 Date: 3/3/2017 5/5/2023 i I SECONDARY SYSTEM CONSTRUCTION PROGRAM (in dollars) 0258 Main Streel PE $150.181 102951 0?58046fi26 RW 55.000 FaGh6es for Pedestrians and B�cyGes NON VDOT Mam Street PedesVian Improvements CN 51.337.'60 23128 CM Route 10 Total :1,492,341 LAP Tier 1 PE.RW,CN Route 10(Intersecdon) (PH.RFPJ g�� 7;31;20J3 0681 Strawberry Plams PE E5.00� •28050 0681046/51 RW $0 ReconstrucUon w!o Added Capac+ty STATE FORCESlHIRED ROU'E 681 RECONSTRUCT 8 5URFACE TREAT CN 5670,000 1700d EQUIPMENT NON-HARD SURFACED ROAD Route 620 Broadwater Rd Total 5675,000 S1ate faces/Hved equ�p PE Route 637 Racetrack Rd CN Only 9999.99 2.7 0644 Turner Drnie PE b8,727 10302t 06a4046628 RW SO Traffic ManagemenUEngineenng NON VDOT Tumer pnve InterSecUon Improvements at Benns CN 5545,667 25024 STP Benns Church(Route 1Q/32) Tolaf 5554,394 Locaily admm�sterea. Baiance to be addressed at M�pration Benns Church(1nte�sectan) CN completion 9999.99 0 1 4/9l20'9 0699 WoodyAcres Way PE 51Q.000 115872 0899046722 RW SO Reconstruction w!o AOdeO Capaury STATE FORCESlMIREO Route 699 ReconsWct 3 Surtace Treat Non-Hard CN �350.000 17004 EQUIPMENT Suriaced Road MAINT Route 679 BeMel ChurCn Lane 7ofal 5360,000 Stale forces/H�red equip PE Dead End CN Only 9999.99 0.8 5r 10/202a 0713 Bla�rs Creek Way PE 510,000 1�9506 0713046734 RW $p Reconstruction w/o Added Capaaty STATE FORCES!HIRED ROUTE 713 RECONSTRUCT S SURFACE TREAT CN 5275.000 47004 E�UIPMENT NON-HARD SURFACE ROAD Route 699 Woody Acres Way Total 5285,000 State faces/H�red eQu�p PE Dead End CN Only 9999 99 0.4 I!1 ai'1U24 Dalc: Pa e 2 0(? C„5/2o:3